HomeMy WebLinkAbout2026.06.18 Item 6b Attachment - Project Addenda ADDENDUM NO. 1
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
2026 Pioneer Trail Waterline Project (REBID)
South Tahoe Public Utility District
South Lake Tahoe, California
May 29, 2026
1
GENERAL NOTES:
• The Mandatory Pre-Bid Meeting was held on May 20, 2026_The sign-in sheet and
presentation from that meeting has been posted for Contractor reference on Planet
Bids.
• This addendum adds a bid item to allow for gate valves instead of, or in addition to,
butterfly valves, based on contractor and supplier concerns related to BABA compliant
valve availability.
• An updated Bid Form is provided for reference, adding a bid item for gate valves and
updated the number of trees to be removed.
• This addendum adds a requirement for the provision of Builder's Risk coverage.
• Updated prevailing wage
• There is no change to the bid opening date.
• As a reminder, hard copy bid bond MUST be received by the District prior to bid
opening.
THE FOLLOWING CHANGES ARE TO BE MADE TO THE PLANS:
1. Sheet D5, Detail 3, Tree Removal Table, following the last line.
ADD: The information in quotes by column reflecting the addition of 26" pine:
ID "14", Sheet "P2", Diameter (IN) "26—, Type "PINE"
THE FOLLOWING CHANGES ARE TO BE MADE TO THE SPECIFICATIONS:
1. Volume 1, Specifications and Contract Documents, cover page.
REPLACE: Existing cover page, dated 2025
WITH: Attached cover page, dated 2026.
2. Section 00 41 00 — Bid Forms, Page 36, following Bid Item 31 description.
Add:
Bid Item 32 — 16-inch Gate Valve Option - Bid item is for the added cost of supplying,
handling, and installing 16-inch diameter gate valves instead of butterfly valves, at
locations shown on the plans. The cost of 16-inch diameter butterfly valves remains
incidental, as applicable, to Bid Item 9 - 16-inch DIP Water Main, Class 300 and Bid
Items 20 through 24 — Waterline Interties.
Bid item will only be utilized at the direction of the District based on documented
availability, or lack thereof, of compliant butterfly valves that jeopardize project
implementation due to BABA compliant material lead times as documented in the
CONTRACTOR's approved schedule.
The CONTRACTOR'S payment for this item shall be by the Each. The CONTRACTOR's
unit price shall be valid for an actual quantity ranging from 0 to the estimated quantity
indicated on the Bid Form.
2
3. Section 00 41 00 — Bid Forms, Pages 41 and 42.
REPLACE: Bid Forms dated May 2026..
WITH: Updated Bid Forms, dated May 29, 2026, as attached, modifying the quantity for
Bid Item No. 6 —Tree Removal and adding Bid Item No. 32
4. Section 00 73 00 Supplementary Conditions, 2.01 Insurance, sub item O., following 4.
Excess/Umbrella Liability.
REPLACE: "5. Not Used."
WITH: "5. Builder's Risk: (Course of Construction) the Contractor shall provide
Builder's Risk "All-Risk" Completed Value Insurance and/or Inland Marine
All Risk Installation Floater Insurance, as may be applicable, in an amount
equal to the Contract price for the entire project which is the subject of the
Contract, including completed work and work in progress. This insurance
shall be in effect until the work is completed and accepted by the District.
This insurance shall cover, including but not limited to, fire, lightning, wind
storms, hail, explosion, riot, riot attending a strike, civil commotion, smoke
damage, damage by aircraft or vehicles, vandalism and malicious mischief,
theft and collapse. The insurance shall be written in a completed form with
losses payable to the Contractor and owner, as their interests may appear.
The Builder's Risk policy shall also include the provisions and/or
endorsements required in Other Provisions, Part 2.01.O.6.e of this Section."
5. Section 00 73 00 Supplementary Conditions, 2.01 Insurance, sub item 0.6.e
REPLACE: "e. Not Used"
WITH: "e. The Contractor's Builders Risk policy shall contain the following provisions:
1) Coverage is amended to include the South Tahoe Public Utility District
as an additional insured and as the loss payee.
2) For any claims related to this Contract, the Contractor's insurance
coverage shall be primary insurance as respects the District. Any
insurance or self-insurance maintained by the District shall be excess
of the Contractor's insurance and shall not contribute with it.
3) The insurer waives any and all transfer rights of recovery (subrogation)
it may have against the South Tahoe Public Utility District.
4) Any failure to comply with the claim reporting provisions of the policies
or any breach of a policy warranty shall not affect coverage under the
policy applicable to the Additional Insureds."
6. Section 00 73 00 Supplementary Conditions, Exhibit B, Wage Determinations, Residential
REPLACE: Attachment General Decision Number: CA20260019 01/30/2026, with date
stamp of 3/9/2026, 3:29 PM
WITH: General Decision Number: CA20260019 05/18/2026, attached.
7. Section 00 73 00 Supplementary Conditions, Exhibit B, Wage Determinations, Building,
Heavy (Heavy and Dredging) and Highway
REPLACE: Attachment General Decision Number: CA20260007 01/23/2026, with date
stamp of 3/9/2026, 3:30 PM
WITH: General Decision Number: CA20260007 05/18/2026, attached.
3
This Addendum No. 1, pages 1 through 129 shall become part of the Contract and all provisions
of the Contract shall apply therein.
The date and time for the Bid Opening has not changed. The time provided for the completion of
the Contract has not changed.
The District appreciates the questions received and Contractor interest in this Project.
SOUTH TAHOE PUBLIC UTILITY DISTRICT May 29, 2026
QFtOF ESS/pN
�, R. Cp4ko
�F
7935 / m
N� x13 3/31/2 �Q
9T CIVIL Qom'
OF CA�\FO
Trevor Coolidge, P.E.
Senior Engineer
Ph. (530) 543-6278
Attached:
Contract Plans and Specifications Cover Page, dated 2026
Bid Forms, dated May 29, 2026
Wage Determination, Residential, General Decision Number: CA20260019 05/18/2026
Wage Determination, Building, Heavy, General Decision Number: CA20260007 05/18/2026
4
SPECIFICATIONS
AND
CONTRACT DOCUMENTS FOR THE
2026 PIONEER TRAIL WATERLINE PROJECT (REBID)
(PTRL WL)
QROFEss, N
k.� RR.coo;:!
I
�� Mn+
�, p. 3/ 1i28 �
'9r crv« i�
,_,0
SOUTH TAHOE PUBLIC UTILITY DISTRICT
SOUTH LAKE TAHOE, CALIFORNIA
May 8, 2026
CONSTRUCTION OF
2026 Pioneer Trail Waterline Project (Rebid)
FOR
SOUTH TAHOE PUBLIC UTILITY DISTRICT
THE BID SCHEDULE IS TO BE COMPLETED ELECTRONICALLY IN THE ELECTRONIC
BIDDING SYSTEM AMD IS INCLUDED HERE FOR INFORMATION PURPOSES ONLY.
BID SCHEDULE A: (Refer to Bid Descriptions for a more detailed description for each of
the following bid items)
Item Description Unit of. Approx. Unit PrSe Line Total
No. Measure Quantity
1 Mobilization and Demobilization LS �1-I
2 Erosion Control/BMPs/SWPPP LS:N IN
Compliance ���/�
3 Groundwater Dewatering LS I
4 Traffic Control LS 1 �
5 Sheeting, Shoring and Bracing or S\ 1 �N
Equivalent Method ��� \�\
6 Tree Removal EA 4\
7 Project Layout and Waterline LS 1
Surveying ��
8 As- Directed Pothole EA \\✓� `0 ✓
9 16-inch DIP Water Main, Class L \\ 8 0
25 \, \� \ �E\�\� \\\\
10 h PAW r Main, Class LF 200
11 %, 8- Water Main, Class 350 I7. -^ 60
12 Addi ' -foot Pipeline Depth L 420
13 Waterline Non-Excavatable Rock CY 200
Removal /
14 2-inch Poly Service \ LF 180
15 3/4-inch Services y EA 2
16 Fire Hydrant \y✓ EA 13
17 Golden ail Pree LS 1
ReducingStation
18 Jicarilla iPressure Reducing LS 1
Valveati�
19 Susquehana Drive Pressure LS 1
Reducing Valve Station
20 Tie-In #1 - Near Marshall and LS 1
Cattlemans (P9)
21 Tie-In #2 - Kokanee/Pioneer (P9) LS 1
May 29, 2026 SECTION 00 41 00
2026 PIONEER TRAIL BID FORMS
WATERLINE PROJECT(REBID) 41
Item Description Unit of Approx. Unit Price Line Total
No. Measure Quantity
22 Tie-In #3 - Golden Bear/Pioneer LS 1
(Sheet P8)
23 Tie-In #4 -Jicarilla/Pioneer(Sheet LS 1
P2)
24 Tie-In #5 - Sus/Pioneer (Sheet P1) LS 1
25 Abandon Water Main Blow-off EA 1
26 Abandon Water Main Valves EA 4
27 Abandon PRV Vault, Golden Bear EA 1
PRV at Marshall
28 Abandon 6-inch and Larger CY 45
Waterlines with Slurry
29 Waterline 8-inch Trench Patch SFF� 27000
30 Waterline 3-Inch Mill and Overlay SF : 48000
31 Fire Hydrant Removal EA; \ 2
32 16-inch Gate Valve Option i y ` v„ �`A,
THE BID SCHEDULE IS TO BE COMP ETEP ELECTRONICALLY IN THE ELECTRONIC
BIDDING SYSTEM AND IS INCLI<EDAiERE FOR INFORMATI N PURPOSES ONLY.
F 13ID SCHEDU E
. \ \\ N:
C-- \ \
May 29, 2026 SECTION 00 41 00
2026 PIONEER TRAIL BID FORMS
WATERLINE PROJECT(REBID) 42
5/29/26,3:33 PM SAM.gov
"General Decision Number: CA2O26O019 05/18/2026
State: California
Construction Types: Residential
Counties: California Counties of
Alameda, Contra Costa, El Dorado, Marin,
Monterey, Napa, Placer, Sacramento, San
Benito, San Francisco, San Mateo, Santa
Clara, Santa Cruz, Solano, Sonoma,
Sutter, Yolo and Yuba
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up
to and including 4 stories)
Modification Number Publication Date
4 01/30/2026
5 05/18/2026
ASBEOO16-002 01/01/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO
ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: EL
DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA
COUNTIES) $ 64.56 25.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO
ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO
& SANTA CLARA COUNTIES) $ 84.76 25.07
ASBEOO16-009 05/01/2024
Rates Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: EL
DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA
COUNTIES) $ 34.56 11.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,
SAN MATEO & SANTA CLARA COUNTIES) $ 36.53 9.27
https://sam.gov/wage-determination/CA20260019/5 1/75
5/29/26,3:33 PM SAM.gov
BRCA0003-001 08/01/2024
Rates Fringes
MARBLE FINISHER $ 42.06 19.80
BRCA0003-002 05/01/2024
Rates Fringes
BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY
PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK,
SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND
TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR
ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT
WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN
ADDITION TO THE ABOVE. (B) OPERATING A SAW OR
GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE
REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL
RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE $ 54.18 27.82
BRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO,
SUTTER SPECIALTY PAY: (A) UNDERGROUND WORK
SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH
BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE
PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK
IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE
$1.25 PER HOUR IN ADDITION TO THE ABOVE. (B)
OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER
HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE
PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE
REGULAR RATE $ 52.76 25.01
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO,
SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND
WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES,
CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT
SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR
RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL
RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE.
(B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25
PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE
NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE
THE REGULAR RATE $ 56.94 26.28
BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN
MATEO, SOLANO, SONOMA SPECIALTY PAY: (A)
UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK,
MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE
CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE
REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW
SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO
THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL
RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C)
GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR
ABOVE THE REGULAR RATE $ 57.02 28.50
BRCA0003-007 07/01/2024
Rates Fringes
TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR:
$1.00 PER HOUR ADDITIONAL $ 60.58 29.79
TERRAZZO FINISHER FOOTNOTE: BASE MACHINE
OPERATOR: $1.00 PER HOUR ADDITIONAL $ 44.93 20.98
BRCA0003-009 08/01/2024
Rates Fringes
MARBLE MASON $ 61.72 30.31
https://sam.gov/wage-determination/CA20260019/5 2/75
5/29/26,3:33 PM SAM.gov
BRCA0003-012 04/01/2024
Rates Fringes
TILE LAYER (SONOMA) $ 56.79 22.54
TILE LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER,
YOLO, YUBA) $ 55.55 21.08
TILE LAYER (ALAMEDA, CONTRA COSTA, MARIN,
MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) $ 59.92 22.62
TILE FINISHER (SONOMA) $ 35.78 19.23
TILE FINISHER (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO, YUBA) $ 35.00 17.44
TILE FINISHER (ALAMEDA, CONTRA COSTA, MARIN,
MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) $ 37.75 19.28
CARPOO22-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY) $ 60.49 35.11
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO
COUNTY) $ 60.39 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN FRANCISCO COUNTY) $ 60.54 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
FRANCISCO COUNTY) $ 60.39 33.52
CARP0035-005 07/01/2021
Rates Fringes
DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El
Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba
Counties $ 24.07 18.58
DRYWALL STOCKER/SCRAPPER: (AREA 2) AREA 2:
Monterey, San Benito & Santa Cruz Counties $ 24.49 18.58
DRYWALL STOCKER/SCRAPPER: (AREA 1) AREA 1:
Alameda, Contra Costa, Marin, Napa, San Francisco,
San Mateo, Santa Clara, Solano & Sonoma Counties $ 27.43 18.58
DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El
Dorado, Placer, Sacramento, Sutter, Yolo, &
YubaCounties $ 48.12 31.93
DRYWALL INSTALLERS/LATHERS: (AREA 2) AREA 2:
Monterey, San Benito & Santa Cruz Counties $ 48.97 31.93
DRYWALL INSTALLERS/LATHERS: (AREA 1) AREA 1:
Alameda, Contra Costa, Marin, Napa, San Francisco,
San Mateo, Santa Clara, Solano & Sonoma Counties $ 54.85 31.93
CARP0035-009 07/01/2020
Rates Fringes
CARPENTER: MILLWRIGHT MARIN COUNTY $ 52.75 32.41
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY $ 52.65 30.82
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW
OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR,
SAW FILER MARIN COUNTY $ 52.80 30.82
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN
COUNTY $ 52.65 30.82
CARPOO46-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER
(WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE:
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST)
https://sam.gov/wage-determination/CA20260019/5 3/75
5/29/26,3:33 PM SAM.gov
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49
AND TERRITORY INSIDE THE CITY LIMITS OF
PLACERVILLE $ 57.01 35.11
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO
(WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES
FOOTNOTE: PLACER COUNTY (WEST) INCLUDES
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY
LIMITS OF PLACERVILLE $ 54.51 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER EL DORADO (WEST), PLACER
(WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE:
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST)
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49
AND TERRITORY INSIDE THE CITY LIMITS OF
PLACERVILLE $ 54.66 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL
DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO
COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY
LIMITS OF PLACERVILLE $ 60.39 33.52
CARP0046-003 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER
(EAST), SUTTER AND YUBA COUNTIES) $ 55.66 35.11
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST),
PLACER (EAST), SUTTER AND YUBA COUNTIES) $ 53.16 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER EL DORADO (EAST), PLACER
(EAST), SUTTER AND YUBA COUNTIES $ 53.31 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL
DORADO (EAST), PLACER (EAST), SUTTER AND YUBA
COUNTIES) $ 60.39 33.52
CARP0152-001 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY) $ 52.75 32.41
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA
COUNTY) $ 52.65 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (CONTRA COSTA COUNTY) $ 52.80 30.82
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(CONTRA COSTA COUNTY) $ 52.65 30.82
CARP0180-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT SOLANO COUNTY $ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER SOLANO COUNTY $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
SOLANO COUNTY $ 54.85 31.49
https://sam.gov/wage-determination/CA20260019/5 4/75
5/29/26,3:33 PM SAM.gov
CARPO217-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY) $ 60.49 35.11
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY) $ 60.39 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN MATEO COUNTY) $ 60.54 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
MATEO COUNTY) $ 60.39 33.52
CARPO405-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY) $ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA
COUNTY) $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CLARA COUNTY) $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CLARA COUNTY) $ 54.85 31.49
CARPO405-002 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY) $ 51.47 33.08
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO
COUNTY) $ 48.97 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN BENITO COUNTY) $ 49.12 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
BENITO COUNTY) $ 54.85 31.49
CARPO505-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY) $ 51.47 33.08
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ
COUNTY) $ 48.97 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CRUZ COUNTY) $ 49.12 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CRUZ COUNTY) $ 54.85 31.49
CARPO605-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY) $ 51.47 33.08
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY) $ 48.97 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (MONTEREY COUNTY) $ 49.12 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(MONTEREY COUNTY) $ 54.85 31.49
CARPO713-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY) $ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY) $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
https://sam.gov/wage-determination/CA20260019/5 5/75
5/29/26,3:33 PM SAM.gov
ERECTOR, SAW FILER (ALAMEDA COUNTY) $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(ALAMEDA COUNTY) $ 54.85 31.49
CARP0751-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES).$ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA
COUNTIES) $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (NAPA AND SONOMA COUNTIES) $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(NAPA AND SONOMA COUNTIES) $ 54.85 31.49
ELEC0006-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 67.65 31.78
SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 58.83 31.51
ELEC0006-005 06/01/2025
Rates Fringes
ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON
RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL
WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING
UNITS; AND NEW WOOD FRAME SINGLE STRUCTURE 1 OR 2
FAMILY HOUSES, OR ON ALL WOOD- CONSTRUCTED
BUILDINGS NOT TO EXCEED 20 LIVING UNITS UNDER 1
ROOF EXCLUDING PROJECTS OR TRACTS CONTAINING MORE
THAN 2 HOUSES, OR MORE THAN 1 BUILDING $ 55.50 25.64
https://sam.gov/wage-determination/CA20260019/5 6/75
5/29/26,3:33 PM SAM.gov
ELEC0006-009 06/01/2024
Rates Fringes
ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:).$ 91.25 48.05
ELEC0180-002 12/01/2023
Rates Fringes
ELECTRICIAN (NAPA & SOLANO COUNTIES) $ 38.50 21.16
ELECO234-002 12/30/2025
Rates Fringes
ELECTRICIAN: ZONE B: (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF
ZONE A $ 77.45 33.97
ELECTRICIAN: ZONE A: (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ,
MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR
MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING,
AND AN AREA EXTENDING 5 MILES EAST AND WEST OF
HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY
LINE $ 70.41 33.76
ELECO234-004 12/01/2021
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS,
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT
SYSTEMS $ 55.12 24.30
SOUND & COMMUNICATIONS: INSTALLER (MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS,
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT
SYSTEMS $ 47.93 24.09
ELEC0302-002 03/01/2025
Rates Fringes
ELECTRICIAN (CONTRA COSTA COUNTY) $ 66.26 35.84
https://sam.gov/wage-determination/CA20260019/5 7/75
5/29/26,3:33 PM SAM.gov
CABLE SPLICER (CONTRA COSTA COUNTY) $ 74.54 36.09
ELECO302-004 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 61.04 31.08
SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 53.08 30.84
ELECO332-002 06/01/2025
Rates Fringes
ELECTRICIAN (SANTA CLARA COUNTY) $ 47.35 23.49
ELECO332-004 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 67.08 31.26
SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
https://sam.gov/wage-determination/CA20260019/5 8/75
5/29/26,3:33 PM SAM.gov
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 58.33 31.00
ELEC0340-001 02/01/2016
Rates Fringes
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND
APARTMENTS UP TO AND INCLUDING 3 STORIES (EL
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA
COUNTIES) $ 23.10 12.48
ELECTRICIAN: FOUR STORIES (EL DORADO, PLACER,
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) $ 39.06 24.51
ELEC0340-004 03/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (COLUSA,
PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF
WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION
IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING
ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS,
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT
SYSTEMS $ 46.00 25.68
SOUND & COMMUNICATIONS: INSTALLER (COLUSA,
PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF
WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION
IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING
ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS,
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT
SYSTEMS $ 40.00 25.50
ELEC0401-006 01/01/2021
Rates Fringes
https://sam.gov/wage-determination/CA20260019/5 9/75
5/29/26,3:33 PM SAM.gov
ELECTRICIAN (EL DORADO AND PLACER COUNTIES)
ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER
HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR
ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR $ 31.88 8.46
ELEC0551-003 12/01/2025
Rates Fringes
ELECTRICIAN (MARIN AND SONOMA COUNTIES) $ 41.00 24.26
ELEC0595-004 06/01/2025
Rates Fringes
ELECTRICIAN (ALAMEDA COUNTY) $ 76.00 49.07
CABLE SPLICER (ALAMEDA COUNTY) $ 87.40 49.41
ELEC0595-007 12/01/2024
Rates Fringes
SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR
POWER SUPPLY; INCLUSION OR EXCLUSION OF
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS $ 56.68 28.35
ELEC0617-002 06/01/2025
Rates Fringes
ELECTRICIAN (SAN MATEO COUNTY) $ 86.00 51.07
ELEV0008-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION:
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5
YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF
SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING, AND CHRISTMAS DAY $ 84.05 38.44
ENGI0003-009 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: CRANES: Clamshell and dragline
up to and including 1 cu. yd.; Cranes 45 tons and
under; Self-propelled boom-type lifting device 45
tons and under (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE LISTED
https://sam.gov/wage-determination/CA20260019/5 10/75
5/29/26,3:33 PM SAM.gov
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR
ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW)
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 63.06 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: HYDRAULIC: Clamshell and
dragline up to and including 1 cu. yd.; Cranes 45
tons and under; Self-propelled boom-type lifting
device 45 tons and under (EL DORADO, MONTEREY,
NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ,
SONOMA, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE
RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 44.44 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: OILER: Clamshell and dragline up
to and including 1 cu. yd.; Cranes 45 tons and
under; Self-propelled boom-type lifting device 45
tons and under (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE LISTED
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR
ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW)
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
https://sam.gov/wage-determination/CA20260019/5 11/75
5/29/26,3:33 PM SAM.gov
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 42.55 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and
dragline up to and including 1 cu. yd.; Cranes 45
tons and under; Self-propelled boom-type lifting
device 45 tons and under (EL DORADO, MONTEREY,
NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ,
SONOMA, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE
RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 44.83 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: CRANES: Clamshell and dragline
over 1 cu. yd. up to and including 7 cu. yds.;
Crane, over 45 tons up to and including 100 tons;
Derrick barge, 100 tons and under; Self-propelled
boom-type lifting device, over 45 tons; Tower crane
(EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO,
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND
YUBA COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
https://sam.gov/wage-determination/CA20260019/5 12/75
5/29/26,3:33 PM SAM.gov
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 64.70 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: OILER: Clamshell and dragline
over 1 cu. yd. up to and including 7 cu. yds.;
Crane, over 45 tons up to and including 100 tons;
Derrick barge, 100 tons and under; Self-propelled
boom-type lifting device, over 45 tons; Tower crane
(EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO,
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND
YUBA COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 42.83 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and
dragline over 1 cu. yd. up to and including 7 cu.
