Loading...
HomeMy WebLinkAbout2026.05.21 Item 7a Attachment - Bid Summary South Tahoe Public Utility District ● 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ● Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: May 13, 2026 To: Board Members, Paul Hughes From: Starlet Glaze, Contracts Specialist Laura Hendrickson, Associate Engineer Subject: 2026 Water Meter Installation Project At 10:00 AM on Friday, May 8, 2026, we received five (5) electronic bids via PlanetBids for the above- referenced project. The bids submitted ranged from $916,350.00 to $1,159,002.00. The Engineer’s Estimate for this project was $967,900.00 A careful review and analysis of the three lowest responsive responsible bids received showed only minor deviations. See attached spreadsheet and list of deviations for a full breakdown of each bid. White Rock Construction, Inc. is the apparent low bidder. I contacted the Contractors State License Board and confirmed the following: • License Number: 640958 • Status: Current and active • Expiration Date: July 31, 2026 • Entity Type: Corporation • License Classification: Class A – General Engineering Additionally, I verified with the California Department of Industrial Relations that White Rock Construction, Inc. is properly registered under PWCR Number 1000011381. Advertised on 03/27/2026 Bid Opening on May 08, 2026 10:00 AM (PDT) Item Num Description Unit of Measure Quantity White Rock Construction, Inc. Vinciguerra Construction F. W. Carson Co. Haen Constructors Alcon Construction & Engineering, Inc Engineer's Estimate 1 Mobilization and Demobilization (not to exceed 10% of Total Bid Schedule) LS 1 $26,000.00 $30,000.00 $29,933.00 $85,000.00 $107,095.00 $85,000.00 2 Construction BMPs and Erosion Control LS 1 $5,100.00 $20,000.00 $21,201.00 $7,500.00 $15,000.00 $35,000.00 3 Traffic Control LS 1 $11,299.79 $10,000.00 $42,537.00 $12,000.00 $50,000.00 $30,000.00 4 Sheeting, Shoring, and Bracing or Equivalent LS 1 $2,700.00 $5,000.00 $15,530.00 $7,500.00 $15,000.00 $25,000.00 5 Groundwater Dewatering LS 1 $3,700.00 $2,500.00 $13,228.00 $1,500.00 $20,000.00 $10,000.00 6 As-Directed Pothole EA 14 $16,800.00 $7,000.00 $21,952.00 $16,800.00 $17,486.00 $14,000.00 7 3/4" Base Water Meter Installation EA 45 $222,500.25 $315,000.00 $217,260.00 $303,750.00 $248,715.00 $225,500.00 8 1" Base Water Meter Installation EA 28 $156,899.96 $217,000.00 $157,220.00 $201,600.00 $163,156.00 $195,000.00 9 Hot Tap New Water Service EA 16 $40,000.00 $80,000.00 $183,392.00 $36,800.00 $212,752.00 $70,000.00 10 Abandon Water Service EA 14 $22,400.00 $14,000.00 $50,638.00 $54,600.00 $20,034.00 $28,000.00 11 Allowance for Customer Side Water Service Relocations LS 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 12 Add for Traffic-Rated Installations EA 25 $62,500.00 $12,500.00 $47,525.00 $25,000.00 $37,500.00 $17,500.00 13 Water Service Valve Replacement, 3/4" Single EA 8 $8,400.00 $3,200.00 $11,856.00 $14,400.00 $13,184.00 $5,200.00 14 Water Service Valve Replacement, 1" Single EA 6 $8,100.00 $4,800.00 $9,864.00 $11,400.00 $10,488.00 $4,500.00 15 Freeze Water Service for Valve Replacement EA 12 $6,000.00 $6,000.00 $35,676.00 $31,200.00 $11,688.00 $7,800.00 16 Additional 1-foot Excavation Depth EA 7 $2,450.00 $70.00 $12,999.00 $4,900.00 $22,204.00 $1,400.00 17 3" Asphalt Patch Paving SF 2500 $67,500.00 $40,000.00 $42,500.00 $60,000.00 $27,500.00 $30,000.00 18 4" Asphalt Patch Paving SF 5600 $154,000.00 $98,000.00 $78,400.00 $162,400.00 $67,200.00 $84,000.00 $916,350.00 $965,070.00 $1,091,711.00 $1,136,350.00 $1,159,002.00 $967,900.00 $916,350.00 $965,070.00 $1,091,711.00 $1,136,350.00 $1,159,002.00 $967,900.00 Subtotal Total 2026 Water Meter Installation Project 2026 Water Meter Installation Project Bid Opening: Friday, May 8, 2026, at 10:00 a.m. During