HomeMy WebLinkAboutTO#20 Env_Permitting_CEQA WL Projectsn 161#11 Rall 14 IV, Lmg zkyj [oil This task order is made and entered into as of the 7th day of October 2021 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Sierra Ecotone Solutions, LLC, hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated January 15, 2015, and as specifically hereinafter set forth, the parties do hereby agree as follows: 1. PURPOSE The purpose of this Task Order No. 20 is to provide Professional Services to support DISTRICT's environmental and permitting requirements, and to perform a Tiered Initial Study to comply with California Environmental Quality Act (CEQA), for the Apache Avenue, Bijou neighborhood, Herbert -Walkup neighborhood, and Lake Tahoe Boulevard Waterline Replacement Projects located in the City of South Lake Tahoe, County of El Dorado, California. 2. SCOPE OF WORK A full description of services is contained in CONSULTANT's proposal dated September 23, 2021, and further outlined therein by Tasks 1-4. This proposal is attached hereto, marked as EXHIBIT "A" and by this reference is made a part of this task order. 3. STAFFING Services will be performed by Garth Ailing, Project Manager and Senior Scientist. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. TIME OF PERFORMANCE Work for this Task Order No. 20 shall commence on October 7, 2021, and be completed on or before December 31, 2021, unless otherwise directed by the DISTRICT. 5. PAYMENT Payment to CONSULTANT for services performed under this Task Order shall be in accordance with CONSULTANT'S unit fee schedule for the person(s) assigned to the project task. The cost ceiling for this Task Order shall not exceed Fourteen Thousand Six Hundred Thirty -Five Dollars ($14,635.00) except as provided in Article IV of the January 15, 2015, Master Agreement. 1 6. LAF30R CODEiw All State of California prevailing wa e laws must be compiled with In the performance of work related to this Tas'�' Order. These include, bW are not limfted iLabori i+i i 0 through 1860. MELONIE* BOARD ! Pq SIEPRA ECOTONE SOLUTIONS 530.41611W - PO Box 1297 Zephyr Cove� NV 89449 - SleffaEcowne6clutions-mm Mr. Adrian Combes S*Yth Ta6te Tyl#lic Titilitr1i strict 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Sierra Ecotone Solutions (SES) appreciates the opportunity to support South Tahoe Public Utility District's (District) environmental and permitting requirements for the District's Herbert Walkup, Apache, Bijou I and Lake Tahoe Boulevard Pipeline Rehabilitation and Replacement Projects. As requested, SES has prepared a scope of work and estimated budget for the preparation of California Environmental Quality Act (CEQA) Tiered Initial Study for this project. In order to prepare the scope of work fcrovided below, the following assumptions are used: • A Tiered Initial Study (IS) will be the appropriate CEQA document; • The new IS will tier off the Initial Study prepared for the District Wide Sewer and Water Pipeline Network Replacement Project; • The project will be located within the right-of-way (ROW), in ROWs currently occupied by water or sewer pipes; • The District will prepare necessary permit applications and pay associated filing fees; • A Biological Assessment will be prepared for the project; and • The District will provide the background materials and data (e.g., project locations, equipment lists, cultural resource reports, GIS files, and project descriptions) necessary to prepare the IS; • It is anticipated this project will be either exempt from Tahoe Regional Planning Agency (TRPA) review or Qualified Exempt under the existing Memorandum of Understanding between the District and TRPA. If a Public Service Application is required the content and analysis included in the IS/Neg Dec will be incorporated for use as the TRPA Initial Environmental Checklist and will be billed under separate cover; • If a phase of the work proposed is required to extend beyond the ROW, to ROWs that are not currently occupied by underground water or sewer utilities or into ROWs in sensitive areas, additional site -specific analysis may be required due to potential impacts to resources. The level of analysis and environmental review will b,i tependent • project specifics and site characteristics. Scope of or • Meetings with • Staff Sierra Ecotone Solutions (SES) will visit the sites, collect available background information for the project area from the District, and review environmental •• and survey/study documents prepared for other projects that have been permitted in the project area. SES will obtain maps and drawings of the proposed sewer and waterlines to be replaced and a general description of the proposed project from the District, and will prepare a written project description that is •': adequate detail for use in the Tiered Initial Study. During the course of preparing the environmental documentation, up to two (2) meetings will be attended by the SES project manager to discuss the Project with District and agency staff to ensure adequacy of the analysis and to discuss and resolve potential issues. SES will use the description of the project prepared in Task I to prepare thi Administrative Draft Tiered IS. The Administrative Draft Tiered IS will provide: • A brief description of the project; • The location of the project; • A proposed finding that the project will not have a significant effect on t environment (this is anticipated but will be determined during analysis); • Analysis in an Initial Study documenting reasons to support the finding-, and • Mitigation measures, if any, which will be included in the project to avo •• significant effects. 