HomeMy WebLinkAbout2026.03.19 District Board Agenda Packet E UTH TA110 • 1950 • `Na `G, Noe �C UTILITY p`STP SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, March 19, 2026 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Joel Henderson, Director BOARD MEMBERS Kelly Sheehan, Director Nick Haven, Vice President Shane Romsos, President Nick Exline, Director Paul Hughes, General Manager Andrea Salazar, Chief Financial Officer 1 . CALL TO ORDER REGULAR MEETING- PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE PUBLIC (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION 6. ITEMS FOR BOARD ACTION a. 2026 Stateline Tanks Recoating Project (Brent Goligoski,Senior Engineer) (1) Adopt the Addenda to the design Plans and Specifications pursuant to California Government Code Section 830.6; (2) Find minor irregularities in the bid from Unified Field Services Corporation to be immaterial and waive immaterial irregularities; and (3) Award Contract for the 2026 Stateline Tanks Recoating Project to the lowest responsive, responsible bidder, Unified Field Services Corporation, in the amount of $2,000,964. b. 2026 Advanced Metering Infrastructure Water Meter Installation Project (Laura Hendrickson, P.E.,Associate Engineer) 1) Adopt the Project Plans and Specifications for the 2026 Advanced Metering Infrastructure Water Meter Installation Project per California Government Code 830.6; 2) Find Sensus meters as the sole-brand per Public Contracting Code Section 3400(c) reason 2; and 3) Authorize District staff to advertise for construction bids for the 2026 AMI Water Meter Installation Project. REGULAR BOARD MEETING AGENDA-March 19, 2026 PAGE-2 c. 2026 Facilities HVAC Upgrades (Laura Hendrickson, P.E.,Associate Engineer) 1) Approve the proposed Scope of Work by Integrated Project Solutions for 2026 Facilities HVAC Upgrades; and 2) Authorize the General Manager to execute a Professional Services Agreement and Task Order No. 1 with Integrated Project Solutions in the amount of $128,650. d. Liability Claim Against South Tahoe Public Utility District Received from Charter Communications (Ryan Lee, Customer Service Manager) Reject the Claim against South Tahoe Public Utility District for losses allegedly sustained by Charter Communications. 7. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS (Discussions may take place; however, no action will be taken.) 8. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) a. State of the Groundwater Basin (Mark Seelos, Water Resource Manager) 10. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) 1 1. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 03/05/2026-2:00 p.m. Regular Board Meeting at the District 03/10/2026-3:30 p.m. Operations Committee Meeting at the District 03/11/2026- 10:00 a.m. El Dorado Water Agency Meeting in Placerville 03/18/2026-8:00 a.m. Employee Communications Committee Meeting (Henderson Representing) Future Meetings/Events 04/02/2026- 2:00 p.m. Regular Board Meeting at the District 12. ITEMS FOR CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed-three minute limit.) a. Pursuant to Section 54956.9(d)(1) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Yolo County Superior Court Case CV 2021-1686, Alpine County vs. South Tahoe Public Utility District; et al. ADJOURNMENT (The next Regular Board Meeting is Thursday, April 2, 2026, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month.A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m.and 5:00 p.m.,Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved.Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only.Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged.Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard;comments should be brief and directed to the specifics of the item being considered.Please provide the Clerk of the Board with a copy of all written materials presented at the meeting.Comments on items not on the Agenda can be heard during"Comments from the Audience;" however,action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda,which are not included with the Board packet,will be made available for public inspection at the same time they are distributed or made available to the Board,and can be viewed at the District office,at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings.If particular accommodations are needed,please contact the Clerk of the Board at(530) 544-6474,extension 6203.All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA -March 19, 2026 PAGE -3 H TA/yptc ec A14s) r • 1 9 5 0 ' S�P�G� IC UTILITY D1 SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR Thursday, March 19, 2026 ITEMS FOR CONSENT a. RECEIVE AND FILE PAYMENT OF CLAIMS (Greg Dupree, Accounting Manager) Receive and file Payment of Claims in the amount of $1,569,060.30. b. REGULAR BOARD MEETING MINUTES: March 5, 2026 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve March 5, 2026, Minutes PAYMENT OF CLAIMS FOR APPROVAL March 19, 2026 Payroll 3/3/26 710,436.42 Total Payroll 710,436.42 ADP & Insight eTools 1,112.00 AFLAC/WageWorks claims and fees 295.20 Ameritas - Insurance Payments 8,857.00 Total Vendor EFT 10,264.20 Weekly Approved Check Batches Water Sewer Total Wednesday, March 4, 2026 275,812.91 145,898.03 421,710.94 Wednesday, March 11, 2026 111,243.69 309,567.15 420,810.84 Checks, Voids and Reissues 0.00 697.76 697.76 Total Accounts Payable Checks 843,219.54 Utility Management Refunds 5,140.14 Total Utility Management Checks 5,140.14 Grand Total $1,569,060.30 Payroll EFTs & Checks 3/3/2026 EFT CA Employment Taxes &W/H 35,709.95 EFT Federal Employment Taxes &W/H 154,954.76 EFT CaIPERS Contributions 101,996.61 EFT Empower Retirement-Deferred Comp 27,859.08 EFT Stationary Engineers Union Dues 3,284.32 EFT CDHP Health Savings (HSA) 7,401.24 EFT Retirement Health Savings 22,857.12 EFT Employee Direct Deposits 355,323.04 CHK Employee Garnishments 177.69 CHK Employee Paychecks 872.61 Total 710,436.42 sOVTH TgHO Payment of Claims -a- Payment Date Range 02/26/26 - 03/11/26 s" Report By Vendor - Invoice A&az er . 1950 • w��`o Summary Listing G UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 44039-AFLAC 035075 Insurance Supplement Payable Paid by EFT#6345 02/25/2026 03/04/2026 02/28/2026 03/04/2026 653.94 Vendor 44039-AFLAC Totals Invoices 1 $653.94 Vendor 48605-AIRGAS USA LLC 9169153305 Field,Shop&Safety Supplies Paid by EFT#6346 02/09/2026 03/04/2026 02/28/2026 03/04/2026 424.45 Inventory Vendor 48605-AIRGAS USA LLC Totals Invoices 1 $424.45 Vendor 49581-ALERT MEDIA INC INV42606 Service Contracts Paid by EFT#6347 02/21/2026 03/04/2026 04/30/2026 03/04/2026 5,603.76 Vendor 49581-ALERT MEDIA INC Totals Invoices 1 $5,603.76 Vendor 43949-ALPEN SIERRA COFFEE ROASTING CO 253723 Office Supply Issues Paid by EFT#6348 02/24/2026 03/04/2026 02/28/2026 03/04/2026 138.50 253724 Office Supply Issues Paid by EFT#6348 02/24/2026 03/04/2026 02/28/2026 03/04/2026 78.65 253900 Office Supply Issues Paid by EFT#6397 03/03/2026 03/11/2026 03/31/2026 03/11/2026 138.50 253901 Office Supply Issues Paid by EFT#6397 03/03/2026 03/11/2026 03/31/2026 03/11/2026 78.65 Vendor 43949-ALPEN SIERRA COFFEE ROASTING CO Totals Invoices 4 $434.30 Vendor 10906-ALPINE COUNTY TAX COLLECTOR 2nd 25-26 Land Taxes Paid by Check#115293 09/03/2025 03/11/2026 03/31/2026 03/11/2026 53,223.47 Vendor 10906-ALPINE COUNTY TAX COLLECTOR Totals Invoices 1 $53,223.47 Vendor 50108-ALPINE WATERSHED GROUP 18ALPINEWP1 DWR PROP 1 IRWM INV#18 Paid by EFT#6349 03/02/2026 03/04/2026 03/02/2026 03/04/2026 44,414.56 Vendor 50108-ALPINE WATERSHED GROUP Totals Invoices 1 $44,414.56 Vendor 49337-AMAZON CAPITAL SERVICES INC 1MV6-QY9D-FW1X Generators Paid by EFT#6350 02/16/2026 03/04/2026 02/28/2026 03/04/2026 837.36 1GR4-VJNM-1XCL Shop Supplies Paid by EFT#6350 02/26/2026 03/04/2026 02/28/2026 03/04/2026 442.55 Vendor 49337-AMAZON CAPITAL SERVICES INC Totals Invoices 2 $1,279.91 Vendor 49951-ARIAT INTERNATIONAL INC 9002944456 Safety Equipment-Physicals Paid by EFT#6398 02/11/2026 03/11/2026 02/28/2026 03/11/2026 843.52 9003011860 Safety Equipment-Physicals Paid by EFT#6398 02/18/2026 03/11/2026 02/28/2026 03/11/2026 295.76 Vendor 49951-ARIAT INTERNATIONAL INC Totals Invoices 2 $1,139.28 Vendor 45202-AT&T MOBILITY 287257798939 226 Telephone Paid by EFT#6399 02/19/2026 03/11/2026 02/28/2026 03/11/2026 186.44 Vendor 45202-AT&T MOBILITY Totals Invoices 1 $186.44 Vendor 48000-AT&T/CALNET 3 000024835745 Telephone Paid by EFT#6351 02/20/2026 03/04/2026 02/28/2026 03/04/2026 31.61 000024835747 Telephone Paid by EFT#6351 02/20/2026 03/04/2026 02/28/2026 03/04/2026 920.92 000024835748 Telephone Paid by EFT#6351 02/20/2026 03/04/2026 02/28/2026 03/04/2026 115.85 000024836001 Telephone Paid by EFT#6351 02/20/2026 03/04/2026 02/28/2026 03/04/2026 31.76 Vendor 48000-AT&T/CALNET 3 Totals Invoices 4 $1,100.14 Vendor 50103-AZUL ELECTRIC SUPPLY LLC 012422 Shop Supplies Paid by EFT#6352 02/19/2026 03/04/2026 02/28/2026 03/04/2026 278.46 012441 Shop Supplies Paid by EFT#6400 02/24/2026 03/11/2026 02/28/2026 03/11/2026 22.49 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 1 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 ,% Report By Vendor - Invoice A&az er . 1950 • W��`0 Summary Listing C UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 50103-AZUL ELECTRIC SUPPLY LLC Totals Invoices 2 $300.95 Vendor 49269- BACKGROUNDS ONLINE 589576 Personnel Expense Paid by EFT#6401 12/31/2025 03/11/2026 02/28/2026 03/11/2026 58.10 Vendor 49269-BACKGROUNDS ONLINE Totals Invoices 1 $58.10 Vendor 49339-BASEFORM INC 02232026-401 Pipe-Covers &Manholes Paid by EFT#6353 02/23/2026 03/04/2026 02/28/2026 03/04/2026 2,430.00 02232026-402 Pipe-Covers &Manholes Paid by EFT#6353 02/23/2026 03/04/2026 02/28/2026 03/04/2026 2,584.87 Vendor 49339-BASEFORM INC Totals Invoices 2 $5,014.87 Vendor 50486-CARRIE BAUWENS MILEAGE 021226 Travel-Meetings-Education Paid by EFT#6354 02/23/2026 03/04/2026 02/28/2026 03/04/2026 102.23 Vendor 50486-CARRIE BAUWENS Totals Invoices 1 $102.23 Vendor 45009-BENTLY RANCH 214123 Biosolid Disposal Costs Paid by EFT#6402 02/17/2026 03/11/2026 02/28/2026 03/11/2026 1,397.70 214140 Biosolid Disposal Costs Paid by EFT#6402 02/24/2026 03/11/2026 02/28/2026 03/11/2026 1,618.50 214156 Biosolid Disposal Costs Paid by EFT#6402 03/02/2026 03/11/2026 03/31/2026 03/11/2026 1,643.70 Vendor 45009-BENTLY RANCH Totals Invoices 3 $4,659.90 Vendor 48768-BOBCAT OF RENO INC P49625 Automotive Paid by EFT#6355 02/18/2026 03/04/2026 02/28/2026 03/04/2026 747.66 P49672 Automotive Paid by EFT#6355 02/20/2026 03/04/2026 02/28/2026 03/04/2026 766.03 P49776 Automotive Paid by EFT#6403 02/26/2026 03/11/2026 03/31/2026 03/11/2026 350.38 Vendor 48768-BOBCAT OF RENO INC Totals Invoices 3 $1,864.07 Vendor 50431- BREAKTHROUGH TRAINING 3850 Staff Development Paid by EFT#6356 02/03/2026 03/04/2026 03/31/2026 03/04/2026 3,500.00 Vendor 50431-BREAKTHROUGH TRAINING Totals Invoices 1 $3,500.00 Vendor 48638-CALIFORNIA RURAL WATER ASSOC 2026 Dues-Memberships- Paid by EFT#6404 03/01/2026 03/11/2026 03/31/2026 03/11/2026 1,745.00 Certification Vendor 48638-CALIFORNIA RURAL WATER ASSOC Totals Invoices 1 $1,745.00 Vendor 42328-CDW-G CORP AI16S5C Service Contracts Paid by EFT#6357 02/19/2026 03/04/2026 02/28/2026 03/04/2026 214.94 AI2EE2H Service Contracts Paid by EFT#6357 02/20/2026 03/04/2026 02/28/2026 03/04/2026 8,594.54 AI3DF9P Service Contracts Paid by EFT#6357 02/27/2026 03/04/2026 02/28/2026 03/04/2026 6,299.44 Vendor 42328-CDW-G CORP Totals Invoices 3 $15,108.92 Vendor 48672-CINTAS CORP 5317201701 Safety Equipment-Physicals Paid by EFT#6358 02/06/2026 03/04/2026 02/28/2026 03/04/2026 484.59 Vendor 48672-CINTAS CORP Totals Invoices 1 $484.59 Vendor 12535-CITY OF SOUTH LAKE TAHOE AR206260 Caltrans-City-County- Paid by EFT#6405 02/06/2026 03/11/2026 02/28/2026 03/11/2026 14,554.00 Improvements 2501076 Turf Buy-Back Program Paid by EFT#6405 03/04/2026 03/11/2026 03/31/2026 03/11/2026 5,000.00 2716103 Turf Buy-Back Program Paid by EFT#6405 03/04/2026 03/11/2026 03/31/2026 03/11/2026 5,000.00 2732317 Turf Buy-Back Program Paid by EFT#6405 03/04/2026 03/11/2026 03/31/2026 03/11/2026 5,000.00 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 2 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 ,% Report By Vendor - Invoice A&az er . 1 950 � Nisi��`0 Summary Listing C UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 12535-CITY OF SOUTH LAKE TAHOE Totals Invoices 4 $29,554.00 Vendor 40512-CODALE ELECTRIC SUPPLY S009711034.001 Al Tahoe/Bayview Backup Power Paid by EFT#6359 02/19/2026 03/04/2026 02/28/2026 03/04/2026 8,125.48 S009727676.001 Pump Stations Paid by EFT#6359 02/25/2026 03/04/2026 02/28/2026 03/04/2026 4,175.57 Vendor 40512-CODALE ELECTRIC SUPPLY Totals Invoices 2 $12,301.05 Vendor 49778-COLUMN SOFTWARE PBC B41A7C18-0052 Ads-Legal Notices Paid by EFT#6406 02/16/2026 03/11/2026 02/28/2026 03/11/2026 148.94 Vendor 49778-COLUMN SOFTWARE PBC Totals Invoices 1 $148.94 Vendor 42897-CWEA GOLIGOSKI APP 26 Dues-Memberships- Paid by Check#115284 02/25/2026 02/25/2026 02/28/2026 02/27/2026 255.00 Certification MITCHELL APP 26 Dues-Memberships- Paid by Check#115284 02/25/2026 02/25/2026 02/28/2026 02/27/2026 240.00 Certification Vendor 42897-CWEA Totals Invoices 2 $495.00 Vendor 13854-D&L SUPPLY&CO INC 0000191667 Manhole Frames-Lids-Other Paid by EFT#6407 03/02/2026 03/11/2026 03/31/2026 03/11/2026 35,293.73 Parts Inventory 0000191668 Manhole Frames- Lids-Other Paid by EFT#6407 03/02/2026 03/11/2026 03/31/2026 03/11/2026 6,046.50 Parts Inventory Vendor 13854-D&L SUPPLY&CO INC Totals Invoices 2 $41,340.23 Vendor 49694-DIGITAL TECHNOLOGY SOLUTIONS INC 29806 Telephone Paid by EFT#6408 03/01/2026 03/11/2026 03/31/2026 03/11/2026 295.00 Vendor 49694-DIGITAL TECHNOLOGY SOLUTIONS INC Totals Invoices 1 $295.00 Vendor 48289-DIY HOME CENTER Feb 26 Stmt Buildings&Shop Supplies Paid by EFT#6409 02/28/2026 03/11/2026 02/28/2026 03/11/2026 921.88 Vendor 48289-DIY HOME CENTER Totals Invoices 1 $921.88 Vendor 47836-EVOQUA WATER TECHNOLOGIES LLC 907455812 Service Contracts Paid by EFT#6410 03/01/2026 03/11/2026 03/31/2026 03/11/2026 165.00 Vendor 47836-EVOQUA WATER TECHNOLOGIES LLC Totals Invoices 1 $165.00 Vendor 14890- FEDEX 9-185-53775 Postage Expenses Paid by EFT#6360 02/20/2026 03/04/2026 02/28/2026 03/04/2026 20.58 9-193-95971 Postage Expenses Paid by EFT#6411 02/27/2026 03/11/2026 02/28/2026 03/11/2026 69.97 Vendor 14890-FEDEX Totals Invoices 2 $90.55 Vendor 48294-FEDEX FREIGHT 7382921291 Bakersfield Pump/Motor Paid by EFT#6412 02/07/2026 03/11/2026 02/28/2026 03/11/2026 1,702.75 Replacement Vendor 48294-FEDEX FREIGHT Totals Invoices 1 $1,702.75 Vendor 48715-FLEETCREW-ANELLE MGMT SRV 65170 Service Contracts Paid by EFT#6361 02/25/2026 03/04/2026 02/28/2026 03/04/2026 639.00 Vendor 48715-FLEETCREW-ANELLE MGMT SRV Totals Invoices 1 $639.00 Vendor 44934-FLOWSERVE PUMP DIV 7308567 Bayview Well Rehab Paid by EFT#6413 02/19/2026 03/11/2026 02/28/2026 03/11/2026 19,946.93 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 3 of 11 sOVTH ratio Payment of Claims -a- Payment Date Range 02/26/26 - 03/11/26 s" Report By Vendor - Invoice A&az er . 1950 • w��`o Summary Listing C`UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 1249598 Sunset/Vahalla Well Spare Paid by EFT#6362 02/23/2026 03/04/2026 02/28/2026 03/04/2026 10,330.44 Submersible Motor Vendor 44934-FLOWSERVE PUMP DIV Totals Invoices 2 $30,277.37 Vendor 48402-FLYERS ENERGY LLC 26-584867 Gasoline Fuel Inventory Paid by EFT#6414 02/26/2026 03/11/2026 02/28/2026 03/11/2026 2,450.04 26-584872 Gasoline&Diesel Expense Paid by EFT#6414 02/26/2026 03/11/2026 02/28/2026 03/11/2026 1,706.47 Vendor 48402-FLYERS ENERGY LLC Totals Invoices 2 $4,156.51 Vendor 50500-DANIEL GAUL PER DIEM 031726 Travel-Meetings- Education Paid by Check#115294 02/27/2026 03/11/2026 03/31/2026 03/11/2026 136.00 Vendor 50500-DANIEL GAUL Totals Invoices 1 $136.00 Vendor 49575-JOEL GOLIGOSKI CWEA CSM2 26 Dues-Memberships- Paid by EFT#6363 02/23/2026 03/04/2026 02/28/2026 03/04/2026 119.00 Certification Vendor 49575-JOEL GOLIGOSKI Totals Invoices 1 $119.00 Vendor 15600-GRAINGER 9803623595 Pump Stations Paid by EFT#6364 02/11/2026 03/04/2026 02/28/2026 03/04/2026 121.13 9816771621 Secondary Equipment Paid by EFT#6364 02/23/2026 03/04/2026 02/28/2026 03/04/2026 263.34 9818465610 Buildings Paid by EFT#6364 02/23/2026 03/04/2026 02/28/2026 03/04/2026 261.62 9821554392 Buildings Paid by EFT#6364 02/25/2026 03/04/2026 02/28/2026 03/04/2026 59.23 Vendor 15600-GRAINGER Totals Invoices 4 $705.32 Vendor 49931- HAJOCA CORP S014897998.001 Pump Stations Paid by EFT#6365 02/25/2026 03/04/2026 02/28/2026 03/04/2026 905.27 Vendor 49931- HAJOCA CORP Totals Invoices 1 $905.27 Vendor 48332-HDR ENGINEERING INC 1200802318 Contractual Services Paid by EFT#6366 02/16/2026 03/04/2026 02/28/2026 03/04/2026 3,174.75 Vendor 48332-HDR ENGINEERING INC Totals Invoices 1 $3,174.75 Vendor 44430-HIGH SIERRA BUSINESS SYSTEMS 152056 Service Contracts Paid by EFT#6415 03/02/2026 03/11/2026 02/28/2026 03/11/2026 64.76 Vendor 44430-HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 1 $64.76 Vendor 50499- KARELLI HOLDER-BRASIL Final Check 2026 Final Check Paid by Check#115285 02/27/2026 02/27/2026 02/28/2026 02/27/2026 202.76 Vendor 50499- KARELLI HOLDER-BRASIL Totals Invoices 1 $202.76 Vendor 49604-HOUSTON MAGNANI AND ASSOCIATES 7972 Public Relations Expense Paid by EFT#6367 02/27/2026 03/04/2026 02/28/2026 03/04/2026 800.00 Vendor 49604-HOUSTON MAGNANI AND ASSOCIATES Totals Invoices 1 $800.00 Vendor 45122- HYDRAULIC INDUSTRIAL SERVICES INC 68573 Automotive Paid by EFT#6368 02/26/2026 03/04/2026 02/28/2026 03/04/2026 384.14 68574 Automotive Paid by EFT#6368 02/26/2026 03/04/2026 02/28/2026 03/04/2026 825.00 Vendor 45122- HYDRAULIC INDUSTRIAL SERVICES INC Totals Invoices 2 $1,209.14 Vendor 49984-IBIS SCIENTIFIC LLC IN087253 Laboratory Supplies Paid by EFT#6416 01/29/2026 03/11/2026 02/28/2026 03/11/2026 505.82 IN087286 Laboratory Supplies Paid by EFT#6416 01/29/2026 03/11/2026 02/28/2026 03/11/2026 241.06 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 4 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 s" Report By Vendor - Invoice A&az er . 1950 • w.100 Summary Listing C UTILITY DI— Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount IN087692 Laboratory Supplies Paid by EFT#6369 02/09/2026 03/04/2026 02/28/2026 03/04/2026 262.26 IN087590 Laboratory Supplies Paid by EFT#6416 02/10/2026 03/11/2026 02/28/2026 03/11/2026 990.07 IN087690 Laboratory Equipment Paid by EFT#6416 02/16/2026 03/11/2026 02/28/2026 03/11/2026 254.23 Vendor 49984-IBIS SCIENTIFIC LLC Totals Invoices 5 $2,253.44 Vendor 43208-IN-SITU INC SVI002261 Laboratory Equipment Paid by EFT#6417 02/11/2026 03/11/2026 02/28/2026 03/11/2026 269.07 Vendor 43208-IN-SITU INC Totals Invoices 1 $269.07 Vendor 48056-INFOSEND INC 305808 Postage Expenses and Printing Paid by EFT#6418 02/28/2026 03/11/2026 02/28/2026 03/11/2026 12,136.72 Vendor 48056-INFOSEND INC Totals Invoices 1 $12,136.72 Vendor 48140-INTEGRITY LOCKSMITH i45809 Automotive Paid by EFT#6419 02/13/2026 03/11/2026 02/28/2026 03/11/2026 156.89 i45814 Buildings Paid by EFT#6419 02/24/2026 03/11/2026 02/28/2026 03/11/2026 54.38 Vendor 48140-INTEGRITY LOCKSMITH Totals Invoices 2 $211.27 Vendor 44110-J&L PRO KLEEN INC 40227 Janitorial Services Paid by EFT#6370 02/16/2026 03/04/2026 02/28/2026 03/04/2026 7,000.00 Vendor 44110-J&L PRO KLEEN INC Totals Invoices 1 $7,000.00 Vendor 48683-JJ KELLER&ASSOC 9110896945 Service Contracts Paid by EFT#6371 01/30/2026 03/04/2026 04/30/2026 03/04/2026 2,495.00 Vendor 48683-JJ KELLER&ASSOC Totals Invoices 1 $2,495.00 Vendor 50024-JONES MAYER 138523 Legal Services December 2025 Paid by EFT#6420 12/31/2025 03/11/2026 12/31/2025 03/11/2026 4,898.81 139385 Legal Services January 2026 Paid by EFT#6420 01/31/2026 03/11/2026 01/31/2026 03/11/2026 2,496.50 Vendor 50024-JONES MAYER Totals Invoices 2 $7,395.31 Vendor 40821-KENNEDY JENKS CONSULTANTS INC 186303 Contractual Services Paid by EFT#6421 02/26/2026 03/11/2026 02/28/2026 03/11/2026 4,340.70 Vendor 40821- KENNEDY JENKS CONSULTANTS INC Totals Invoices 1 $4,340.70 Vendor 49725-LAKESIDE TERMITE&PEST CONTROL 021616978 Buildings Paid by EFT#6422 02/26/2026 03/11/2026 02/28/2026 03/11/2026 475.00 013771407 Buildings Paid by EFT#6422 03/04/2026 03/11/2026 03/31/2026 03/11/2026 150.00 Vendor 49725-LAKESIDE TERMITE&PEST CONTROL Totals Invoices 2 $625.00 Vendor 22200-LANGENFELD ACE HARDWARE Feb 26 Stmt Buildings&Shop Supplies Paid by EFT#6372 02/28/2026 03/04/2026 02/28/2026 03/04/2026 503.48 Vendor 22200- LANGENFELD ACE HARDWARE Totals Invoices 1 $503.48 Vendor 22550-LIBERTY UTILITIES 200008895860 226 Electricity Paid by Check#115287 02/18/2026 03/04/2026 02/28/2026 03/04/2026 1,038.27 200008895969 126 Electricity Paid by Check#115287 02/18/2026 03/04/2026 02/28/2026 03/04/2026 18,706.33 200008919454 126 Electricity Paid by Check#115287 02/18/2026 03/04/2026 02/28/2026 03/04/2026 74.07 200008928315 126 Electricity Paid by Check#115287 02/18/2026 03/04/2026 02/28/2026 03/04/2026 13,438.40 200008937290 126 Electricity Paid by Check#115287 02/18/2026 03/04/2026 02/28/2026 03/04/2026 32.09 200008923563 226 Electricity Paid by Check#115287 02/19/2026 03/04/2026 02/28/2026 03/04/2026 3,448.09 200008904043 226 Electricity Paid by Check#115287 02/20/2026 03/04/2026 02/28/2026 03/04/2026 845.15 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 5 of 11 sOVTH TgHO Payment of Claims -a- Payment Date Range 02/26/26 - 03/11/26 ,% Report By Vendor - Invoice 'O&az 1950 w.100 Summary Listing C UTILITY p18 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 200008919538 226 Electricity Paid by Check#115286 02/20/2026 03/04/2026 02/28/2026 03/04/2026 45.12 200008919603 226 Electricity Paid by Check#115287 02/20/2026 03/04/2026 02/28/2026 03/04/2026 414.20 200008923399 226 Electricity Paid by Check#115286 02/20/2026 03/04/2026 02/28/2026 03/04/2026 5,295.89 200008895654 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 583.29 200008895761 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 898.88 200008923795 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 336.46 200008928927 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 411.03 200008932457 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 27.39 200008932648 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 163.47 200008932747 226 Electricity Paid by Check#115295 02/25/2026 03/11/2026 02/28/2026 03/11/2026 90.35 200008923704 226 Electricity Paid by Check#115295 02/26/2026 03/11/2026 02/28/2026 03/11/2026 132,009.29 200008909257 226 Electricity Paid by Check#115296 02/27/2026 03/11/2026 02/28/2026 03/11/2026 3,199.98 200008928828 226 Electricity Paid by Check#115296 02/27/2026 03/11/2026 02/28/2026 03/11/2026 97.25 200008932168 226 Electricity Paid by Check#115296 02/27/2026 03/11/2026 02/28/2026 03/11/2026 4,318.92 200008937415 226 Electricity Paid by Check#115296 02/27/2026 03/11/2026 02/28/2026 03/11/2026 28.47 Vendor 22550-LIBERTY UTILITIES Totals Invoices 22 $185,502.39 Vendor 50498-JOE LICHTENSTEIN 3482119 Water Use Reduction Rebates Paid by EFT#6423 02/26/2026 03/11/2026 02/28/2026 03/11/2026 482.15 Vendor 50498-JOE LICHTENSTEIN Totals Invoices 1 $482.15 Vendor 47903-LINDE GAS&EQUIPMENT INC 55047481 Shop Supplies Paid by EFT#6424 02/22/2026 03/11/2026 02/28/2026 03/11/2026 804.10 55061649 Shop Supplies Paid by EFT#6424 02/22/2026 03/11/2026 02/28/2026 03/11/2026 82.73 Vendor 47903-LINDE GAS&EQUIPMENT INC Totals Invoices 2 $886.83 Vendor 45059-LUMOS&ASSOCIATES 131051 FLL FM Shorezone Stabilization Paid by EFT#6373 02/13/2026 03/04/2026 02/28/2026 03/04/2026 2,900.00 Vendor 45059-LUMOS&ASSOCIATES Totals Invoices 1 $2,900.00 Vendor 48169-MCCi LLC NE26953 Laserfiche Upgrade Paid by EFT#6374 01/16/2026 03/04/2026 02/28/2026 03/04/2026 4,028.22 Vendor 48169-MCCi LLC Totals Invoices 1 $4,028.22 Vendor 21701- MCCLATCHY COMPANY LLC IN124431 Ads-Legal Notices Paid by EFT#6425 02/28/2026 03/11/2026 02/28/2026 03/11/2026 514.03 Vendor 21701-MCCLATCHY COMPANY LLC Totals Invoices 1 $514.03 Vendor 18150-MEEKS LUMBER&HARDWARE Feb 26 Stmt Buildings&Small Tools Paid by EFT#6426 02/28/2026 03/11/2026 02/28/2026 03/11/2026 970.90 Vendor 18150-MEEKS LUMBER&HARDWARE Totals Invoices 1 $970.90 Vendor 49765-NAPA AUTO PARTS Feb 26 Stmt Automotive&Shop Supplies Paid by EFT#6427 02/28/2026 03/11/2026 02/28/2026 03/11/2026 3,910.29 Vendor 49765-NAPA AUTO PARTS Totals Invoices 1 $3,910.29 Vendor 49208-NEVADA NEWS GROUP 57217 Ads-Legal Notices Paid by EFT#6428 01/31/2026 03/11/2026 02/28/2026 03/11/2026 805.00 57218 Ads-Legal Notices Paid by EFT#6428 01/31/2026 03/11/2026 02/28/2026 03/11/2026 325.00 Vendor 49208-NEVADA NEWS GROUP Totals Invoices 2 $1,130.00 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 6 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 ,% Report By Vendor - Invoice A&az er . 