yds.; Crane, over 45 tons up to and including 100
tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45
tons; Tower crane (EL DORADO, MONTEREY, NAPA,
PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA,
SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES
ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00
PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 45.07 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: CRANES: Clamshell and dragline
https://sam.gov/wage-determination/CA20260019/5 13/75
5/29/26,3:33 PM SAM.gov
over 7 cu. yds.; Crane, over 100 tons; Derrick,
over 100 tons; Derrick barge pedestal-mounted, over
100 tons; Self-propelled boom-type lifting device,
over 100 tons (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 66.39 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: OILER: Clamshell and dragline
over 7 cu. yds.; Crane, over 100 tons; Derrick,
over 100 tons; Derrick barge pedestal-mounted, over
100 tons; Self-propelled boom-type lifting device,
over 100 tons (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 43.79 31.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and
dragline over 7 cu. yds.; Crane, over 100 tons;
Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled
boom-type lifting device, over 100 tons (EL DORADO,
MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA
COUNTIES) FOOTNOTE: Work suspended by ropes or
https://sam.gov/wage-determination/CA20260019/5 14/75
5/29/26,3:33 PM SAM.gov
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 46.08 31.15
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 8-A:
Elevator operator; Skidsteer loader-Bobcat 743
series or smaller, and similar (without
attachments); Mini excavator under 25 H.P.
(backhoe-trencher); Tub grinder wood chipper (EL
DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN
BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA
COUNTIES FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 54.69 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit
sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand;
Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic
monitor; Ken seal machine (or similar);
Mixermobile; Oiler; Pump operator; Refrigeration
plant; Reservoir-debris tug (self- propelled
floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine;
Shuttlecar; Self-propelled power sweeper operator
(includes vacuum sweeper); Slusher operator;
Surface heater; Switchperson; Tar pot firetender;
Tugger hoist, single drum; Vacuum cooling plant;
https://sam.gov/wage-determination/CA20260019/5 15/75
5/29/26,3:33 PM SAM.gov
Welding machine (powered other than by electricity)
(EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO,
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND
YUBA COUNTIES FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 56.71 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7:
Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary
lift or similar; Combination slurry mixer and/or
cleaner; Drilling equipment, 20 ft. and under
m.r.c.; Firetender (hot plant); Grouting machine
operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift
slab machine (Vagtborg and similar types); Maginnes
internal full slab vibrator; Material hoist (1
drum); Mechanical trench shield; Pavement breaker
with or without compressor combination); Pipe
cleaning machine (tractor propelled and supported);
Post driver; Roller (except asphalt); Chip Seal;
Self-propelled automatically applied concrete
curing mahcine (on streets, highways, airports and
canals); Self-propelled compactor (without dozer);
Signalperson; Slip-form pumps (lifting device for
concrete forms); Tie spacer; Tower mobile;
Trenching machine, maximum digging capacity up to
and including 5 ft. depth; Truck- type loader (EL
DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN
BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA
COUNTIES FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
https://sam.gov/wage-determination/CA20260019/5 16/75
5/29/26,3:33 PM SAM.gov
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 57.79 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6:
Armor-Coater (or similar); Ballast jack tamper;
Boom-type backfilling machine; Assistant plant
engineer; Bridge and/or gantry crane; Chemical
grouting machine, truck-mounted; Chip spreading
machine operator; Concrete saw (self-propelled unit
on streets, highways, airports and canals); Deck
engineer; Drilling equipment Texoma 600, Hughes 200
Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer
loader, Bobcat larger than 743 series or similar
(with attachments); Locomotive; Lull hi-lift or
similar; Oiler, truck mounted equipment; Pavement
breaker, truck-mounted, with compressor
combination; Paving fabric installation and/or
laying machine; Pipe bending machine (pipelines
only); Pipewrapping machine (tractor propelled and
supported); Screed(except asphaltic concrete
paving); Self- propelled pipeline wrapping machine;
Tractor; Self-loading chipper; Concrete barrier
moving machine (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 58.88 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5:
Cast-in-place pipe laying machine; Combination
slusher and motor operator; Concrete conveyor or
concrete pump, truck or equipment mounted; Concrete
conveyor, building site; Concrete pump or pumperete
gun; Drilling equipment, Watson 2000, Texoma 700 or
similar; Drilling and boring machinery, horizontal
(not to apply to waterliners, wagon drills or
jackhammers); Concrete mixer/all; Person and/or
material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar
types); Mechanical burm, curb and/or curb and
gutter machine, concrete or asphalt); Mine or shaft
hoist; Portable crusher; Power jumbo operator
(setting slip-forms, etc., in tunnels); Screed
https://sam.gov/wage-determination/CA20260019/5 17/75
5/29/26,3:33 PM SAM.gov
(automatic or manual); Self-propelled compactor
with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5
ft. depth; Vermeer T-6O0B rock cutter or similar
(EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO,
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND
YUBA COUNTIES FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1:
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO,
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ,
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 60.15 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4:
Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including
3/4 cu. yd.; Concrete batch plant (wet or dry);
Dozer and/or push cat; Pull- type elevating loader;
Gradesetter, grade checker (GPS, mechanical or
otherwise); Grooving and grinding machine; Heading
shield operator; Heavy-duty drilling equipment,
Hughes, LDH, Watson 3000 or similar; Heavy-duty
repairperson and/or welder; Lime spreader; Loader
under 4 cu. yds.; Lubrication and service engineer
(mobile and grease rack); Mechanical finishers or
spreader machine (asphalt, Barber-Greene and
similar); Miller Formless M-9000 slope paver or
similar; Portable crushing and screening plants;
Power blade support; Roller operator, asphalt;
Rubber-tired scraper, self-loading (paddle-wheels,
etc.); Rubber- tired earthmoving equipment
(scrapers); Slip form paver (concrete); Small
tractor with drag; Soil stabilizer (P & H or
equal); Spider plow and spider puller; Tubex pile
rig; Unlicensed constuction work boat operator, on
site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar
Pugmill equipment) (EL DORADO, MONTEREY, NAPA,
PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA,
SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES
ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00
PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
https://sam.gov/wage-determination/CA20260019/5 18/75
5/29/26,3:33 PM SAM.gov
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 61.36 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3:
Asphalt milling machine; Cable backhoe; Combination
backhoe and loader over 3/4 cu. yds.; Continuous
flight tie back machine assistant to engineer or
mechanic; Crane mounted continuous flight tie back
machine, tonnage to apply; Crane mounted drill
attachment, tonnage to apply; Dozer, slope brd;
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.;
Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull);
Power shovels, up to and including 1 cu. yd.;
Pre-stress wire wrapping machine; Side boom cat,
572 or larger; Track loader 4 cu. yds. and over;
Wheel excavator (up to and including 750 cu. yds.
per hour) (EL DORADO, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,
YOLO AND YUBA COUNTIES FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 62.69 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2:
Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work
boat operator, on site; Power blade operator
(finish); Power shovels, over 1 cu. yd. up to and
including 7 cu. yds. m.r.c. (EL DORADO, MONTEREY,
NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ,
SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE
RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
https://sam.gov/wage-determination/CA20260019/5 19/75
5/29/26,3:33 PM SAM.gov
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 64.09 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1:
Operator of helicopter (when used in erection
work); Hydraulic excavator, 7 cu. yds. and over;
Power shovels, over 7cu. yds. (EL DORADO, MONTEREY,
NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ,
SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE
RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2:
SONOMA
Area 1: All but the Northwestern
Area 2: Reaminder $ 65.54 34.69
ENGI0003-010 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 4: CRANES: Boom Truck or dual
purpose A-frame truck, non-rotating over 15 tons;
Truck-mounted rotating telescopic boom type lifting
device, Manitex or similar (boom truck) over 15
tons; Truck-mounted rotating telescopic boom type
lifting device, Manitex or similar (boom truck) -
under 15 tons;(ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
https://sam.gov/wage-determination/CA20260019/5 20/75
5/29/26,3:33 PM SAM.gov
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 37.86 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: TRUCK CRAINE OILER: Clamshell
and dragline up to and including 1 cu. yd.; Cranes
45 tons and under; Self-propelled boom-type lifting
device 45 tons and under (ALAMEDA, CONTRA COSTA,
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND
SOLANO COUNTIES) FOOTNOTE: Work suspended by ropes
or cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 37.58 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: OILER: Clamshell and dragline
up to and including 1 cu. yd.; Cranes 45 tons and
under; Self-propelled boom-type lifting device 45
tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 35.11 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: HYDRAULIC: Clamshell and
dragline up to and including 1 cu. yd.; Cranes 45
https://sam.gov/wage-determination/CA20260019/5 21/75
5/29/26,3:33 PM SAM.gov
tons and under; Self-propelled boom-type lifting
device 45 tons and under (ALAMEDA, CONTRA COSTA,
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND
SOLANO COUNTIES) FOOTNOTE: Work suspended by ropes
or cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 37.20 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 3: CRANES: Clamshell and dragline
up to and including 1 cu. yd.; Cranes 45 tons and
under; Self-propelled boom-type lifting device 45
tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 63.06 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and
dragline over 1 cu. yd. up to and including 7 cu.
yds.; Crane, over 45 tons up to and including 100
tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45
tons; Tower crane (ALAMEDA, CONTRA COSTA, MARIN,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
https://sam.gov/wage-determination/CA20260019/5 22/75
5/29/26,3:33 PM SAM.gov
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 37.83 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: OILER: Clamshell and dragline
over 1 cu. yd. up to and including 7 cu. yds.;
Crane, over 45 tons up to and including 100 tons;
Derrick barge, 100 tons and under; Self-propelled
boom-type lifting device, over 45 tons; Tower crane
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGES
RATES ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 35.34 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 2: CRANES: Clamshell and dragline
over 1 cu. yd. up to and including 7 cu. yds.;
Crane, over 45 tons up to and including 100 tons;
Derrick barge, 100 tons and under; Self-propelled
boom-type lifting device, over 45 tons; Tower crane
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE:
Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGES
RATES ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
https://sam.gov/wage-determination/CA20260019/5 23/75
5/29/26,3:33 PM SAM.gov
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 64.70 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: CRANES: Clamshell and dragline
over 7 cu. yds.; Crane, over 100 tons; Derrick,
over 100 tons; Derrick barge pedestal-mounted, over
100 tons; Self-propelled boom-type lifting device,
over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 66.39 34.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: OILER: Clamshell and dragline
over 7 cu. yds.; Crane, over 100 tons; Derrick,
over 100 tons; Derrick barge pedestal-mounted, over
100 tons; Self-propelled boom-type lifting device,
over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES) FOOTNOTE: Work suspended by ropes or
cables, or work on a Yo-Yo Cat: $.60 per hour
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 35.59 28.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and
dragline over 7 cu. yds.; Crane, over 100 tons;
https://sam.gov/wage-determination/CA20260019/5 24/75
5/29/26,3:33 PM SAM.gov
Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled
boom-type lifting device, over 100 tons (ALAMEDA,
CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO,
SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. ""AREA 1"" WAGES RATES
ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL $2.00
PER HOUR ABOVE AREA 1
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2
NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 38.05 28.03
OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 8-A:
Elevator operator; Skidsteer loader-Bobcat 743
series or smaller, and similar (without
attachments); Mini excavator under 25 H.P.
(backhoe-trencher); Tub grinder wood chipper
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES) ""AREA 1""
WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 54.69 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit
sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand;
Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic
monitor; Ken seal machine (or similar);
Mixermobile; Oiler; Pump operator; Refrigeration
plant; Reservoir-debris tug (self- propelled
floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine;
Shuttlecar; Self-propelled power sweeper operator
(includes vacuum sweeper); Slusher operator;
Surface heater; Switchperson; Tar pot firetender;
https://sam.gov/wage-determination/CA20260019/5 25/75
5/29/26,3:33 PM SAM.gov
Tugger hoist, single drum; Vacuum cooling plant;
Welding machine (powered other than by electricity)
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1""
WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) FOOTNOTE: Work suspended by ropes or cables,
or work on a Yo-Yo Cat: $.60 per hour additional.
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 56.71 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7:
Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary
lift or similar; Combination slurry mixer and/or
cleaner; Drilling equipment, 20 ft. and under
m.r.c.; Firetender (hot plant); Grouting machine
operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift
slab machine (Vagtborg and similar types); Maginnes
internal full slab vibrator; Material hoist (1
drum); Mechanical trench shield; Pavement breaker
with or without compressor combination); Pipe
cleaning machine (tractor propelled and supported);
Post driver; Roller (except asphalt); Chip Seal;
Self-propelled automatically applied concrete
curing mahcine (on streets, highways, airports and
canals); Self-propelled compactor (without dozer);
Signalperson; Slip-form pumps (lifting device for
concrete forms); Tie spacer; Tower mobile;
Trenching machine, maximum digging capacity up to
and including 5 ft. depth; Truck- type loader
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1""
WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) FOOTNOTE: Work suspended by ropes or cables,
or work on a Yo-Yo Cat: $.60 per hour additional.
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
https://sam.gov/wage-determination/CA20260019/5 26/75
5/29/26,3:33 PM SAM.gov
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 57.79 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6:
Armor-Coater (or similar); Ballast jack tamper;
Boom- type backfilling machine; Assistant plant
engineer; Bridge and/or gantry crane; Chemical
grouting machine, truck-mounted; Chip spreading
machine operator; Concrete saw (self-propelled unit
on streets, highways, airports and canals); Deck
engineer; Drilling equipment Texoma 600, Hughes 200
Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer
loader, Bobcat larger than 743 series or similar
(with attachments); Locomotive; Lull hi-lift or
similar; Oiler, truck mounted equipment; Pavement
breaker, truck-mounted, with compressor
combination; Paving fabric installation and/or
laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete
paving); Self- propelled pipeline wrapping machine;
Tractor; Self-loading chipper; Concrete barrier
moving machine (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR
ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW)
FOOTNOTE: Work suspended by ropes or cables, or
work on a Yo-Yo Cat: $.60 per hour additional.