staff reviews of the bids received, several minor irregularities and informational items were identified within the three lowest bids. These items were reviewed and verified by staff and were determined not to affect the responsiveness of the bids. Deviations and information identified during bid analysis of the three lowest responsive and responsible bids received: White Rock Construction, Inc. • List of Subcontractors o The DIR Registration number of one subcontractor listed on the Bid Form did not appear on the California Department of Industrial Relations (DIR) websites. o Staff obtained and verified the correct DIR Registration number and confirmed that the subcontractor is properly registered and current with the DIR. • Equipment Materials and Supply List o One of the Equipment and Suppliers listed on the Bid form was spelled incorrectly. o Staff was able to verify the correct entity name and that they meet District requirements. • Bidder’s General Information o Item 6 included the name of the agent, along with the brokerage address and phone number. The name, address, and phone number of the surety company were not provided. o Staff contacted the agent directly to obtain the surety information and was able to determine that the Bid Bond is valid and that the surety company meets District requirements. • Certification by Contractor’s Insurance Broker o The insurance company name was spelled incorrectly on the certification form. o Staff contacted the agent directly, obtained the correct insurance company information, and verified that the coverage meets the District requirements. Vinciguerra Construction, Inc. • Equipment Materials and Supply List o The full names of some suppliers were not listed. These suppliers are industry standard and staff was able to determine the intended suppliers. F. W. Carson Co. • Bidder’s General Information o Item 6 included the name of the surety company, but not the address or phone number. The address and phone number of the broker agency were included, but not the agent’s name. o Staff contacted the brokerage agency directly and was able to speak to the agent to confirm that the Bid Bond is valid and that the surety company meets District requirements. • List of Subcontractors o The address of the subcontractor was not provided. o Staff obtained and verified the entity name and confirmed that the subcontractor is properly licensed with the CSLB and registered and current with the DIR. Summary Staff reviewed the bid documents submitted by the three apparent lowest bidders and verified the items noted above. The identified irregularities were determined to be minor and did not affect the responsiveness of the bids or the bidders’ ability to perform the work. 2026 Water Meter Installation Project CONTRACTOR’S SUBCONTRACTORS 1 WHITE ROCK CONSTRUCTION, INC. Description of Work Subcontractors Name & Address Asphalt Paving Item 17, 18 12.07% Qualcon Contractors, Inc. P.O. Box 2889 Minden, NV 89423 CA#684075; CA DIR(PWC) #1000007403 House Connection Plumbing Item 11 2.48% Summit Plumbing Co 1165 Sawmill Rd Gardnerville, NV 89410 CA#1107679 (C36); CA DIR(PWC) #1001128721 Trucking 3.01% Hansen Trucking, Inc P.O. Box 1183 Gardnerville, NV 89410 CA DIR(PWC) #10006657906 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer Aggregate Base Material Knox Material / Knox Material Asphalt mixes for paved areas Tahoe Asphalt / Tahoe Asphalt Concrete and grout mixes Sierra Tahoe Ready Mix / Sierra Tahoe Ready Mix Piping and Fittings Pipe – Western Nevada Supply / Centennial Plastics Fittings – Western Nevada Supply / Ford Meter Box – Western Nevada Supply / Mueller Company Meter and valve boxes Western Nevada Supply / Jensen Precast Pipe Bedding Material Knox Material / Knox Material Service valves, 2” and smaller