1 950 � Nisi��`0 Summary Listing C`UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 44872-NEW RESOURCES GROUP INC 00056644 Water Conservation Supplies Paid by EFT#6375 02/18/2026 03/04/2026 02/28/2026 03/04/2026 1,999.00 Vendor 44872- NEW RESOURCES GROUP INC Totals Invoices 1 $1,999.00 Vendor 19355-NEWARK IN ONE 38526750 Pump Stations Paid by EFT#6376 02/19/2026 03/04/2026 02/28/2026 03/04/2026 291.47 Vendor 19355-NEWARK IN ONE Totals Invoices 1 $291.47 Vendor 48565-PLANETBIDS INC 1024409 Service Contracts Paid by EFT#6377 02/12/2026 03/04/2026 02/28/2026 03/04/2026 10,926.18 Vendor 48565-PLANETBIDS INC Totals Invoices 1 $10,926.18 Vendor 49961- PLATINUM ADVISORS LLC 39948 Public Relations Expense Paid by EFT#6378 03/01/2026 03/04/2026 03/31/2026 03/04/2026 750.00 Vendor 49961-PLATINUM ADVISORS LLC Totals Invoices 1 $750.00 Vendor 50182- RDO EQUIPMENT CO E0356276 Replace Mole Paid by EFT#6379 02/26/2026 03/04/2026 02/28/2026 03/04/2026 9,046.98 Vendor 50182-RDO EQUIPMENT CO Totals Invoices 1 $9,046.98 Vendor 49732-REINTECH LLC 6D5KRGC3-0001 Service Contracts Paid by EFT#6380 02/26/2026 03/04/2026 02/28/2026 03/04/2026 250.00 Vendor 49732-REINTECH LLC Totals Invoices 1 $250.00 Vendor 48144-RELIANCE STANDARD JAN26A LTD/Life Insurance Management Paid by Check#115288 01/01/2026 03/04/2026 01/31/2026 03/04/2026 2,938.57 JAN2026 Voluntary Life Payable Paid by Check#115288 01/09/2026 03/04/2026 01/31/2026 03/04/2026 1,482.53 JAN26B LTD/Life Insurance Union/Board Paid by Check#115288 01/12/2026 03/04/2026 01/31/2026 03/04/2026 3,439.88 Payable FEB2026 Voluntary Life Payable Paid by Check#115288 02/01/2026 03/04/2026 02/28/2026 03/04/2026 1,496.98 FEB26A LTD/Life Insurance Management Paid by Check#115288 02/01/2026 03/04/2026 02/28/2026 03/04/2026 2,938.57 FEB26B LTD/Life Insurance Union/Board Paid by Check#115288 02/01/2026 03/04/2026 02/28/2026 03/04/2026 3,370.59 Payable Vendor 48144-RELIANCE STANDARD Totals Invoices 6 $15,667.12 Vendor 48110-ROCKWELL SOLUTIONS INC 3749 TKSPS Spare Seal Paid by EFT#6381 03/02/2026 03/04/2026 02/28/2026 03/04/2026 6,955.46 Vendor 48110-ROCKWELL SOLUTIONS INC Totals Invoices 1 $6,955.46 Vendor 50472-SCHAAF&WHEELER CONSULTING CIVIL ENGINEERS 42811 Force Main ARV Replacement Paid by EFT#6382 01/31/2026 03/04/2026 02/28/2026 03/04/2026 20,098.50 Vendor 50472-SCHAAF&WHEELER CONSULTING CIVIL ENGINEERS Totals Invoices 1 $20,098.50 Vendor 48911-JOHN SHERIDAN CWEA LAB2 2026 Dues-Memberships- Paid by EFT#6429 03/05/2026 03/11/2026 03/31/2026 03/11/2026 119.00 Certification Vendor 48911-JOHN SHERIDAN Totals Invoices 1 $119.00 Vendor 48944-CHRISTOPHER SKELLY PER DIEM 033126 Travel-Meetings-Education Paid by EFT#6430 02/11/2026 03/11/2026 03/31/2026 03/11/2026 159.00 Vendor 48944-CHRISTOPHER SKELLY Totals Invoices 1 $159.00 Vendor 45014-SMITH POWER PRODUCTS INC Run by Erika Franco on 03/11/2026 12:44:42 PM Page 7 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 s" Report By Vendor - Invoice A&az er . 1 950 � W •��`0 Summary Listing C UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 3267197 Generators Paid by EFT#6383 07/09/2025 03/04/2026 02/28/2026 03/04/2026 (3,306.64) 592148 Generator Controller Assembly Paid by EFT#6383 02/09/2026 03/04/2026 02/28/2026 03/04/2026 8,573.50 Vendor 45014-SMITH POWER PRODUCTS INC Totals Invoices 2 $5,266.86 Vendor 23450-SOUTH TAHOE REFUSE 440408 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 224.68 440343 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 2,359.14 440450 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 674.04 440492 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 850.00 440598 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 674.04 440931 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 1,348.08 447491 Refuse Disposal Paid by EFT#6431 03/01/2026 03/11/2026 02/28/2026 03/11/2026 832.18 Vendor 23450-SOUTH TAHOE REFUSE Totals Invoices 7 $6,962.16 Vendor 45168-SOUTHWEST GAS 910004972305 226 Natural Gas Paid by EFT#6432 02/23/2026 03/11/2026 02/28/2026 03/11/2026 81.54 910005005635 226 Natural Gas Paid by EFT#6432 02/23/2026 03/11/2026 02/28/2026 03/11/2026 93.00 910000416139 226 Natural Gas Paid by EFT#6432 02/24/2026 03/11/2026 02/28/2026 03/11/2026 555.82 910000192416 226 Natural Gas Paid by EFT#6432 02/25/2026 03/11/2026 02/28/2026 03/11/2026 604.18 910000421502 226 Natural Gas Paid by EFT#6432 02/26/2026 03/11/2026 02/28/2026 03/11/2026 1,461.26 910000429959 226 Natural Gas Paid by EFT#6432 02/26/2026 03/11/2026 02/28/2026 03/11/2026 203.65 910000429960 226 Natural Gas Paid by EFT#6432 02/26/2026 03/11/2026 02/28/2026 03/11/2026 18,441.29 910005021566 226 Natural Gas Paid by EFT#6432 02/26/2026 03/11/2026 02/28/2026 03/11/2026 1,912.60 Vendor 45168-SOUTHWEST GAS Totals Invoices 8 $23,353.34 Vendor 50117-SPECTRA SERVICES INC 113338 New Analytical Balance Paid by EFT#6384 02/17/2026 03/04/2026 02/28/2026 03/04/2026 10,816.93 Vendor 50117-SPECTRA SERVICES INC Totals Invoices 1 $10,816.93 Vendor 49588-MATTHEW STEVENS NV DMV 2026 REIM Dues-Memberships- Paid by EFT#6385 02/24/2026 03/04/2026 02/28/2026 03/04/2026 255.00 Certification Vendor 49588-MATTHEW STEVENS Totals Invoices 1 $255.00 Vendor 24050-TAHOE BASIN CONTAINER SERVICE 447965 Biosolid Disposal Costs Paid by EFT#6433 03/01/2026 03/11/2026 02/28/2026 03/11/2026 14,923.42 447968 Refuse Disposal Paid by EFT#6433 03/01/2026 03/11/2026 02/28/2026 03/11/2026 436.53 448018 Refuse Disposal Paid by EFT#6433 03/01/2026 03/11/2026 02/28/2026 03/11/2026 32.50 448069 Refuse Disposal Paid by EFT#6433 03/01/2026 03/11/2026 02/28/2026 03/11/2026 30.00 448360 Refuse Disposal Paid by EFT#6433 03/01/2026 03/11/2026 02/28/2026 03/11/2026 38.00 Vendor 24050-TAHOE BASIN CONTAINER SERVICE Totals Invoices 5 $15,460.45 Vendor 48229-TAHOE DAILY TRIBUNE IN224730 Ads-Legal Notices Paid by EFT#6434 02/28/2026 03/11/2026 02/28/2026 03/11/2026 903.00 Vendor 48229-TAHOE DAILY TRIBUNE Totals Invoices 1 $903.00 Vendor 48927-TAHOE VALLEY LODGE 1075 Standby Accommodations Paid by EFT#6435 02/28/2026 03/11/2026 02/28/2026 03/11/2026 2,905.00 Vendor 48927-TAHOE VALLEY LODGE Totals Invoices 1 $2,905.00 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 8 of 11 sOVTH TgHO Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 s" Report By Vendor - Invoice A&az er . 1 950 � W •��`0 Summary Listing C`UTILITY 018 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49420-THATCHER COMPANY OF NEVADA INC 2026400100714 Hypochlorite Paid by EFT#6436 02/28/2026 03/11/2026 03/31/2026 03/11/2026 9,600.00 Vendor 49420-THATCHER COMPANY OF NEVADA INC Totals Invoices 1 $9,600.00 Vendor 48085-ULINE 203896659 Buildings Paid by EFT#6386 02/06/2026 03/04/2026 02/28/2026 03/04/2026 204.33 204014248 Shop Supplies Paid by EFT#6386 02/10/2026 03/04/2026 02/28/2026 03/04/2026 183.70 Vendor 48085-ULINE Totals Invoices 2 $388.03 Vendor 48262-UPS FREIGHT 0000966628076 Postage Expenses Paid by EFT#6437 02/14/2026 03/11/2026 02/28/2026 03/11/2026 149.32 0000966628086 Postage Expenses Paid by EFT#6387 02/21/2026 03/04/2026 02/28/2026 03/04/2026 125.03 0000966628096 Postage Expenses Paid by EFT#6437 02/28/2026 03/11/2026 02/28/2026 03/11/2026 102.40 Vendor 48262-UPS FREIGHT Totals Invoices 3 $376.75 Vendor 49947-CUST#593278 USABLUEBOOK INV00962430 Wells Paid by EFT#6388 02/12/2026 03/04/2026 02/28/2026 03/04/2026 1,328.11 INV00962791 Wells Paid by EFT#6388 02/13/2026 03/04/2026 02/28/2026 03/04/2026 161.82 INV00962832 Wells Paid by EFT#6388 02/13/2026 03/04/2026 02/28/2026 03/04/2026 32.37 INV00963730 Primary Equipment Paid by EFT#6388 02/16/2026 03/04/2026 02/28/2026 03/04/2026 5,949.78 Vendor 49947-CUST#593278 USABLUEBOOK Totals Invoices 4 $7,472.08 Vendor 45243-VELOCITY VEHICLE GROUP XA261171993:01 Automotive Paid by EFT#6389 02/11/2026 03/04/2026 02/28/2026 03/04/2026 76.11 XA261172291:01 Automotive Paid by EFT#6389 02/13/2026 03/04/2026 02/28/2026 03/04/2026 68.50 XA261172536:01 Automotive Paid by EFT#6389 02/18/2026 03/04/2026 02/28/2026 03/04/2026 434.38 XA261172290:01 Automotive Paid by EFT#6389 02/20/2026 03/04/2026 02/28/2026 03/04/2026 66.32 XA261172536:02 Automotive Paid by EFT#6389 02/23/2026 03/04/2026 02/28/2026 03/04/2026 352.87 XA261173089:01 Automotive Paid by EFT#6389 02/25/2026 03/04/2026 02/28/2026 03/04/2026 359.61 Vendor 45243-VELOCITY VEHICLE GROUP Totals Invoices 6 $1,357.79 Vendor 48576-VELOCITYEHS 344845 Safety Programs Paid by EFT#6390 01/27/2026 03/04/2026 03/31/2026 03/04/2026 5,065.39 Vendor 48576-VELOCITYEHS Totals Invoices 1 $5,065.39 Vendor 44580-VESTIS SERVICES LLC 598002395 Uniform Payable Paid by EFT#6391 01/14/2025 03/04/2026 02/28/2026 03/04/2026 (189.60) 598002177 Uniform Payable Paid by EFT#6391 10/22/2025 03/04/2026 02/28/2026 03/04/2026 (89.20) 5980358056 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 72.39 5980358057 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 46.75 5980358058 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 49.83 5980358059 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 5.45 5980358060 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 13.50 5980358061 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 15.14 5980358062 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 121.13 5980358063 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 58.90 5980358064 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 25.90 5980358065 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 4.35 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 9 of 11 yoV•rH TAho F Payment of Claims A._ _ Payment Date Range 02/26/26 - 03/11/26 se~ "�e� Report By Vendor - Invoice Summary Listing ' A`B ker 1950 W 'C UTILITY 1:01 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 5980358066 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 78.85 5980358067 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 109.13 5980358068 Uniform Payable Paid by EFT#6391 02/18/2026 03/04/2026 02/28/2026 03/04/2026 110.21 5980359603 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 72.39 5980359604 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 46.75 5980359605 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 49.83 5980359606 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 5.45 5980359607 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 13.50 5980359608 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 15.14 5980359609 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 111.13 5980359610 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 58.90 5980359611 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 25.90 5980359612 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 4.35 5980359613 Uniform Payable Paid by EFT#6438 02/25/2026 03/11/2026 02/28/2026 03/11/2026 68.85 Vendor 44580-VESTIS SERVICES LLC Totals Invoices 26 $904.92 Vendor 49540-WATER SYSTEMS CONSULTING INC 12184 WWTP Ballast Ponds Paid by EFT#6392 01/31/2026 03/04/2026 02/28/2026 03/04/2026 5,327.25 12207 Contractual Services Paid by EFT#6392 01/31/2026 03/04/2026 02/28/2026 03/04/2026 2,205.00 12208 Bijou PS Rehab Paid by EFT#6392 01/31/2026 03/04/2026 02/28/2026 03/04/2026 3,095.75 Vendor 49540-WATER SYSTEMS CONSULTING INC Totals Invoices 3 $10,628.00 Vendor 49098- MATT WEISER SWRCB D1 CERT Dues-Memberships- Paid by EFT#6439 03/02/2026 03/11/2026 03/31/2026 03/11/2026 70.00 Certification SWRCB T1 APP Dues-Memberships- Paid by EFT#6439 03/02/2026 03/11/2026 03/31/2026 03/11/2026 50.00 Certification Vendor 49098-MATT WEISER Totals Invoices 2 $120.00 Vendor 25850-WESTERN NEVADA SUPPLY 12130164 Valves Elbows Ts Flanges Paid by EFT#6440 02/10/2026 03/11/2026 03/31/2026 03/11/2026 8,754.77 Inventory 12135623 Pump Stations Paid by EFT#6393 02/17/2026 03/04/2026 02/28/2026 03/04/2026 745.58 12136249 Boxes-Lids-Extensions Inventory Paid by EFT#6393 02/17/2026 03/04/2026 02/28/2026 03/04/2026 1,143.75 12122473-1 Pipe-Covers &Manholes Paid by EFT#6393 02/23/2026 03/04/2026 02/28/2026 03/04/2026 731.15 11892317 2026 AMI Tower Paid by EFT#6393 02/24/2026 03/04/2026 01/31/2026 03/04/2026 121,466.14 32134872 Primary Equipment Paid by EFT#6440 02/25/2026 03/11/2026 02/28/2026 03/11/2026 243.95 12135330 Meters&Parts Inventory Paid by EFT#6440 03/04/2026 03/11/2026 03/31/2026 03/11/2026 14,220.85 Vendor 25850-WESTERN NEVADA SUPPLY Totals Invoices 7 $147,306.19 Vendor 49930-WHITE CAP 50035507080 Manhole Frames-Lids-Other Paid by EFT#6394 02/20/2026 03/04/2026 02/28/2026 03/04/2026 6,224.85 Parts Inventory Vendor 49930-WHITE CAP Totals Invoices 1 $6,224.85 Vendor 42323-WHITE ROCK CONSTRUCTION 26-05AR PRV,Washoan-Acoma Retainage Paid by Check#115289 03/04/2026 03/04/2026 02/28/2026 03/04/2026 12,187.50 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 10 of 11 el" TAN Payment Payment of Claims _ Payment Date Range 02/26/26 - 03/11/26 syy '" e� Report By Vendor - Invoice AGet� 1950 w��`�� Summary Listing C UTILITY p18 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 42323-WHITE ROCK CONSTRUCTION Totals Invoices 1 $12,187.50 Vendor 47918-WINDSHIELD PROS OF TAHOE I0T004593 Automotive Paid by EFT#6395 02/20/2026 03/04/2026 02/28/2026 03/04/2026 350.00 Vendor 47918-WINDSHIELD PROS OF TAHOE Totals Invoices 1 $350.00 Vendor 48781-WORLD OIL REFINING I500-01337595 Service Contracts Paid by EFT#6441 02/26/2026 03/11/2026 02/28/2026 03/11/2026 153.00 Vendor 48781-WORLD OIL REFINING Totals Invoices 1 $153.00 Vendor 50392-ZORO INV18285187 Shop Supplies Paid by EFT#6396 02/06/2026 03/04/2026 02/28/2026 03/04/2026 75.86 INV18378535 Buildings&Pump Stations Paid by EFT#6396 02/19/2026 03/04/2026 02/28/2026 03/04/2026 565.77 Vendor 50392-ZORO Totals Invoices 2 $641.63 Grand Totals Invoices 223 $843,219.54 Run by Erika Franco on 03/11/2026 12:44:42 PM Page 11 of 11 yCUTH TAkoF AG QK'e 1950 Ja.7.0‘ e4'C UTILITY D%010 SOUTH TAHOE PUBLIC UTILITY DISTRICT Joel Henderson, Director BOARD MEMBERS Kelly Sheehan, Director Nick Haven, Vice President Shane Romsos, President Nick Exline, Director Paul Hughes, General Manager Andrea Salazar, Chief Financial Officer REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT March 5, 2026 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:00 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Romsos, Directors Haven, Henderson, Sheehan, Exline Staff: Paul Hughes, Andrea Salazar, Ryan Jones, Melonie Guttry, Shannon Chandler, Chris Stanley, Chris Skelly, Greg Dupree, Shelly Thomsen, IV Jones, Cliff Bartlett, Lauren Benefield, Megan Colvey, Brent Goligoski, Ryan Lee, Dan Arce, Kilty Devine, Laura Hendrickson, Ron Goralski, Donielle Morse, Trevor Coolidge, Jim Kelly 1. PLEDGE OF ALLEGIANCE: 2. COMMENTS FROM THE PUBLIC: None 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None 4. ADOPTION OF CONSENT CALENDAR: Moved Sheehan/Second Haven/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to approve the Consent Calendar as presented. a. TANGLEWOOD WELL PROJECT (Mark Seelos,Water Resources Manager) 1) Approved the attached Scope of Work for Montgomery and Associates to provide well design services for the Tanglewood Production Well Project, and 2) Authorized the General Manager to execute Task Order No. 2 with Montgomery and Associates in the amount of $51,120. b. BAKERSFIELD WELL REHABILITATION PROJECT (Mark Seelos, Water Resources Manager) 1) Approved Change Order No. 1 for Bakersfield Well Rehabilitation Project in the amount of $13,825; and 2) Authorized the General Manager to execute Change Order No. 1. REGULAR BOARD MEETING MINUTES: March 5 , 2026 PAGE-2 c. DECEMBER 31, 2025 FISCAL YEAR TO DATE FINANCIAL STATEMENTS (Andrea Salazar, Chief Financial Officer) Received and filed the December 31, 2025 Income Statement and Balance Sheet Reports. d. RECEIVE AND FILE PAYMENT OF CLAIMS (Greg Dupree,Accounting Manager) Received and filed Payment of Claims in the amount of $5,034,466.79. e. REGULAR BOARD MEETING MINUTES: February 5, 2026 (Melanie Guttry, Executive Services Manager/Clerk of the Board) Approved February 5, 2026, Minutes 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION: None 6. ITEMS FOR BOARD ACTION: a. Purchase of Spare Motors for Luther Pass Pump Station (Chris Stanley, Field Operations Manager and Jeremy Rutherdale, Field Operations Supervisor) —Jeremy Rutherdale provided details regarding the purchase of spare motors for Luther Pass Pump Station and addressed questions from the Board. Director Exline requested a list of backup equipment, and Chris Stanley acknowledged that a list is being established and can be shared with the Board. Moved Sheehan/Second Exline/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to authorize the purchase of one 700 horsepower and one 1,000 horsepower Nidec Motors, from Industrial Electrical Co., to be utilized as spare motors for the Luther Pass Pump Station in the amount of $147,805.01, not including taxes and shipping. b. APN 001-310-001 Grant of Easement (Adrian Combes, Director of Operations) — Chris Stanley provided details regarding the Grant of Easement for APN 001-310-001 and addressed questions from the Board. Moved Exline/Second Sheehan/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Approve Grant of Easement to Caltrans for a drainage easement located on APN 001-310-001; and 2) Approve a Right-of-Way Contract with the State of California Department of Transportation. c. 2026-2027 Sewer Line Spot Repair and Lateral Abandonments Services Rebid (Richard Jones Iv, Collections & Effluent Operations Supervisor) — IV Jones provided details regarding the 2026-2027 Sewer Line Spot Repair and Lateral Abandonments Sewer Services Rebid and addressed questions from the Board. Moved Sheehan/Second Henderson/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to award bid to the lowest responsive, responsible bidder, Robotic Sewer Solutions, Inc., in the amount of $284,225. d. Purchase of 2026 Ford F350 Flatbed Truck with Travel-Vac 300 Vacuum Unit (Cliff Bartlett, Fleet/Equipment Supervisor) — Cliff Bartlett provided details regarding the purchase of a 2026 Ford F350 Flatbed Truck and addressed questions from the Board. Moved Haven/Second Henderson/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Authorize purchase of one (1) 2026 Ford F350 Flatbed Truck with a Travel-Vac Model REGULAR BOARD MEETING MINUTES: March 5 , 2026 PAGE-3 300 Vacuum from Rush Truck Centers through the Sourcewell Purchasing Authority, Bid Contract No. 032824-RTG in the amount of $120,430.06, including taxes, registration, upfit, and delivery; and 2) Authorize the General Manager to execute documents necessary to complete purchase. e. South Upper Truckee Well Pump Replacement Project (Mark Seelos, Water Resources Manager) - Mark Seelos provided details regarding the South Upper Truckee Well Pump Replacement Project and addressed questions from the Board. Moved Romsos/Second Haven/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Adopt the Plans and Specifications for the South Upper Truckee Well Pump Replacement Project per California Government Code 830.6; and 2) Authorize staff to advertise for construction bids for the South Upper Truckee Well Pump Replacement Project. f. 2026 Pioneer Trail Waterline Project (Trevor Coolidge,Senior Engineer) —Trevor Coolidge provided details regarding the 2026 Pioneer Trail Waterline Project and addressed questions from the Board. He further reported that staff are only requesting to advertise for construction bids today. Moved Romsos/Second Henderson/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to authorize District staff to advertise for construction bids for the 2026 Pioneer Trail Waterline Project. g. Upper Truckee Pump Station Rehabilitation Project (Brent Goligoski,Senior Engineer) — Brent Goligoski provided details regarding the Upper Truckee Pump Station Rehabilitation Project and addressed questions from the Board. Moved Henderson/Second Exline/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Approve Change Order No. 3 to T&S Construction Co., Inc., in the amount of ($27,116.60); and 2) Authorize the General Manager to execute Change Order No. 3. h. Skalar Autoanalyzer Standardization and Purchase (Dan Arce, Laboratory Director) — Dan Arce provided details regarding the Skalar Autoanalyzer Standardization and Purchase and addressed questions from the Board. Moved Romsos/Second Exline/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Authorize Sole Source/Sole Brand standardization of Skalar SAN++ Advanced Continuous Flow Analyzer; and 2) Approve the purchase of Skalar Advanced Continuous Flow Analyzer purchase in an amount up to $80,300. i. Standardize on NexGen Enterprise Asset Management and Approve Renewal Authority (Chris Skelly, Information Technology Manager) —Chris Skelly provided details regarding the Standardizing on Nexen Enterprise Asset Management and addressed questions from the Board. Director Haven requested the District look at a commitment of longer term contract going forward. Moved Sheehan/Second Haven/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Approve standardization on the NexGen Enterprise Asset Management software platform as the District's enterprise asset management system; 2) Approve a sole source determination for NexGen Enterprise Asset Management licensing, support, and maintenance renewals (and publisher-authorized modules integral to the platform); and 3) Authorize staff to REGULAR BOARD MEETING MINUTES: March 5 , 2026 PAGE-4 purchase the Fiscal Year 2026 renewals of the District's Enterprise Asset Management Software solution from NexGen Asset Management in the amount of $100,000. j. Pioneer Trail Waterline and Pressure Reducing Valve Upgrade Installment Sale Agreement (Andrea Salazar, chief Financial Officer) —Andrea Salazar provided details regarding the Pioneer Trail Waterline Pressure Reducing Valve Upgrade Installment Sale Agreement. Moved Romsos/Second Exline/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to approve Resolution No. 3327-26, the Installment Sale Agreement Resolution of the Board of Directors of the South Tahoe Public Utility District for the Pioneer Trail Waterline and Pressure Reducing Valve Upgrade project. k. Bijou 1 Waterline Replacement Project (Laura Hendrickson, Associate Engineer) — Laura Hendrickson provided details regarding the Bijou 1 Waterline Replacement Project. Moved Sheehan/Second Exline/Henderson Yes/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes to 1) Approve Change Order No. 5 to Vinciguerra Construction, Inc. in the amount of $7,000; and 2) Authorize the General Manager to execute Change Order No. 5. 7. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS: Director Sheehan reported she attended her first Operations Committee meeting on February 10. She provided details regarding the Lakeside intertie that was recently opened in the middle of the night due to pump failures and that staff were able to get them back online within a couple of days. Software is being used in the field that was created by the District's Information Technology Department. Director Henderson further reported regarding changes to the type of crop being grown in Alpine County. Director Haven provided details regarding the El Dorado Water Agency meeting on February 11 and will continue to attend remotely, providing public access to the meeting here at the District. 8. BOARD MEMBER REPORTS: President Romsos reported that the Board attended a Capital Improvement Program Board Workshop at 11:00 a.m. today, which was very well done. 9. STAFF/ATTORNEY REPORTS: Lauren Benefield provided a PowerPoint Presentation regarding Assembly Bill 1572 - Non- Functional Turf Ban and addressed questions from the Board. 10. GENERAL MANAGER REPORT: Nothing to report 11. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS 12. BREAK AND ADJOURN TO CLOSED SESSION: 3:16 p.m. RECONVENE TO OPEN SESSION: 3:44 p.m. a. Pursuant to Section 54956.8 of the California Government Code, Closed Session may be held for conference with real property negotiators prior to the purchase, sale, exchange, or lease of real property by or for any local agency. The negotiating parties are Paul Hughes, General Manager; Ryan Jones, General Counsel; Tech Ventures QOZB, LLC, owner of the subject REGULAR BOARD MEETING MINUTES: March 5 , 2026 PAGE-5 property located at 930 Tanglewood Drive, California; and Radley Raven of The Oppenheim Group Real Estate, the owner's agent. Under negotiation are the price and terms of payment No reportable Board Action b. Pursuant to Section 54956.9(d)(1) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Yolo County Superior Court Case CV 2021-1686, Alpine County vs. South Tahoe Public Utility District; et al No reportable Board Action ADJOURNMENT: 3:45 p.m. Shane Romsos, Board President South Tahoe Public Utility District Melonie Guttry, Executive Services Manager/ Clerk of the Board South Tahoe Public Utility District General Manager Paul Hughes • 1950 . Directors ya�'� "'eV r Nick Haven South Shane 7Zomsos _ Joel Henderson ��`- �" public Utility District KellYSheehan NicK Exline 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Brent Goligoski, Senior Engineer MEETING DATE: March 19, 2026 ITEM - PROJECT NAME: 2026 Stateline Tanks Recoating Project REQUESTED BOARD ACTION: (1) Adopt the Addenda to the design Plans and Specifications pursuant to California Government Code Section 830.6; (2) Find minor irregularities in the bid from Unified Field Services Corporation to be immaterial and waive immaterial irregularities; and (3) Award Contract for the 2026 Stateline Tanks Recoating Project to the lowest responsive, responsible bidder, Unified Field Services Corporation, in the amount of $2,000,964. DISCUSSION: On February 5, 2026, the Board adopted the Plans and Specifications and authorized staff to advertise for construction bids for the 2026 Stateline Tanks Recoating Project (Project). The Project consists of full interior and exterior recoating, including removal of existing coatings of two potable water storage tanks which store approximately 1.25-million- gallons and 2.25-million-gallons each; modification to existing ladders and fall protection systems; demolition and replacement of cathodic protection systems, replacement of miscellaneous tank hardware, minor earthwork, and site restoration. A mandatory pre-bid conference was held on February 24, 2026, with 15 contractors in attendance. The bid period opened at 2:00 p.m. on Tuesday, March 3, 2026. The District received eight bids ranging from $2,000,964 to $2,952,500. The total Engineer's Estimate for this Project was $2,245,000. A summary of the bids, along with staff recommendations regarding bid irregularities is attached. The attached Addenda numbered 1 through 3 were prepared by District staff to modify the Plans and Specifications throughout the bid period to address questions posed by bidders. These three Addenda clarified requirements regarding caulking, dust containment, tank shutdown restrictions and other scheduling details, and answered other minor questions. Brent Goligoski Page 2 March 19, 2026 SCHEDULE: Notice to Proceed upon Board approval, Construction in 2026 and 2027 COSTS: $2,000,964 ACCOUNT NO: 20.30.8554 (SLTNK1), 20.30.8555 (SLTNK2) BUDGETED AMOUNT AVAILABLE: $642,598 (FY26 20.30.8554); ($22,221) (FY26 20.30.8555) Additional budget to be added in Fiscal Year 27 and Fiscal Year 28 to Project accounts. IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): ® Yes ❑ No ❑ N/A ATTACHMENTS: Memorandum regarding bid results and minor irregularities; Addenda Nos. 1-3 to the design Plans and Specifications (attached separately) CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO /� CHIEF FINANCIAL OFFICER: YES AI NO South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: March 9, 2026 To: Board Members, Paul Hughes From: Starlet Glaze, Contracts Specialist Subject: 2026 Stateline Tanks Recoating Project At 2:00 PM on Tuesday, March 3, 2026, we received eight (8) electronic bids via PlanetBids for the above-referenced project. The bids submitted ranged from $2,000,964.00 to $2,952,500.00. The Engineer's Estimate for this project was $2,245,000.00 A careful review and analysis of the three lowest responsive responsible bids received showed only minor deviations. See attached spreadsheet and list of deviations for a full breakdown of each bid. Unified Field Services Corporation is the apparent low bidder. I contacted the Contractors State License Board and confirmed the following: • License Number: 1009928 • Status: Current and active • Expiration Date: December 31, 2027 • Entity Type: Corporation • License Classification: Class A — General Engineering, C33 — Painting and Decorating, C10 — Electrical, B — General Building Additionally, I verified with the California Department of Industrial Relations that Unified Filed Services Corporation is properly registered under PWCR Number 1000042614. South Tahoe Public Utility District• 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 2026 Stateline Tanks Recoating Project Advertisement Date:February 6,2026 Bid Opening on March 03,2026 2:00 PM(PST) Unified Field I Polytech So Cal Pacific Resource Services Euro Style Olympus and Industrial, Amp United Construction Development Paso Robles Engineer's Item Description Unit Quantity Corporation Management Associates,Inc. Incorporated LLC Corporation Company Tank,Inc. Estimate Bid Schedule A:Stateline Tanks Recoating-Tank 1 1 Tank 1 Mobilization and Demobilization LS 1 $35,000.00 $40,000.00 $15,000.00 $110,675.00 $100,000.00 $60,000.00 $73,500.00 $20,000.00 $74,900.00 2 Tank 1 Cathodic Protection System LS 1 $50,000.00 $70,000.00 $46,750.00 $34,500.00 $30,625.00 $35,000.00 $50,000.00 $30,000.00 $40,000.00 3 Tank 1 Interior Recoating LS 1 $487,253.00 $468,000.00 $486,900.00 $491,538.00 $540,000.00 $440,000.00 $537,300.00 $608,000.00 $526,900.00 4 Tank 1 Exterior Recoating LS 1 $243,661.00 $225,000.00 $279,000.00 $346,663.00 $145,000.00 $325,000.00 $405,300.00 $378,600.00 $128,500.00 5 Tank 1 Exterior Tank Ladder and Security Gate Modifications LS 1 $24,750.00 $34,000.00 $22,000.00 $25,875.00 $51,750.00 $25,500.00 $41,400.00 $22,500.00 $15,000.00 6 Tank 1 Miscellaneous Appurtenances and Abandonments LS 1 $22,000.00 $42,000.00 $13,600.00 $23,000.00 $51,750.00 $23,000.00 $12,700.00 $20,000.00 $7,800.00 7 Tank 1 Erosion Control and Site Restoration LS 1 $25,000.00 $5,000.00 $17,500.00 $64,500.00 $139,380.00 $135,000.00 $50,300.00 $121,200.00 $19,700.00 8 Tank 1 Allowance for Miscellaneous Steel Repairs LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 Subtotal $897,664.00 $894,000.00 $890,750.00 $1,106,751.00 $1,068,505.00 $1,053,500.00 $1,180,500.00 $1,210,300.00 $822,800.00 Bid Schedule B:Stateline Tanks Recoating-Tank 2 _ 9 Tank 2 Mobilization and Demobilization LS 1 $35,000.00 $40,000.00 $10,000.00 $120,054.00 $100,000.00 $75,000.00 $75,500.00 $20,000.00 $129,300.00 10 Tank 2 Cathodic Protection System LS 1 $40,000.00 $48,000.00 $22,800.00 $27,600.00 $25,000.00 $40,800.00 $44,200.00 $24,000.00 $90,000.00 11 Tank 2 Interior Recoating LS 1 $646,724.00 $738,000.00 $796,200.00 $586,848.00 $819,000.00 $800,000.00 $713,000.00 $1,007,000.00 $936,900.00 12 Tank 2 Exterior Recoating LS 1 $324,576.00 $345,000.00 $376,100.00 $396,547.00 $192,000.00 $475,000.00 $552,300.00 $540,000.00 $228,500.00 13 Tank 2 Miscellaneous Appurtenances and Abandonments LS 1 $22,000.00 $37,000.00 $14,700.00 $23,000.00 $81,000.00 $23,000.00 $12,700.00 $20,000.00 $7,800.00 14 Tank 2 Erosion Control and Site Restoration LS 1 $25,000.00 $5,000.00 $17,500.00 $36,500.00 $139,380.00 $135,000.00 $48,200.00 $121,200.00 $19,700.00 15 Tank 2 Allowance for Miscellaneous Steel Repairs LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 Subtotal $1,103,300.00 $1,223,000.00 $1,247,300.00 $1,200,549.00 $1,366,380.00 $1,558,800.00 $1,455,900.00 $1,742,200.00 $1,422,200.00 I Total' $2,000,964.00 $2,117,000.00I $2,138,050.00I$2,307,300.00I $2,434,885.00I $2,612,300.00I $2,636,400.00I $2,952,500.00I $2,245,000.00 2026 Stateline Tanks Recoating Project Bid Opening: Tuesday, March 3, 2026, at 2:00 p.m. During staff reviews of the bids received, several minor irregularities and informational items were identified within the three lowest bids. These items were reviewed and verified by staff and were determined not to affect the responsiveness of the bids. Deviations and information identified during bid analysis of the three lowest responsive and responsible bids received: Unified Field Services Corporation • List of Subcontractors o The entity names of the two subcontractors listed on the Bid Form did not match the names shown on the California Contractors State License Board (CSLB) or California Department of Industrial Relations (DIR) websites. o Staff obtained and verified the correct entity names and confirmed that both subcontractors are properly licensed with the CSLB and registered and current with the DIR. • Certification by Contractor's Insurance Broker o The certification form was completed incorrectly. The insurance agent's name was listed on Line 1 rather than the brokerage agency name. The brokerage agency name was listed on Line 2 instead of the insurance company name, and the insurance company name was not provided. o Staff contacted the agent directly, obtained the correct insurance company information, and verified that the coverage meets the District's requirements. Euro Style Management • List of Subcontractors o Full addresses for the two subcontractors listed on the Bid Form were not provided. o The entity names of the subcontractors listed did not match the names shown on the CSLB or DIR websites. o Staff obtained and verified the correct entity names and confirmed that both subcontractors are registered and active with the DIR and hold current business licenses. • Bidder's General Information o Item 6 included the name of the agent and brokerage company, along with the brokerage address and phone number. The address and phone number for the surety company were not provided. o Staff contacted the agent directly to confirm that the Bid Bond is valid and that the surety company meets District requirements. • Certification by Contractor's Insurance Broker o The certification form was completed incorrectly. The agent and brokerage company were listed, but the insurance company information was not provided. o Staff contacted the agent directly to obtain the insurance company name and verified that the coverage meets the District's requirements. Olympus and Associates, Inc. • Certification by Contractor's Insurance Broker o The certification form was completed incorrectly. The brokerage agency name was listed in the third paragraph where the insurance company name should have been provided. • List of Subcontractors o The entity names of the two subcontractors listed on the Bid Form did not match the names shown on the CSLB or DIR websites. o Staff obtained and verified the correct entity names and confirmed that both subcontractors are properly licensed with the CSLB and registered and current with the DIR. Summary Staff reviewed the bid documents submitted by the lowest bidders and verified the items noted above. The identified irregularities were determined to be minor and did not affect the responsiveness of the bids or the bidders' ability to perform the work. 2026 STATELINE TANKS RECOATING PROJEC CONTRACTOR'S SUBCONTRACTORS Unified Field Services Corporation Description of Work Subcontractors Name &Address Mechanical 2% Paso Robles Tank 3883 Wentworth Dr. Hemet, CA 92545 CA#784971; CA DIR(PWC)#1000002079 Cathodic Protection 2% ACCI 5627 Stoneridge Dr. Pleasanton, CA 94588 CA#654613; CA DIR(PWC)#1000028833 Named Equipment/Material Supplier List: Equipment/Material Supplier/ Manufacturer 1. Interior Coating System Sherwin Williams I Sherwin Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Kleen Blast/ Kleen Blast Euro Style Management Description of Work Subcontractors Name &Address Scaffolding 7% CSI 1451 Loveridge Rd. Pittsburg, CA 94565 CA#835630; CA DIR(PWC)#1000001499 Cathodic Protection 2% ACCI 5627 Stoneridge Dr. Pleasanton, CA 94588 CA#654613; CA DIR(PWC)#1000028833 Named Equipment/Material Supplier List: Equipment/Material Supplier/ Manufacturer 1. Interior Coating System Sherwin Williams I Sherwin Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Kleen Blast Olympus and Associates, Inc. Description of Work Subcontractors Name &Address Tank Modifications and Upgrades 11% Crosno Construction 819 Sheridan Road Arroyo Grande, CA 93420 CA#835288; CA DIR(PWC)#1000006959 1 2026 STATELINE TANKS RECOATING PROJEC CONTRACTOR'S SUBCONTRACTORS Scaffolding 7% Champion Scaffolding 1563 Solano Avenue#332 Berkley, CA 94707 CA#935850; CA DIR(PWC)#1000041220 Cathodic Protection 2% Corrosion Integrity LLC 3837 Howsley Rd Pleasant Grove, CA 95668 CA#1057714; CA DIR(PWC)#1000421416 Named EquipmentlMaterial Supplier List: Equipment/Material Supplier I Manufacturer 1. Interior Coating System Sherwin Williams I Sherwin Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Kleen Blast Abrasive/ Kleen Blast Abrasive Polytech Industrial, Incorporated Description of Work Subcontractors Name &Address Welding, cathodic protection, fall protection, Paso Robles Tank, Inc. misc. appurtenances, repairs 10% CA#784971; CA DIR(PWC)#1000002079 Scaffolding and containment 9% Commercial Scaffolding of California Incorporated CA#835630; CA DIR(PWC)#1000001499 Named EquipmentlMaterial Supplier List: EquipmentlMaterial Supplier 1 Manufacturer 1. Interior Coating System Sherwin Williams I Sherwin Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Kleen Blast/ Kleen Blast AMP United LLC Description of Work Subcontractors Name &Address Cathodic Protection System 2% Corrosion Integrity 3837 Howsley Rd, Pleasant Grove, CA 95668 CA#1057714; CA DIR(PWC)#1000421416 Structural Repairs 10% Paso Robles Tank Inc. 3883 Wentworth Dr Buildings A & B Hemet, CA 92545 CA#784971; CA DIR(PWC)#1000002079 Named Equipment/Material Supplier List: Equipment/Material Supplier I Manufacturer 1. Interior Coating System Tnemec/Tnemec 2. Exterior Coating System Tnemec/Tnemec 3. Abrasive Blast Material MES I Green Diamond 2 2026 STATELINE TANKS RECOATING PROJEC CONTRACTOR'S SUBCONTRACTORS So Cal Pacific Construction Corporation DBA National Coating and Lining Description of Work Subcontractors Name &Address Cathodic Protection 3.5% Farwest Corrosion Control Company 12029 Regentview Avenue Downey, CA 90241 CA#248232; CA DIR(PWC)#1000000051 Mechanical 19% Paso Robles Tank Inc. 3883 Wentworth Dr. Hemet, CA 92545 CA#784971; CA DIR(PWC)#1000002079 Named EquipmentlMaterial Supplier List: EquipmentlMaterial Supplier/ Manufacturer 1. Interior Coating System Sherwin Williams I Sherman Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Allredi I Harsco Resource Development Company, LLC Description of Work Subcontractors Name &Address All work but what is listed below 87.6% Resource Development Company, LLC 1050 Linda Way Sparks, NV 89431 CA#1050646; CA DIR(PWC)#1000064750 Scaffold and Containment 10.7% Champion Scaffold Services, Inc. 1569 Solano Ave. #332 Berkley, CA 94707 CA#935850; CA DIR(PWC)#1000041220 Cathodic Protection 1.7% Corrosion Integrity, LLC 4144 Wheelright Way Roseville, CA 95747 CA#1057714; CA DIR(PWC)#1000421416 Named Equipment/Material Supplier List: Equipment/Material Supplier I Manufacturer 1. Interior Coating System Sherwin Williams I Sherman Williams 2. Exterior Coating System Sherwin Williams I Sherwin Williams 3. Abrasive Blast Material Green Diamond I Green Diamond 3 2026 STATELINE TANKS RECOATING PROJEC CONTRACTOR'S SUBCONTRACTORS Paso Robles Tank, Inc. Description of Work Subcontractors Name &Address Protective Coatings 40% Brandsafway Services, LLC Fairfield, CA CA#972968 CA DIR(PWC)#1000006640 Cathodic Protection 1% Corrosion Integrity, LLC Roseville, CA CA#1057714; CA DIR(PWC)#1000421416 Erosion Control & Site Restoration 5% Canyon Springs Enterprises Temecula, CA CA#806747; CA DIR(PWC)#1000002091 Named EquipmentlMaterial Supplier List: EquipmentlMaterial Supplier I Manufacturer 1. Interior Coating System Sherwin Williams 2. Exterior Coating System Sherwin Williams 3. Abrasive Blast Material All Redi/ Harsco 4 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2026 STATE LI N E TANKS RECOATING PROJECT South Tahoe Public Utility District South Lake Tahoe, California February 12, 2026 1 THE FOLLOWING CHANGES SHALL BE MADE TO THE BID SET: SPECIFICATIONS Section 00 10 00 — Invitation to Bid Page 1&2 Paragraph 10 CHANGE: Entire Paragraph TO: Questions or comments regarding this Project must be submitted electronically via our electronic bidding system and must be received by the District no later than 4:00PM, WEDNESDAY, FEBRUARY 25TH, 2026. Questions received after the date indicated will not be accepted. Questions submitted via telephone call, email or faxes will not be accepted. Responses from the District will be communicated via the electronic bidding system. Section 00 10 00 — Invitation to Bid Page 2 Paragraph 11 CHANGE: Entire Paragraph TO: A mandatory Pre-Bid Conference will be held at the South Tahoe Public Utility District, Board Room, 1275 Meadow Crest Drive, South Lake Tahoe, California on FEBRUARY 24TH at 10:00AM. Any bidder absent from the Pre-Bid Conference shall have their bid disqualified as nonresponsive. A tour of the site of work will be conducted as part of the Pre-Bid Conference if weather conditions allow. Section 09 97 13.13 — Interior Coating for Welded Steel Reservoir Page 22 Part 3.09, A, Sentence 1 CHANGE: Entire Sentence TO: Prior to when the finish coat is cured, the Contractor shall completely fill and seal all voids, bolt holes, around the entryways, the knuckle/shell interface, pipe penetrations, and the floor/roof pedestals, with Sikaflex-1A caulking or approved substitute to provide a tightly adherent, smooth and continuous seam of caulk. Section 09 97 13.23 — Exterior Coating for Welded Steel Reservoir Page 10 Part 1.06, F ADD: Part 1.06, F, 3. The District will consider alternative surface preparation or containment systems if the Contractor can demonstrate, through submitted documentation and/or field demonstrations that the proposed system provides equal or greater control of spent abrasive, debris, and emissions, achieves the specified surface preparation standard, and meets all applicable environmental and safety requirements. Any proposed alternative system must be submitted for review and written approval by the District prior to use. Acceptance of an alternative system is at the District's sole discretion and shall not be assumed. Section 09 97 13.23 — Exterior Coating for Welded Steel Reservoir Page 11 Part 2.01, A, 1.,b,2) CHANGE: Carboline PSX700 TO: Carboxane 2000 2 PLANS Not used. This Addendum No. 1, pages 1 through 60, shall become part of the Contract, and all provisions of the Contract shall apply therein. The date and time for the Bid Opening has not changed. The time provided for the completion of the Contract has not changed. SOUTH TAHOE PUBLIC UTILITY DISTRICT February 12, 2026 Brent Goligoski, P.E. �` �'t CO %sl Senior Engineer ' Ph. (530) 543-6266 C 90322 C1V1AL- P �r£OF I.