""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO,
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 58.88 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5:
Cast-in-place pipe laying machine; Combination
slusher and motor operator; Concrete conveyor or
concrete pump, truck or equipment mounted; Concrete
conveyor, building site; Concrete pump or pumperete
gun; Drilling equipment, Watson 2000, Texoma 700 or
similar; Drilling and boring machinery, horizontal
(not to apply to waterliners, wagon drills or
jackhammers); Concrete mixer/all; Person and/or
material hoist; Mechanical finishers (concrete)
https://sam.gov/wage-determination/CA20260019/5 27/75
5/29/26,3:33 PM SAM.gov
(Clary, Johnson, Bidwell Bridge Deck or similar
types); Mechanical bum, curb and/or curb and
gutter machine, concrete or asphalt); Mine or shaft
hoist; Portable crusher; Power jumbo operator
(setting slip-forms, etc., in tunnels); Screed
(automatic or manual); Self-propelled compactor
with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5
ft. depth; Vermeer T-6O0B rock cutter or similar
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1""
WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended
by ropes or cables, or work on a Yo-Yo Cat: $.60
per hour additional. ""AREA 1"" WAGE RATES ARE
LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS
BELOW) FOOTNOTE: Work suspended by ropes or cables,
or work on a Yo-Yo Cat: $.60 per hour additional.
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA,
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA,
SANTA CRUZ, SOLANO, YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 60.15 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4:
Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including
3/4 cu. yd.; Concrete batch plant (wet or dry);
Dozer and/or push cat; Pull- type elevating loader;
Gradesetter, grade checker (GPS, mechanical or
otherwise); Grooving and grinding machine; Heading
shield operator; Heavy-duty drilling equipment,
Hughes, LDH, Watson 3000 or similar; Heavy-duty
repairperson and/or welder; Lime spreader; Loader
under 4 cu. yds.; Lubrication and service engineer
(mobile and grease rack); Mechanical finishers or
spreader machine (asphalt, Barber-Greene and
similar); Miller Formless M-9000 slope paver or
similar; Portable crushing and screening plants;
Power blade support; Roller operator, asphalt;
Rubber-tired scraper, self-loading (paddle-wheels,
etc.); Rubber- tired earthmoving equipment
(scrapers); Slip form paver (concrete); Small
tractor with drag; Soil stabilizer (P & H or
equal); Spider plow and spider puller; Tubex pile
rig; Unlicensed constuction work boat operator, on
site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar
Pugmill equipment) (ALAMEDA, CONTRA COSTA, MARIN,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR
ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW)
FOOTNOTE: Work suspended by ropes or cables, or
https://sam.gov/wage-determination/CA20260019/5 28/75
5/29/26,3:33 PM SAM.gov
work on a Yo-Yo Cat: $.60 per hour additional.
""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO,
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 61.36 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3:
Asphalt milling machine; Cable backhoe; Combination
backhoe and loader over 3/4 cu. yds.; Continuous
flight tie back machine assistant to engineer or
mechanic; Crane mounted continuous flight tie back
machine, tonnage to apply; Crane mounted drill
attachment, tonnage to apply; Dozer, slope brd;
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.;
Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull);
Power shovels, up to and including 1 cu. yd.;
Pre-stress wire wrapping machine; Side boom cat,
572 or larger; Track loader 4 cu. yds. and over;
Wheel excavator (up to and including 750 cu. yds.
per hour) (ALAMEDA, CONTRA COSTA, MARIN, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO
COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR
ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW)
FOOTNOTE: Work suspended by ropes or cables, or
work on a Yo-Yo Cat: $.60 per hour additional.
""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO,
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 62.69 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2:
Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work
boat operator, on site; Power blade operator
(finish); Power shovels, over 1 cu. yd. up to and
https://sam.gov/wage-determination/CA20260019/5 29/75
5/29/26,3:33 PM SAM.gov
including 7 cu. yds. m.r.c. (ALAMEDA, CONTRA COSTA,
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND
SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED
BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS
BELOW) FOOTNOTE: Work suspended by ropes or cables,
or work on a Yo-Yo Cat: $.60 per hour additional.
""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO,
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 64.09 34.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1:
Operator of helicopter (when used in erection
work); Hydraulic excavator, 7 cu. yds. and over;
Power shovels, over 7 cu. yds. (ALAMEDA, CONTRA
COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA
AND SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED
BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS
BELOW) FOOTNOTE: Work suspended by ropes or cables,
or work on a Yo-Yo Cat: $.60 per hour additional.
""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work
suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional. AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO,
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 65.54 34.69
ENGI0003-011 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
https://sam.gov/wage-determination/CA20260019/5 30/75
5/29/26,3:33 PM SAM.gov
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 49.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 47.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 54.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 52.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 57.85 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA,
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT
https://sam.gov/wage-determination/CA20260019/5 31/75
5/29/26,3:33 PM SAM.gov
BETWEEN AREA 1 AND AREA 2 AS NOTED
ELDORADO
Area 1: North Central
Area 2:
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern
PLACER
Area 1: All but the Central
Area 2: Remainder $ 55.85 28.56
IRON0377-001 01/01/2025
Rates Fringes
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA
COUNTIES) PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 55.33 35.15
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA,
SAN MATEO, SANTA CLARA COUNTIES) PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 45.78 26.51
IRON0377-003 01/01/2025
Rates Fringes
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(SAN FRANCISCO CITY AND COUNTY) PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
https://sam.gov/wage-determination/CA20260019/5 32/75
5/29/26,3:33 PM SAM.gov
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 55.83 35.15
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND
COUNTY) PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 45.78 26.51
IRON0433-005 01/01/2025
Rates Fringes
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL
(REMAINING COUNTIES) PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 50.70 35.15
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES)
PREMIUM
$6.00 additional per hour at the following
locations: China Lake Naval Test Station, Chocolate
Mountains Naval Reserve-Niland, Edwards AFB, Fort
Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas
Island, Susanville Federal Prison, 29 Palms -
Marine Corps, U.S. Marine Base - Barstow, U.S.
Naval Air Facility - Sealey, Vandenberg
$4.00 additional per hour at the following
locations: Army Defense Language Institute -
Monterey, Fallon Air Base, Naval Post Graduate
School - Monterey, Yermo Marine Corps Logistics
$2.00 additional per hour at the following
locations: Port Hueneme, Port Mugu, U.S. Coast
Guard Station - Two Rock $ 45.78 26.51
LAB00067-007 06/30/2025
Rates Fringes
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA
https://sam.gov/wage-determination/CA20260019/5 33/75
5/29/26,3:33 PM SAM.gov
2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN
BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO,
AND YUBA COUNTIES) SCOPE OF WORK: Covers site
mobilization; initial site clean-up; site
preparation; removal of asbestos-containing
materials from walls and ceilings; or from pipes,
boilers and mechanical systems only if they are
being scrapped; encapsulation, enclosure and
disposal of asbestos-containing materials by hand
or with equipment or machinery; scaffolding;
fabrication of temporary wooden barriers; and
assembly of decontamination stations $ 38.15 30.03
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA
1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN
FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK:
Covers site mobilization; initial site clean-up;
site preparation; removal of asbestos-containing
materials from walls and ceilings; or from pipes,
boilers and mechanical systems only if they are
being scrapped; encapsulation, enclosure and
disposal of asbestos-containing materials by hand
or with equipment or machinery; scaffolding;
fabrication of temporary wooden barriers; and
assembly of decontamination stations $ 39.15 30.03
LABOO185-001 06/26/2023
Rates Fringes
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND
YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS : $0.25 PER HOUR ADDITIONAL $ 28.94 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: NEW CONSTRUCTION (EL DORADO,
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER
HOUR ADDITIONAL $ 35.25 27.30
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker
(salvaging of other building materials) (EL
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS:
$0.25 PER HOUR ADDITIONAL $ 35.35 27.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker
(removing and salvaging of sash, windows and
materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL $ 35.50 27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (EL
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS :
$0.25 PER HOUR ADDITIONAL. $ 35.25 27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (EL DORADO,
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER
HOUR ADDITIONAL $ 35.37 27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS
https://sam.gov/wage-determination/CA20260019/5 34/75
5/29/26,3:33 PM SAM.gov
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL $ 35.96 27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND
YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS : $0.25 PER HOUR ADDITIONAL $ 36.46 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4:
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE
JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL
CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING
AND MOVING TO THE NEXT POINT OF ERECTION"". (EL
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL. $ 28.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3:
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO
AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL $ 35.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2:
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (EL DORADO, PLACER, SACRAMENTO, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL $ 35.35 27.30
https://sam.gov/wage-determination/CA20260019/5 35/75
5/29/26,3:33 PM SAM.gov
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E:
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. (EL DORADO, PLACER,
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL $ 36.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C:
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING (EL DORADO, PLACER, SACRAMENTO, SUTTER,
YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.
$ 35.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A:
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL $ 35.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1:
Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker,
bander, pipewrapper, conduit layer, plastic
pipelayer; Certified hazardous waste worker
including Leade Abatement; Compactors of all types;
Concrete and magnesite mixer, 1/2 yd. and under;
Concrete pan work; Concrete sander; Concrete saw;
Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker;
Form raiser, slip forms; Green cutter; Headerboard,
Hubsetter, aligner, by any method; High pressure
blow pipe (1-1/2"""" or over, 100 lbs.
pressure/over); Hydro seeder and similar type;
Jackhammer operator; Jacking of pipe over 12
inches; Jackson and similar type compactor; Kettle
tender, pot and worker applying asphalt, lay-kold,
creosote, lime, caustic and similar type materials
(applying means applying, dipping or handling of
such materials); Lagging, sheeting, whaling,
bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry);
https://sam.gov/wage-determination/CA20260019/5 36/75
5/29/26,3:33 PM SAM.gov
No joint pipe and stripping of same, including
repair of voids; Pavement breaker and spader,
including tool grinder; Perma curb; Pipelayer
(including grade checking in connection with
pipelaying); Precast-manhole setter; Pressure pipe
tester; Post hole digger, air, gas and electric;
Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud
gun; Riprap stonepaver and rock-slinger, including
placing of sacked concrete and/or sand (wet or dry)
and gabions and similar type; Rotary scarifier or
multiple head concrete chipping scarifier; Roto and
Ditch Witch; Rototiller; Sandblaster, pot, gun,
nozzle operators; Signalling and rigging; Tank
cleaner; Tree climber; Turbo blaster; Vibrascreed,
bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal);
Asbestos and mold removal worker (EL DORADO,
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL $ 35.50 27.30
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW;
LASER BEAM IN CONNECTION WITH LABORERS' WORK;
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND
YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL $ 36.20 27.30
LAB00185-003 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (EL DORADO, PLACER,
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) $ 36.29 25.55
LAB00261-001 06/26/2023
Rates Fringes
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: NEW CONSTRUCTION (MARIN, SAN
FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR
ADDITIONAL $ 36.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER
HOUR ADDITIONAL $ 29.94 27.30
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS) (MARIN,
SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS ): $0.25 PER HOUR
ADDITIONAL $ 36.35 27.30
https://sam.gov/wage-determination/CA20260019/5 37/75
5/29/26,3:33 PM SAM.gov
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS ADN
MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS:
$0.25 PER HOUR ADDITIONAL. $ 36.50 27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (MARIN,
SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL $ 36.25 27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (MARIN, SAN
FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL $ 36.37 27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN (MARIN, SAN FRANCISCO, AND SAN
MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL $ 36.96 27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A) : $0.25 PER HOUR
ADDITIONAL $ 37.46 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4:
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON
ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE
MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD.
THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE
USED IN THE PERFORMANCE OF ""FORM STRIPPING,
CLEANING AND OILING AND MOVING TO THE NEXT
POINT OF ERECTION"". (MARIN, SAN FRANCISCO, AND SAN
MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS (UNDERGROUND
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
https://sam.gov/wage-determination/CA20260019/5 38/75
5/29/26,3:33 PM SAM.gov
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 29.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3:
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY) (MARIN, SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00
PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER""
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES,
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE
RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2:
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (MARIN, SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00
PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER""
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES,
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE
RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
https://sam.gov/wage-determination/CA20260019/5 39/75
5/29/26,3:33 PM SAM.gov
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E:
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. (MARIN, SAN FRANCISCO, AND
SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS (UNDERGROUND
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 37.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C:
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING (MARIN, SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00
PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER""
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES,
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE
RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A:
https://sam.gov/wage-determination/CA20260019/5 40/75
5/29/26,3:33 PM SAM.gov
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (MARIN, SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00
PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER""
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES,
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE
RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1:
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPDXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
https://sam.gov/wage-determination/CA20260019/5 41/75
5/29/26,3:33 PM SAM.gov
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER (MARIN, SAN
FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.50 27.30
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW;
LASER BEAM IN CONNECTION WITH LABORERS' WORK;
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A) : $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. $ 37.20 27.30
LABOO261-008 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK MARIN COUNTY $ 37.54 25.55
https://sam.gov/wage-determination/CA20260019/5 42/75
5/29/26,3:33 PM SAM.gov
LABOO261-011 07/01/2023
Rates Fringes
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO
COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS
SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES,
TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00
PER DAY ADDITIONAL. WORK IN LIVE SEWAGE: $2.50 PER
DAY ADDITIONAL $ 37.05 27.45
LABOO261-012 07/01/2023
Rates Fringes
PLASTERER TENDER (EL DORADO, MARIN, NAPA, PLACER,
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL $ 39.77 28.54
LABOO261-013 07/01/2023
Rates Fringes
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL $ 41.93 30.32
LABOO27O-001 06/26/2023
Rates Fringes
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA
""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 35.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY
PERIOD (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA
CRUZ COUNTIES) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional $ 28.94 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA
""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY
PERIOD (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional $ 29.94 27.30
LABORERS:, WRECKING - AREA B: GROUP 2 :
Semi-skilled wrecker (salvaging of other building
materials)(AREA ""B"" - MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional $ 35.35 27.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled
wrecker (removing and salvaging of sash, windows
and materials) (AREA ""B"" - MONTEREY, SAN BENITO,
AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working
off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 35.50 27.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled
wrecker (salvaging of other building materials)
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers
https://sam.gov/wage-determination/CA20260019/5 43/75
5/29/26,3:33 PM SAM.gov
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.35 27.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled
wrecker (removing and salvaging of sash, windows
and materials) (AREA ""A"" - SANTA CLARA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 36.50 27.30
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 35.25 27.30
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 35.37 27.30
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN,
GUNMAN, POTMAN, GORUNDMAN (AREA ""B"" - MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 35.96 27.30
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL
NOZZLEMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional $ 36.46 27.30
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.25 27.30
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.37 27.30
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN,
GUNMAN, POTMAN, GROUNDMAN (AREA ""A"" - SANTA CLARA
COUNTY) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 36.96 27.30
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL
NOZZLEMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional $ 37.46 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 4: All clean-up work of debris, grounds and
building including but not limited to: street
cleaner; cleaning and washing windows; brick
cleaner (jobsite only); material cleaner (jobsite
only). The classification ""material cleaner"" is to
be utilized under the following conditions: A: at
demolition site for the salvage of the material.
B: at the conclusion of a job where the material is
to be salvaged and stocked to be reused on another
job. C: for the cleaning of salvage material at the
jobsite or temporary jobsite yard. The material
cleaner classification should not be used in the
performance of """"form stripping, cleaning and
oiling and moving to the next point of
erection"". (AREA ""B"" - MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. $ 28.94 27.30
https://sam.gov/wage-determination/CA20260019/5 44/75
5/29/26,3:33 PM SAM.gov
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 3: Construction laborers, including bridge
and general laborer; Dump, load spotter; Flag
person; Fire watcher; Fence erector; Guardrail
erector; Gardener, horticultural and landscape
laborer; Jetting; Limber, brush loader and piler;
Pavement marker (button setter); Maintenance,
repair track and road beds; Streetcar and railroad
construction track laborer; Temporary air and water
lines, Victaulic or similar; Tool room attendant
(jobsite only) (AREA ""B"" - MONTEREY, SAN BENITO,
AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working
off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. $ 35.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 2: Asphalt shoveler; Cement dumper and
handling dry cement or gypsum; Choke-setter and
rigger (clearing work); Concrete bucket dumper and
chute; Concrete chipping and grinding; Concrete
laborer (wet or dry); Driller tender, chuck tender,
nipper; Guinea chaser (stake), grout crew; High
pressure nozzle, adductor; Hydraulic monitor (over
100 lbs. pressure); Loading and unloading, carrying
and hauling of all rods and materials for use in
reinforcing concrete construction; Pittsburgh
chipper and similar type brush shredders; Sloper;
Single foot, hand-held, pneumatic tamper; All
pneumatic, air, gas and electric tools not listed
in Groups 1 through 1-f; Jacking of pipe - under 12
inches (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA
CRUZ COUNTIES) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. $ 35.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-F: Wire winding machine in connection with
guniting or shot crete (AREA ""B"" - MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. $ 36.08 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-E: Work on and/or in bell hole footings and
shafts thereof, and work on and in deep footings.
