Loading...
HomeMy WebLinkAboutTO#5 Review Dam Settlement data_ICR_HP_DVRGA NTT FLEMING, LLC This Agreement is made and entered into as of the 7th day of January 2025 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Gannett Fleming, Inc., hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated June 10, 2019 and as specifically hereinafter set forth, the parties do hereby agree as follows: PURPOSE The purpose of this Task Order is for CONSULTANT to collect and perform professional engineering review of dam settlement survey monitoring data for the Indian Creek and Harney Place Dams at Diamond Valley Ranch in Alpine County, California. A full description of services is contained in CONSULTANT's written proposal "Indian Creek and Harvey Place Dams -Settlement Monitoring Consulting CA State Dam Nos. 1062 and 1062-Y referred to as "Task Order No. 5 Request (Revised)" dated January 6, 2025. Tasks are more specifically outlined by the Scope of Work contained in said proposal, which is attached hereto as Exhibit "A", and by this reference is made a part of this task order. 3. STAFFING Services will be provided by Francisco Saldana, PG, Project Manager, and Casey D. Smith, PG, CEG, Project Director. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. Work for this Task Order No. 5 shall commence on or about January 17, 2025 or sooner (within 10 days of Notice to Proceed), and shall be completed on or about March 7, 2025, unless otherwise directed by the District. The site survey is dependent on snow conditions that may affect the project schedule if the field survey cannot be completed as planned; necessary schedule adjustments will be discussed and agreed upon with the District if this occurs. Pay,ment to CONSULTANT for services pe!-fotrned under this Task Order No 5 shall be in ?ccordance with CONSULTANT'S "Project Budget Backup" (attached hereto as part of Exhibit "A") for the persons assigned to the project tasks, All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 7. C:C:T: CY11n f-, f EC -r— .\1r- E DATEE This Task Order No 5 shall become effective upon execution by both parties. And shall serve as Notice to Proceed upon execution by DISTRICT IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Agreement to be executed the day and year first above written. i�11 uwqiaiii!� PAUL HUG/S, NE MANAGER ATTEST: MELONIE GUTTRY, CLEkK OF BOARD GANNETT FLEMING, INC. By: DARREN MACK, P.E., G.E., VICE PRESIDENT 1420 Rocky Ridge Drive Suite 380 Roseville, CA 95661 P 916.677 4800 gannenfleming,corn To: Adrian Combes South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96510 From: Casey Smith, PG, CEG Francisco Saldana, PG Date: January 6, 2025 e: Indian Creek and Harvey Place Dams — Settlement Monitoring Consulting California State Dam Nos. 1062 and 1062-3 Alpine County, C We have prepared this Task Order No. 5 request to perform the collection and an engineering review of dam settlement monitoring data for the Indian Creek and Harvey Place Dams, which are located in Alpine County, California and are owned and operated by South Tahoe Public Utility District (STPUD). Each facility has a main and an auxiliary dam that are comprised of separate earthfill embankments. We understand that regular surveying of the dam monitoring points has been performed since 2012 to monitor the settlement of the embankments. SAGE Engineers, Inc. (now Gannett Fleming) provided the most recent review of the settlement monitoring data in 2018 and submitted a Settlement Data Review Report (Ref. 1) detailing the findings and recommendations for future monitoring. The 2018 report recommended that settlement surveys should continue to be performed every 5 years. In addition, it was recommended that STPUD consider continuing twice -a -year surveys for the Harvey Place Auxiliary Dam until the next evaluation. At the request of STPUD, Gannett Fleming will collect and perform an engineering review/evaluation of the survey data and produce a summary report for submittal to California Division of Safety of Dams (DSOD) by STPUD, as detailed further below. Field Survev—Gannett Fleming will utilize Epoch Geospatial & Land Surveying Services (Epoch-Geo) as a direct subconsultant to perform the survey of the dam settlement monitoring points. It is anticipated that survey will take up two (2) days to complete depending on the ease of locating and verifying benchmark/control and the existing monitoring station markers in the field. A Gannett Fleming representative will accompany Epoch-Geo personnel during one day of the survey work to assist with locating site features and to perform a high-level site reconnaissance of the dam crests. IWAlffil Task Order muuneqvest—/ndiancren and Harvey Place Dams (Revised) Survey Data Review Page zo|s Deliverables. u Ali Epuch-Geu stamped and signed survey report detallIng the survey efforts and values determined in