��� 3 SECTION 00 10 00 SOLICITATION INVITATION TO BID The South Tahoe Public Utility District (STPUD or District) invites sealed bids by electronic submission only for the construction of the 2026 STATELINE TANKS RECOATING PROJECT ("Project"). Electronic Bids will be received until 2:00PM, TUESDAY, MARCH 3RD, 2026. Hard copy original Bid Bond (or other acceptable form of bid security) MUST be delivered to District in advance of the Bid deadline. Bids submitted after this time will not be accepted by the electronic bidding system. All bids that have been timely received will be publicly opened and the content read aloud at the STPUD offices, Conference Room 1, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. All interested parties are invited to attend. Bids shall be valid for 60 calendar days after the bid opening date, as required in the Bid Form. The site of the work is located on DISTRICT property (APN 029-260-029 and APN 029-260-027), surrounded by California Tahoe Conservatory property and situated within Van Sickle Bi-State Park, near the City of South Lake Tahoe, in the County of El Dorado, California. The work to be performed consists of: Full interior and exterior recoating, including removal of existing coatings, of two potable water storage tanks which store approximately 1.25-million-gallons and 2.25-million-gallons each; modification to existing ladders and fall protection systems; demolition and replacement of cathodic protection systems, replacement of miscellaneous tank hardware, minor earthwork, and site restoration. A copy of the Contract Documents are on file and may be examined at the South Tahoe Public Utility District Offices, 1275 Meadow Crest Drive, South Lake Tahoe, California. In order to download the Contract Documents and receive addendums and notifications when issued, Bidders must register as a vendor at the District's Vendor Portal: http://www.planetbids.com/portal/portal.cfm?CompanylD=21516 Electronic bids will also be submitted through this website. Paper bids will not be accepted. Contract Documents are available for free download on the District's Vendor Portal. For assistance in downloading these documents or registering as a vendor contact Star Glaze, Contracts Specialist at (530) 543-6205. All bids are to be submitted electronically as required in Section 00 20 00 Instructions for Procurement. Paper bids will NOT be accepted. Hard copy original Bid Bond must be delivered to the District in advance of the bid deadline. After electronic bidding, each bidder shall submit their original Bid Forms to South Tahoe Public Utility District at 1275 Meadow Crest Drive, South Lake Tahoe, California by 2:00PM, THURSDAY, MARCH 5T",2026. Questions or comments regarding this Project must be submitted electronically via our electronic bidding system and must be received by the District no later than :OOPM,WEDNESDAY,FEBRUARY FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 1 1 25TH, 2026 Addenduml 1I:00PM, TUESDAY, FEBRUARY 21T*4026 Addendum 1. Questions received after the date indicated will not be accepted. Questions submitted via telephone call,email or faxes will not be accepted. Responses from the District will be communicated via the electronic bidding system. A mandatory Pre-Bid Conference will be held at the South Tahoe Public Utility District, Board Room, 1275 Meadow Crest Drive,South Lake Tahoe,California on FEBRUARY 24TH at 10:00AM Addendum 1 FEBRUARY 17TH at 10:00 AM. Any bidder absent from the Pre-Bid Conference shall have their bid disqualified as non-responsive.A tour of the site of work will be conducted as part of the Pre-Bid Conference if weather conditions allow. In accordance with the provisions of California Public Contract Code section 3300,the South Tahoe Public Utility District has determined that bidders shall possess a valid C33 contractor license at the time of bid opening, the Contract is awarded, and for the duration of the Contract, provided the subcontractor responsible for Bid Items 2, 5, 6, 7, 8, 10, 13, 14, and 15 holds a valid Class A contractor's license, as outlined in Section 00 20 00, Part 3.01 of the project specifications. Failure to possess the specified license shall render the bid non-responsive and shall act as a bar to awarding the contract to any bidder not possessing said license at the time of award. Contractors or subcontractors responsible for the surface preparation and application of protective coatings shall also possess valid Association for Materials Protection and Performance (AMPP) QP1 accreditation. This project is subject to prevailing wage requirements. Pursuant to Labor Code section 1773, the District has obtained the prevailing rate of per diem wages and the prevailing rate for holiday and overtime work in the locality in which the work will be performed for each craft, classification,or type of worker needed. Not less than the determined rates shall be paid to all workers employed in the performance of the contract. Such rates of wages are on file with the Department of Industrial Relations and in the office of the District and are available to any interested party upon request. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the Bidder's and its subcontractors' current registration with the Department of Industrial Relations to perform public work. Bidder shall certify that Bidder and all listed subcontractors are currently and validly registered with the Department of Industrial Relations and shall include its registration number on its bid. If awarded a Contract, the Bidder and its subcontractors of every tier shall maintain active registration with the Department of Industrial Relations for the duration of the Project. It shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements. The California Air Resources Board ("CARB") implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations ("Regulation")which are effective on January 1, 2024 and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/defauIt/files/barcu/regact/2022/off-roaddiesel/froa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the duration of the Project. Bidders must provide, with their Bid, a completed and signed copy of the Fleet Compliance Certification included in Section 00 41 00 Bid FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 1 2 Forms.At the District's request,within 48 hours after the Bid Opening, Bidder must submit copies of Bidder's and all listed subcontractors' most recent, valid Certificate of Reported Compliance ("CRC")issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non- responsive. Pursuant to the provisions in Section 6707 of the California Labor Code, each Bid submitted in response to this Invitation to Bid shall contain adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders for the State of California. Pursuant to Section 22300 of the California Public Contract Code, the successful bidder may substitute securities for any moneys withheld by the District to ensure performance under the Contract as specified in Section 00 20 00. Each bid shall be accompanied by cash, a certified or cashier's check, or bid bond secured from a surety company satisfactory to the District, the amount of which shall not be less than ten percent (10%) of the submitted bid price or as detailed in Section 00 20 00, Bid Security, Part 2.05, made payable to the South Tahoe Public Utility District as bid security. The successful bidder will be required to furnish the District with a faithful performance bond and a labor and material payment bond each in an amount equal to 100% of the Contract Price, prior to execution of the Contract. All bonds are to be in the forms set forth herein, secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Public Contract Code§3400(b), if the District has made any findings designating certain materials products, things, or services by specific brand or trade name without alternative, such findings and the materials, products, things, or services and their specific brand or trade names will be set forth in Section 01 60 00, Product Requirements, of the Contract Documents. The South Tahoe Public Utility District reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards to the lowest responsive, responsible bidder in the best interest of the District. If alternate bid items are called for in the Contract Documents,the lowest bid will be determined on the basis of the base bid only. M,060-- OAV,()/6 Megan Colvey, P.E. Director of Engineering/District Engineer SOUTH TAHOE PUBLIC UTILITY DISTRICT END OF SECTION FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 1 3 SECTION 09 97 13.13 INTERIOR COATING FOR WELDED STEEL RESERVOIR PART 1 GENERAL 1.01 SUMMARY A. The Contractor shall perform interior coating work as follows: 1. Stateline Tank#1: provide all labor, materials, equipment and incidentals required for: a. Complete removal of all the existing interior coatings on interior surfaces and appurtenances, including but not limited to interior shell, roof support system, floor, ladder, overflow, interior roof plates, vents, piping, manways, hatches, and all other miscellaneous steel on the interior of the Stateline Tank#1 potable water reservoir. b. Complete coating of the reservoir interior shell, roof support system, floor, ladder, overflow, interior roof plates, roof drain piping, and all other miscellaneous steel on the interior of the Stateline Tank#1 potable water reservoir with an NSF 61/UL Water-approved lining system. The full coating system shall be an NSF 61/UL Water-approved system for contact in potable water service. c. It is the District's intent to have the Contractor remove and replace the coating system of all of the Stateline Tank#1's interior steel surfaces, in their entirety, and any omission of specific tank features or elements not expressly stated in this specification are not deliberate and should be accounted for. 2. Stateline Tank#2: provide all labor, materials, equipment and incidentals required for: a. Complete removal of all the existing interior coatings on interior surfaces and appurtenances, including but not limited to interior shell, roof support system, floor, ladder, overflow, interior roof plates, vents, piping, manways, hatches, and all other miscellaneous steel on the interior of the Stateline Tank#2 potable water reservoir. b. Perform full interior coating, including surface preparation, of the reservoir interior shell, roof support system, floor, ladder, overflow, interior roof plates, roof drain piping, and all other miscellaneous steel on the interior of the Stateline Tank#2 potable water reservoir with an NSF 61/UL Water-approved lining system. The full coating system shall be an NSF 61/UL Water-approved system for contact in potable water service. c. It is the District's intent to have the Contractor remove and replace the coating system of all of the Stateline Tank#2's interior steel surfaces, in their entirety, and any omission of specific tank features or elements not expressly stated in this specification are not deliberate and should be accounted for. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 1 B. The Contractor shall apply the coating system as indicated herein and, in a manner, prescribed by these specifications and the manufacturer's printed application instructions. The interior coating system must be completed prior to coating work on the exterior. C. Stateline Storage Tanks information: 1. Year Built: 1994 for Stateline Tank No. 1 and 1995 for Stateline Tank No. 2. 2. Diameter: Stateline Tank No. 1 = 90 ft, Stateline Tank No. 2 = 120 ft 3. Shell Height: 27 ft for both tanks 4. Knuckle Height: 3 ft for both tanks 5. Center Height: 33 ft. 6. Capacity: Stateline No.1 = 1.25 MG, Stateline No. 2. = 2.25 MG D. Existing interior coatings: 1. Stateline Tank#1 and #2: a. The Stateline Tank#1 and #2 were originally coated in 1994 and 1995 respectively; the coating product is unknown. b. Tank information, including dry film thickness of existing coating, heavy metal analysis, and recently assessed coating and steel condition, is presented in "Attachment A- 2025 Stateline Tanks Condition Assessment Report", of this project specification. 2. The Contractor shall bear all costs associated with stripping, handling, storing, testing, transport, and disposal of all waste. It shall be the Contractors responsibility to estimate the quantity and classification of waste associated with the work. 1.02 REFERENCES A. The Contractor shall comply with the requirements of the Steel Structures Painting Council Painting Manual, Volume 1 and 2, Good Painting Practices, including the Association for Materials Protection and Performance, American Society of Testing and Materials, and American Water Works Association D-102, for application and surface preparation, and all applicable OSHA and safety standards. B. The following standards (including the most recent update or version) shall govern the work unless specified otherwise in these specifications: FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 2 ASTM D4214 Standard Test Methods for Evaluating the Degree of Chalking of Exterior Paint Films ASTM D4414 Standard Practice for Measurement of Wet Film Thickness of Organic Coatings by Notched Gauges ASTM D4417 Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM D4541 Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers ASTM D5402 Standard Practice for Assessing the Solvent Resistance of Organic Coatings Using Solvent Rubs ASTM D7091 Standard Practice for Non-Destructive Measurement of Dry Film Thickness of Non-Magnetic Coatings Applied to Ferrous Metals and Non-Magnetic, Non-Conductive Coatings to Non-Ferrous Metals SSPC-Vol.1, Steel Structures Painting Manual, Good Painting Practice. SSPC-Vol.2, Steel Structures Painting Manual, Systems and Specifications. SSPC-SP 1 Solvent Cleaning SSPC-SP 2 Hand Tool Cleaning SSPC-SP 3 Power Tool Cleaning SSPC-SP 5 White Metal Blast Cleaning SSPC-SP Guide 11 Stripe Coating SSPC-SP 6 Commercial Blast Cleaning SSPC-SP 7 Brush-Off Blast Cleaning SSPC-SP 10 Near White Blast Cleaning SSPC-SP 11 Power Tool Cleaning to Bare Metal SSPC-AB 1 Mineral and Slag Abrasives SSPC-PA 1 Shop, Field and Maintenance Painting SSPS-PA Guide 3 Guide to Safety in Paint Application SSPS-PA Guide 12 Lighting SSPC-Guide to Vis 1-89 Visual Standard for Abrasive Blast Cleaned Steel SSPC-V15 (3-93) Visual Standard for Power& Hand-Tool Cleaned Steel SSPC Guide 6 Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations AWWA D102-97 Standard for Painting Steel Water-Storage Tanks AWWA C652 Disinfection of Water Storage Facilities. ISO-8502-3 Preparation of Steel Substrates (Class 2) NACE SP0188 Discontinuity (Holiday)Testing of New Protective Coatings on Conductive Substrates NACE SP0287 Field Measurements of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using Replica Tape All applicable State and Federal OSHA safety standards. C. The Contractor shall consult the District Engineer regarding any situations not covered by the reference standards or this specification; however, it is the Contractor not the District that is ultimately responsible for proper coating application. D. National Association of Corrosion Engineers (NACE) standards, referenced herein. E. National Sanitation Foundation (NSF) standards, referenced herein. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT—Addendum No.1 3 1.03 SUBMITTALS A. Coating contractor shall provide SSPC QP1 and a letter stating certification for the application of the coating systems to be applied. B. The manufacturer shall provide written certification that the CONTRACTOR's supervisor and each applicator performing Work on the project have been trained and approved by the manufacturer to apply the selected coating system. C. The Contractor shall provide a submittal for each material to be used in the work. At a minimum provide submittals for Abrasive materials, Paint systems, Thinners, and any other additives. D. The Contractor shall include the following data in the interior coating system submittal: 1. Weight in pounds/gallon —ASTM D-2196 2. % solids by volume—ASTM D-2369 3. Percent solids by weight—ASTM D-2369 4. Air cure dry time to re-coat—ASTM D-1640 5. Minimum adhesion to steel substrate—ASTM D-4541 using a type II instrument (Minimum acceptable adhesion shall be 800 p.s.i.). 6. Adhesion between coats—ASTM D-4541 7. Letter from dehumidification manufacture that the equipment has been properly sized as per the specification requirements. E. The Contractor shall provide technical data for the dehumidification or heating equipment to be used to hold a blast and to be used during curing. F. The Contractor shall submit the manufacturers latest written product data sheets on each product to be used, and current manufacturer's safety data sheets (S.D.S.) on all materials to be used in the surface preparation and coating operations including abrasives, thinners, cleaning fluids, and solvents. The Contractor shall maintain on the job site at all times S.D.S. and product data sheets. The Contractor shall post required signage for lead work. G. The Contractor shall include the following data in the manufacturer's recommended handling and installation instructions for the proposed paint system submittal: 1. Storage— including maximum and minimum storage temperatures 2. Surface preparation for immersion and non-immersion 3. Coating repair 4. Application equipment 5. Mixing and application of coating system — including a table of minimum and maximum time to re-coat as a function of temperature 6. Curing — including curing time required before holiday testing, and curing time required before immersion as function of temperature and coating thickness. Minimum and maximum re-coat times. 7. Ventilation and Containment System 8. Acceptable temperatures at the time of application. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 4 9. Health and Safety Plan 10. Fire Safety Plan. H. The Contractor shall include the following data in the equipment submittal: 1. Details of vacuum system for removing dust and abrasive from abrasive blast cleaned surfaces. 2. The manufacturer's latest written operation instructions including recommendations for air filter maintenance and change interval for air compressors used for work. I. The Contractor shall include the following data in the report submittal: 1. Actual weight of blast cleaning abrasive used for field abrasive blast cleaning, submitted within 24 hours after blasting is completed. 2. Quantity of coating material used for each coat, submitted within 24 hours after completion of each coat. 3. Name of laboratories proposed to be used to test wastes and reservoir water prior to testing any materials. 4. Laboratory test results for representative waste samples prior to removing any waste materials from the job site. At a minimum, the samples shall be tested for total concentrations of the 17 metals identified in Title 22, for comparison to Total Threshold Limit Concentrations (TTLC) values. The California Waste Extraction Test (WET) shall be performed for each analyte of each sample for which the total concentration exceeds 10 times the STLC value, if any, as specified in Title 22. Reactivity, corrosively, and Ignitability testing shall be performed as required by Title 22 and/or the District or representative of the disposal facility. 5. Receipts from disposal site for all waste. Receipts shall identify disposed material and source, show quantity of disposed material in tons or cubic yards, and show method used for final disposition as buried, incinerated, and chemically treated and/or other means. 6. Quantity of thinner used for each coat and total amount used. J. The Contractor shall include the following data in the disposal plan submittal: 1. Certification that the materials disposal plan complies with all applicable requirements of the Federal Resource Conservation and Recovery Act; Title 22 and Title 26 of the California Administrative Code; and other applicable regulations of local, state and federal agencies having jurisdiction over the disposal of spent abrasive blast media, removed coating materials, and other waste, whether hazardous or non-hazardous. 2. The name and Environmental Laboratory Accreditation Program Certificate number of laboratory that will sample and test spent abrasive blast media and removed coating materials. Include statement of the laboratory's certified testing areas and analyses that the laboratory is qualified to perform. 3. Written permission to dispose of material from disposal site representative. Include name, address, and telephone number of disposal site and of representative. 4. The District shall provide written acceptance of the disposal plan prior to disposal of any wastes. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 5 1.04 QUALITY ASSURANCE A. Installer's Qualifications: 1. The Contractor shall have an active California C-33 license. 2. The Contractor shall provide SSPC QP1 and a letter stating certification for the application of the coating systems to be applied. 3. The Contractor shall provide written evidence to the District Engineer that workers furnished have performed quality work and possess experience and knowledge in surface preparation and the application of high-performance industrial coatings. 