Loading...
HomeMy WebLinkAboutSLXNGS_RFP_2021.06.29_RedactedSOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS PROSPECTIVE PROPOSERS LIST CONTACT FIRM MAILING ADDRESS Rob Natoli, P.E.Water Systems Consulting, Inc. Kelye McKinney West Yost Larry Ernst, PG, CHg Wood Rodgers SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS POSSIBLE CONSULTANTS LIST CONTACT FIRM MAILING ADDRESS Sonny Lunde, P.E.Brown & Caldwell Ed Wallace, P.E.Northwest Hydraulics Larry Ernst, PG, CHg Wood Rodgers Tim Williams, PE Kennedy Jenks Consultants Katie Ross-Smith, PhD Edmund Tarter, P.E. Shelley Read SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS ENGINEERING SERVICES PROJECT :SLXNGS; WLXNGS RFP EVALUATION & SELECTION CRITERIA 1 PROXIMITY: Rank the Project Team in terms of proximity to or familiarity with the area and regulatory agencies in which the project is located.10 2 CAPACITY/CAPABILITY: Rank the Project Team in terms of capacity and capability of the firm, including sub-contractors, to perform the work, including any specialized services, within the given time limitations.15 3 NEEDS/SPECIALIZED COMPETENCE: Rank the Project Team in terms of project needs and the specialized competence(s) of the firm.25 4 EXPERIENCE: Rank the the project team in terms of its proven experience in well restoration, aquifer testing and groundwater treatment system design. 20 5 APPROACH: Rank the project team in terms of its approach including evidence of understanding of scope of work, project needs, limitations and requirements.30 TOTAL 100 Rank the proposals using the following criteria using a 1 to 10 grading scale with 10 being the highest. Enter your scores on the accompanying scoring sheet using the product of your score to provide on the Scoring Sheet would be 7 x 10 = 70. SLXNGS_RFP_2021.06.29Criteria 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS REVIEWED BY (initial): RL TECHNICAL PROPOSAL REVIEW SCORING SHEET COMPANY Ca r d n o , I n c . SCORE 1 PROXIMITY (10 Pts.) 1a Team Members proximity to District Service Area 5 5 5 5 4 1b Lake Tahoe Basin Projects - Active 3 1 1 2 2 1c Lake Tahoe Basin Projects - Completed 2 2 2 2 2 2 CAPACITY/CAPABILITY (15 Pts.) 2a Project Team Member Number and Expertise Specified 5 5 4 4 5 2b Organization Chart Matches Project Team Description 4 4 4 4 4 2c Manpower Estimate- Aligns with Approach 6 6 6 5 6 3 NEEDS/SPECIALIZED COMPETENCE (25 Pts.) 3a Utility Pipeline Condition Assessments 5 4 3 3 5 3b Field Survey Methods 5 4 3 2 5 3c Geomorphology/Hydrologic Analysis 5 5 5 4 5 3d Asset Management 5 4 4 3 5 3e GIS; Information Management Systems (IMS)5 4 4 4 4 4 EXPERIENCE (20 Pts.) 4a Utility Pipeline Condition Assessments 4 3 3 3 4 4b Geomorphology- Stream Classification 4 4 3 3 4 4c Three relevant projects (4 pts per project)12 10 9 9 12 5 APPROACH (30 Pts.) 5a Consultant/District Coordination Plan Described 5 5 5 5 5 5b FS Data Collection Methods Explained 5 4 3 3 5 5c CCTV Pipe Rating/Non-Destructive Testing Specified 5 5 4 3 4 5d Potential Benefits Specified 6 5 4 3 6 5e Number of field surveys (expected)5 5 2 3 4 5f Schedule aligns with RFP Section 8 constraints 4 4 4 4 4 TOTAL SCORE 100 89 78 74 95 Y Y Y Y Only 20 field sites inspected with 10 detailed Proposal had