'I The Administrative Draft IS/Neg Dec will be prepared by SES for review by the District. The • IS will rely on the analysis • for the District Wide Sewer and Water Pipeline Network Replacement Project. The proposed projects include portions of the project areas that lie within TRPA delineated Stream Environment Zones (SEZ). These areas were previously eliminated • the District Wide Project Area. Inclusion • the SEZ areas for these projects will be analyzed • •. to the following subject areas only and will tier off the analysis in the District Wide IS: Biological Resources and Hydrology and Water Quality. CEQA Appendix G criteria will be utilized • the evaluation criteria in the Tiered IS. Following one round • review by the District, SES will revise as appropriate, produce the Tiered IS. If new significant impacts are not identified and it is determined the project • as Categorical Exemption in accordance with Article 19 • 15300, then the ■ Tiered Initial Study will not be required to be circulated, and Task 3 would not be performed. Task 3 - Final Environmental Documentation and Attend Hearing Upon conclusion of the circulation period of the IS/Neg Dec, a Final Environmental Documentation package will be prepared for District review and presentation to the District Board for approval. Once the Board has approved the Project, a Notice of Determination will be prepared and sent to the El Dorado County Clerks office for 30- day posting. The filing of a Notice of Determination starts a 30-day statute of limitations on court challenges to the District's approval under CEQA. SES will also coordinate with the Clerks office concerning the District's submittal of wildlife impact fees. Task 4 — Preparation of Biological Assessment SES will prepare a Biological Assessment (BA) to analyze potential impacts to wildlife (terrestrial and aquatic) and vegetation in accordance with US Fish and Wildlife Service guidelines as outlined in the attached guidance memorandum. Direct, indirect and cumulative effects will be disclosed for special status species and habitats that may be present within the project areas and defined area of potential effects (APE). Recommendations will be included if necessary to reduce or avoid adverse impacts to sensitive and special status species and habitats that may be present within the project area or APE. Based on the analysis and determinations in the BA, CA Waterboard will coordinate needs for consultation, conference, and or technical assistance between US Fish and Wildlife Service and Contractor. Follow-up work that lies outside the scope of this document and may be required includes a nesting bird survey that would be required to be performed prior to commencement of construction, dewatering plans and water sampling and traffic control measures that may be necessary to mitigate impacts. M Tasks I and the Initial Study for the project will be completed by the end of November 2021 assuming a notice to proceed from the District is forthcoming. The Hearing identified in Task 2 may occur concurrently with the 30-day circulation. Task 3 and 4 will be complete within 10 days after the completion of the circulation assuming no major comments are received on the IS/Neg Dec. This schedule assumes that the District will provide SES with project base mapping and a general definition of the proposed action within 30 days of receipt of notice to proceed and that the IS/Neg Dec will begin circulation approximately 9 weeks after design documents and project description are provided to SES. The estimated work effort for each task is provided below. Tasks will be completed by Garth Alling (Project Manager and Senior Scientist), and Jennifer DeMartino (GIS and Mapping Support). Task Task I - Review Background Information/Prepare Project Description/Attend meetings (2) Task 2 - Prepare Initial Study/Negative Declaration and Atten Hearing (1) Task 3 - Final Environmental Documentation and Attend Hearing (1) Hours/Rate 25 at $135 d 20 at $135 14 at $95 10 at $135 4 at $95 T 40 at $135 Direct Costs L Total Estimated Costs I $5,400 $100 $14,635 Should you have any questions concerning the assumptions or proposed scope/costs, please do not hesitate to contact me at 530.416.2440. Sincerely, IWAUMM-1