4. The Contractor shall provide written evidence to the District Engineer that the Contractor has a minimum of five years of experience in the painting of water storage tanks and a current list of water tank painting projects for the past five years (five minimum). 5. The Contractor shall submit five projects within the last five years using plural component equipment and NSF-61 100% solids epoxy on the interior of potable water storage tanks. The information shall include Name of project, size of project, name and phone number of owner or Engineer. 6. The Contractor shall provide a certification, from the coating manufacturer, in application of the specified coatings for at least five years prior to commencement of this work on potable water storage reservoirs. B. The Contractor shall conform to all the standards of craftsmanship as discussed in the Steel Structures Painting Council's Painting Manual, Volume 1, Good Painting Practice. These techniques include but are not limited to: multiple passes of the spray gun, with each pass overlapped 50%, and "cross hatching" successive coats of paint. A stripe (Brush coat) is required on all welds prior to the finish coat. C. The District has retained a 3rd party Special Coating Inspector ("Inspector" or "Coating Inspector") and inspection firm to oversee all quality control related to coating operations. The Inspector will report directly to the District's Engineer and/or Project Manager and shall act with the Engineer's authority in all matters related to construction. The Inspector will be an AMPP Certified Coating Inspector, who will inspect any or all phases of work to be performed as outlined herein. The Inspector shall be an addition to the District Inspector. The District Inspector shall remain the primary observer for all work on the project. The Inspector shall work for and report to the District. The Contractor shall not rely upon the Inspector or District Inspector for documentation of environmental conditions and assuring compliance with plans and specifications. D. The Contractor shall notify the District Engineer in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. E. The Contractor shall provide access to the Inspector and/or District Inspector for examination of all materials, tools, and equipment to be used in the blasting and coating operations. The Inspector and/or District Inspector shall have the authority to direct the Contractor to remove, replace, or repair any materials, tools, or FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 6 equipment found not to be in conformance with the Contract Documents including the approved shop drawings and manufacturer's recommendations. F. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to observe any safety efforts of the Contractor by the Inspector and/or District Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Inspector and/or District Inspector. The Contractor shall indemnify, defend, and save harmless the District, the Inspector, and District Inspector, from all liability associated therewith. G. The Contractor's workmanship shall conform to standards and recommendations of SSPC Vol. 1, especially Chapters 5.1 and 6. H. The District may use any testing method deemed necessary by the Inspector and/or District Inspector to verify quality of work. The District may, but is not required to, monitor the quality of work pursuant to this section. I. The Contractor shall ensure proper materials handling and use, including: all coating materials are labeled and used in accordance with SSPC-PA 1, Paragraphs 5.1.1 thru 5.1.5, except all coating system materials without a stated shelf life shall be delivered and used within six months of the date of manufacture; and certification, from any source, that the coating system materials are still suitable for use beyond the stated shelf life or beyond the six month period specified above will not be accepted. All equipment and materials shall be stored in a secured ventilated container. J. The Contractor shall perform the necessary quality assurance in accordance with an approved plan. The Contractor will supply all inspection equipment, required by the Inspector and/or District Inspector. The District reserves the right to use the Contractor's equipment at any time. K. The Contractor shall comply with the following conditions in collection and analysis of wastes: 1. All testing of spent abrasive blast media and removed coating materials to classify these wastes as hazardous or non-hazardous shall be performed by a laboratory that complies with and is certified under the Environmental Laboratory Accreditation Program (ELAP) of the California Department of Health Services. 2. Any Laboratory performing analysis shall provide for comparison to TTLC, STLC, TCLP limits, and RCA limits, and to all other applicable regulatory limits. Laboratory shall retain samples at least ninety (90) calendar days after all analyses are complete. 3. The Contractor shall ensure collection of as many representative samples as required by the representative of the disposal facility, but not less than 4 total. 4. The Contractor shall ensure the following: a. each sample shall have an identifying sample number assigned when the sample is taken; FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 7 b. each sample number shall be included on the sampling chain of custody and in all reports, correspondence, and other documentation related to the sample; c. each sample shall have a sampling chain of custody; d. and, each chain of custody show the name and organization of each person having custody of the sample, and also show the sample number, job name and location, time of day and date sample was taken, material sampled, and tests to be performed. 5. The Contractor shall notify the District at least 24 hours prior to sampling collection for the purpose of District verification of samples collected. 6. Manufacturer's Representative: The Contractor shall, at no cost to the District, provide a qualified technical representative of the coating system manufacturer at the job-site as required by the District to resolve problems related to the coating system or the application of the system. 1.05 DELIVERY, STORAGE AND HANDLING A. Coating system materials: 1. The Contractor shall assure that all materials delivered to the job site are in their original unopened containers. 2. The Contractor shall not use any product older than 1 year from the original manufacturer's factory batch date as listed on the unopened container. B. Abrasive grit/abrasive blast media materials: 1. Delivery of abrasive grit/abrasive blast media shall be in original labeled moisture-proof bags or airtight bulk containers. Abrasives shall not be reused. C. The Contractor shall submit, for the District Engineer's acceptance, a specified material storage area and store all materials in the approved location. 1. Store materials in a single, approved location. 2. Store coating system materials in enclosed, secure, and ventilated structures, and maintain temperature inside the structure within the temperature range recommended by the manufacturer. 3. Keep storage location clean, neat, and free of fire hazards. 4. All operating equipment shall be placed into secondary containment to prevent accidental spills. 5. The Contractor shall maintain material storage areas in a clean condition, free of solvent rags, and wastepaper. The Contractor shall remove debris and other fire hazards and dispose of such items in accordance with all the applicable regulations at the end of each workday. D. The Contractor shall exercise extreme care when handling or disposing of materials or substances listed in Section 8-339 of Division 4 (California Code of Occupational Safety and Health Regulations) of Title 26 (Toxics) of the California Code of Regulations, or as evidenced by the S.D.S. E. The Contractor shall immediately notify the District Engineer of any spill of material that is a hazardous substance in accordance with the appropriate jurisdiction. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 8 F. Avoid spilling thinners, solvents, paint products or other materials that contain toxic substances. All compressors and operating equipment shall be placed in secondary containment. All sewer or site drains shall be covered. G. Remove discarded thinners, solvents, and paint products from the jobsite daily. 1.06 PROJECT CONDITIONS A. Existing Substrate Condition 1. The Contractor should expect that the entire surface under the existing coatings to be corroded, having mill scale, or having weld spatter, and shall provide for such conditions, accordingly, including complete removal of such materials down to bare steel in accordance with SSPC SP10 on all interior surfaces. 2. SSPC-SP 5, White Metal Blast Cleaning, is acceptable in localized areas that are unavoidably overblasted due to surface configuration, access limitations, or complex geometry. The District will not provide additional compensation for areas that are overblasted beyond the specified SSPC-SP 6 surface preparation requirements. B. Tank Status and Access 1. The District will drain the reservoir upon seven (7) days advance written notice from the Contractor. The District shall perform a lock out and tag out of all energized equipment such as water and electrical equipment. The reservoir may contain up to twelve (12) inches of water and silt at the start of Work. The Contractor shall remove and dispose of all remaining water and silt prior to commencing surface preparation and coating operations. 2. The Contractor shall remove the existing cathodic protection system without damaging splicing connections and wires, except where demolition and abandonment is indicated in the Contract Documents. C. Environmental Conditions for Surface Preparation and Coating 1. Coating and surface preparation operations shall only be performed when environmental conditions are within the limits prescribed by the coating manufacturer. 2. Coating shall not be applied when metal temperature is less than five degrees Fahrenheit (5°F) above the dew point and rising for a minimum of six (6) hours. 3. Relative humidity and dew point shall be measured using a sling psychrometer with U.S. Weather Bureau psychrometric tables, or with an electronic dew- point meter approved by the District. 4. These conditions shall be maintained continuously during abrasive blasting, coating application, curing, and repair operations. D. Environmental Control Responsibility 1. The Contractor shall provide all environmental controls required to protect the Work and to establish and maintain the required temperature, humidity, and dew point conditions at no additional cost to the District. E. Dehumidification and Temperature Control FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 9 1. The Contractor shall provide and use dehumidification and temperature-control equipment during blast cleaning, coating application, and curing whenever ambient conditions would otherwise prevent compliance with coating manufacturer requirements. 2. When Work is subject to extended periods of low temperature or high humidity, the Contractor shall maintain the established production schedule by providing all labor, equipment, and materials necessary to maintain a controlled environment. 3. Dehumidification systems shall be capable of maintaining required dew-point separation, temperature, and relative humidity within the enclosure as specified by the coating manufacturer. 4. The Contractor shall bear all costs and liability resulting from dehumidification equipment failure, breakdown, power failure, or downtime. F. Curing and Hold-Before-Service Conditions 1. Following application of the final coating and completion of repairs, the Contractor shall provide forced heated air ventilation for a minimum of seventy-two (72) hours at seventy degrees Fahrenheit (70°F), or longer if recommended by the coating manufacturer. 2. Ventilation shall provide not less than one (1) to four (4) complete air changes every hour during curing. 3. The Contractor shall maintain temperature and humidity controls until the coating system has reached the minimum cure required for holiday testing, cleaning, disinfection, and service. G. Acceptance and Fill Conditions 1. The Contractor shall allow three (3) consecutive working days for the District to fill the reservoir after coating cure is complete. 2. The reservoir shall not be placed into service until the coating system is free of taste, odor, volatile organic contamination, and adverse aesthetic effects, and water quality meets State and Federal drinking water standards. 1.07 WARRANTY A. The total warranty period shall be two years from the final acceptance date. B. A one-year inspection will be required, as per AWWA D102. 1. At the time of tank acceptance for service, the District Engineer shall schedule the first anniversary inspection. The inspection of the tank shall be scheduled for a date between the first day of the eleventh month and the thirtieth day of the eleventh month following acceptance. This schedule for the inspection shall be considered tentative and the Contractor will be notified of the inspection schedule no later than the first day of the tenth month following acceptance of the tank. 2. Contractor shall provide floor protection, lighting, and scaffolding during the inspection. Contractor shall provide access (scaffolding, ladders, lift, etc.) to facilitate inspection of exterior coatings. 3. The Contractor shall furnish ventilation, as necessary for the inspection. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 10 4. The Contractor shall be present at the inspection and disinfect the reservoir after repairs are complete. 5. Contractor shall be present at the inspection. C. Upon completion of this inspection, the Inspector will prepare a report that includes but is not limited to, the methods used in the inspection, the equipment and personnel on hand at the time of the inspection, a summary of findings, the number and types of failures observed, the percentage of surface area where failures have occurred, the names of the persons making the inspections, photographs of all deficiencies found, and any other information relevant to the condition and maintenance of the tank. D. The District shall consider any location where coating has delaminated, peeled, blistered, or cracked; and any location where rusting is evident as failure of the coating system. In addition, the District shall consider photographs or reports of the coating imperfections or failures as acceptable evidence of failure. E. The Contractor shall be liable for all remedial work including repair of all failures by removing the deteriorated coating, cleaning the surface, and recoating with the same system in accordance with this Section. The District may allow surface preparation of small failures (areas less than 1 sq ft.) by cleaning to bare metal in accordance with appropriate SSPC-SP standards, however, the method of repair is at the sole discretion of the District. F. The District will prepare a schedule for remedial work completion, to be no more than thirty (30) calendar days after the submittal of the inspection report to the Contractor. Upon failure of the Contractor to commence remedial work within ten calendar days after the starting date established by the District, the District may at its option, retain another Contractor to perform the remedial work. The Contractor shall be liable for actual cost of all such remedial work plus a 20 percent District administrative cost. G. The Contractor shall bear the expense of all warranty inspections of the remedial work required by the District. The Contractor shall disinfect the reservoir after the inspection and repairs. PART 2 PRODUCTS 2.01 INTERIOR COATING SYSTEM A. INT-EPDX-ROOF — Epoxy for potable water immersion and above water exposure for tank interiors: High-build, epoxy resin shall have a solids content of at least 70% by volume, and shall be suitable for long-term potable water exposure. The coating shall be NSF 61 approved for contact with drinking water. The Contractor shall provide the following new interior coating systems consisting of a thin film epoxy on the rafters, roof plates, and down 6" onto the shell and interior piping. 1. Product: a. Carboline Hydroplate 1086 b. Sherwin William Sherplate 600 FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 11 c. Tnemec L140 Pota Pox Plus d. Or Approved equal 2. Color: a. First Coat:Buff b. Second Coat:White B. INT-EPDX-TANK - 100% solids thick film epoxy recommended for corrosion protection of steel water storage tanks. 1. Product a. Carboline Hydroplate 6500 b. Sherwin Williams Sherplate PW c. Tnemec Series FC22 Epoxoline d. Approved equal 2. Color a. White C. The Contractor shall not use or allow to come in contact with any portion of the tank interior, any coating system and/or any thinners or additives which have not been approved and listed by the National Sanitation Foundation, Standard 600 (NSF 600) and NSF 61 for use in potable water reservoirs. D. Minimum adhesion value (ASTM D-4541) for the lining system using a type II or type V instrument shall be 800 P.S.I. E. The interior roof, rafters, and shell shall be coated, and tested prior to any repairs on the floor of the tank. F. The Contractor shall provide coating "certified non-lead" (less than 0.06 percent lead by weight in the dried film) as defined in Part 1303 of the Consumer Products Safety Act. 2.02 ABRASIVES A. The Contractor shall use abrasive grit for field blast cleaning conforming to the following: 1. Produce a surface profile of 3.5 to 4.5 mils for the floor, shell, roof supports, ladder, and over flow. 2. Produce a surface profile of 2 to 3 mils for the roof plates, rafters, and down onto the shell 1'. 3. New, clean and free of contaminants, and containing no hazardous materials. Silica sand will not be allowed. 4. Certified by California Air Resources Board, Executive Order G-565. 5. Conform to all applicable requirements of the Local Air Quality District. 6. Iron alumina silicate with a MOHs hardness of 7.8 to 8.2 capable of producing the required surface profile. Approved products include Kleenblast as made available by Kleen Blast, 30028 Industrial Parkway, Hayward, CA 94544. 7. Green Diamond as made available by Green Diamond Performance Materials, Riddle, Oregon. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 12 8. Garnet abrasive with less than 0.1% respirable crystalline silica and no heavy metals. Approved products include Barton Garnet as made available by Kleen Blast, 30028 Industrial Parkway, Hayward, CA 94544. PART 3 EXECUTION 3.01 GENERAL A. The District will drain the reservoir, with 7 days advance written notice from the Contractor. The reservoir may have up to twelve (12) inches of water and silt remaining. The Contractor shall be responsible for disposing the remaining water and silt. The Contractor shall remove the existing cathodic protection system without damaging the splicing connections and wires, except in cases where the cathodic protection system has been identified for demolition and abandonment per the project plans and specifications. B. When the new interior coating has completely cured, the Contractor shall clean and disinfect the reservoir in accordance with AWWA C652. C. After filling the reservoir, the District shall test the reservoir water for bacteriologic and volatile organic contamination, and for aesthetic quality. The District shall not accept the project until the reservoir water meets California Department of Health Services (DHS) and federal drinking water standards. In addition, the tank will not be accepted until the coating system is free of taste and odor associated with the coating product and does not impart any adverse aesthetic quality to District water. D. The interior roof, rafters and shell shall be completely coated, tested, and repaired prior to any operations on the floor of the tank. E. The Contractor shall dispose of all wastes from abrasive blasting and any other wastes or debris generated during work. The Contractor shall sample, and test wastes as required by applicable regulatory agencies, and as necessary for classification of wastes prior to disposal. The Contractor shall bear all costs for waste sampling, testing, accumulation, transport, and disposal, including the cost for wastes classified as hazardous and non-hazardous. F. When considering the proposed work schedule, the Contractor shall allow three (3) consecutive working days for the District to fill the Reservoir after the coating has cured. G. At least two days prior to start of work, the Contractor shall arrange with the District for a pre-preparation conference at the job site to ensure that all parties are familiar with the entire project, including specifications and the manufacturer's printed application instructions. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 13 3.02 QUALITY CONTROL A. The Contractor shall provide adequate lighting, without shadows, during all phases of work to ensure that work is performed as specified and that the entire work area is illuminated. B. The Contractor shall use properly functioning equipment capable of performing the task required herein. C. The Contractor shall provide ground supported scaffolding and lighting (SSPC Guide12), as determined by the Inspector, to facilitate visual and instrument inspection by the Inspector of each phase of the work and of the completed work, as so placed as directed to minimize glare and shadows. Work will be rejected if proper lighting is not achieved for a proper inspection. All scaffolding shall be equipped with stairways, no exterior ladders. D. The Contractor shall provide personnel to move scaffolding and furnish other assistance to Inspectors and/or District Inspectors as required. E. The District Coating Inspector will examine surfaces after abrasive blast cleaning to verify that all deposits of contaminants have been removed as per surface clean as per ISO 8502-3 (Class 2). The Contractor shall blow down and vacuum all surfaces prior to District inspection. Tank floors shall be vacuumed. F. All operating equipment shall be placed into secondary containment to prevent accidental spills. G. The Contractor shall verify cleanliness of all spray application equipment prior to, or no later than, time of mixing coating material. H. The Contractor shall measure wet film thickness per ASTM D4414 during coating application of coating to ensure adequate coating thickness, taking at least one measurement for each 100 square feet of application area. The Contractor shall measure dry film thickness after each coat using a non-destructive magnetic dry film thickness gauge. I. The Contractor shall verify at a minimum of two times daily that air supply is free of oil and moisture contamination (ASTM D-4285). The Contractor shall use effective oil and water separators in all main compressor airlines and shall be placed as close as practicable to the equipment. Prior to using compressed air, the Contractor shall test the quality of air downstream of the separators at suitable outlets by blowing the air on clean white blotter for 2 minutes to check for any contamination, oil, or moisture. J. The Contractor shall perform the following daily: measure air temperature, humidity, relative humidity, and metal surface temperature, and determine dew point and relative humidity prior to abrasive blasting or painting. The Contractor shall provide portable temperature and humidity recorders to provide continuous permanent data for blasted steel areas of the reservoir to be coated and, repeat measurements and determination of dew point as often as the District Inspector deems necessary but FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 14 not less often than every four hours at the start of preparation operations and run constantly until final cure. K. The Contractor shall maintain a written record of measurements and dew points, and time that measurements were taken, keep such record on-site, and make records available to Inspector and/or District Inspector on request. L. The Contractor shall furnish 1 roll of Testex tape 1.5 to 4.5 mils X-course and course tape for 0.8 - 2.5 mils profiles prior to the start of abrasive blasting. The Inspector and/or District Inspector may evaluate surface preparation using field abrasive blasting standards, and Testex tape. Evaluation may include inspection of blasted surfaces for dust and abrasive residue, using clear adhesive coated tape per ISO 8502-3. Evaluation will be made immediately prior to coating application. M. The Inspector and/or District Inspector may, but is not required to, also measure coating thickness, at random locations, after each coat. SSPC —PA 2 (Level 2) is only to be used for the calibration of dry film thickness gauges. This is a minimum maximum dry film thickness specification. Dry film thickness readings will not be averaged. All inspection equipment shall be supplied by the Contractor. All equipment shall have current calibration certificates. The District reserves the right to use their own equipment at any time. N. The District Coating Inspector will evaluate cleanliness of coated surface immediately prior to application of a subsequent coat. O. The Contractor shall test all coated surfaces for pinholes (NACE SPO-188) and holidays after application of the final coat in accordance with the following: 1. Perform test in presence of the District Coating Inspector. 2. Perform test after coating has cured as recommended by the manufacturer. 3. Use an appropriate detector, such as Elcometer#236 or as approved by the District representative. 4. Re-test after coating repairs. 5. The District may hire a third-party inspector to inspect Contractor's work, but the ultimate responsibility for the quality of the Contractor's work and the performance of contractual obligations remains with the Contractor. 3.03 LIMITING ENVIRONMENTAL CONDITIONS A. The Contractor shall apply coatings only when conditions are within the limits prescribed by the manufacturer. B. Contractor shall not abrasive blast or apply coatings when air temperature is less than 5 degrees F above dew point and on the rise for a minimum of six hours unless the dehumidification equipment will be operating. 1. The Contractor shall measure relative humidity and dew point using a sling psychrometer in conjunction with U.S. Department of Commerce Weather Bureau Psychrometric Tables. Elcometer 319 Dew Point meter, or equal, may also be used. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 15 C. The Contractor shall complete any blasting, coating and testing operations within the duration of time as specified. D. The Contractor shall provide all environmental controls required to protect the work and provide the environmental conditions required to perform the work, at no additional cost to the District. 3.04 DEHUMIDIFICATION AND VENTILATION A. The Contractor shall provide dehumidification as required to establish and maintain the specified temperature and relative humidity inside the reservoir twenty fours a day, seven days a week until final cure. The Contractor shall bear all cost and liability for work resulting from dehumidification equipment failure, breakdown, power failure, or down time. B. The Contractor shall provide dehumidification continuously from start of abrasive blasting, until a minimum of three (3) days after application of final coat and all repairs are completed, or for a longer period as recommended by the coating system's manufacturer. The Contractor shall submit a letter from the dehumidification manufacture that the equipment has been properly sized for this project prior to any abrasive blasting operations. Working hour meters are required on the dehumidification units. C. The Contractor shall be expected to maintain the established production schedule despite these potentially adverse conditions by providing all labor, equipment and materials necessary to maintain a controlled environment in the area where work is to be performed. The Contractor shall provide dehumidification equipment consisting of a solid desiccant (not liquid, granular, or loose lithium chloride) design having a single rotary desiccant bed capable of continuous operation, fully automatic with drip-proof electrical controller. Air heaters alone are not acceptable as dehumidification units. D. The Contractor shall ensure that relative humidity of processed air from dehumidification unit does not exceed forty five percent (45%). E. The air change rate for maintaining the required spread of 10°F between inside surface temperature and inside space dew point temperature with a maximum relative humidity of 45% in the space will depend upon the type of equipment to be used and the time of year during the application. There shall be one (1) to two (2) air changes per hour, depending on the air volume of the space to be controlled, to hold the desired degree of cleanliness of the surface. F. The Contractor shall ensure areas adjacent to the surface that is to be blasted and coated are not exposed to a relative humidity greater than forty-five percent (45%) at any time during blasting, cleaning, coating, or curing. G. The Contractor shall ensure that during blast cleaning and coating, and for 96 hours after final coat and all repairs are completed, dehumidification units maintain an air and steel temperature of 60 degrees F minimum inside the reservoir. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 16 H. The Contractor shall ensure dehumidification equipment is placed as close to reservoir manhole as possible. I. The Contractor shall ensure cleaning of dehumidification filters prior to start of dehumidification and weekly cleaning thereafter. J. The Contractor shall ensure dehumidification tubing is maintained as follows: 1. Mechanically connected and sealed with duct tape at joints. 2. Extended to the center of the Reservoir and attached to a diffuser that will distribute air equally throughout Reservoir. 3. Have no dust or other foreign matter inside tubing. K. The Contractor shall provide and maintain 24-hour strip chart recorder for humidity and temperature and place humidity and temperature measuring devices inside reservoir at the start of abrasive blasting operations. 3.05 PREPARATION FOR COATING A. The Contractor shall prepare surfaces to be coated in accordance with the coating manufacturer's instructions but not less than specified herein. B. The Contractor should expect that the entire surface under the existing coatings to be corroded, having mill scale, or having weld spatter, and shall provide for such conditions, accordingly, including complete removal of such materials down to bare steel in accordance with SSPC SP10 on all interior surfaces. SSPC SP5 is also acceptable in areas that are over blasted due to difficult access or configuration of the beam/surface. The District will not compensate the Contactor for areas that are over blasted. C. During blast cleaning operations, inlet, outlet, overflow, and drain openings in bottom of tank shall be covered with plywood bulkheads, or other approved barriers, to prevent entry of spent abrasive, removed coating or other foreign materials. D. Prior to abrasive blasting or other mechanical surface preparation, the Contractor shall clean all surfaces to be coated in accordance with SSPC-SP 1. This work shall include, without limitation, removal of all visible and invisible oil, grease, dirt, salts, welding residues, and other surface contaminants, regardless of quantity or extent. Cleaning shall include inspection of all surfaces using ultraviolet (black-light) methods to identify the presence of oils and greases not visible under normal lighting. All detected contamination shall be completely removed prior to abrasive blasting. Slag, weld spatter, and weld-metal accumulations shall be removed by chipping, scraping, or grinding in accordance with NACE SP-0188 prior to abrasive blasting. No additional compensation or time extension will be provided for cleaning of surfaces that are heavily contaminated, greasy, or otherwise dirty prior to surface preparation. E. The Contractor shall provide blast cleaning including: removal of existing coating, under film corrosion, corrosion, and other corrosion products from all areas to be coated; and, preparation of all surfaces to be coated by abrasive blast cleaning to SSPC-SP-10 near white metal with a surface profile of 3.5 to 4.5 mils for the 100% FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 17 solids epoxy and 2 to 3 mils for the thin film epoxy. For every 500 square feet, or less, of surface blasted, the surface profile shall be tested with the use of Press-o- Film as manufactured by Testex, Elcometer 122 Testex Replica Tape, or other NACE RP0287 approved equal, at locations to be determined by the Inspector. F. The Contractor shall ensure complete abrasive blast cleaning of metal prior to application of coating system. The Contractor will provide a hold back of 5" in areas to be welded if the welder requests it. G. The Contractor shall not reuse abrasive blast media unless the media is specifically designed for reuse, if steel abrasive is used the working mixture shall be a minimum of 75% grit and 25% shot. Automatic blast units shall be approved by the District before use on the exterior roof. The Contractor shall be fully aware of the different required anchor profiles that are required for different products. H. The Contractor shall ensure maintenance of abrasive blasting equipment including: 1. Installation of an oil moisture separator in the airline between compressor and blast machine. 2. Installation of an air cooler/dryer in the airline between the compressor and the oil and moisture separator. 3. Use of venturi nozzle. I. The Contractor shall ensure all surfaces to be blast cleaned are electrically grounded during blast cleaning. All air and blast lines will have cable whip checks installed. J. The Contractor shall provide exhaust air dust collectors to prevent discharge of dust to outside air. No dust socks are allowed. The Contractor shall provide and use a dust containment system that shall consist of a 12,000 cfm, or higher, mobile industrial dust collector. Approved dust collector products include DC12000 as manufactured by Industrial Vacuum Equipment Corporation, or equal. K. The Contractor shall mask-off and protect all exposed machined metal surfaces, plastic, rubber, and other surfaces not to be painted or that may be damaged by abrasive blasting or tying in to coating systems. L. The Contractor shall remove all dust and abrasive from freshly blasted surfaces by use of a District approved vacuum system. When the Contractor is painting the roof plates, rafters, knuckle, shell and roof support there shall be no more than 1" of remaining grit on the floor during coating application. Care shall be taken to not contaminate the lower surfaces of the wall during the coating application. M. The Contractor shall dispose of abrasive blast media and other waste materials off- site and in accordance with approved material disposal plan and discard material directly from the reservoir to a portable container and remove container from site. The Contractor shall ensure media is not placed on ground or other intermediate location. No abrasives shall be reused at any time. N. For spot repairs, all surfaces and edges of the existing sound coating material surrounding bare metal and spot-cleaned areas shall be feathered to a smooth FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 18 transition using sandpaper to eliminate loose and/or abrupt edges. The CONTRACTOR shall power tool clean small repair areas less than 1 sq. ft. according to SSPC SP11 to meet the manufacturer's recommended profile. An MBX Bristleblaster or equivalent shall be used to perform power tool cleaning per SP11. The existing coating shall be abraded a minimum of 3 inches beyond the edge of the bare steel. Abrasive blasted surfaces shall require a minimum of 6 inches of lightly abraded existing coating. O. For spot repairs, all sharp edges and welds shall be rounded or chamfered and all burrs, bare steel, and weld splatter shall be ground smooth per NACE SP0178 and SSPC SP2 and SP3. 3.06 INTERIOR COATING SYSTEM A. INT-EPDX-ROOF 1. Apply the coating system in accordance with the coating manufacturer's published product data sheet and written application instructions to achieve the following total dry film thickness (DFT): a. Minimum total DFT: 16.0 mils b. Maximum total DFT: 20.0 mils c. Apply in one or more coats as required. Maximum DFT per coat shall not exceed the manufacturer's written recommendations. d. Submit manufacturer's application instructions showing proposed number of coats and target DFT. 2. Apply the INT-EPDX-ROOF coating system to the interior tank rafters, roof plates, interior piping, and the upper 6 inches of the tank shell measured downward from the underside of the roof(knuckle). B. INT-EPDX-TANK 1. Apply the coating system in accordance with the coating manufacturer's published product data sheet and written application instructions to achieve the following total dry film thickness (DFT): a. Minimum total DFT: 25.0 mils b. Maximum total DFT: 35.0 mils c. Apply in one or more coats as required. Maximum DFT per coat shall not exceed the manufacturer's written recommendations. d. Submit manufacturer's application instructions showing proposed number of coats and target DFT. 2. Apply the INT-EPDX-TANK coating system to the tank floor, shell, ladder, column roof supports, and overflow, terminating 6 inches below the underside of the roof(knuckle). 3.07 APPLICATION A. The Contractor shall adhere to general application requirements as follows: 1. Mix and apply all coatings in accordance with the manufacturer's recommendations and instructions, the applicable requirements of SSPC-PA 1, and as specified herein. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 19 2. Obtain Inspector's evaluation and approval of steel surface preparation immediately prior to application of first coat. 3. Obtain Inspector's evaluation and approval of cleanliness of previous coat immediately prior to application of a subsequent coat. 4. Contractor shall provide paint pump ratio testing at the beginning of each application. 5. Completely coat all surfaces above shell prior to coating shell. The floor will be abrasive blasted and coated after the shell, roof, roof supports, and rafters are completely caulked, tested, and repaired. 6. For each portion of the Reservoir-shell, roof, and floor, complete application. 7. Apply coatings by plural component spray except: a. Roof plates, rafters and surfaces of the roof support columns above the overflow elevation. b. Areas of less than 2 square inches may be brushed, or the roof and rafters. c. Required brush striping of edges, welds, nuts, bolts, rafter edges, and roof plate edges. The thin film stripe coat will be applied as a totally independent coat by brush and allowed to dry prior to application of the finish coat. The stripe coat will be the same as the system being applied. No other products shall be allowed for stripe coats. 8. Apply coatings at a temperature recommended by manufacturer. Prior to mixing, coating materials shall be not less than 90 degrees F. Use explosion- proof inline heaters, as necessary. 9. Scaffolding or other support system shall be free of abrasive blast media, dirt, and other foreign matter prior to coating application. 10. The Contractor should be fully aware that most epoxies can produce amine blush which must be removed prior to over coating and disinfection. 11. Finish coat shall be uniform in color and gloss over the entire surface. Finish coat shall be smooth to touch with no sags, runs, dry spray, over-spray, cracks, pinholes or other surface defects and must be even in color and appearance. When coating is applied, the previously coated area will be masked off to prevent overspray onto newly painted surfaces. 12. Coating should not be applied closer than 6 inches from an unprepared surface. 13. The Contractor shall apply a totally independent brush coat and allowed to dry to all welds, plate edges, rafter edges, nuts, bolts, and hard to reach areas prior to application of the finish coat. 14. For spot repairs, the new coating shall overlap the existing coating that has been abraded with power tools by a minimum of 2 inches. The new coating shall overlap the existing coating that has been abraded with abrasive blasting by a minimum of 3 inches. B. The Contractor shall remove areas of paint in excess of allowable mils specified. C. The Contractor shall provide additional coats to achieve specified minimum dry film thickness. D. The Contractor shall provide application equipment as follows: 1. Airless spray pumps in compliance with manufacturer's requirements, having an anti-freeze device, and fluid filter. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 20 2. Use fluid tip size recommended by manufacturer. 3. Use clean fluid lines not previously used to apply zinc-rich or water-based coating materials. 4. Clean equipment using only products recommended by the coating manufacturer. 5. Blow lines to remove all thinners prior to painting. 6. Barcol hardness testing is required eight hours of each application of the 10% solids epoxy. 7. Each application a sample shall be sprayed onto plastic and marked with the date and time of application including the batch number. This sample shall retained be given to the project Engineer. 8. Plural Component Coatings: After each component of the plural component coating system has been thoroughly heated, the Contractor shall perform a paint pump ratio test prior to each application in the presence of the Inspector. 9. The Contractor shall place two new see-through containers with preprinted volumetric marks on a flat surface. The hose valve for each component shall be opened simultaneously and each component flow rate shall be allowed to stabilize by pouring the discharging materials into separate disposable containers. After the flow is stabilized, the hoses shall be transferred to the pre-printed volumetric containers and the valves shall be shut off after one of the containers has been filled, depending on the mixing ratio recommended by the Manufacturer. If the volumetric quantity of coating in the containers does not match the Manufacturer's recommendation, the Contractor shall reduce or increase the pressure and temperature until it meets the specified mixing ratio. No spraying shall be performed until the ratio test result has been accepted by the Inspector. 10. All plural component pump gauges shall be in working order prior to any application, if gauges are not working, they shall be immediately replaced. All gauges shall be in the zero position when pump is off. If the pump error alarm goes off the Contractor shall immediately shutdown and repair the pump. E. The Contractor shall provide coating repairs as follows: 1. Touch-up or refinish all chipped, abraded, or otherwise unsatisfactory portions of the work in accordance with the manufacturer's recommendations. The Contractor should be fully aware that high solids epoxies can amine blush. 2. Re-coating or touch-up of areas that have cured beyond the maximum time recommended by the manufacturer require the following special preparation. 3. Sweep blast area and 3-inches into the surrounding area. Sweep blast under low pressure to uniformly abrade surface and feather edges. Feather edges by sanding or other means acceptable to the Inspector. 4. Remove abrasive blast residue from blasted area with special attention to marginal areas of intact coating. 5. All repairs will be masked off. F. After the specified coating has properly cured, the Contractor shall measure the DFT with an ASTM D7092-approved gauge in accordance with SSPC PA 2 with a Level 2 thickness restriction. G. After the specified coating has properly cured, the Contractor shall test all coated interior surfaces for pinholes and holidays using a high voltage spark tester FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 21 according to NACE SP0188. Testing shall be witnessed by the District Inspector. The required test voltage shall be established by the manufacturer's recommendations and testing of induced holidays. For surfaces having a total dry film coating thickness exceeding 20 mils, a high voltage holiday detector shall be used. The unit shall be adjusted to operate at the voltage required in NACE SP0188 for the average DFT applied in the area to be tested. The electrode movement over the coating surface shall be continuous and shall proceed in a systematic manner, which ensures 100% coverage of the coated interior steel surfaces. All defects shall be clearly marked by the District Inspector followed by repair and retesting by the Contractor until it is approved. Approved holiday testers include Tinker& Rasor Model AP-W, D.E. Stearns Co. Model 14/20, Elcometer 236 15 kV, or equal. 