many proofreading errors, Logical approach, relevant experience, clear CRITERIA RECOMMEND (Y/N) COMMENTS X:\Projects\Wastewater\STPUD Stream Xings\2021 Pipeline Xngs\RFP\Review\SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS REVIEWED BY (initial):TRC TECHNICAL PROPOSAL REVIEW SCORING SHEET COMPANY Ca r d n o , I n c . SCORE 1 PROXIMITY (10 Pts.) 1a Team Members proximity to District Service Area 5 5 4 4 4 1b Lake Tahoe Basin Projects - Active 3 3 2 1 3 1c Lake Tahoe Basin Projects - Completed 2 2 1 1 2 2 CAPACITY/CAPABILITY (15 Pts.) 2a Project Team Member Number and Expertise Specified 5 5 4 3 4 2b Organization Chart Matches Project Team Description 4 4 4 3 4 2c Manpower Estimate- Aligns with Approach 6 5 4 4 5 3 NEEDS/SPECIALIZED COMPETENCE (25 Pts.) 3a Utility Pipeline Condition Assessments 5 4 4 4 5 3b Field Survey Methods 5 5 3 1 3 3c Geomorphology/Hydrologic Analysis 5 4 3 1 5 3d Asset Management 5 4 3 3 5 3e GIS; Information Management Systems (IMS)5 5 5 1 4 4 EXPERIENCE (20 Pts.) 4a Utility Pipeline Condition Assessments 4 4 4 3 4 4b Geomorphology- Stream Classification 4 4 3 2 4 4c Three relevant projects (4 pts per project)12 12 4 4 12 5 APPROACH (30 Pts.) 5a Consultant/District Coordination Plan Described 5 4 4 3 4 5b FS Data Collection Methods Explained 5 4 5 3 4 5c CCTV Pipe Rating/Non-Destructive Testing Specified 5 5 5 5 5 5d Potential Benefits Specified 6 6 6 5 6 5e Number of field surveys (expected)5 4 4 4 5 5f Schedule aligns with RFP Section 8 constraints 4 4 4 4 4 TOTAL SCORE 100 93 76 59 92 N Y Good local contacts, 1850 hours. Technical layout. Did not pick up on proposed count. Good, but less relevant experience in Tahoe, Numerous typos, high hour estimate (2300+), limited understanding of project. Highly focused on condition assessment, limited mention of stream morphology - unclear of for local projects. Minor disconnect between CRITERIA RECOMMEND (Y/N) COMMENTS X:\Projects\Wastewater\STPUD Stream Xings\2021 Pipeline Xngs\RFP\Review\SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS REVIEWED BY (initial):SMC TECHNICAL PROPOSAL REVIEW SCORING SHEET COMPANY Ca r d n o , I n c . SCORE 1 PROXIMITY (10 Pts.) 1a Team Members proximity to District Service Area 5 5 3 4 5 1b Lake Tahoe Basin Projects - Active 3 2 0 3 0 1c Lake Tahoe Basin Projects - Completed 2 2 2 2 2 2 CAPACITY/CAPABILITY (15 Pts.) 2a Project Team Member Number and Expertise Specified 5 3 5 1 5 2b Organization Chart Matches Project Team Description 4 2 4 1 4 2c Manpower Estimate- Aligns with Approach 6 4 5 5 5 3 NEEDS/SPECIALIZED COMPETENCE (25 Pts.) 3a Utility Pipeline Condition Assessments 5 5 5 4 5 3b Field Survey Methods 5 3 3 2 5 3c Geomorphology/Hydrologic Analysis 5 4 4 1 5 3d Asset Management 5 2 4 2 2 3e GIS; Information Management Systems (IMS)5 1 5 5 4 4 EXPERIENCE (20 Pts.) 4a Utility Pipeline Condition Assessments 4 4 3 2 3 4b Geomorphology- Stream Classification 4 3 3 1 4 4c Three relevant projects (4 pts per project)12 9 8 9 12 5 APPROACH (30 Pts.) 5a Consultant/District Coordination Plan Described 5 2 4 2 5 5b FS Data Collection Methods Explained 5 3 5 5 5 5c CCTV Pipe Rating/Non-Destructive Testing Specified 5 5 2 2 4 5d Potential Benefits Specified 6 2 2 1 4 5e Number of field surveys (expected)5 5 2 4 3 5f Schedule aligns with RFP Section 8 constraints 4 4 4 4 4 TOTAL SCORE 100 70 73 60 86 CRITERIA RECOMMEND (Y/N) COMMENTS X:\Projects\Wastewater\STPUD Stream Xings\2021 Pipeline Xngs\RFP\Review\SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS REVIEWED BY (initial): IB TECHNICAL PROPOSAL REVIEW SCORING SHEET COMPANY Ca r d n o , I n c . SCORE 1 PROXIMITY (10 Pts.) 1a Team Members proximity to District Service Area 5 4 2 3 2 1b Lake Tahoe Basin Projects - Active 3 1 1 1 3 1c Lake Tahoe Basin Projects - Completed 2 2 3 2 2 2 CAPACITY/CAPABILITY (15 Pts.) 2a Project Team Member Number and Expertise Specified 5 3 3 1 5 2b Organization Chart Matches Project Team Description 4 4 3 2 4 2c Manpower Estimate- Aligns with Approach 6 5 3 3 4 3 NEEDS/SPECIALIZED COMPETENCE (25 Pts.) 3a Utility Pipeline Condition Assessments 5 3 3 4 5 3b Field Survey Methods 5 5 2 3 4 3c Geomorphology/Hydrologic Analysis 5 5 2 1 5 3d Asset Management 5 1 1 1 5 3e GIS; Information Management Systems (IMS)5 3 4 4 5 4 EXPERIENCE (20 Pts.) 4a Utility Pipeline Condition Assessments 4 2 3 3 4 4b Geomorphology- Stream Classification 4 4 2 1 4 4c Three relevant projects (4 pts per project)12 9 6 10 12 5 APPROACH (30 Pts.) 5a Consultant/District Coordination Plan Described 5 2 4 3 4 5b FS Data Collection Methods Explained 5 5 4 3 3 5c CCTV Pipe Rating/Non-Destructive Testing Specified 5 3 3 3 4 5d Potential Benefits Specified 6 4 3 3 5 5e Number of field surveys (expected)5 4 1 2 3 5f Schedule aligns with RFP Section 8 constraints 4 2 4 4 4 TOTAL SCORE 100 71 57 57 87 Y Weak on ND Testing methods and experience; Stroing on stream channel morphology assessment; unclear how field surveys would be coordinated with District CCTV Inspections; Field Surveys; 2-man crew for 35 Days for 203 sites (600 hours) = 5.5 sites/day (~ 33 % of Total = ~1,850) ; Project team size/expertise = 2.3 (efficient) Org Chart Members does not match ManPower Estimate (missing hours for AM Team Member); Team Size/Expertise = 2.3; heavily weighted on data evaluation; Total Hours = 1158 hours; Field Surveys = 224 hrs (20 sites) ~11.2 hrs/site (~ 20% of Total Hours). Org. Chart lacks sufficient detail; Weak on Stream Channel Morph; Lacks resume decription for key team members (hydrologist, survey crew lead, GIS, AM); Project team size/expertise = 7 (inefficient); Total Hours = 2,330; Field Survey = 1,116 (90 sites) ~12.4 hrs/site (48% of Total Hours). V. Strong Project Team; Pipeline Conditions Assessment, Stream Morphology Assessment; AM, GIS. Total Hours = 1464 Hours; Field Survey 412 Hours; 40 sites; ~10.3 hrs/site (~28% of Total Hours); Project Team size/expertise = 3 (efficient) Average Cost per Site at $300,000 Budget Level 1,478$ 15,000$ 3,333$ 7,500$ CRITERIA RECOMMEND (Y/N) COMMENTS X:\Projects\Wastewater\STPUD Stream Xings\2021 Pipeline Xngs\RFP\Review\SLXNGS_RFP_2021.06.29 8/26/2026 SOUTH TAHOE PUBLIC UTILITY DISTRICT UTILITY PIPELINE CROSSINGS ASSESSMENTS PROPSAL RANKINGS (1 = Low; 4 = High) Cardno, Inc. Carollo Engineers, Inc.Farr West Engineering Kennedy/Jenks Consultants Reviewer 1 3 2 1 4 Reviewer 2 3 2 1 4 Reviewer 3 4 2 1 3 Reviewer 4 2 3 1 4 Reviewer 5 3 3 1 4 TOTAL SCORE 15 12 5 19 FIRM SLXNGS_RFP_2021.06.29 10 8/26/2026