Western Nevada Supply / Mueller Company Revegetation Materials Comstock Seed / Local Source, Comstock Seed Meter Pits and Setters Western Nevada Supply / Mueller Company VINCIGUERRA CONSTRUCTION, INC. Description of Work Subcontractors & Address Sawcutting (P) 1% Austerman, Inc. 1960 Channel Dr. West Sacramento, CA 95691 CA#686965; CA DIR(PWC)#1000004658 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer Aggregate Base Material V & T Rock / V & T Rock Asphalt mixes for paved areas Tahoe Asphalt / Tahoe Asphalt Concrete and grout mixes Sierra Tahoe Ready Mix/Sierra Tahoe Ready Mix 2026 Water Meter Installation Project CONTRACTOR’S SUBCONTRACTORS 2 Piping and fittings Service Pipe – CAP Floww / ADS Brass Fittings – CAP Floww / AY McDonald Meter and valve boxes CAP Floww / Jensen Precast Pipe Bedding Material Cinderlite / Cinderlite Service valves, 2” and smaller CAP Floww / AY McDonald Revegetation materials Comstock Seed / Comstock Seed Meter Pits and Setters CAP Floww / AY McDonald F.W. Carson Co. Description of Work Subcontractors & Address Hot Tap & Freeze Water Line 0.02% Tap Master, Inc. 1647 Willow Pass Rd #136 Concord, CA 94520 CA#697696; CA DIR(PWC)#1000000405 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer Aggregate Base Material Cinderlite Trucking Corp / Cinderlite Trucking Corp Asphalt mixes for paved areas Tahoe Asphalt / Tahoe Asphalt Concrete and grout mixes Sierra Tahoe Ready Mix / Sierra Tahoe Ready Mix Piping and Fittings Western Nevada Supply / Mueller Company Meter and valve boxes Western Nevada Supply / Jensen Precast Pipe Bedding Material Al’s Excavating / Al’s Excavating Service valves, 2” and smaller Western Nevada Supply / Mueller Company Revegetation Materials None / None Meter Pits and Setters Western Nevada Supply / Mueller Company Haen Constructors Description of Work Subcontractors & Address Paving Line Items 17 & 18 17% Ron Fuller Construction 2092 Eloise Ave South Lake Tahoe, CA 96150 CA#517412; CA DIR(PWC)#1000018557 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer Aggregate Base Material Brunswick Canyon Matl’s / Brunswick Canyon Matl’s Asphalt mixes for paved areas Tahoe Asphalt / Tahoe Asphalt Concrete and grout mixes Sierra Tahoe Ready Mix / Sierra Tahoe Ready Mix Piping and Fittings Western Nevada Supply / Centennial Plastics, Ford/Mueller 2026 Water Meter Installation Project CONTRACTOR’S SUBCONTRACTORS 3 Meter and valve boxes Western Nevada Supply / Jensen Infrastructure Pipe Bedding Material Brunswick Canyon Matl’s / Brunswick Canyon Matl’s Service valves, 2” and smaller Western Nevada Supply / Mueller Company Revegetation Materials Haen Constructors / Haen Constructors Meter Pits and Setters Western Nevada Supply / Mueller Company Alcon Construction & Engineering, Inc. Description of Work Subcontractors Name & Address Traffic Control, Signs/rentals 5% Road-Tech Safety Services 4151 South Shingle Rd, Suite #1 Shingle Springs, CA 95682 CA#796857; CA DIR(PWC)#0022833 Hydro Excavation & Trucking 10% Island Excavating P.O. Box 10251 South Lake Tahoe, CA 96150 CA#986174; CA DIR(PWC)#1001168052 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer Aggregate Base Material Cinderlite / Cinderlite Asphalt mixes for paved areas Tahoe Asphalt / Tahoe Asphalt Concrete and grout mixes Sierra Tahoe Ready Mix / Sierra Tahoe Ready Mix Piping and Fittings Pipe – Western Nevada Supply / Centennial Plastics Fittings – Western Nevada Supply / Ford Meter Box – Western Nevada Supply / Mueller Company Meter and valve boxes Western Nevada Supply / Jensen Precast Pipe Bedding Material Cinderlite / Cinderlite Service valves, 2” and smaller Western Nevada Supply / Mueller Company Revegetation Materials Tahoe Outdoor Living / Tahoe Outdoor Living Meter Pits and Setters Western Nevada Supply / Mueller Company