3.08 INTERIOR CURING AND CLEANING A. The Contractor shall provide curing conditions (i.e. ventilation and dehumidification) in accordance with the conditions recommended by the coating material manufacturer or by this section, whichever is the highest requirement, prior to placing the completed coating system into service. B. Curing shall include providing ventilation at a rate of at least one complete air change every four hours. C. Equipment shall have a time recorder that provides a cumulative record of operating time. D. Deliver air from ventilating fan to center of reservoir through continuous flexible duct that is not reduced in area from the fan outlet. E. Prior to re-installation of roof vent covers removed during forced air ventilation, the Contractor shall ensure cleaning as follows: 1. Clean dust and abrasive-blasting residue from the roof ventilation screens and top of rafter lips. F. The Contractor shall have the District flush the inlet line prior to cleaning operations. Thoroughly wash down with water all interior surfaces, including but not limited to, roof, rafters, walls, floor, piping and supports. All amine blush must be removed prior to putting the reservoir into service. The Contractor shall steam clean surfaces where necessary. 3.09 SEAL CAULKING A. Prior to when the finish coat is cured, the Contractor shall completely fill and seal all voids, bolt holes, around the entryways, the knuckle/shell interface, pipe penetrations Addendum 1 and the floor/roof pedestals, with Sikaflex-1A caulking or approved substitute to provide a tightly adherent, smooth and continuous seam of caulk. This application may be performed after the application of epoxy or as directed by the manufacturer. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 22 B. Sealant, Sikaflex-1A caulking or approved substitute, may be required at roof plate and rafter interfaces where gaps or crevices are present, subject to approval by the Engineer or Coating Inspector. 3.10 MANWAY GASKETS AND VENT SCREENS A. The Contractor shall supply new manway gaskets for tank manways. B. The vent screens shall be replaced with new vent screens per AWWA D100. The woven wire mesh shall be 16 x 16x 0.009 inch wire by 6 inches wide by X inches long. 3.11 RESERVOIR DISINFECTION A. Upon complete curing, the Contractor shall submit in writing to the District certification that the coating is cured and ready to be placed into service for disinfection and testing. Reservoir cleaning and disinfection shall not commence without written certification. All amine blush must be removed prior to disinfection. B. After all other work has been completed, the Contractor shall ensure that the interior of the Reservoir is thoroughly cleaned and disinfected in accordance with the most current edition of AWWA C652, Disinfection of Water Storage Facilities. The Contractor shall ensure the reservoir is disinfected in accordance with Chlorination Method 2, which requires spray wash of the Reservoir interior with a 200-mg/m1 chlorine solution. The District will assist the Contractor in filling the Reservoir and the Contractor shall allow three (3) consecutive working days for the owner to fill the Reservoir. C. The Contractor shall furnish all cleaning and disinfection materials and all equipment and labor necessary for the cleaning and disinfecting operations. D. After the first 24 hours have elapsed once the tank is full, the District will take a sample of the water to be used for bacteriological contaminants. If the results of this test are negative, the tank will be considered satisfactorily disinfected. If the results are positive, the tank shall be drawn down to that depth that will permit the addition of sodium hypochlorite to a final concentration of 10-mg/L. This depth will be determined upon an evaluation of the chlorine residual provided for in this Section of these Project Special Provisions. E. The Contractor shall ensure that any water used in cleaning and in disinfection of the Reservoir, is discharged in a manner acceptable to the District and the appropriate water pollution control agency. The Contractor shall ensure all water discharged is de-chlorinated. 3.12 CONTRACTOR/ COATING INSPECTOR INTERACTION & COMPLIANCE A. Inspection 1. The District has retained a coating inspection firm to oversee all quality control related to coating operations. The tank inspector will report directly to the District Engineer and shall act with the Engineer's authority in all matters related to tank construction. The Inspector will be an N.A.C.E. Certified FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 23 Coating Inspector, who will inspect any or all phases of work to be performed as outlined herein. The tank inspector shall be an addition to the District Inspector; authority shall be limited to tank related work only. The District Inspector shall remain the primary observer for all work on the project. The tank inspector shall work for and report to the District. The Contractor shall not rely upon the tank inspector for documentation of environmental conditions and assuring compliance with plans and specifications. 2. The Contractor shall notify the District Engineer in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. 3. The Coating Inspector shall examine all materials, tools, and equipment to be used in the blasting and coating operations and shall have the authority to direct the Contractor to remove, replace, or repair any materials, tools, or equipment found not to be in conformance with the Contract Documents including the approved shop drawings and manufacturer's recommendations. The tank inspector will also observe the Contractor's safety activities throughout blasting and coating operations and the Contractor shall immediately rectify any deficiencies noted in that observation. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to observe any safety efforts of the Contractor by the Tank Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Tank Inspector. The Contractor shall indemnify, defend, and save harmless the District and the Tank Inspector from all liability associated therewith. 4. The SSPC-Vis1 pictorial surface standards along with dry film and wet film thickness gauges will be used by the Coating Inspector to determine acceptability of the paint application. 5. The inspection devices listed below, or approved equivalents, shall be provided by the Contractor to the Inspector as required in good working condition and with calibration data prior to beginning any Work. These items shall remain available until final acceptance of the coating applications per the parameters listed below: a. Film Thickness Testing —The Inspector shall determine where and how often to test for film thicknesses. It shall be measured in accordance with SSPC PA 2 with a Level 2 thickness restriction. No measurements shall be made until at least 8 hours after application of the coating. A theoretical thickness shall also be calculated from the quantities of materials applied. The instruments shall have the capability of measuring 25% over the specified coating thickness and shall produce an actual reading and shall not be estimated. No measurements shall be made until at least 8 hours after application of the coating. The following testing instruments are acceptable. 1) Wet film gauge: Notched gauge approved by ASTM D4414 2) Metallic Surfaces— On ferrous and non-ferrous metals, the dry film coating thickness shall be using one of the following: 3) PosiTestor 6000 4) Elcometer Model 456 FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 24 6. Prepared surfaces and all coating system component applications shall be inspected prior to each succeeding application. The procedure for collecting representative thickness data shall be as follows: a. The Inspector shall determine where and how often to test for film thicknesses, and as a minimum the requirements of SSPC-PA 2 with a Level 2 thickness restriction and calibration will be followed. b. At each inspection point, a minimum of three gauge readings shall be taken, moving the gauge 1 to 3 inches for each new gauge reading. c. Discard any unusually high or low gauge reading that cannot be repeated consistently. Take the average (mean) of the three gauge readings as the spot measurement. The average spot measurement shall meet or exceed the specified dry film thickness for each application per the Level 2 thickness requirement. d. The Contractor shall perform hardness testing after each application in the presence of the Inspector. 7. The Contractor shall afford the tank inspector all reasonable facilities and assistance in monitoring the coating and priming operations. The Contractor shall provide weekly copies of their daily work reports to the tank Coating Inspector. Such reports shall include, but not be limited to, the day and date of work performed, the relevant weather conditions, the type and amount of work performed, all work related to the safety of the operation, and personnel assigned to work actually performed. 8. To facilitate adequate inspection of all surfaces, the Contractor shall provide scaffolding or rigging necessary for the Coating Inspector to perform dry film thickness readings, and visual holiday inspection as required by these specifications and reference standards. The Contractor shall provide personnel to move scaffolding or rigging at the instructions of the Engineer. 9. The tank Coating Inspector shall have authority to direct the Contractor to suspend operations when environmental conditions fall outside the manufacturer's recommended parameters. The Contractor shall comply with these directions and shall not proceed until the tank Coating Inspector determines environmental conditions are sufficient to proceed. Failure to suspend coating operations as directed or restarting work without the direction of the tank Coating Inspector shall be cause for rejection of work so performed. 10. The Contractor shall immediately remove and replace all such work in accordance with these Project Special Provisions and directions of the tank inspector. No additional compensation will be allowed for work resulting from failure to comply with the tank inspector or for surfaces not otherwise conforming to the provisions of these Project Special Provisions. B. Coating inspector authority 1. The tank Coating Inspector shall have authority to direct the Contractor to suspend operations when environmental conditions fall outside the manufacturer's recommended parameters. 2. The Contractor shall comply with directions and shall not proceed until the tank Coating Inspector determines environmental conditions are sufficient to proceed. Failure to suspend coating operations as directed or restarting work without the direction of the tank Coating Inspector shall be cause for rejection of work so performed. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 25 3. The Contractor shall immediately remove and replace all such work in accordance with these Project Special Provisions and directions of the Coating Inspector. 4. No additional compensation will be allowed for work resulting from failure to comply with the tank inspector or for surfaces not otherwise conforming to the provisions of these Project Special Provisions. C. Safety 1. The Contractor shall provide a safe work environment at all times. In the event the Coating Inspector notes any safety deficiencies, the Contractor shall immediately rectify noted deficiencies. 2. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to observe any safety deficiencies of the Contractor by the Coating Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Coating Inspector. 3. The Contractor shall save harmless the District and the Coating Inspector from all liability associated therewith. D. Inspection assistance 1. To facilitate adequate inspection of all surfaces, the Contractor shall provide scaffolding or rigging necessary for the Coating Inspector to perform dry film thickness readings, and visual holiday inspection as required by these specifications and reference standards. 2. The Contractor shall provide personnel to move scaffolding or rigging at the instructions of the Coating Inspector. E. Notification 1. The Contractor shall notify the Coating Inspector in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. F. Acceptability for paint application 1. The SSPC-Vis1 pictorial surface standards along with dry film and wet film thickness gauges will be used by the Coating Inspector to determine acceptability of the paint application. 2. The Contractor shall provide necessary testing equipment to perform the above-mentioned tests. G. Reporting 1. The Contractor shall afford the Coating Inspector all reasonable facilities and assistance in monitoring the coating and priming operations. 2. The Contractor shall provide weekly copies of daily work reports to the tank Coating Inspector. Such reports shall include, but not be limited to, the day and date of work performed, the type and amount of work performed, all work related to the safety of the operation, and personnel assigned to work actually performed. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 26 3.13 SOAK PERIOD &TESTING FOR VOLATILE ORGANIC COMPOUNDS A. The Contractor shall ensure that water in the Reservoir is allowed to soak for five (5) days after the Reservoir has been filled to the over-flow level and disinfected. B. After the five-day soak period the District will sample and submit a single sample to a certified laboratory to test the water for presence of organic chemical contaminants (e.g. TCE, PCE, etc.) possibly having leached from the new paint system. The sample is to be tested in accordance with EPA Method 524.2. The water sample will be collected by the District in the presence of the Contractor and should be a true representation of the water in the Reservoir at the time. C. The Contractor shall be liable for all costs associated with re-testing water if reservoir water draining and refilling is necessary. D. The District Engineer shall evaluate and determine acceptability of the aesthetic quality of the water as a condition of final acceptance of the work. Constituent levels found from sample results which are at or below regulated maximum contaminant levels specified by state and federal standards shall not be the sole basis for tank acceptance. E. The District Engineer may reject all work, or a portion thereof based on any adverse taste or odor detected or other conditions affecting the aesthetic quality of the water. 3.14 DISPOSAL OF EXISTING COATINGS AND SPENT ABRASIVE BLAST MEDIA A. The Contractor shall dispose of spent abrasive blast media and removed coating materials in accordance with a District approved disposal plan. B. The Contractor shall coordinate and pay all costs for sampling and testing of spent abrasive blast media and removed coating materials in order to document waste class. Minimum sampling and testing requirements are listed previously in this Section. C. Prior to removal of hazardous wastes off-site, the Contractor shall allow adequate time for District to review laboratory test results, as well as the time required to obtain a Hazardous Waste Generator's U.S. EPA ID Number, if required the District will provide the Contractor with written notice to dispose of all or a portion of the spent abrasive blast media and/or removal coating materials as hazardous waste, if so determined by the District that such disposal is required. D. The Contractor shall be responsible for all costs associated with accumulating, transporting, and disposing of spent abrasive blast media and removed coating materials. 3.15 REPAIRS A. If an area is found to have an improper finish, insufficient film thickness or other deficiencies; the Contractor shall clean, prepare, and topcoat the coating surface per the manufacturer's recommendations to obtain the specified finish and coverage. Work shall be free of runs, bridges, shiners, laps, or other imperfections. FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 27 B. Damaged or defective coating shall be removed by the Contractor and shall be prepared per the specified water and abrasive blast cleaning to meet the clean surface requirements before recoating 3.16 CLEAN-UP A. Upon completion of the work, the Contractor shall make a detailed inspection of all work. B. The Contractor shall be solely responsible for all paint over-spray or fugitive dust fallout claims. C. The Contractor shall remove all spattering, spits, and blemishes. D. Upon completion, of work, the Contractor shall remove all staging, tarps, scaffolding, and containers from the site, including but not limited to: paint and thinner containers and excess paint and thinner (to be disposed of in conformance to all current regulations); paint spots removed and the entire job site cleaned; all damage to surfaces resulting from the work from this section to be cleaned, repaired or refinished to the complete satisfaction of the District. All clean up shall be completed within 7 calendar days starting at the last day of holiday testing of the reservoir. The Contractor shall allow adequate time for District for review of laboratory test results, as well as the time required to obtain a Hazardous Waste Generator's U.S. EPA ID Number if required. E. The District will provide the Contractor with written notice to dispose of all or a portion of the spent abrasive blast media and/or removed coating materials, as required. F. The Contractor shall bear all costs associated with site clean up. END OF SECTION FEBRUARY 2026 SECTION 09 97 13.13 2026 STATELINE TANKS INTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 28 SECTION 09 97 13.23 EXTERIOR COATING FOR WELDED STEEL RESERVOIR PART 1 GENERAL 1.01 SUMMARY A. The Contractor shall perform exterior coating work as follows: 1. Stateline Tanks #1: provide all labor, materials, equipment and incidentals required for: a. Complete removal of all the existing exterior coatings on exterior surfaces and appurtenances, including but not limited to roof, shell, ladders, guardrails, pipes, manways, hatches, vents, etc. b. Provide full containment structure around tank to contain and protect the environment and persons from fugitive dust, blast media, coating overspray, etc. c. Perform full exterior coating, including surface preparation, of the exterior surfaces and appurtenances, including but not limited to the roof, shell, ladders, guardrails, pipes, manways, hatches, vents, etc. d. It is the District's intent to have the Contractor remove and replace the coating system of all of the Stateline Tank#1's exterior steel surfaces, in their entirety, and any omission of specific tank features or elements not expressly stated in this specification are not deliberate and should be accounted for. 2. Stateline Tanks #2: provide all labor, materials, equipment and incidentals required to: a. Completely remove all the existing exterior coatings on exterior surfaces and appurtenances, including but not limited to roof, shell, ladders, guardrails, pipes, manways, hatches, vents, etc. b. Provide full containment structure around tank to contain and protect the environment and public from fugitive dust, blast media, coating overspray, etc. c. Perform full exterior coating, including surface preparation, of the exterior surfaces and appurtenances, including but not limited to the roof, shell, ladders, guardrails, pipes, manways, hatches, vents, etc. d. It is the District's intent to have the Contractor remove and replace the coating system of all of the Stateline Tank#2's exterior steel surfaces, in their entirety, and any omission of specific tank features or elements not expressly stated in this specification are not deliberate and should be accounted for. B. The Contractor shall apply the coating system as indicated herein and, in a manner, prescribed by these specifications and the manufacturers printed application instructions. The interior coating system must be completed prior to coating work on the exterior. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 1 C. Stateline Storage Tanks Information: 1. Year Built: 1994 for Stateline Tank No. 1 and 1995 for Stateline Tank No. 2. 2. Diameter: Stateline Tank No. 1 = 90 ft, Stateline Tank No. 2 = 120 ft 3. Shell Height: 27 ft for both tanks 4. Knuckle Height: 3 ft for both tanks 5. Center Height: 33 ft. 6. Capacity: Stateline No.1 = 1.25 MG, Stateline No. 2. = 2.25 MG D. Existing interior coatings: 1. Stateline Tank#1 and #2: a. The Stateline Tank#1 and #2 were originally coated in 1994 and 1995 respectively; the coating product is unknown. b. Tank information, including dry film thickness of existing coating, heavy metal analysis, and recently assessed coating and steel condition, is presented in "Attachment A- 2025 Stateline Tanks Condition Assessment Report", of this project specification. 