Loading...
HomeMy WebLinkAboutTO#17 Bird Survey_RockyIThis Task Order No. 17 is made and entered into as of the 20th day of April 2021 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Sierra Ecotone Solutions, LLC, hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated January 15, 2015 and as specifically hereinafter set forth, the parties do hereby agree as follows: 2 C3 4 PURPOSE The purpose of this Task Order No. 17 is for professional services to provide a Nesting Bird Pre -Construction Survey for the Rocky Point I Waterline and PRV Replacement Project located in El Dorado County, California. SCOPE OF WORK A full description of service dated April 12, 2020 more proposal is attached hereto, part of this task order. STAFFING !s is contained in CONSULTANT's written proposal specifically outlined therein as Tasks 1 and 2. This marked "Exhibit A", and by this reference is made a Services will be performed by Garth Alling, Principal Biologist. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. TIME OF PERFORMANCE Work for this Task Order No. 17 shall commence on April 20, 2021 and be completed on or before May 12, 2021 unless otherwise directed by the DISTRICT. 5. PAYMENT Payment to CONSULTANT for services performed under Task Order No. 17 shall be in accordance with CONSULTANT'S unit fee schedule for the persons assigned to the project task. The cost ceiling for this task order shall not exceed One thousand Six Hundred Twenty Dollars ($1,520.00) except as provided in Article IV of the 1/15/15 Master Agreement. All State of California prevailing wage laws must be complied with in thz performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. wmmngs�t� This Task Order No. 17 shall be in effect upon execution by all parties, and shal,' service as Notice to Proceed upon execution by DISTRICT. SOUT OE PUBLIC UTILITY DISTRICT 2Q, . P. . M.B.A. Aprilate JO R- IEL, P. _.B.A. Dd 2021 GENERAL MANAGER/ENGINEER ATTEST: MELONIE GUTTRY/,gC)LEIRKF BOARD SIERRA ECOTONE SOLUTIONS, LLC I- - Z.Z,4Prz, 44TALLING, PRIM 5N�')31 &A L OLOGIST Date 0 rSleRRA eCOTONE SOLUTION 530.416.2W - PO Sax 1297 Lephyr Cove, NV 99448 - SlerrakaxoneSoludons IPSNITIMPTOW1, Mr. Adrian Combes South Tahoe Public Utility Distrid 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 P 0 1 IN I UNIJIM" W1 WAXV-41 W.11101 oil I'lill 9149"1 W Pursuant to your request, this letter serves as a proposed scope of work and budget estimate for Sierra Ecotone Solutions to provide a nesting bird pre -construction survey for work to be performed on the Rocky Point I Pipeline Project. Scope Sierra Ecotone Solutions (Garth Alling) will complete the following tasks: Ta�k_j — Preconstruction Nest iq,1;J1ird Survey — Visual surveys to determine the presence of nesting birds will be performed within the project area including habitat immediately adjacent to the proposed projects. Survey areas will be recorded and any identified nest locations will be recorded and marked in the field. All nesting bird surveys will be performed within 14 days prior to commencement of construction activities. If an active nest is found close enough to the construction area to be disturbed by the proposed projects and associated activities, the extent of a construction -free buffer zone will be established and maintained around the nest. The buffer shall be maintained until the biologist determines the nest is no longer active. Task 2 - Reporting: — Sierra Ecotone Solutions will report the results in memorandum format to STPUD. Survey data, GPS files, and summary notes will be provided to STPUD within 48 hours of completion. If sensitive species are noted, an active migratory bird nest identified, the CDFW and/or USFWS will be notified if necessary. 6=7mv -1 - - -• rOWWWWWWrow1k - - - •- W%MWAM'0PWf7AWWFWA—W possible. All reporting will be complete within 48 hours of the survey. HOURS LABOR DIRECT TASK COST COST TASK TOTAL Task 1 10 $1,350 $0 $1,350 Task 2 2 $270 $0 $270 Total 12 $1,620 $0 $1,620 I itYE"=fMrY?FCT6T3MWme witn any questions. I 100K torward to worKing with you on this project. Regards, Garth Alling Principal Biologist I;Mmwu