(A deep footing is a hole 15 feet or more in
depth.) In the event the depth of the footing is
unknown at the commencement of excavation, and the
final depth exceeds 15 feet, the deep footing wage
rate would apply to all employees for each and
every day worked on or in the excavation of the
footing from the date of inception. (AREA ""B"" -
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. $ 36.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-C: Burning and welding in connection with
laborers' work; Synthetic thermoplastics and
similar type welding (AREA ""B"" - MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. $ 35.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver
model DH143 and similar type drills; Track driller;
Jack leg driller; Wagon driller; Mechanical
drillers, all types regardless of type or method of
https://sam.gov/wage-determination/CA20260019/5 45/75
5/29/26,3:33 PM SAM.gov
power; Mechanical pipe layers, all types regardless
of type or method of power; Blaster and powder; All
work of loading, placing and blasting of all powder
and explosives of whatever type regardless of
method used for such loading and placing; High
scalers (including drilling of same); Tree topper;
Bit grinder (AREA ""B"" - MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. $ 35.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1: Asphalt spreader boxes (all types); Barko,
Wacker and similar type tampers; Buggymobile;
Caulker, bander, pipewrapper, conduit layer,
plastic pipelayer; Certified hazardous waste worker
including Leade Abatement; Compactors of all types;
Concrete and magnesite mixer, 1/2 yd. and under;
Concrete pan work; Concrete sander; Concrete saw;
Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker;
Form raiser, slip forms; Green cutter; Headerboard,
Hubsetter, aligner, by any method; High pressure
blow pipe (1-1/2"""" or over, 100 lbs.
pressure/over); Hydro seeder and similar type;
Jackhammer operator; Jacking of pipe over 12
inches; Jackson and similar type compactor; Kettle
tender, pot and worker applying asphalt, lay-kold,
creosote, lime, caustic and similar type materials
(applying means applying, dipping or handling of
such materials); Lagging, sheeting, whaling,
bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry);
No joint pipe and stripping of same, including
repair of voids; Pavement breaker and spader,
including tool grinder; Perma curb; Pipelayer
(including grade checking in connection with
pipelaying); Precast-manhole setter; Pressure pipe
tester; Post hole digger, air, gas and electric;
Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud
gun; Riprap stonepaver and rock-slinger, including
placing of sacked concrete and/or sand (wet or dry)
and gabions and similar type; Rotary scarifier or
multiple head concrete chipping scarifier; Roto and
Ditch Witch; Rototiller; Sandblaster, pot, gun,
nozzle operators; Signalling and rigging; Tank
cleaner; Tree climber; Turbo blaster; Vibrascreed,
bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal);
Asbestos and mold removal worker (AREA ""B"" -
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. $ 35.50 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
CONSTRUCTION SPECIALIST: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers'
work; Cast-in- place manhole form setter; Pressure
pipelayer; Davis trencher - 300 or similar type
(and all small trenchers); Blaster; Diamond
driller; Multiple unit drill; Hydraulic drill
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. $ 36.20 27.30
https://sam.gov/wage-determination/CA20260019/5 46/75
5/29/26,3:33 PM SAM.gov
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 4: All clean-up work of debris, grounds and
building including but not limited to: street
cleaner; cleaning and washing windows; brick
cleaner (jobsite only); material cleaner (jobsite
only). The classification ""material cleaner"" is to
be utilized under the following conditions: A: at
demolition site for the salvage of the material.
B: at the conclusion of a job where the material is
to be salvaged and stocked to be reused on another
job. C: for the cleaning of salvage material at the
jobsite or temporary jobsite yard. The material
cleaner classification should not be used in the
performance of """"form stripping, cleaning and
oiling and moving to the next point of
erection"". (AREA ""A"" - SANTA CLARA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. Sewer cleaners shall receive $4.00
per day above Group 1 wage rates. ""Sewer cleaner""
means any worker who handles or comes in contact
with raw sewage in small diameter sewers. Those
who work inside recently active, large diameter
sewers, and all recently active sewer manholes,
shall receive $5.00 per day above Group 1 wage
rates. Maintenance and repair track and road beds
(underground structures). All employees performing
work covered herein shall receive $ .25 per hour
above their regular rate for all work performed on
underground structures not specifically covered
herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It
shall apply to cut and cover work of subway
construction after the temporary cover has been
placed $ 29.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 3: Construction laborers, including bridge
and general laborer; Dump, load spotter; Flag
person; Fire watcher; Fence erector; Guardrail
erector; Gardener, horticultural and landscape
laborer; Jetting; Limber, brush loader and piler;
Pavement marker (button setter); Maintenance,
repair track and road beds; Streetcar and railroad
construction track laborer; Temporary air and water
lines, Victaulic or similar; Tool room attendant
(jobsite only) (AREA ""A"" - SANTA CLARA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. Sewer cleaners shall receive $4.00
per day above Group 1 wage rates. ""Sewer cleaner""
means any worker who handles or comes in contact
with raw sewage in small diameter sewers. Those
who work inside recently active, large diameter
sewers, and all recently active sewer manholes,
shall receive $5.00 per day above Group 1 wage
rates. Maintenance and repair track and road beds
(underground structures). All employees performing
work covered herein shall receive $ .25 per hour
above their regular rate for all work performed on
underground structures not specifically covered
herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It
shall apply to cut and cover work of subway
construction after the temporary cover has been
placed $ 36.25 27.30
https://sam.gov/wage-determination/CA20260019/5 47/75
5/29/26,3:33 PM SAM.gov
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 2: Asphalt shoveler; Cement dumper and
handling dry cement or gypsum; Choke-setter and
rigger (clearing work); Concrete bucket dumper and
chute; Concrete chipping and grinding; Concrete
laborer (wet or dry); Driller tender, chuck tender,
nipper; Guinea chaser (stake), grout crew; High
pressure nozzle, adductor; Hydraulic monitor (over
100 lbs. pressure); Loading and unloading, carrying
and hauling of all rods and materials for use in
reinforcing concrete construction; Pittsburgh
chipper and similar type brush shredders; Sloper;
Single foot, hand-held, pneumatic tamper; All
pneumatic, air, gas and electric tools not listed
in Groups 1 through 1-f; Jacking of pipe - under 12
inches (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional. Sewer cleaners shall receive $4.00 per
day above Group 1 wage rates. ""Sewer cleaner""
means any worker who handles or comes in contact
with raw sewage in small diameter sewers. Those
who work inside recently active, large diameter
sewers, and all recently active sewer manholes,
shall receive $5.00 per day above Group 1 wage
rates. Maintenance and repair track and road beds
(underground structures). All employees performing
work covered herein shall receive $ .25 per hour
above their regular rate for all work performed on
underground structures not specifically covered
herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It
shall apply to cut and cover work of subway
construction after the temporary cover has been
placed $ 36.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-F: Wire winding machine in connection with
guniting or shot crete (AREA ""A"" - SANTA CLARA
COUNTY AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA
CRUZ COUNTIES) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. Sewer cleaners
shall receive $4.00 per day above Group 1 wage
rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 37.08 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-E: Work on and/or in bell hole footings and
shafts thereof, and work on and in deep footings.
(A deep footing is a hole 15 feet or more in
depth.) In the event the depth of the footing is
unknown at the commencement of excavation, and the
final depth exceeds 15 feet, the deep footing wage
https://sam.gov/wage-determination/CA20260019/5 48/75
5/29/26,3:33 PM SAM.gov
rate would apply to all employees for each and
every day worked on or in the excavation of the
footing from the date of inception. (AREA ""A"" -
SANTA CLARA COUNTY) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. Sewer cleaners
shall receive $4.00 per day above Group 1 wage
rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 37.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-C: Burning and welding in connection with
laborers' work; Synthetic thermoplastics and
similar type welding (AREA ""A"" - SANTA CLARA
COUNTY) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. Sewer cleaners shall
receive $4.00 per day above Group 1 wage rates.
""Sewer cleaner"" means any worker who handles or
comes in contact with raw sewage in small diameter
sewers. Those who work inside recently active,
large diameter sewers, and all recently active
sewer manholes, shall receive $5.00 per day above
Group 1 wage rates. Maintenance and repair track
and road beds (underground structures). All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 36.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver
model DH143 and similar type drills; Track driller;
Jack leg driller; Wagon driller; Mechanical
drillers, all types regardless of type or method of
power; Mechanical pipe layers, all types regardless
of type or method of power; Blaster and powder; All
work of loading, placing and blasting of all powder
and explosives of whatever type regardless of
method used for such loading and placing; High
scalers (including drilling of same); Tree topper;
Bit grinder (AREA ""A"" - SANTA CLARA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. Sewer cleaners shall receive $4.00
per day above Group 1 wage rates. ""Sewer cleaner""
means any worker who handles or comes in contact
with raw sewage in small diameter sewers. Those
who work inside recently active, large diameter
sewers, and all recently active sewer manholes,
https://sam.gov/wage-determination/CA20260019/5 49/75
5/29/26,3:33 PM SAM.gov
shall receive $5.00 per day above Group 1 wage
rates. Maintenance and repair track and road beds
(underground structures). All employees performing
work covered herein shall receive $ .25 per hour
above their regular rate for all work performed on
underground structures not specifically covered
herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It
shall apply to cut and cover work of subway
construction after the temporary cover has been
placed $ 36.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1: Asphalt spreader boxes (all types); Barko,
Wacker and similar type tampers; Buggymobile;
Caulker, bander, pipewrapper, conduit layer,
plastic pipelayer; Certified hazardous waste worker
including Leade Abatement; Compactors of all types;
Concrete and magnesite mixer, 1/2 yd. and under;
Concrete pan work; Concrete sander; Concrete saw;
Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker;
Form raiser, slip forms; Green cutter; Headerboard,
Hubsetter, aligner, by any method; High pressure
blow pipe (1-1/2"""" or over, 100 lbs.
pressure/over); Hydro seeder and similar type;
Jackhammer operator; Jacking of pipe over 12
inches; Jackson and similar type compactor; Kettle
tender, pot and worker applying asphalt, lay-kold,
creosote, lime, caustic and similar type materials
(applying means applying, dipping or handling of
such materials); Lagging, sheeting, whaling,
bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry);
No joint pipe and stripping of same, including
repair of voids; Pavement breaker and spader,
including tool grinder; Perma curb; Pipelayer
(including grade checking in connection with
pipelaying); Precast-manhole setter; Pressure pipe
tester; Post hole digger, air, gas and electric;
Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud
gun; Riprap stonepaver and rock-slinger, including
placing of sacked concrete and/or sand (wet or dry)
and gabions and similar type; Rotary scarifier or
multiple head concrete chipping scarifier; Roto and
Ditch Witch; Rototiller; Sandblaster, pot, gun,
nozzle operators; Signalling and rigging; Tank
cleaner; Tree climber; Turbo blaster; Vibrascreed,
bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal);
Asbestos and mold removal worker (AREA ""A"" - SANTA
CLARA COUNTY) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. Sewer cleaners
shall receive $4.00 per day above Group 1 wage
rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
https://sam.gov/wage-determination/CA20260019/5 50/75
5/29/26,3:33 PM SAM.gov
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 36.50 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
CONSTRUCTION SPECIALIST: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers'
work; Cast-in- place manhole form setter; Pressure
pipelayer; Davis trencher - 300 or similar type
(and all small trenchers); Blaster; Diamond
driller; Multiple unit drill; Hydraulic drill (AREA
""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. Sewer
cleaners shall receive $4.00 per day above Group 1
wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 37.20 27.30
LAB00270-002 07/01/2023
Rates Fringes
MASON TENDER, BRICK (SANTA CRUZ COUNTY) $ 35.29 26.85
MASON TENDER, BRICK (SANTA CLARA COUNTY) $ 35.29 26.85
LAB00270-006 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN
BENITO COUNTIES) $ 36.29 25.55
LAB00270-008 07/01/2023
Rates Fringes
PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK
ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR
ADDITIONAL $ 40.68 29.68
LAB00270-009 07/01/2023
Rates Fringes
PLASTERER TENDER (MONTEREY AND SAN BENITO
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL $ 40.68 29.68
LAB00304-001 06/26/2023
Rates Fringes
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: NEW CONSTRUCTION (ALAMEDA
COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
https://sam.gov/wage-determination/CA20260019/5 51/75
5/29/26,3:33 PM SAM.gov
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL $ 36.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD
(ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL $ 29.94 27.30
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled
wrecker (salvaging of other building materials)
(ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL $ 36.35 27.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker
(removing and salvaging of sash, windows and
materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL $ 36.50 27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA
COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25
PER HOUR ADDITIONAL $ 36.25 27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA
COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25
PER HOUR ADDITIONAL $ 36.37 27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN (ALAMEDA COUNTY) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR
ADDITIONAL $ 36.96 27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN
(ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS: $0.25 PER HOUR ADDITIONAL $ 37.46 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL
CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION —MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON
ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE
MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD.
THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE
USED IN THE PERFORMANCE OF ""FORM STRIPPING,
CLEANING AND OILING AND MOVING TO THE NEXT
POINT OF ERECTION"". (ALAMEDA COUNTY) FOOTNOTE:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
https://sam.gov/wage-determination/CA20260019/5 52/75
5/29/26,3:33 PM SAM.gov
INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS (UNDERGROUND
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 29.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY) (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
https://sam.gov/wage-determination/CA20260019/5 53/75
5/29/26,3:33 PM SAM.gov
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 37.08 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. (ALAMEDA COUNTY)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A) : $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 37.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
https://sam.gov/wage-determination/CA20260019/5 54)75
5/29/26,3:33 PM SAM.gov
GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (ALAMEDA COUNTY) FOOTNOTE: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. $ 36.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
https://sam.gov/wage-determination/CA20260019/5 55/75
5/29/26,3:33 PM SAM.gov
LAGGING HAMMER; MAGNESITE, EPDXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER (ALAMEDA COUNTY)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A) : $0.25 PER HOUR
ADDITIONAL. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 36.50 27.30
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW;
LASER BEAM IN CONNECTION WITH LABORERS' WORK;
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) :
$0.25 PER HOUR ADDITIONAL. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
https://sam.gov/wage-determination/CA20260019/5 56/75
5/29/26,3:33 PM SAM.gov
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 37.20 27.30
LAB00304-006 07/01/2023
Rates Fringes
BRICK TENDER (ALAMEDA COUNTY) FOOTNOTES: WORK ON
JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED:
$2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25
PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY
ADDITIONAL $ 37.05 27.45
LAB00304-007 07/01/2023
Rates Fringes
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL $ 41.93 30.32
LAB00324-001 06/26/2023
Rates Fringes
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 35.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY
PERIOD (AREA ""B"" - NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTE: Laborers working off or with
or from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 28.94 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA
""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.25 27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL &
LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY
PERIOD (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional $ 29.94 27.30
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled
wrecker (salvaging of other building materials)
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 35.35 27.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled
wrecker (removing and salvaging of sash, windows
and materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTE: Laborers working off or with
or from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 35.50 27.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled
wrecker (salvaging of other building materials)
(AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional $ 36.35 27.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled
wrecker (removing and salvaging of sash, windows
https://sam.gov/wage-determination/CA20260019/5 57)75
5/29/26,3:33 PM SAM.gov
and materials) (AREA ""A"" - CONTRA COSTA COUNTY )
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 36.50 27.30
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 35.25 27.30
LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 35.37 27.30
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman,
Gunman, Potman, Groundman (AREA ""B"" - NAPA, SOLANO,
AND SONOMA COUNTIES) FOOTNOTE: Laborers working
off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 35.96 27.30
LABORERS:, GUNITE - AREA B: GROUP 1: Structural
nozzleman (AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 36.46 27.30
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer
(AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.25 27.30
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman
(AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional $ 36.37 27.30
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman,
Gunman, Potman, Groundman (AREA ""A"" - CONTRA COSTA
COUNTY) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional $ 36.96 27.30
LABORERS:, GUNITE - AREA A: GROUP 1: Structural
nozzleman (AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional $ 37.46 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 4: All clean-up work of debris, grounds and
building including but not limited to: street
cleaner; cleaning and washing windows; brick
cleaner (jobsite only); material cleaner (jobsite
only). The classification ""material cleaner"" is to
be utilized under the following conditions: A: at
demolition site for the salvage of the material.
B: at the conclusion of a job where the material is
to be salvaged and stocked to be reused on another
job. C: for the cleaning of salvage material at the
jobsite or temporary jobsite yard. The material
cleaner classification should not be used in the
performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"". (AREA
""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional. $ 28.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 3: Construction laborers, including bridge
and general laborer; Dump, load spotter; Flag
person; Fire watcher; Fence erector; Guardrail
https://sam.gov/wage-determination/CA20260019/5 58/75
5/29/26,3:33 PM SAM.gov
erector; Gardener, horticultural and landscape
laborer; Jetting; Limber, brush loader and piler;
Pavement marker (button setter); Maintenance,
repair track and road beds; Streetcar and railroad
construction track laborer; Temporary air and water
lines, Victaulic or similar; Tool room attendant
(jobsite only) (AREA ""B"" - NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. $ 35.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 2: Asphalt shoveler; Cement dumper and
handling dry cement or gypsum; Choke-setter and
rigger (clearing work); Concrete bucket dumper and
chute; Concrete chipping and grinding; Concrete
laborer (wet or dry); Driller tender, chuck tender,
nipper; Guinea chaser (stake), grout crew; High
pressure nozzle, adductor; Hydraulic monitor (over
100 lbs. pressure); Loading and unloading, carrying
and hauling of all rods and materials for use in
reinforcing concrete construction; Pittsburgh
chipper and similar type brush shredders; Sloper;
Single foot, hand-held, pneumatic tamper; All
pneumatic, air, gas and electric tools not listed
in Groups 1 through 1-f; Jacking of pipe - under 12
inches (AREA ""B"" - NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. $ 35.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-F: Wire winding machine in connection with
guniting or shot crete (AREA ""B"" - NAPA, SOLANO,
AND SONOMA COUNTIES) FOOTNOTE: Laborers working off
or with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. $ 36.08 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-E: Work on and/or in bell hole footings and
shafts thereof, and work on and in deep footings.
(A deep footing is a hole 15 feet or more in
depth.) In the event the depth of the footing is
unknown at the commencement of excavation, and the
final depth exceeds 15 feet, the deep footing wage
rate would apply to all employees for each and
every day worked on or in the excavation of the
footing from the date of inception. (AREA ""B"" -
NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional. $ 36.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-C: Burning and welding in connection with
laborers' work; Synthetic thermoplastics and
similar type welding (AREA ""B"" - NAPA, SOLANO, AND
SONOMA COUNTIES) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. $ 35.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver
model DH143 and similar type drills; Track driller;
Jack leg driller; Wagon driller; Mechanical
drillers, all types regardless of type or method of
power; Mechanical pipe layers, all types regardless
of type or method of power; Blaster and powder; All
work of loading, placing and blasting of all powder
and explosives of whatever type regardless of
https://sam.gov/wage-determination/CA20260019/5 59/75
5/29/26,3:33 PM SAM.gov
method used for such loading and placing; High
scalers (including drilling of same); Tree topper;
Bit grinder (AREA ""B"" - NAPA, SOLANO, AND SONOMA
COUNTIES) $ 35.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1: Asphalt spreader boxes (all types); Barko,
Wacker and similar type tampers; Buggymobile;
Caulker, bander, pipewrapper, conduit layer,
plastic pipelayer; Certified hazardous waste worker
including Leade Abatement; Compactors of all types;
Concrete and magnesite mixer, 1/2 yd. and under;
Concrete pan work; Concrete sander; Concrete saw;
Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker;
Form raiser, slip forms; Green cutter; Headerboard,
Hubsetter, aligner, by any method; High pressure
blow pipe (1-1/2"""" or over, 100 lbs.
pressure/over); Hydro seeder and similar type;
Jackhammer operator; Jacking of pipe over 12
inches; Jackson and similar type compactor; Kettle
tender, pot and worker applying asphalt, lay-kold,
creosote, lime, caustic and similar type materials
(applying means applying, dipping or handling of
such materials); Lagging, sheeting, whaling,
bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry);
No joint pipe and stripping of same, including
repair of voids; Pavement breaker and spader,
including tool grinder; Perma curb; Pipelayer
(including grade checking in connection with
pipelaying); Precast-manhole setter; Pressure pipe
tester; Post hole digger, air, gas and electric;
Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud
gun; Riprap stonepaver and rock-slinger, including
placing of sacked concrete and/or sand (wet or dry)
and gabions and similar type; Rotary scarifier or
multiple head concrete chipping scarifier; Roto and
Ditch Witch; Rototiller; Sandblaster, pot, gun,
nozzle operators; Signalling and rigging; Tank
cleaner; Tree climber; Turbo blaster; Vibrascreed,
bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal);
Asbestos and mold removal worker (AREA ""B"" - NAPA,
SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. $ 35.50 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B:
CONSTRUCTION SPECIALIST: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers'
work; Cast-in- place manhole form setter; Pressure
pipelayer; Davis trencher - 300 or similar type
(and all small trenchers); Blaster; Diamond
driller; Multiple unit drill; Hydraulic drill (AREA
""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE:
Laborers working off or with or from bos'n chairs,
swinging scaffolds, belts: $0.25 per hour
additional. $ 36.20 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 4: All clean-up work of debris, grounds and
building including but not limited to: street
cleaner; cleaning and washing windows; brick
cleaner (jobsite only); material cleaner (jobsite
only). The classification ""material cleaner"" is to
be utilized under the following conditions: A: at
https://sam.gov/wage-determination/CA20260019/5 60/75
5/29/26,3:33 PM SAM.gov
demolition site for the salvage of the material.