PDF format. Gannett Fleming will utilize the existing survey data a'd survey data collected 'in the task above to develop settlement plots similar to those provided in the 2018 report prepared by SAGE Engineers, Inc (Ref, 1, Figures 1 through 5). The plots will be used to evaluatt the amount and rate of dam settlement that has occurred since monitoring began in 2012, Summary Reaort - Gannett Fleming will prepare a brief letter report that includes a description of will be included in the report as figures. The Epoch-Geo survey report will be attached. The report will bc signed and stamped by a California Certified Enginperinr "t Delivcrobies A draft version of the summary report will be submitted to STPUD in electronic (PDF) format for review and comment. Gannett Fleming will update the draft report based on the review comments (as appropriate) and submit afinal summary report in both electronic (PDF)and hand copy format, The Microsoft Excel file containing the dam settlement data and plots will be electronically submitted to STPUD for future use. 0 Project nation Perform project management tasks including project setup, invoicing, budget review and tracking, staffing control, information distribution, and periodic check -in calls with STPUD. Based onour understanding ofthe project, the sun/eyviUbeperfomnedwithn10-daysofnotioe\oproceed (weather and snow conditions permitting). We anticipate submitting the draft summary report approximately six (6) weeks from the date the survey is performed. The final report will be submitted within one (1)week ufreceiving STPUQreview comments. ESTIMATED FEES Our estimated fee to perform the foregoing Scope of Work is $24,384.70. The work will be billed on a'time and expenses' basis in accordance with the attached budget backup. We will not *mreeri the budget presented above to perform the proposed Scope of Work. Should additional work, site visits, or meetings be required in addition to the Scope ofWork above, or should s[gn|McmrK changes be required due to reasons beyond the control of Gannett Fleming, STPUD will be notified' and the time required for these items will be billed on a 'time and expenses' basis. If this proposal is acceptable, please forward the necessary contract documentation, referencing this Scope of Services, in accordance with our Master Agreement for Consulting Services for our review and signature. EXHIBIT A to TASK ORDER 5 GANNETT KJ FLEMING Task Order No. 5 Request — Indian Creek and Harvey Place Dams (Revised) Survey Data Review Page 3 of 3 F.M—f-Trz= 1, Indian Creek and Harvey Place Dams — Settlement Data Review Report, California State Dam Nos. 1062 and 1062-3, Alpine County, California; prepared by SAGE Engineers, dated December 11, 2018. Mao MR Field Survey Francisco SaIdana Expenses Epoch Geospatial & Land Surveying Services (with 15% markup) 1.15 $6,250,00 $7,187 50 Reimbursable Mileage 240 $0.66 $157.20 Data PlottinglReview Francisco Saldana 16 $200.00 $3,200.00 Casey D. Smith 4 $305.00 $1,220.00 Summary Report Francisco SaIdana 16 $200.00 53,200.00 Casey D. Smith 9 $305,00 52,440 nn Faiz I. MakdIsi 4 $340.00 $1,360.00 Project MonagementlCoordinotion Francisco Saidana 12 $200.00 $2,400.00 -----2asev P. Smith 4 ...... ... $305.00 . . .... . . ......... $1,220.00 11/8/24 I Re: 2024 STPUD Dam Monitoring Indian Creek Main and Auxiliary Dam Harvey Place Main and Auxiliary Dam Markleeville, CA Alpine County Here is my cost and services proposal to provide surveying services for the South Tahoe Public Utility District's (STPUD) 2024 Dam Monitoring. Task " I — Monitoring Surveys: Field and office efforts to perform settlement monitoring surveys for the dam sites referenced qbove. Efforts included locatin - existing monitorin benchmark/control and exi=g monitoring station markers as reported in the SAGE Dec.2018 report provided. Total Survey Fee for Task 1 ........................... $6,250 Notes: 1. Additional efforts may be needed if existing monitoring benchmark/control and existing monitoring station markers can not be located. 2. It is assumed that STPUD will provide access to each location on the day of survey and efforts are anticipated to take 2 days to complete. Deliverables: 1. A stamped and signed survey report detailing survey efforts and values determined with be provided in digital (.pdf) format. The above estimated fees shall not be exceeded without prior authorization from client and shall remain valid for 15 days. Our current schedule would enable us to begin work within 10 days of your notice to proceed, weather permitting. This schedule is subject to review when work is authorized. If you would like us to proceed, please send a Task Order for review. Cinnaralar Michael Farrauto, PLS President EPOCH Land Surveying Services, Inc. Page I of I EPOCH Geaspedal acid Larid SLlrveying Services EXHIBIT A to TASK ORDER 5 wvvv,d epoch-geo.cuii