B: at the conclusion of a job where the material is
to be salvaged and stocked to be reused on another
job. C: for the cleaning of salvage material at the
jobsite or temporary jobsite yard. The material
cleaner classification should not be used in the
performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"". (AREA
""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional.
Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any
worker who handles or comes in contact with raw
sewage in small diameter sewers. Those who work
inside recently active, large diameter sewers, and
all recently active sewer manholes, shall receive
$5.00 per day above Group 1 wage rates. Maintenance
and repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 29.94 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 3: Construction laborers, including bridge
and general laborer; Dump, load spotter; Flag
person; Fire watcher; Fence erector; Guardrail
erector; Gardener, horticultural and landscape
laborer; Jetting; Limber, brush loader and piler;
Pavement marker (button setter); Maintenance,
repair track and road beds; Streetcar and railroad
construction track laborer; Temporary air and water
lines, Victaulic or similar; Tool room attendant
(jobsite only) (AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: Laborers working off or with or from
bos'n chairs, swinging scaffolds, belts: $0.25 per
hour additional. Sewer cleaners shall receive
$4.00 per day above Group 1 wage rates. ""Sewer
cleaner"" means any worker who handles or comes in
contact with raw sewage in small diameter sewers.
Those who work inside recently active, large
diameter sewers, and all recently active sewer
manholes, shall receive $5.00 per day above Group 1
wage rates. Maintenance and repair track and road
beds (underground structures). All employees
performing work covered herein shall receive $ .25
per hour above their regular rate for all work
performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 36.25 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
https://sam.gov/wage-determination/CA20260019/5 61/75
5/29/26,3:33 PM SAM.gov
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING
AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
(AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER
HOUR ADDITIONAL.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. $ 36.35 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-G CONTRA COSTA COUNTY: Pipelayer (including
grade checking on connection with peiplaying);
Caulker; Bander; Pipewrapper; Conduit layer;
Plastic pipe layer; pressure pipe tester; No joint
pipe and stripping of same, including repair of
voids; Precast manhole setters, cast in place
manhole from setters (AREA ""A"" - CONTRA COSTA
COUNTY) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. Sewer cleaners shall
receive $4.00 per day above Group 1 wage rates.
""Sewer cleaner"" means any worker who handles or
comes in contact with raw sewage in small diameter
sewers. Those who work inside recently active,
large diameter sewers, and all recently active
sewer manholes, shall receive $5.00 per day above
Group 1 wage rates. Maintenance and repair track
and road beds (underground structures). All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 36.70 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-F: Wire winding machine in connection with
guniting or shot crete (AREA ""A"" - CONTRA COSTA
COUNTY) FOOTNOTE: Laborers working off or with or
from bos'n chairs, swinging scaffolds, belts:
$0.25 per hour additional. Sewer cleaners shall
receive $4.00 per day above Group 1 wage rates.
""Sewer cleaner"" means any worker who handles or
comes in contact with raw sewage in small diameter
sewers. Those who work inside recently active,
https://sam.gov/wage-determination/CA20260019/5 62/75
5/29/26,3:33 PM SAM.gov
large diameter sewers, and all recently active
sewer manholes, shall receive $5.00 per day above
Group 1 wage rates. Maintenance and repair track
and road beds (underground structures). All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 37.08 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS
UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE
RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND
EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE
FOOTING FROM THE DATE OF
(AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. $ 37.05 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-C: (BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND
SIMILAR TYPE
(AREA ""A"" - CONTRA COSTA COUNTY)
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR
ADDITIONAL.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
https://sam.gov/wage-determination/CA20260019/5 63/75
5/29/26,3:33 PM SAM.gov
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. $ 36.55 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL
DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT
(AREA ""A"" - CONTRA COSTA COUNTY)
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. $ 36.72 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1: Asphalt spreader boxes (all types); Barko,
Wacker and similar type tampers; Buggymobile;
Caulker, bander, pipewrapper, conduit layer,
plastic pipelayer; Certified hazardous waste worker
including Leade Abatement; Compactors of all types;
Concrete and magnesite mixer, 1/2 yd. and under;
Concrete pan work; Concrete sander; Concrete saw;
Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker;
Form raiser, slip forms; Green cutter; Headerboard,
Hubsetter, aligner, by any method; High pressure
blow pipe (1-1/2"""" or over, 100 lbs.
pressure/over); Hydro seeder and similar type;
Jackhammer operator; Jacking of pipe over 12
inches; Jackson and similar type compactor; Kettle
tender, pot and worker applying asphalt, lay-kold,
creosote, lime, caustic and similar type materials
(applying means applying, dipping or handling of
such materials); Lagging, sheeting, whaling,
bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry);
No joint pipe and stripping of same, including
repair of voids; Pavement breaker and spader,
including tool grinder; Perma curb; Pipelayer
(including grade checking in connection with
pipelaying); Precast-manhole setter; Pressure pipe
tester; Post hole digger, air, gas and electric;
https://sam.gov/wage-determination/CA20260019/5 64/75
5/29/26,3:33 PM SAM.gov
Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud
gun; Riprap stonepaver and rock-slinger, including
placing of sacked concrete and/or sand (wet or dry)
and gabions and similar type; Rotary scarifier or
multiple head concrete chipping scarifier; Roto and
Ditch Witch; Rototiller; Sandblaster, pot, gun,
nozzle operators; Signalling and rigging; Tank
cleaner; Tree climber; Turbo blaster; Vibrascreed,
bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal);
Asbestos and mold removal worker (AREA ""A"" - CONTRA
COSTA COUNTY) FOOTNOTE: Laborers working off or
with or from bos'n chairs, swinging scaffolds,
belts: $0.25 per hour additional. Sewer cleaners
shall receive $4.00 per day above Group 1 wage
rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 36.50 27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A:
CONSTRUCTION SPECIALIST Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers'
work; Cast-in- place manhole form setter; Pressure
pipelayer; Davis trencher - 300 or similar type
(and all small trenchers); Blaster; Diamond
driller; Multiple unit drill; Hydraulic drill (AREA
""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers
working off or with or from bos'n chairs, swinging
scaffolds, belts: $0.25 per hour additional. Sewer
cleaners shall receive $4.00 per day above Group 1
wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes, shall receive $5.00
per day above Group 1 wage rates. Maintenance and
repair track and road beds (underground
structures). All employees performing work covered
herein shall receive $ .25 per hour above their
regular rate for all work performed on underground
structures not specifically covered herein. This
paragraph shall not be construed to apply to work
below ground level in open cut. It shall apply to
cut and cover work of subway construction after the
temporary cover has been placed $ 37.20 27.30
LAB00324-011 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA
COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER
HOUR ADDITIONAL $ 36.84 26.24
https://sam.gov/wage-determination/CA20260019/5 65/75
5/29/26,3:33 PM SAM.gov
LAB00324-015 07/01/2023
Rates Fringes
BRICK TENDER (CONTRA COSTA COUNTY) FOOTNOTES:
WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS
REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT
GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK:
$2.00 PER DAY ADDITIONAL $ 37.05 27.45
LAB00324-017 07/01/2023
Rates Fringes
PLASTER TENDER (EL DORADO, MARIN, NAPA, PLACER,
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA
COUNTIES) Work on a swing stage scaffold: $1.00 per
hour additional $ 39.77 28.54
PAINOO16-002 01/01/2025
Rates Fringes
PAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST:
$0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25
ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE
GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR.
100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00
ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR
WATER LEVEL $6.00 ADDITIONAL PER HOUR $ 43.45 22.80
PAINOO16-009 01/01/2024
Rates Fringes
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MONTEREY,
SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA,
SANTA CRUZ AND SONOMA COUNTIES) $ 59.00 33.03
PAINOO16-011 01/01/2025
Rates Fringes
DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL
DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO,
BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA
COUNTIES $ 59.63 31.29
DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA,
CONTRA COSTA, NAPA, SAN FRANCISCO, SAN
SANTA CLARA, SOLANO AND SONOMA COUNTIES $ 63.76 32.69
PAINOO16-013 01/01/2025
Rates Fringes
PAINTER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY,
NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA
CRUZ, SOLANO & SONOMA COUNTIES) FOOTNOTES:
SPRAY WORK: $0.50 ADDITIONAL PER HOUR. EXOTIC
MATERIALS: $1.25 ADDITIONAL PER HOUR $ 53.38 28.04
PAINOO16-019 01/01/2025
Rates Fringes
PAINTER (SAN FRANCISCO COUNTY) $ 57.00 28.04
PAINO169-006 01/01/2024
Rates Fringes
https://sam.gov/wage-determination/CA20260019/5 66/75
5/29/26,3:33 PM SAM.gov
GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY,
NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA
CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO
COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80
CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD,
INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY;
GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH
ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY.
80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE
GRIZZLY ISLAND MANAGEMENT AREA) $ 56.22 34.00
PAINO567-002 07/01/2025
Rates Fringes
PAINTER: SPRAY PAINTER (EL DORADO AND PLACER
COUNTIES) PREMIUMS: SPRAY & PAPERHANGER =
$O.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST =
$O.5O/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK =
$1.00/HR SWING STAGE = $2.00/HR *A SPECIAL
COATING IS A COATING THAT REQUIRES THE MIXING OF 2
OR MORE PRODUCTS $ 41.43 16.16
PAINTER: PAPER HANGER (EL DORADO AND PLACER
COUNTIES) PREMIUMS: SPRAY & PAPERHANGER =
$O.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST =
$O.5O/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK =
$1.00/HR SWING STAGE = $2.00/HR *A SPECIAL
COATING IS A COATING THAT REQUIRES THE MIXING OF 2
OR MORE PRODUCTS $ 42.19 16.16
PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER
COUNTIES) PREMIUMS: SPRAY & PAPERHANGER =
$O.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST =
$O.5O/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK =
$1.00/HR SWING STAGE = $2.00/HR *A SPECIAL
COATING IS A COATING THAT REQUIRES THE MIXING OF 2
OR MORE PRODUCTS $ 39.43 16.16
PAINO567-008 07/01/2022
Rates Fringes
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES) $ 34.27 16.47
PAINO567-011 07/01/2024
Rates Fringes
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER
COUNTIES) STEEPLEJACK-DRYWALL FINISHER OVER 40
FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER
HOUR $ 42.79 16.12
PAINO767-002 01/01/2024
Rates Fringes
GLAZIER (EL DORADO, PLACER, SACRAMENTO, SOLANO,
SUTTER, YOLO AND YUBA COUNTIES) PAID HOLIDAYS:
NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY,
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY AND
CHRISTMAS DAY. FOOTNOTE: EMPLOYEE REQUIRED TO
WEAR A BODY HARNESS SHALL RECEIVE $1.50 ABOVE THE
BASIC HOURLY RATE AT ANY ELEVATION $ 43.25 35.62
PAIN1176-001 07/01/2022
Rates Fringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
https://sam.gov/wage-determination/CA20260019/5 67/75
5/29/26,3:33 PM SAM.gov
IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT
SEALING $ 35.11 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND
APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING;
HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND
MARKINGS $ 40.83 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND
INSTALLER $ 34.71 17.62
PAIN1237-002 01/01/2024
Rates Fringes
SOFT FLOOR LAYER (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) $ 48.54 26.59
PLAS0066-001 07/01/2019
Rates Fringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND
SAN MATEO COUNTIES) $ 42.41 30.73
PLAS0300-002 07/01/2018
Rates Fringes
PLASTERER (AREA 355: MARIN COUNTY) $ 36.73 31.68
PLASTERER (AREA 337: MONTEREY COUNTY) $ 32.88 31.68
PLASTERER (AREA 295: EL DORADO, NAPA, PLACER,
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA
COUNTIES) $ 32.70 31.68
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA &
SANTA CRUZ COUNTIES) $ 32.88 31.68
PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER $ 32.15 23.27
PLUM0038-003 07/01/2025
Rates Fringes
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2)
NEW CONSTRUCTION IN SAN FRANCISCO COUNTY (MARIN,
SAN FRANCISCO & SONOMA COUNTIES) $ 91.00 49.49
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1)
Wood Frame Construction in San Francisco, and all
work in Marin & Sonoma Counties (MARIN, SAN
FRANCISCO & SONOMA COUNTIES) $ 82.00 48.18
PLUM0038-007 07/01/2025
Rates Fringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY
FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES) $ 77.35 36.53
PLUM0062-001 01/01/2026
Rates Fringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ
COUNTIES) $ 57.75 43.60
PLUM0159-002 07/01/2024
Rates Fringes
https://sam.gov/wage-determination/CA20260019/5 68/75
5/29/26,3:33 PM SAM.gov
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA
COUNTY) $ 43.72 20.29
PLUM0228-002 01/01/2026
Rates Fringes
PLUMBER (SUTTER & YUBA COUNTIES) $ 52.75 41.39
PLUM0342-002 07/01/2025
Rates Fringes
PLUMBER & STEAMFITTER (ALAMEDA COUNTY) $ 80.50 50.45
PLUM0343-002 01/01/2026
Rates Fringes
PLUMBERS AND PIPEFITTERS (NAPA AND SOLANO
COUNTIES) FOOTNOTES: WORK FROM TRUSSES,
TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM
THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL. WORK
FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR
SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL $ 37.35 21.15
PLUM0350-002 08/01/2023
Rates Fringes
PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER
COUNTIES (LAKE TAHOE BASIN ONLY)) $ 52.14 18.71
PLUM0355-002 07/01/2025
Rates Fringes
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER
(ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA,
PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA
CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA
COUNTIES) $ 36.01 18.50
PLUM0393-002 09/01/2013
Rates Fringes
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA
COUNTIES) $ 30.90 7.90
PLUM0447-003 07/01/2025
Rates Fringes
PLUMBERS AND PIPEFITTERS (EL DORADO,PLACER,
SACRAMENTO AND YOLO COUNTIES) $ 55.58 24.02
PLUM0467-001 07/01/2025
Rates Fringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY) $ 87.75 41.44
ROOF0040-001 08/01/2024
Rates Fringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES) $ 55.30 22.97
ROOF0081-003 08/01/2024
Rates Fringes
ROOFER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO,
AND SONOMA COUNTIES) $ 54.94 23.34
https://sam.gov/wage-determination/CA20260019/5 69/75
5/29/26,3:33 PM SAM.gov
R00F0081-005 08/01/2023
Rates Fringes
ROOFER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO
AND YUBA COUNTIES) $ 46.73 21.36
ROOF0095-001 08/01/2023
Rates Fringes
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) $ 55.17 21.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA
CLARA, AND SANTA CRUZ COUNTIES) $ 53.17 21.51
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND
MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA,
AND SANTA CRUZ COUNTIES) $ 57.17 21.51
SFCA0483-002 01/01/2026
Rates Fringes
SPRINKLER FITTER (ALAMEDA, CONTRA COSTA, MARIN,
NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO
AND SONOMA COUNTIES:) $ 49.82 18.05
SFCA0669-006 01/01/2026
Rates Fringes
SPRINKLER FITTER (MONTEREY, SAN BENITO AND SANTA
CRUZ COUNTIES) $ 49.69 29.72
SFCA0669-012 01/01/2026
Rates Fringes
SPRINKLER FITTER (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) $ 52.06 29.86
SHEE0104-002 07/01/2025
Rates Fringes
SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY &
SAN BENITO $ 60.64 39.04
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ $ 55.16 34.18
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA,
CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN
MATEO, SANTA CLARA, SOLANO & SONOMA $ 67.03 50.79
SHEE0104-017 07/01/2020
Rates Fringes
SHEET METAL WORKER (EL DORADO, PLACER, SACRAMENTO,
SUTTER, YOLO AND YUBA COUNTIES) $ 30.29 16.41
TEAM0094-001 07/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND
OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT
OVER 7 AXLES FOOTNOTES: ARTICULATED DUMP
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX);
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE
RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL
https://sam.gov/wage-determination/CA20260019/5 70/75
5/29/26,3:33 PM SAM.gov
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE
APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. $ 44.56 34.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS.
AND UNDER 65 YDS.; WATER PULLS - DW 1O'S, 20'S,
21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING
AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS
(WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK
HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES;
DW1O'S, 2O'S, 21'S AND OTHER SIMILAR CAT TYPE,
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID
AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR
GREASE TANK TRAILERS OR OTHER MISCELLANEOUS
TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND
TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX);
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE
RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE
APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. $ 44.21 34.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND
INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.;
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS,
7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL
TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY
TRANSPORT TILLER PERSON; SELF- PROPELLED STREET
SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK
- HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR
RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING
TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON
AND ROAD OILER; DRY DISTRIBUTION TRUCK (A
BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL
RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION
OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE
DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER;
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR
THE EQUIPMENT UTILIZED. $ 43.86 34.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND
UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.;
WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS,
UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK;
RUBBER-TIRED MUCK CAR (NOT SELF-LOADED);
RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME
DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD
OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER
AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED
TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK;
BULK CEMENT SPREADER (WITH OR WITHOUT AUGER);
DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY
PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR
TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.
HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER;
https://sam.gov/wage-determination/CA20260019/5 71/75
5/29/26,3:33 PM SAM.gov
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE);
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. $ 43.56 34.28
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.;
SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK
(WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK
SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK
TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY);
CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS;
FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON;
SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL
DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK;
TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK
TENDER (INCLUDING LOADING AND UNLOADING); TEAM
DRIVER; TOOL ROOM ATTENDANT (REFINERIES)
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER;
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR
THE EQUIPMENT UTILIZED. $ 43.26 34.28
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
https://sam.gov/wage-determination/CA20260019/5 72/75
5/29/26,3:33 PM SAM.gov
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
ASUA, QUAVGA, •SAA, or ASCA denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUMO198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The *SU, identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2O22-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
https://sam.gov/wage-determination/CA20260019/5 73/75
5/29/26,3:33 PM SAM.gov
for the classifications and rates under that identifier.
*SU, wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The •SA, identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2O23-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the •SA. identifier took
effect under state law in the state from which the rates were
adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
https://sam.gov/wage-determination/CA20260019/5 74/75
5/29/26,3:33 PM SAM.gov
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
https://sam.gov/wage-determination/CA20260019/5 75/75
5/29/26,3:34 PM SAM.gov
"General Decision Number: CA20260007 05/18/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Alpine, Amador, Butte, Colusa, El
Dorado, Glenn, Lassen, Marin, Modoc,
Napa, Nevada, Placer, Plumas,
Sacramento, Shasta, Sierra, Siskiyou,
Solano, Sonoma, Sutter, Tehama, Trinity,
Yolo and Yuba
Building Construction Projects (excluding Amador County only)
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work)
Heavy Construction Projects (excludes water well drilling)
Highway Construction Projects
Modification Number Publication Date
3 01/23/2026
4 05/18/2026
ASBE0016-001 01/01/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 2) $ 64.56 25.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 1) $ 84.76 25.07
ASBE0016-007 05/01/2025
Rates Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2) $ 44.73 12.75
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1) $ 35.31 12.75
BOIL0549-002 01/01/2021
Rates Fringes
BOILERMAKER: (2) REMAINING COUNTIES $ 45.60 38.99
BOILERMAKER: (1) MARIN & SOLANO COUNTIES $ 49.62 41.27
BRCA0003-001 08/01/2024
https://sam.gov/wage-determination/CA20260007/4 1/47
5/29/26,3:34 PM SAM.gov
Rates Fringes
MARBLE FINISHER $ 42.06 19.80
BRCA0003-004 05/01/2024
Rates Fringes
BRICKLAYER (AREA 2) $ 57.02 28.50
BRICKLAYER (AREA 1) $ 52.76 25.01
BRCA0003-008 07/01/2024
Rates Fringes
TERRAZZO WORKER/SETTER $ 60.58 29.79
TERRAZZO FINISHER $ 44.93 20.98
BRCA0003-010 04/01/2024
Rates Fringes
TILE LAYER AREA 4: SONOMA $ 56.79 22.54
TILE LAYER AREA 3: MARIN, NAPA, SOLANO, SISKIYOU $ 59.92 22.62
TILE LAYER AREA 2: ALPINE, AMADOR $ 55.17 22.52
TILE LAYER AREA 1: BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO,
YUBA $ 55.55 21.08
TILE FINISHER AREA 2: ALPINE, AMADOR $ 34.76 19.22
TILE FINISHER AREA 4: SONOMA $ 35.78 19.23
TILE FINISHER AREA 3: MARIN, NAPA, SOLANO,
SISKIYOU $ 37.75 19.28
TILE FINISHER AREA 1: BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO,
YUBA $ 35.00 17.44
BRCA0003-014 08/01/2024
Rates Fringes
MARBLE MASON $ 61.72 30.31
CARP0034-001 07/01/2021
Rates Fringes
DIVER: MANIFOLD OPERATOR (STANDBY) DEPTH PAY
(SURFACE DIVING): 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT $ 59.51 34.69
https://sam.gov/wage-determination/CA20260007/4 2/47
5/29/26,3:34 PM SAM.gov
DIVER: MANIFOLD OPERATOR (MIXED GAS) DEPTH PAY
(SURFACE DIVING) : 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT $ 64.51 34.69
DIVER: DIVER WET DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT
221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT $ 103.62 34.69
DIVER: DIVER TENDER DEPTH PAY (SURFACE DIVING) :
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
https://sam.gov/wage-determination/CA20260007/4 3/47
5/29/26,3:34 PM SAM.gov
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT $ 59.51 34.69
DIVER: DIVER STANDBY DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150
FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT $ 60.51 34.69
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN
DEPTH PAY (SURFACE DIVING): 050 TO 100 FT
$2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT
151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER
$5.00 PER FOOT SATURATION DIVING: THE STANDBY
RATE SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT $ 54.10 34.69
C4RP0034-003 07/01/2021
Rates Fringes
PILEDRIVER $ 54.10 34.69
CARP0035-001 08/01/2020
Rates Fringes
DRYWALL STOCKER/SCRAPPER: (AREA 4) $ 22.97 18.22
DRYWALL STOCKER/SCRAPPER: (AREA 3) $ 23.64 18.22
DRYWALL STOCKER/SCRAPPER: (AREA 1) $ 26.33 18.22
DRYWALL INSTALLERS/LATHERS: : (AREA 4) $ 45.92 31.26
DRYWALL INSTALLERS/LATHERS: : (AREA 3) $ 47.27 31.26
DRYWALL INSTALLERS/LATHERS: : (AREA 1) $ 52.65 31.26
CARP0035-009 07/01/2020
https://sam.gov/wage-determination/CA20260007/4 4/47
5/29/26,3:34 PM SAM.gov
Rates Fringes
CARPENTER: MILLWRIGHT MARIN COUNTY $ 52.75 32.41
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY $ 52.65 30.82
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW
OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR,
SAW FILER MARIN COUNTY $ 52.80 30.82
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN
COUNTY $ 52.65 30.82
CARP0035-010 07/01/2020
Rates Fringes
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA
3 $ 31.38 23.03
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA
2 $ 32.71 23.03
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA
1 $ 36.43 23.03
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3 $ 27.96 23.03
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2 $ 29.08 23.03
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1 $ 32.21 23.03
INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3 $ 25.16 22.53
INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2 $ 26.11 22.53
INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1 $ 28.76 22.53
CARP0046-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER
(WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE:
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST)
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49
AND TERRITORY INSIDE THE CITY LIMITS OF
PLACERVILLE $ 57.01 35.11
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO
(WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES
FOOTNOTE: PLACER COUNTY (WEST) INCLUDES
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY
LIMITS OF PLACERVILLE $ 54.51 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER EL DORADO (WEST), PLACER
(WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE:
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST)
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49
AND TERRITORY INSIDE THE CITY LIMITS OF
PLACERVILLE $ 54.66 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL
DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO
COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY
LIMITS OF PLACERVILLE $ 60.39 33.52
CARP0046-002 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT ALPINE, COLUSA, EL DORADO
(EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND
YUBA COUNTIES $ 55.66 35.11
https://sam.gov/wage-determination/CA20260007/4 5/47
5/29/26,3:34 PM SAM.gov
CARPENTERS: JOURNEYMAN CARPENTER ALPINE, COLUSA,
EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA,
SUTTER AND YUBA COUNTIES $ 53.16 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER ALPINE, COLUSA, EL DORADO
(EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND
YUBA COUNTIES $ 53.31 33.52
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER
(EAST), SIERRA, SUTTER AND YUBA COUNTIES $ 60.39 33.52
CARP0152-003 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT AMADOR COUNTY $ 47.92 32.41
CARPENTERS: JOURNEYMAN CARPENTER AMADOR COUNTY $ 45.42 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER AMADOR COUNTY $ 45.57 30.82
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
AMADOR COUNTY $ 52.65 30.82
CARP0180-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT SOLANO COUNTY $ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER SOLANO COUNTY $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
SOLANO COUNTY $ 54.85 31.49
CARP0751-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT NAPA AND SONOMA COUNTIES $ 54.95 33.08
CARPENTERS: JOURNEYMAN CARPENTER NAPA AND SONOMA
COUNTIES $ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER NAPA AND SONOMA COUNTIES $ 55.00 31.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER NAPA
AND SONOMA COUNTIES $ 54.85 31.49
CARP1599-001 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT BUTTE, GLENN, LASSEN,
MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY
COUNTIES $ 47.92 32.41
CARPENTERS: JOURNEYMAN CARPENTER BUTTE, GLENN,
LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND
TRINITY COUNTIES $ 45.42 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER BUTTE, GLENN, LASSEN, MODOC,
PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY
COUNTIES $ 45.57 30.82
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA,
SISKIYOU, TEHAMA AND TRINITY COUNTIES $ 52.65 30.82
https://sam.gov/wage-determination/CA20260007/4 6/47
5/29/26,3:34 PM SAM.gov
ELECO18O-001 06/01/2025
Rates Fringes
ELECTRICIAN NAPA AND SOLANO COUNTIES $ 61.56 31.13
CABLE SPLICER NAPA AND SOLANO COUNTIES $ 69.26 31.36
ELECO18O-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN NAPA AND
SOLANO COUNTIES SCOPE OF WORK INCLUDES- SOUND
& VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL,
TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE
ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW
OR MAJOR REMODEL BUILDING PROJECTS OR JOBS],
TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS,
COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE
INTRINSIC TO THE ABOVE. EXCLUDES- EXCLUDES ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE
WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL
BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE
THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDES ENERGY MANAGEMENT SYSTEMS $ 61.04 31.08
SOUND & COMMUNICATIONS: INSTALLER NAPA AND SOLANO
COUNTIES SCOPE OF WORK INCLUDES- SOUND &
VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL,
TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE
ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW
OR MAJOR REMODEL BUILDING PROJECTS OR JOBS],
TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS,
COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE
INTRINSIC TO THE ABOVE. EXCLUDES- EXCLUDES ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE
WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL
BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE
THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDES ENERGY MANAGEMENT SYSTEMS $ 53.08 30.84
ELECO34O-002 03/01/2025
Rates Fringes
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS
TECHNICIAN ALPINE, AMADOR, BUTTE, COLUSA, EL
DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS,
SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES SCOPE
OF WORK INCLUDES THE INSTALLATION TESTING,
SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS
WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE
OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL,
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR
THE FOLLOWING TV MONITORING AND SURVEILLANCE,
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND
https://sam.gov/wage-determination/CA20260007/4 7/47
5/29/26,3:34 PM SAM.gov
FOREGROUND MUSIC INTERCOM AND TELEPHONE
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE
ALARM SYSTEMS INSTALLATION, WIRE PULLING AND
TESTING C. TELEVISION AND VIDEO SYSTEMS
TELEVISION MONITORING AND SURVEILLANCE SYSTEMS,
VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT
SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE
TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY
SYSTEMS PERIMETER SECURITY SYSTEMS
VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS
ACCESS CONTROL SYSTEMS SONAR/INFRARED
MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR
CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE
LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND
DATA ACQUISITION) PCM (PULSE CODE MODULATION)
INVENTORY CONTROL SYSTEMS DIGITAL DATA
SYSTEMS BROADBAND AND BASEBAND AND CARRIERS
POINT OF SALE SYSTEMS VSAT DATA SYSTEMS
DATA COMMUNICATION SYSTEMS RF AND REMOTE
CONTROL SYSTEMS FIBER OPTIC DATA SYSTEMS WORK
EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING
LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED
SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10
FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS.
ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY
CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO
THE ABOVE LISTED SYSTEMS (IN THE SCOPE) . FIRE
ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE
ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING
TWO (2) CONDITIONS APPLY: 1. THE PROJECT
INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES
CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN CONDUIT $ 46.00 25.68
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS
INSTALLER ALPINE, AMADOR, BUTTE, COLUSA, EL
DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS,
SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES SCOPE
OF WORK INCLUDES THE INSTALLATION TESTING,
SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS
WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE
OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL,
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR
THE FOLLOWING TV MONITORING AND SURVEILLANCE,
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND
FOREGROUND MUSIC INTERCOM AND TELEPHONE
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE
ALARM SYSTEMS INSTALLATION, WIRE PULLING AND
https://sam.gov/wage-determination/CA20260007/4 8/47
5/29/26,3:34 PM SAM.gov
TESTING C. TELEVISION AND VIDEO SYSTEMS
TELEVISION MONITORING AND SURVEILLANCE SYSTEMS,
VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT
SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE
TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY
SYSTEMS PERIMETER SECURITY SYSTEMS
VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS
ACCESS CONTROL SYSTEMS SONAR/INFRARED
MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR
CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE
LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND
DATA ACQUISITION) PCM (PULSE CODE MODULATION)
INVENTORY CONTROL SYSTEMS DIGITAL DATA
SYSTEMS BROADBAND AND BASEBAND AND CARRIERS
POINT OF SALE SYSTEMS VSAT DATA SYSTEMS
DATA COMMUNICATION SYSTEMS RF AND REMOTE
CONTROL SYSTEMS FIBER OPTIC DATA SYSTEMS WORK
EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING
LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED
SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10
FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS.
ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY
CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO
THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE
ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE
ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING
TWO (2) CONDITIONS APPLY: 1. THE PROJECT
INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES
CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN CONDUIT $ 40.00 25.50
ELEC0340-003 08/01/2025
Rates Fringes
ELECTRICIAN (REMAINING AREA) ALPINE (WEST OF
SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL
DORADO (WEST OF SIERRA MT. WATERSHED), GLENN,
LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED),
PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF
SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY,
YOLO & YUBA COUNTIES CABLE SPLICER: RECEIVES
110% OF THE ELECTRICIAN BASIC HOURLY RATE $ 52.70 38.68
ELEC0401-005 01/01/2025
Rates Fringes
ELECTRICIAN ALPINE (EAST OF THE MAIN WATERSHED
DIVIDE), EL DORADO (EAST OF THE MAIN WATERSHED
DIVIDE), NEVADA (EAST OF THE MAIN WATERSHED),
PLACER (EAST OF THE MAIN WATERSHED DIVIDE) AND
SIERRA (EAST OF THE MAIN WATERSHED DIVIDE) COUNTIES.$ 48.50 23.04
ELEC0551-004 06/01/2024
Rates Fringes
ELECTRICIAN MARIN AND SONOMA COUNTIES $ 59.17 32.04
ELEC0551-005 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN MARIN & SONOMA
COUNTIES SCOPE OF WORK INCLUDES- SOUND &
VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL,
https://sam.gov/wage-determination/CA20260007/4 9/47
5/29/26,3:34 PM SAM.gov
TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE
ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW
OR MAJOR REMODEL BUILDING PROJECTS OR JOBS],
TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS,
COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE
INTRINSIC TO THE ABOVE. EXCLUDES- EXCLUDES ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE
WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL
BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE
THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDES ENERGY MANAGEMENT SYSTEMS $ 61.04 31.08
SOUND & COMMUNICATIONS: INSTALLER MARIN & SONOMA
COUNTIES SCOPE OF WORK INCLUDES- SOUND &
VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL,
TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE
ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING
WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW
OR MAJOR REMODEL BUILDING PROJECTS OR JOBS],
TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS,
COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE
INTRINSIC TO THE ABOVE. EXCLUDES- EXCLUDES ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE
WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL
BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE
THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDES ENERGY MANAGEMENT SYSTEMS $ 53.08 30.84
ELEC0659-006 01/01/2026
Rates Fringes
ELECTRICIAN MODOC AND SISKIYOU COUNTIES $ 47.04 21.84
ELEC0659-008 02/01/2023
Rates Fringes
LINE CONSTRUCTION: (1) CABLE SPLICER DEL NORTE,
MODOC & SISKIYOU COUNTIES $ 67.80 25.20
LINE CONSTRUCTION: (2) LINEMAN, POLE SPRAYER,
HEAVY LINE EQUIPMENT MAN DEL NORTE, MODOC &
SISKIYOU COUNTIES $ 60.54 24.87
ELEC1245-004 01/01/2025
Rates Fringes
LINE CONSTRUCTION: (3) GROUNDMAN ALL COUNTIES
EXCEPT DEL NORTE, MODOC & SISKIYOU HOLIDAYS: NEW
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY $ 40.76 21.76
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST
OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE
EQUIPMENT ALL COUNTIES EXCEPT DEL NORTE, MODOC &
SISKIYOU HOLIDAYS: NEW YEAR'S DAY, M.L. KING
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER
https://sam.gov/wage-determination/CA20260007/4 10/47
5/29/26,334 PM SAM.gov
THANKSGIVING, CHRISTMAS DAY $ 53.30 22.26
LINE CONSTRUCTION (1) LINEMAN; CABLE SPLICER
HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY ALL COUNTIES EXCEPT DEL NORTE, MODOC
& SISKIYOU $ 70.16 24.71
ELEV0008-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION:
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5
YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF
SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING, AND CHRISTMAS DAY $ 84.05 38.44
ENGI0003-008 08/01/2024
Rates Fringes
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART $ 53.23 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
https://sam.gov/wage-determination/CA20260007/4 11/47
5/29/26,334 PM SAM.gov
SUCTION DREDGING) AREA 2: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART $ 56.53 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN : AREA DESCRIPTIONS AREA 1:
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:
REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:
AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:
REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:
EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:
AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:
SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL
https://sam.gov/wage-determination/CA20260007/4 12/47
5/29/26,334 PM SAM.gov
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:
AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART $ 57.65 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC
COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:
AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:
EASTERN PART COLUSA COUNTY: AREA 1: EASTERN
PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:
NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:
EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART $ 62.61 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
https://sam.gov/wage-determination/CA20260007/4 13/47
5/29/26,334 PM SAM.gov
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART $ 51.23 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
https://sam.gov/wage-determination/CA20260007/4 14/47
5/29/26,334 PM SAM.gov
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART $ 54.53 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC
COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:
AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:
EASTERN PART COLUSA COUNTY: AREA 1: EASTERN
PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:
NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:
EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART $ 60.61 39.55
DREDGING ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN AREA DESCRIPTIONS AREA 1:
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:
REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:
AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:
REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:
https://sam.gov/wage-determination/CA20260007/4 15/47
5/29/26,3:34 PM SAM.gov
EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:
AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:
SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:
AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART $ 55.65 39.55
ENGI0003-019 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 2) $ 49.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 1) $ 47.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 2) $ 54.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 1) $ 52.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 2) $ 57.85 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 1) $ 55.85 28.56
ENGI0003-038 06/29/2020
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 6 $ 42.50 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 5 $ 44.73 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 4 $ 47.37 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Truck Crane Oiler) $ 45.12 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Oiler) $ 42.89 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Lifting devices) $ 49.14 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Truck Crane Oiler) $ 45.41 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Oiler) $ 43.11 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Lifting devices) $ 50.82 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 1 (Truck Crane Oiler) $ 45.66 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
https://sam.gov/wage-determination/CA20260007/4 16/47
5/29/26,3:34 PM SAM.gov
GROUP 1 (Oiler) $ 43.38 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 1 (Lifting devices) $ 52.64 31.15
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 5) $ 58.09 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 4) $ 59.23 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 3) $ 60.37 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 2) $ 61.70 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 1-A) $ 65.43 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 1) $ 62.96 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 5) $ 58.19 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 4) $ 59.33 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 3) $ 60.47 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 2) $ 61.80 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 1) $ 63.06 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 5 $ 62.24 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 4 $ 63.54 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 3 $ 65.56 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 2 $ 67.04 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 1 $ 68.81 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 4 $ 61.30 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 3 (Hydraulic) $ 60.61 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 3 (Cranes) $ 64.34 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 2 $ 66.08 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 1 $ 68.59 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 8-A $ 55.49 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 8 $ 57.70 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 7 $ 58.84 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 6 $ 59.98 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 5 $ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 4 $ 62.57 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 3 $ 63.95 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 2 $ 65.43 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 1 $ 66.96 32.53
ENGI0003-038 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 6 $ 42.50 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 5 $ 44.73 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
https://sam.gov/wage-determination/CA20260007/4 17/47
5/29/26,3:34 PM SAM.gov
GROUP 4 $ 47.37 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Truck Crane Oiler) $ 45.12 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Oiler) $ 42.89 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 3 (Lifting devices) $ 49.14 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Truck Crane Oiler) $ 45.41 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Oiler) $ 43.11 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 2 (Lifting devices) $ 50.82 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 1 (Truck Crane Oiler) $ 45.66 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 1 (Oiler) $ 43.38 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: :
GROUP 1 (Lifting devices) $ 52.64 31.15
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 5) $ 58.09 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 4) $ 59.23 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 3) $ 60.37 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 2) $ 61.70 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 1-A) $ 65.43 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : UNDERGROUND: (GROUP 1) $ 62.96 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 5) $ 58.19 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 4) $ 59.33 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 3) $ 60.47 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 2) $ 61.80 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1: : SHAFTS, STOPES, RAISES: (GROUP 1) $ 63.06 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 5 $ 62.24 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 4 $ 63.54 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 3 $ 65.56 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 2 $ 67.04 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: : GROUP 1 $ 68.81 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 4 $ 61.30 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 3 (Hydraulic) $ 60.61 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 3 (Cranes) $ 64.34 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 2 $ 66.08 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: : GROUP 1 $ 68.59 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 8-A $ 55.49 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 8 $ 57.70 32.53
https://sam.gov/wage-determination/CA20260007/4 18/47
5/29/26,3:34 PM SAM.gov
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 7 $ 58.84 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 6 $ 59.98 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 5 $ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 4 $ 62.57 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 3 $ 63.95 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 2 $ 65.43 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: : GROUP 1 $ 66.96 32.53
IRON0118-012 01/01/2025
Rates Fringes
IRONWORKER ALPINE, LASSEN, MODOC, SISKIYOU AND
TRINITY COUNTIES $ 43.75 34.45
IRON0118-013 01/01/2025
Rates Fringes
IRONWORKER AMADOR, BUTTE, COLUSA,EL DORADO,
GLENN,MARIN, NAPA, NEVADA, PLACER,PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SOLANO, SONOMA, SUTTER,
TEHAMA, YOLO AND YUBA COUNTIES $ 50.70 35.15
LAB00067-003 07/01/2024
Rates Fringes
LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING
COUNTIES $ 36.75 29.69
LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA
COUNTIES $ 37.75 29.69
LAB00067-005 01/01/2024
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II (Area B) $ 34.06 27.32
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II (Area A) $ 35.06 27.32
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I (Area B) $ 36.56 27.32
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I (Area A) $ 37.56 27.32
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (Area B) $ 36.26 27.32
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (Area A) $ 37.26 27.32
LAB00185-002 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK ALPINE, AMADOR,
BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC,
NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA
COUNTIES $ 36.29 25.55
LAB00185-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO AND YUBA COUNTIES $ 46.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5: GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (ALPINE, AMADOR,
https://sam.gov/wage-determination/CA20260007/4 19)47
5/29/26,3:34 PM SAM.gov
BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC,
NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA
COUNTIES) $ 44.42 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4: VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (ALPINE, AMADOR,
BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC,
NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA
COUNTIES) $ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3: BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA
COUNTIES) $ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2: RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER,
TEHAMA, TRINITY, YOLO AND YUBA COUNTIES) $ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO AND YUBA COUNTIES) $ 45.89 27.72
LABOO185-006 06/26/2023
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA B: (ALPINE, AMADOR, BUTTE, COLUSA,
EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER,
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)- (2)
Establishment Warranty Period $ 28.94 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA B: (ALPINE, AMADOR, BUTTE, COLUSA,
EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER,
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)- (1)
New Construction $ 35.25 27.30
LABORER, WRECKING - AREA B: GROUP 2: SEMI-SKILLED
WRECKER (SALVAGING OF OTHER BUILDING MATERIALS)
(ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
https://sam.gov/wage-determination/CA20260007/4 20/47
5/29/26,3:34 PM SAM.gov
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW $ 35.35 27.30
LABORER, WRECKING - AREA B: GROUP 1- SKILLED
WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS
AND MATERIALS) FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA
COUNTIES $ 35.50 27.30
LABORER, GUNITE - AREA B: GROUP 4: GUNITE LABORER
(ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. $ 35.25 27.30
LABORER, GUNITE - AREA B: GROUP 3: REBOUNDMAN
(ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. $ 35.37 27.30
LABORER, GUNITE - AREA B: GROUP 2: NOZZLEMAN,
GUNMAN, POTMAN, GROUNDMAN (ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. $ 35.96 27.30
LABORER, GUNITE - AREA B: GROUP 1- GROUP 1:
STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA
COUNTIES $ 36.46 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND
BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:
https://sam.gov/wage-determination/CA20260007/4 21/47
5/29/26,3:34 PM SAM.gov
A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE
THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF
SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER
CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER,
TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer
cleaners shall receive $4.00 per day above Group 1
wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes shal receive $5.00
per day above Group 1 wage rates.
Maintenance and repair track and road beds. All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed. $ 28.94 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE
AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG
PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL
ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE
LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER;
PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE,
REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD
CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER
LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT
(JOBSITE ONLY) (ALPINE, AMADOR, BUTTE, COLUSA, EL
DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER,
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. Sewer cleaners shall receive $4.00 per day
above Group 1 wage rates. ""Sewer cleaner"" means
any worker who handles or comes in contact with raw
sewage in small diameter sewers. Those who work
inside recently active, large diameter sewers, and
all recently active sewer manholes shal receive
$5.00 per day above Group 1 wage rates.
Maintenance and repair track and road beds. All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 35.25 27.30
https://sam.gov/wage-determination/CA20260007/4 22/47
5/29/26,3:34 PM SAM.gov
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING
AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER,
TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer
cleaners shall receive $4.00 per day above Group 1
wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes shal receive $5.00
per day above Group 1 wage rates.
Maintenance and repair track and road beds. All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 35.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS
AND SHAFTS THEREOF, AND WORK ON AND IN DEEP
FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR
MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE
FOOTING IS UNKNOWN AT THE COMMENCEMENT OF
EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET,
THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL
EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN
THE EXCAVATION OF THE FOOTING FROM THE DATE OF
INCEPTION. (ALPINE, AMADOR, BUTTE, COLUSA, EL
DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER,
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) WORK
ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF,
AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING
IS A HOLE 15 FEET OR MORE IN DEPTH.) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer
cleaners shall receive $4.00 per day above Group 1
wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in
small diameter sewers. Those who work inside
recently active, large diameter sewers, and all
recently active sewer manholes shal receive $5.00
per day above Group 1 wage rates.
https://sam.gov/wage-determination/CA20260007/4 23/47
5/29/26,3:34 PM SAM.gov
Maintenance and repair track and road beds. All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
work of subway construction after the temporary
cover has been placed $ 36.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND
SIMILAR TYPE WELDING (ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. Sewer cleaners shall
receive $4.00 per day above Group 1 wage rates.
""Sewer cleaner"" means any worker who handles or
comes in contact with raw sewage in small diameter
sewers. Those who work inside recently active,
large diameter sewers, and all recently active
sewer manholes shal receive $5.00 per day above
Group 1 wage rates. Maintenance and repair
track and road beds. All employees performing work
covered herein shall receive $ .25 per hour above
their regular rate for all work performed on
underground structures not specifically covered
herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It
shall apply to cut and cover work of subway
construction after the temporary cover has been
placed $ 35.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL
DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (ALPINE, AMADOR, BUTTE, COLUSA, EL
DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER,
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)
Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any
worker who handles or comes in contact with raw
sewage in small diameter sewers. Those who work
inside recently active, large diameter sewers, and
all recently active sewer manholes shal receive
$5.00 per day above Group 1 wage rates.
Maintenance and repair track and road beds. All
employees performing work covered herein shall
receive $ .25 per hour above their regular rate for
all work performed on underground structures not
specifically covered herein. This paragraph shall
not be construed to apply to work below ground
level in open cut. It shall apply to cut and cover
https://sam.gov/wage-determination/CA20260007/4 24/47
5/29/26,3:34 PM SAM.gov
work of subway construction after the temporary
cover has been placed $ 35.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1 LABORER CLASSIFICATIONS CONSTRUCTION
SPECIALIST GROUP: ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO,
WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE;
CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,
PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPDXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP
1-D: MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.
ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. FOOTNOTES: LABORERS
https://sam.gov/wage-determination/CA20260007/4 25/47
5/29/26,3:34 PM SAM.gov
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA
COUNTIES $ 35.50 27.30
LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:):
CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY,
YOLO, YUBA COUNTIES FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. FOOTNOTES: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW $ 36.20 27.30
LAB00185-008 07/01/2023
Rates Fringes
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD:
$1.00 PER HOUR ADDITIONAL $ 39.77 28.54
LAB00261-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. MARIN COUNTY $ 35.06 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
MARIN COUNTY $ 37.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
https://sam.gov/wage-determination/CA20260007/4 26/47
5/29/26,3:34 PM SAM.gov
DRIVER, FLAG PERSON (MARIN COUNTY) $ 37.26 27.30
LAB00261-004 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
MARIN COUNTY $ 46.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIN COUNTY) $ 44.42 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (MARIN COUNTY) $ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (MARIN COUNTY) $ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (MARIN COUNTY) $ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER;
GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIN
COUNTY) $ 45.89 27.72
LAB00261-007 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK MARIN COUNTY $ 37.54 25.55
LAB00261-010 06/26/2023
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (MARIN COUNTY)- (2)
Establishment Warranty Period $ 29.94 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (MARIN COUNTY)- (1) New
Construction $ 36.25 27.30
LABORER, WRECKING - AREA A: : GROUP 1 (MARIN COUNTY) $ 36.50 27.30
LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled
wrecker (salvaging of other building materials)
(MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW $ 36.35 27.30
LABORER, GUNITE - AREA A: : GROUP 1 (MARIN COUNTY) $ 37.46 27.30
LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER
(MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW $ 36.25 27.30
https://sam.gov/wage-determination/CA20260007/4 27/47
5/29/26,3:34 PM SAM.gov
LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN (MARIN
COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. THIS SHALL NOT APPLY TO WORKERS
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A BELOW $ 36.37 27.30
LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN,
GUNMAN, POTMAN, GROUNDMAN (MARIN COUNTY)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW $ 36.96 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: :
GROUP 1 (MARIN COUNTY) $ 36.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND
BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:
A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE
THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF
SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER
CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(MARIN COUNTY) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 29.94 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE
AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG
PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL
ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE
LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER;
PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE,
REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD
CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER
LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT
(JOBSITE ONLY) (MARIN COUNTY) FOOTNOTES:
https://sam.gov/wage-determination/CA20260007/4 28/47
5/29/26,3:34 PM SAM.gov
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING
AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (MARIN COUNTY) FOOTNOTES: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 36.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS
UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE
RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND
https://sam.gov/wage-determination/CA20260007/4 29/47
5/29/26,3:34 PM SAM.gov
EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE
FOOTING FROM THE DATE OF INCEPTION. (MARIN COUNTY)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 37.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-C BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND
SIMILAR TYPE WELDING(MARIN COUNTY) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL
DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (MARIN COUNTY) SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
https://sam.gov/wage-determination/CA20260007/4 30/47
5/29/26,3:34 PM SAM.gov
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:
CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
MARIN COUNTY FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. $ 37.20 27.30
LAB00324-004 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. NAPA, SOLANO, AND SONOMA, COUNTIES.$ 34.06 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
NAPA, SOLANO, AND SONOMA, COUNTIES $ 36.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON NAPA, SOLANO, AND SONOMA,
COUNTIES $ 36.26 27.30
LAB00324-008 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
NAPA, SOLANO, AND SONOMA COUNTIES $ 46.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (NAPA, SOLANO, AND
SONOMA COUNTIES) $ 44.42 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR
https://sam.gov/wage-determination/CA20260007/4 31/47
5/29/26,3:34 PM SAM.gov
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (NAPA, SOLANO, AND
SONOMA COUNTIES) $ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (NAPA, SOLANO, AND SONOMA
COUNTIES) $ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (NAPA, SOLANO, AND SONOMA COUNTIES) $ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER;
GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (NAPA,
SOLANO, AND SONOMA COUNTIES) $ 45.89 27.72
LAB00324-010 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK SOLANO AND SONOMA
COUNTIES $ 36.84 26.24
LAB00324-013 06/26/2023
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA B: (NAPA, SOLANO, AND SONOMA
COUNTIES)- (2) Establishment Warranty Period $ 28.94 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA B: (NAPA, SOLANO, AND SONOMA
COUNTIES)- (1) New Construction $ 35.25 27.30
LABORER, WRECKING - AREA B: : GROUP 1 (NAPA, SOLANO,
AND SONOMA COUNTIES) $ 35.50 27.30
LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled
wrecker (salvaging of other building materials)
NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW $ 35.35 27.30
LABORER, GUNITE - AREA B: : GROUP 1 (NAPA, SOLANO,
AND SONOMA COUNTIES) $ 36.46 27.30
LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER
(NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW $ 35.25 27.30
LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN
(NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
https://sam.gov/wage-determination/CA20260007/4 32/47
5/29/26,3:34 PM SAM.gov
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW $ 35.37 27.30
LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN,
GUNMAN, POTMAN, GROUNDMAN (NAPA, SOLANO, AND
SONOMA COUNTIES) FOOTNOTES: LABORERS WORKING OFF
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. $ 35.96 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND
BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:
A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE
THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF
SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER
CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 28.94 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND
GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON;
FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY) (NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
https://sam.gov/wage-determination/CA20260007/4 33/47
5/29/26,3:34 PM SAM.gov
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 35.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING
AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (NAPA, SOLANO, AND SONOMA COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 35.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH
GUNITING OR SHOT CRETE (NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
https://sam.gov/wage-determination/CA20260007/4 34/47
5/29/26,3:34 PM SAM.gov
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 36.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS
UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE
RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND
EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE
FOOTING FROM THE DATE OF INCEPTION. (NAPA, SOLANO,
AND SONOMA COUNTIES) FOOTNOTES: LABORERS
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 36.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-C BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND
SIMILAR TYPE WELDING (NAPA, SOLANO, AND SONOMA
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO
https://sam.gov/wage-determination/CA20260007/4 35/47
5/29/26,3:34 PM SAM.gov
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED $ 35.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL
DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (NAPA, SOLANO, AND SONOMA COUNTIES)
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 35.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO,
WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE;
CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,
PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPDXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
https://sam.gov/wage-determination/CA20260007/4 36/47
5/29/26,3:34 PM SAM.gov
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER (NAPA, SOLANO,
AND SONOMA COUNTIES) FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED $ 35.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:
CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
NAPA, SOLANO, AND SONOMA COUNTIES FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL
NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW.
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED $ 36.20 27.30
PAINO016-004 01/01/2025
Rates Fringes
PAINTERS MARIN, NAPA, SOLANO & SONOMA COUNTIES
PREMIUMS: EXOTIC MATERIALS - $1.25 ADDITIONAL PER
HOUR. SPRAY WORK: - $0.50 ADDITIONAL PER HOUR.
INDUSTRIAL PAINTING - $0.25 ADDITIONAL PER HOUR
[WORK ON INDUSTRIAL BUILDINGS USED FOR THE
https://sam.gov/wage-determination/CA20260007/4 37/47
5/29/26,3:34 PM SAM.gov
MANUFACTURE AND PROCESSING OF GOODS FOR SALE OR
SERVICE; STEEL CONSTRUCTION (BRIDGES), STACKS,
TOWERS, TANKS, AND SIMILAR STRUCTURES] HIGH WORK:
OVER 50 FEET - $2.00 PER HOUR ADDITIONAL 100 TO
180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET
- $6.00 PER HOUIR ADDITIONAL $ 53.38 28.04
PAIN0016-005 01/01/2025
Rates Fringes
DRYWALL FINISHER/TAPER ALPINE, BUTTE, COLUSA, EL
DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS),
GLENN, LASSEN (WEST OF HWY. 395, EXCLUDING HONEY
LAKE); MARIN, MODOC, NAPA, NEVADA (WEST OF THE
SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE
SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO,
SHASTA, SIERRA (WEST OF THE SIERRA NEVADA
MOUNTAINS), SISKIYOU, SOLANO, SONOMA, SUTTER,
TEHAMA, TRINITY, YOLO AND YUBA COUNTIES $ 59.63 31.29
PAIN0016-007 01/01/2025
Rates Fringes
PAINTERS ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO
(WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN,
LASSEN (WEST OF HIGHWAY 395, EXCLUDING HONEY LAKE),
MODOC, NEVADA (WEST OF THE SIERRA NEVADA
MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA
MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA
(WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU,
SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES
SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC
MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME:
OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00
ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR
WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT
ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER
HOUR $ 43.45 22.80
PAIN0016-008 01/01/2024
Rates Fringes
SOFT FLOOR LAYER MARIN, NAPA, SOLANO AND SONOMA
COUNTIES $ 59.00 33.03
PAIN0169-004 01/01/2024
Rates Fringes
GLAZIER MARIN , NAPA & SONOMA COUNTIES; SOLANO
COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80
CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD,
INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY;
GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH
ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY.
80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE
GRIZZLY ISLAND MANAGEMENT AREA) $ 56.22 34.00
PAIN0567-001 07/01/2025
Rates Fringes
PAINTERS: SPRAY PAINTER EL DORADO COUNTY (EAST OF
THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST
OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING
HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA
NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE
https://sam.gov/wage-determination/CA20260007/4 38/47
5/29/26,3:34 PM SAM.gov
SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST
OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS: SPECIAL
COATINGS (BRUSH), AND SANDBLASTING = $O.5O/HR
SPECIAL COATINGS (SPRAY), AND STEEPLEJACK =
$1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR
SWING STAGE = $2.00/HR *A SPECIAL COATING IS A
COATING THAT REQUIRES THE MIXING OF 2 OR MORE
PRODUCTS $ 41.43 16.16
PAINTERS: PAPERHANGER (EL DORADO COUNTY (EAST OF
THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST
OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING
HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA
NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST
OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS: SPECIAL
COATINGS (BRUSH), AND SANDBLASTING = $O.5O/HR
SPECIAL COATINGS (SPRAY), AND STEEPLEJACK =
$1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR
SWING STAGE = $2.0O/HR *A SPECIAL COATING IS A
COATING THAT REQUIRES THE MIXING OF 2 OR MORE
PRODUCTS $ 42.19 16.16
PAINTERS: BRUSH AND ROLLER EL DORADO COUNTY (EAST
OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY
(EAST OF HIGHWAY 395, BEGINNING AT STACEY AND
INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF
THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY
(EAST OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS:
SPECIAL COATINGS (BRUSH), AND SANDBLASTING =
$O.5O/HR SPECIAL COATINGS (SPRAY), AND STEEPLEJACK
= $1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR
SWING STAGE = $2.00/HR *A SPECIAL COATING IS A
COATING THAT REQUIRES THE MIXING OF 2 OR MORE
PRODUCTS $ 39.43 16.16
PAINO567-007 07/01/2022
Rates Fringes
SOFT FLOOR LAYER EL DORADO COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF
HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING
HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA
NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS) AND SIERRA COUNTY (EAST OF
THE SIERRA NEVADA MOUNTAINS)) $ 34.27 16.47
PAINO567-010 07/01/2024
Rates Fringes
DRYWALL: (2) STEEPLEJACK - TAPER, OVER 40 FT WITH
OPEN SPACE BELOW EL DORADO COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF
HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING
HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA
NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST
OF THE SIERRA NEVADA MOUNTAINS) $ 44.29 16.12
DRYWALL: (1) TAPER (EL DORADO COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF
HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING
HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA
NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE
SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST
OF THE SIERRA NEVADA MOUNTAINS) $ 42.79 16.12
https://sam.gov/wage-determination/CA20260007/4 39/47
5/29/26,3:34 PM SAM.gov
PAIN0767-004 01/01/2024
Rates Fringes
GLAZIER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO
(REMAINDER), SUTTER, TEHAMA, TRINITY, YOLO, YUBA $ 43.25 35.62
PAIN1176-001 07/01/2022
Rates Fringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT
SEALING $ 35.11 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND
APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING;
HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND
MARKINGS $ 40.83 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND
INSTALLER $ 34.71 17.62
PAIN1237-001 01/01/2024
Rates Fringes
SOFT FLOOR LAYER ALPINE; COLUSA; EL DORADO (WEST
OF THE SIERRA NEVADA MOUNTAINS); GLENN; LASSEN
(WEST OF HIGHWAY 395, BEGINNING AT STACEY AND
INCLUDING HONEY LAKE); MODOC; NEVADA (WEST OF THE
SIERRA NEVADA MOUNTAINS); PLACER (WEST OF THE
SIERRA NEVADA MOUNTAINS); PLUMAS; SACRAMENTO;
SHASTA; SIERRA (WEST OF THE SIERRA NEVADA
MOUNTAINS); SISKIYOU; SUTTER; TEHAMA; TRINITY; YOLO
AND YUBA COUNTIES $ 48.54 26.59
PLAS0300-003 07/01/2018
Rates Fringes
PLASTERER AREA 355: NAPA & SONOMA COUNTIES $ 32.70 31.68
PLASTERER AREA 355: MARIN $ 36.73 31.68
PLASTERER AREA 295: ALPINE, AMADOR, BUTTE,
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA,
PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SOLANO, SUTTER, TEHEMA, TRINITY, YOLO &
YUBA COUNTIES $ 32.70 31.68
PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER $ 32.15 23.27
PLUM0038-002 07/01/2025
Rates Fringes
PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER
(MARIN AND SONOMA COUNTIES) $ 91.00 49.40
PLUM0038-006 07/01/2025
Rates Fringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY
FITTER MARIN & SONOMA COUNTIES $ 77.35 36.53
https://sam.gov/wage-determination/CA20260007/4 40/47
5/29/26,3:34 PM SAM.gov
PLUMO228-001 01/01/2026
Rates Fringes
PLUMBER BUTTE, COLUSA, GLENN, LASSEN, MODOC,
PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA,
TRINITY & YUBA COUNTIES $ 52.75 41.39
PLUMO343-001 07/01/2025
Rates Fringes
PLUMBER/PIPEFITTER: ALL OTHER WORK NAPA AND
SOLANO COUNTIES FOOTNOTES: WHILE FITTING
GALVANIZED MATERIAL: $.75 PER HOUR ADDITIONAL.
WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED
STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER
HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS,
BOATSWAINS CHAIRS OR SIMILAR DEVICES: $.75 PER HOUR
ADDITIONAL $ 71.60 38.38
PLUMO35O-001 08/01/2023
Rates Fringes
PLUMBER/PIPEFITTER EL DORADO COUNTY (LAKE TAHOE
AREA ONLY); NEVADA COUNTY (LAKE TAHOE AREA ONLY);
AND PLACER COUNTY (LAKE TAHOE AREA ONLY) $ 52.14 18.71
PLUMO355-001 07/01/2025
Rates Fringes
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO,
SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES $ 36.01 18.50
PLUMO442-003 01/01/2026
Rates Fringes
PLUMBER AMADOR (SOUTH OF SAN JOAQUIN RIVER) AND
ALPINE COUNTIES $ 58.45 38.74
PLUMO447-001 07/01/2025
Rates Fringes
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL WORK AMADOR
(NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING
LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE
AREA); PLACER (EXCLUDING LAKE TAHOE AREA),
SACRAMENTO AND YOLO COUNTIES $ 55.58 24.02
PLUMBER/PIPEFITTER: JOURNEYMAN AMADOR (NORTH OF
SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE
AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER
(EXCLUDING LAKE TAHOE AREA), SACRAMENTO AND YOLO
COUNTIES $ 67.37 30.00
ROOFOO81-006 08/01/2024
Rates Fringes
ROOFER MARIN, NAPA, SOLANO AND SONOMA COUNTIES $ 54.94 23.34
ROOFOO81-007 08/01/2023
Rates Fringes
ROOFER ALPINE, BUTTE, COLUSA, EL DORADO,
GLENN,LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER,
https://sam.gov/wage-determination/CA20260007/4 41/47
5/29/26,3:34 PM SAM.gov
TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES $ 46.73 21.36
SFCAO483-003 01/01/2026
Rates Fringes
SPRINKLER FITTER (FIRE SPRINKLERS) MARIN, NAPA,
SOLANO AND SONOMA COUNTIES $ 81.54 41.35
SFCAO669-003 01/01/2026
Rates Fringes
SPRINKLER FITTER (ALPINE, BUTTE, COLUSA, EL DORADO,
GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER,
TEHAMA, TRINITY, YOLO AND YUBA COUNTIES) $ 52.06 29.86
SHEEO104-006 06/29/2020
Rates Fringes
SHEET METAL WORKER: MECHANICAL CONTRACTS $200,000
OR LESS MARIN, NAPA, SOLANO SONOMA & TRINITY
COUNTIES $ 55.92 45.29
SHEET METAL WORKER: ALL OTHER WORK MARIN, NAPA,
SOLANO SONOMA & TRINITY COUNTIES $ 64.06 46.83
SHEEO104-009 07/01/2021
Rates Fringes
SHEET METAL WORKER AMADOR, COLUSA, EL DORADO,
NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA
COUNTIES $ 47.85 41.90
SHEEO104-010 07/01/2020
Rates Fringes
SHEET METAL WORKER ALPINE COUNTY $ 43.50 37.42
SHEEO104-011 07/01/2020
Rates Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY
BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC,
NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES $ 44.45 35.55
SHEEO104-014 07/01/2020
Rates Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY
(MARIN, NAPA, SOLANO, SONOMA AND TRINITY COUNTIES) $ 44.45 35.55
SHEEO104-019 07/01/2020
Rates Fringes
SHEET METAL WORKER: MECHANICAL JOBS OVER $200,000
BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA,
SIERRA, SISKIYOU AND TEHAMA COUNTIES $ 46.60 40.21
SHEET METAL WORKER: MECHANICAL JOBS $200,000 &
UNDER BUTTE, GLENN, LASSEN, MODOC, PLUMAS,
SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES $ 35.16 35.88
TEAMOO94-001 07/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND
https://sam.gov/wage-determination/CA20260007/4 42/47
5/29/26,3:34 PM SAM.gov
OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT
OVER 7 AXLES FOOTNOTES: ARTICULATED DUMP
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX);
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE
RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE
APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. TRUCK DRIVER
CLASSIFICATIONS $ 44.56 34.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS.
AND UNDER 65 YDS.; WATER PULLS - DW 1O'S, 20'S,
21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING
AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS
(WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK
HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES;
DW1O'S, 2O'S, 21'S AND OTHER SIMILAR CAT TYPE,
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID
AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR
GREASE TANK TRAILERS OR OTHER MISCELLANEOUS
TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND
TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX);
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE
RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE
APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. TRUCK DRIVER
CLASSIFICATIONS $ 44.21 34.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND
INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.;
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS,
7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL
TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY
TRANSPORT TILLER PERSON; SELF- PROPELLED STREET
SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK
- HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR
RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING
TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON
AND ROAD OILER; DRY DISTRIBUTION TRUCK (A
BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL
RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION
OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE
DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER;
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR
THE EQUIPMENT UTILIZED. TRUCK
DRIVER CLASSIFICATIONS $ 43.86 34.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND
UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.;
WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS,
UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK;
https://sam.gov/wage-determination/CA20260007/4 43/47
5/29/26,3:34 PM SAM.gov
RUBBER-TIRED MUCK CAR (NOT SELF-LOADED);
RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME
DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD
OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER
AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED
TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK;
BULK CEMENT SPREADER (WITH OR WITHOUT AUGER);
DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY
PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR
TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.
HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER;
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE);
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.
TRUCK DRIVER CLASSIFICATIONS $ 43.56 34.28
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.;
SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK
(WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK
SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK
TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY);
CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS;
FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON;
SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL
DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK;
TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK
TENDER (INCLUDING LOADING AND UNLOADING); TEAM
DRIVER; TOOL ROOM ATTENDANT (REFINERIES)
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER;
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR
THE EQUIPMENT UTILIZED. TRUCK
DRIVER CLASSIFICATIONS $ 43.26 34.28
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
https://sam.gov/wage-determination/CA20260007/4 44/47
5/29/26,3:34 PM SAM.gov
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
*SU., AUAVGA, •SA., or *SC, denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUMO198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
https://sam.gov/wage-determination/CA20260007/4 45/47
5/29/26,3:34 PM SAM.gov
The *SU* identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2O22-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
*SU* wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The •SA• identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2O23-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the •SA• identifier took
effect under state law in the state from which the rates were
adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
https://sam.gov/wage-determination/CA20260007/4 46/47
5/29/26,3:34 PM SAM.gov
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION "
https://sam.gov/wage-determination/CA20260007/4 47/47
ADDENDUM NO. 2
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
2026 Pioneer Trail Waterline Project (REBID)
South Tahoe Public Utility District
South Lake Tahoe, California
June 4, 2026
1
GENERAL NOTES:
• This addendum clarifies the ductile iron pipe class in response to a question
submitted via PlanetBids and adds a detail for the concrete collar surrounding water
valves and manholes in paved areas.
• There are no changes to the bid opening date or bid items.
• As a reminder, hard copy bid bond MUST be received by the District prior to bid
opening.
THE FOLLOWING CHANGES ARE TO BE MADE TO THE PLANS:
1. Sheet D5, Detail 5, Not Used
REPLACE: "Not Used
WITH: "EXISTING MANHOLE COVER & VALVE BOX REHABILITATION"
2. Sheet D5, Detail 5
INSERT: Attached detail 5/D5, EXISTING MANHOLE COVER & VALVE BOX
REHABILITATION
3. Sheet D2, Detail 1, Trench Detail —Within Paved Areas, following Note 4.
ADD: "5. Refer to detail 5/D5 for valves and manholes located within paved area."
THE FOLLOWING CHANGES ARE TO BE MADE TO THE SPECIFICATIONS:
1. Section 00 41 00 — Bid Forms, Page 35, Bid Item 9 description, update to match bid form
description.
REPLACE: "Class 350"
WITH: "Class 250"
2. Addendum 1, Section 00 41 00 — Bid Forms, Bid Item 32 — 16-inch Gate Valve Option
REPLACE: "Class 300"
WITH: "Class 250"
This Addendum No. 2, pages 1 through 3 shall become part of the Contract and all provisions of
the Contract shall apply therein.
The date and time for the Bid Opening has not changed. The time provided for the completion of
the Contract has not changed.
SOUTH TAHOE PUBLIC UTILITY DISTRICT QRpFESS/pN June 4, 2026
<OOFiR. Cpn9F
Trevor Coolidge, P.E. �\ �,022
CD
Senior Engineer w 7935, /m
Ph. (530) 543-6278
N Exp. 3/31/2;
'91' CIVIC- Q-
Attached: OF CA��FO
Detail 5/D5, EXISTING MANHOLE COVER &VALVE BOX REHABILITATION
2
12"MIN
AC 1 2" or 2"METAL RISER RINGS
9"MIN OR
TOP OF STRUCTURE ', (2 RINGS MIN)
#4 BAR CENTERED
4,000 PSI CONCRETE COLLAR; 4"OR 2 2'METAL
REQUIRED IN ALL FRAME SEE NOTE#2
TRAFFIC/SHOULDER AREAS 24"GRADE RINGS, MAX HEIGHT
SET 1/4" BELOW AC PAVEMENT 24", SEE NOTE 3.
EXISTING CONE OR FLAT TOP PRECAST RINGS REQUIRE
GROUT&"RAM-NEK",
CAST-IN-PLACE RINGS REQUIRE
HYDROPHILIC WATER STOP
MANHOLE ASSEMBLY PROFILE (TOP SECTION ONLY)
NTS
/1/4"RADIUS\
o°000°o°o f \
°°000�p°pOo°°oo 4 }
pO O°00s`O OD
' O�I�:O OOO
000 000�o°o°o°O °
000 0 0 000
00000 0 0°00 0
oo°o°°°o 000°O0o
#4 BAR.MIN 4"
LONG 0 12"OC
MANHOLE PLAN VIEW
PLACE COLLAR 1}"RISER RING PLAN VIEW
r BELOW AC
12"MIN VARIES
J{[ #4 BAR CENTERED
MIN 9"OR TOP / • ' I:°.d ..
OF STRUCTURE
G5 BOX,
SEE NOTE 4
SECTION A—A
CONCRETE COLLAR (VALVE CLUSTER)
NOTES: NTS
1) DURING ALL MANHOLE WORK A"PARACHUTE"(MANHOLE DEBRIS CATCHER)MUST BE USED TO COLLECT AND REMOVE ALL
DEBRIS FROM MANHOLE.ALL DEBRIS MUST BE REMOVED FROM MANHOLE.AT NO TIME SHALL DEBRIS ENTER THE FLOW
CHANNEL OR SEWER PIPE.CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGE OR SEWER SPILLS, INCLUDING
ASSOCIATED FINES, IF THEY OCCUR AS A RESULT OF CONSTRUCTION DEBRIS ENTERING THE MANHOLE.
2) A TWENTY-FOUR INCH (24")MANHOLE FRAME AND COVER WILL BE SUPPLIED BY THE DISTRICT.THE CONTRACTOR SHALL
SALVAGE AND REUSE MANHOLE FRAMES AND RISERS IF POSSIBLE; IF NEW FRAMES AND RISERS ARE REQUIRED THEY WILL
BE PROVIDED BY THE DISTRICT.THE CONTRACTOR MAY INSTALL A MAXIMUM OF 3"THICK NON-SHRINK GROUT LEVELING
COURSE UNDER THE FRAME TO MATCH THE PAVEMENT GRADE.
3) ALL GRADE RINGS SHALL BE MADE OF PORTLAND CEMENT CONCRETE; PVC GRADE RINGS ARE NOT ALLOWED.ALL GRADE
RING JOINTS SHALL BE GROUTED WITH NON-SHRINK GROUT HAVING A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28
DAYS, CONTAINING AT LEAST 6 SACKS OF CEMENT PER CUBIC YARD,AND HAVING A SLUMP BETWEEN 1 AND 4 INCHES.ALL
JOINTS SHALL BE GROUTED INSIDE AND OUT.THE CONTRACTOR SHALL INSTALL JOINT SEALING COMPOUND AT ALL JOINTS
AND UNDER THE FRAME, USING"RAM-NEK"BY HENRY COMPANY OR AN APPROVED EQUAL. DISTRICT TO PROVIDE"RAM-NEK".
4) REPLACE BROKEN VALVE BOX LIDS, BOXES,RISERS WITH CHRISTY G5, OR EQUAL.ADD RISER TO EVERY BOX REGARDLESS
OF EXISTING.
5) ALL MATERIALS REQUIRED FOR THE WORK DESCRIBED IN THIS DETAIL SHALL BE PROVIDED BY THE CONTRACTOR UNLESS
EXPRESSLY STATED OTHERWISE.
APPROVED BY: EXISTING MANHOLE COVER & SOUTH TA",
( C�w VALVE BOX REHABILITATION
MEGAN COLVEY,DISTRICT E CINEER STANDARD DETAIL AGBC 71 je,\`'c
N0. C74708 un L I N o's
P.E.
DATE:03/16/2026 I SCALE:NTS