2. The Contractor shall bear all costs associated with stripping, handling, storing, testing, transport, and disposal of all waste. It shall be the Contractors responsibility to estimate the quantity and classification of waste associated with the work. 1.02 REFERENCES A. The Contractor shall comply with the requirements of the Steel Structures Painting Council Painting Manual, Volume 1 and 2, Good Painting Practices, including AMPP, the National Association of Corrosion Engineers, American Society of Testing and Materials, and American Water Works Association D-102, for application and surface preparation, and all applicable OSHA and safety standards. B. The following standards (including the most recent update or version) shall govern the work unless specified otherwise in these specifications: FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 2 ASTM D4214 Standard Test Methods for Evaluating the Degree of Chalking of Exterior Paint Films ASTM D4414 Standard Practice for Measurement of Wet Film Thickness of Organic Coatings by Notched Gauges ASTM D4417 Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM D4541 Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers ASTM D5402 Standard Practice for Assessing the Solvent Resistance of Organic Coatings Using Solvent Rubs ASTM D7091 Standard Practice for Non-Destructive Measurement of Dry Film Thickness of Non-Magnetic Coatings Applied to Ferrous Metals and Non-Magnetic, Non-Conductive Coatings to Non-Ferrous Metals SSPC-Vol.1, Steel Structures Painting Manual, Good Painting Practice. SSPC-Vol.2, Steel Structures Painting Manual, Systems and Specifications. SSPC-SP 1 Solvent Cleaning SSPC-SP 2 Hand Tool Cleaning SSPC-SP 3 Power Tool Cleaning SSPC-SP 5 White Metal Blast Cleaning SSPC-SP Guide 11 Stripe Coating SSPC-SP 6 Commercial Blast Cleaning SSPC-SP 7 Brush-Off Blast Cleaning SSPC-SP 10 Near White Blast Cleaning SSPC-SP 11 Power Tool Cleaning to Bare Metal SSPC-AB 1 Mineral and Slag Abrasives SSPC-PA 1 Shop, Field and Maintenance Painting SSPS-PA Guide 3 Guide to Safety in Paint Application SSPS-PA Guide 12 Lighting SSPC-Guide to Vis 1-89 Visual Standard for Abrasive Blast Cleaned Steel SSPC-V15 (3-93) Visual Standard for Power& Hand-Tool Cleaned Steel SSPC Guide 6 Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations AWWA D102-97 Standard for Painting Steel Water-Storage Tanks AWWA C652 Disinfection of Water Storage Facilities. ISO-8502-3 Preparation of Steel Substrates (Class 2) NACE SP0188 Discontinuity (Holiday)Testing of New Protective Coatings on Conductive Substrates NACE SP0287 Field Measurements of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using Replica Tape All applicable State and Federal OSHA safety standards. C. The Contractor shall consult the District Engineer regarding any situations not covered by the reference standards or this specification; however, it is the Contractor not the District that is ultimately responsible for proper coating application. D. National Association of Corrosion Engineers (NACE) standards, referenced herein. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT—Addendum No.1 3 1.03 SUBMITTALS A. Coating contractor shall provide SSPC QP1 and a letter stating certification for the application of the coating systems to be applied. B. The manufacturer shall provide written certification that the CONTRACTOR's supervisor and each applicator performing Work on the project have been trained and approved by the manufacturer to apply the selected coating system. C. The Contractor shall provide a submittal for each material to be used in the work. At a minimum provide submittals for Abrasive materials, Paint systems, Thinners, and any other additives. D. The Contractor shall include the following data in the manufacturer's recommended handling and installation instructions for the proposed paint system submittal: 1. Weight in pounds/gallon —ASTM D-2196 2. % solids by volume—ASTM D-2369 3. Percent solids by weight—ASTM D-2369 4. Air cure dry time to re-coat—ASTM D-1640 5. Minimum adhesion to steel substrate—ASTM D-4541 using a type II instrument (Minimum acceptable adhesion shall be 800 p.s.i.). 6. Adhesion between coats—ASTM D-4541 7. Letter from dehumidification manufacture that the equipment has been properly sized as per the specification requirements. E. The Contractor shall provide technical data for the dehumidification or heating equipment to be used to hold a blast and to be used during curing. F. The Contractor shall submit the manufacturers latest written product data sheets on each product to be used, and current manufacturer's safety data sheets (S.D.S.) on all materials to be used in the surface and coating operations including abrasives, thinners, cleaning fluids, and solvents. The Contractor shall maintain on the job site at all times S.D.S. and product data sheets. The Contractor shall post required signage for lead work. G. The Contractor shall include the following data in the manufacturer's recommended handling and installation instructions for the proposed paint system submittal: 1. Storage— including maximum and minimum storage temperatures 2. Surface preparation 3. Coating repair 4. Application equipment 5. Mixing and application of coating system — including a table of minimum and maximum time to re-coat as a function of temperature 6. Curing — Minimum and maximum re-coat times. 7. Acceptable temperatures at the time of application 8. The Contractor shall include the following data in the report submittal: Quantity of coating material used for each coat, submitted within 24 hours after completion of each coat. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 4 9. Containment plan and equipment and dust collection system. 10. Health and Safely Plan 11. Fire Safety Plan H. The Contractor shall include technical data documenting that the material to be provided complies with these specifications. Submittals will not be accepted until all requirements of this specification have been confirmed. I. The Contractor shall submit, for the District Engineer's acceptance, a written program detailing measures for full containment, and equipment and dust and over- spray control. J. The Contractor shall provide technical data for the dehumidification or heating equipment to be used to hold a blast and to be used during curing. K. If applicable, the Contractor shall submit a lead compliance program 60 days prior to the commencement of any abatement activities in accordance with California Code of Regulations Title 8, Section 1532.1. L. Lead Removal, Containment, Disposal, and Environmental and Personnel Protection Plans: 1. Collection/Storage/Disposal Plan for Coating Chips — If applicable, the Contractor shall provide a written plan for the collection, storage and disposal as outlined in SSPC Guide 7. If the waste is deemed hazardous per CFR Title 22 limits, the name and address of the hazardous waste hauler and a copy of their hauling permit shall be submitted along with the name and address of the final disposal site. When the disposal is completed, a copy of the completed EPA manifest shall be submitted to the City. If spent abrasive lab results exceed CCR Title 22 TCLP limits, hazardous waste disposal costs shall be negotiated with the City as an extra cost per Division 0 — General Conditions. 2. Removal/Containment Plan — If applicable, the Contractor shall provide a written plan for the methods to be employed for surface preparation, containment and collection of debris as outlined in SSPC Guide 6. When designing the system, the Contractor shall recognize the load bearing capacity and integrity of the structure to be coated. The Contractor shall have the containment plan reviewed by the District. 1.04 QUALITY ASSURANCE A. Installer's Qualifications: 1. The Contractor will have an active California C-33 license. 2. The Contractor shall provide SSPC QP1 and a letter stating certification for the application of the coating systems to be applied. 3. The Contractor shall provide written evidence to the District Engineer that workers furnished have performed quality work and possess experience and knowledge in surface preparation and the application of high-performance industrial coatings. 4. The Contractor shall provide written evidence to the District Engineer that the Contractor has a minimum of five years of experience in the painting of water FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 5 storage tanks and a current list of water tank painting projects for the past five years (five minimum). 5. The Contractor shall provide a certification from the coating manufacturer in application of the specified coatings for at least five years prior to commencement of this work on potable water storage reservoirs. B. The Contractor shall conform to all the standards of craftsmanship as discussed in the Steel Structures Painting Council's Painting Manual, Volume 1, Good Painting Practice. These techniques include but are not limited to: multiple passes of the spray gun, with each pass overlapped 50%, and "cross hatching" successive coats of paint. A stripe (Brush coat) is required on all welds prior to the finish coat. C. The District has retained a 3rd party Special Coating Inspector ("Inspector" or "Coating Inspector") and inspection firm to oversee all quality control related to coating operations. The Inspector will report directly to the District's Engineer and/or Project Manager and shall act with the Engineer's authority in all matters related to construction. The Inspector will be an AMPP Certified Coating Inspector, who will inspect any or all phases of work to be performed as outlined herein. The Inspector shall be an addition to the District Inspector. The District Inspector shall remain the primary observer for all work on the project. The Inspector shall work for and report to the District. The Contractor shall not rely upon the Inspector or District Inspector for documentation of environmental conditions and assuring compliance with plans and specifications. D. The Contractor shall notify the District Engineer in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. E. The Contractor shall provide access to the Inspector and/or District Inspector for examination of all materials, tools, and equipment to be used in the blasting and coating operations. The Inspector and/or District Inspector shall have the authority to direct the Contractor to remove, replace, or repair any materials, tools, or equipment found not to be in conformance with the Contract Documents including the approved shop drawings and manufacturer's recommendations. F. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to observe any safety efforts of the Contractor by the Inspector and/or District Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Inspector and/or District Inspector. The Contractor shall indemnify, defend, and save harmless the District, the Inspector, and District Inspector, from all liability associated therewith. G. The Contractor's workmanship shall conform to standards and recommendations of SSPC Vol. 1, especially Chapters 5.1 and 6. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 6 H. The District may use any testing method deemed necessary by the Inspector and/or District Inspector to verify quality of work. The District may, but is not required to, monitor the quality of work pursuant to this section. I. The Contractor shall ensure proper materials handling and use, including: all coating materials are labeled and used in accordance with SSPC-PA 1, Paragraphs 5.1.1 thru 5.1.5, except all coating system materials without a stated shelf life shall be delivered and used within six months of the date of manufacture; and certification, from any source, that the coating system materials are still suitable for use beyond the stated shelf life or beyond the six month period specified above will not be accepted. All equipment and materials shall be stored in a secured ventilated container. J. The Contractor shall perform the necessary quality assurance in accordance with an approved plan. The Contractor will supply all inspection equipment, required by the Inspector and/or District Inspector. The District reserves the right to use the Contractor's equipment at any time. K. The Contractor shall comply with the following conditions in collection and analysis of wastes: 1. All testing of spent abrasive blast media and removed coating materials to classify these wastes as hazardous or non-hazardous shall be performed by a laboratory that complies with and is certified under the Environmental Laboratory Accreditation Program (ELAP) of the California Department of Health Services. 2. Any Laboratory performing analysis shall provide for comparison to TTLC, STLC, TCLP limits, and RCA limits, and to all other applicable regulatory limits. Laboratory shall retain samples at least ninety (90) calendar days after all analyses are complete. 3. The Contractor shall ensure collection of as many representative samples as required by the representative of the disposal facility, but not less than 4 total. 4. The Contractor shall ensure the following: a. each sample shall have an identifying sample number assigned when the sample is taken; b. each sample number shall be included on the sampling chain of custody and in all reports, correspondence, and other documentation related to the sample; c. each sample shall have a sampling chain of custody; d. and, each chain of custody show the name and organization of each person having custody of the sample, and also show the sample number, job name and location, time of day and date sample was taken, material sampled, and tests to be performed. 5. The Contractor shall notify the District at least 24 hours prior to sampling collection for the purpose of District verification of samples collected. 6. Manufacturer's Representative: The Contractor shall, at no cost to the District, provide a qualified technical representative of the coating system manufacturer at the job-site as required by the District to resolve problems related to the coating system or the application of the system. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 7 1.05 DELIVERY, STORAGE AND HANDLING A. Coating system materials: 1. The Contractor shall assure that all materials delivered to the job site are in their original unopened containers. 2. The Contractor shall not use any product older than twelve months from the original manufacturer's factory batch date as listed on the container. B. Abrasive grit/abrasive blast media materials: 1. Delivery of abrasive grit/abrasive blast media shall be in original labeled moisture-proof bags or airtight bulk containers. Abrasives shall not be reused. C. The Contractor shall submit, for the District Engineer's acceptance, a specified material storage area and store all materials in the approved location. 1. Store materials in a single, approved location. 2. Store coating system materials in enclosed, secure, and ventilated structures, and maintain temperature inside the structure within the temperature range recommended by the manufacturer. 3. Keep storage location clean, neat, and free of fire hazards. 4. All operating equipment shall be placed into secondary containment to prevent accidental spills. 5. The Contractor shall maintain material storage areas in a clean condition, free of solvent rags, and wastepaper. The Contractor shall remove debris and other fire hazards and dispose of such items in accordance with all the applicable regulations at the end of each work day. D. The Contractor shall exercise extreme care when handling or disposing of materials or substances listed in Section 8-339 of Division 4 (California Code of Occupational Safety and Health Regulations) of Title 26 (Toxics) of the California Code of Regulations, or as evidenced by the S.D.S. E. The Contractor shall immediately notify the District Engineer of any spill of material that is a hazardous substance in accordance with the appropriate jurisdiction. F. Avoid spilling thinners, solvents, paint products or other materials that contain toxic substances. All compressors and operating equipment shall be placed in secondary containment. All sewer or site drains shall be covered. G. Remove discarded thinners, solvents, and paint products from the job-site daily. 1.06 PROJECT CONDITIONS A. Existing Substrate Condition 1. The Contractor shall expect that exterior steel surfaces beneath the existing coatings may exhibit corrosion, remaining mill scale, weld spatter, and other surface irregularities. The Contractor shall account for these conditions and prepare exterior steel surfaces in accordance with SSPC-SP 6/ NACE No. 3, Commercial Blast Cleaning, prior to application of the exterior coating system. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 8 2. SSPC-SP 5 / NACE No. 1, White Metal Blast Cleaning, is acceptable in localized areas that are unavoidably overblasted due to surface configuration, access limitations, or complex geometry. The District will not provide additional compensation for areas that are overblasted beyond the specified SSPC-SP 6 surface preparation requirements. B. Tank Status and Access 1. One of the two tanks shall be drained and out of service during performance of the exterior coating Work. The District shall perform a lock out and tag out of all energized equipment such as water and electrical equipment. 2. All openings shall be covered and protected to prevent over-spray, dust, or debris from entering the reservoir. The Contractor shall be responsible for all costs resulting from contamination of water inside the in-service reservoir. C. Environmental Conditions for Surface Preparation and Coating 1. Coating and surface preparation operations shall only be performed when environmental conditions are within the limits prescribed by the coating manufacturer. 2. Coating shall not be applied when metal temperature is less than five degrees Fahrenheit (5°F) above the dew point and rising for a minimum of six (6) hours. 3. Relative humidity and dew point shall be measured using a sling psychrometer with U.S. Weather Bureau psychrometric tables, or with an electronic dew- point meter approved by the District. 4. These conditions shall be maintained continuously during abrasive blasting, coating application, curing, and repair operations. D. Environmental Control Responsibility 1. The Contractor shall provide and use dehumidification, temperature control, tenting, ventilation, and all other environmental controls required to protect the Work and to establish and maintain acceptable coating and curing conditions at no additional cost to the District. 2. The Contractor shall complete all blasting, coating, and testing operations within the Contract Time. E. Dehumidification and Temperature Control 1. The Contractor shall provide and use dehumidification and temperature-control equipment during blast cleaning, coating application, and curing whenever ambient conditions would otherwise prevent compliance with coating manufacturer requirements. 2. When Work is subject to extended periods of low temperature or high humidity, the Contractor shall maintain the established production schedule by providing all labor, equipment, and materials necessary to maintain a controlled environment. 3. Dehumidification systems shall be capable of maintaining required dew-point separation, temperature, and relative humidity within the enclosure as specified by the coating manufacturer. 4. The Contractor shall bear all costs and liability resulting from dehumidification equipment failure, breakdown, power failure, or downtime. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 9 F. Containment and Weather Protection 1. A full containment enclosure shall be provided around the tank to prevent release of dust, blast media, and coating overspray into the environment or adjacent properties. A heavy-duty, fire retardant, seamless, shrink-wrap polyethylene sheet treated with UV inhibitors containment system shall be in place for abrasive blasting and spray coating applications on the exterior of the tank. The containment system shall comply with SSPC Guide 6 Class 1A and shall not allow fugitive dusts or coating particulates to leave the immediate work area. 2. Containment, ventilation, and filtration systems shall be designed so that they do not interfere with the Contractor's ability to maintain required temperature, dew-point, and humidity conditions within the work space. 3. The District will consider alternative surface preparation or containment systems if the Contractor can demonstrate, through submitted documentation and/or field demonstrations that the proposed system provides equal or greater control of spent abrasive, debris, and emissions, achieves the specified surface preparation standard, and meets all applicable environmental and safety requirements. Any proposed alternative system must be submitted for review and written approval by the District prior to use. Acceptance of an alternative system is at the District's sole discretion and shall not be assumed. Addendum 1 G. Curing and Hold-Before-Service 1. The Contractor shall maintain ventilation, dehumidification, and temperature control during curing in accordance with coating manufacturer requirements or this specification, whichever is more stringent, prior to placing coated surfaces back into service. 1.07 WARRANTY A. The total warranty period shall be two years from the final acceptance date. B. A one-year inspection will be required, as per AWWA D102. 1. At the time of tank acceptance for service, the District Engineer shall schedule the first anniversary inspection. The inspection of the tank shall be scheduled for a date between the first day of the eleventh month and the thirtieth day of the eleventh month following acceptance. This schedule for the inspection shall be considered tentative and the Contractor will be notified of the inspection schedule no later than the first day of the tenth month following acceptance of the tank. 2. Contractor shall provide access (scaffolding, ladders, lift, etc.) to facilitate inspection of exterior coatings. 3. Contractor shall be present at the inspection. C. Upon completion of this inspection, the Inspector will prepare a report that includes but is not limited to, the methods used in the inspection, the equipment and personnel on hand at the time of the inspection, a summary of findings, the number and types of failures observed, the percentage of surface area where failures have occurred, the names of the persons making the inspections, photographs of all FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 10 deficiencies found, and any other information relevant to the condition and maintenance of the tank. D. The District shall consider any location where coating has delaminated, peeled, blistered, or cracked; and any location where rusting is evident as failure of the coating system. In addition, the District shall consider photographs or reports of the coating imperfections or failures as acceptable evidence of failure. E. The Contractor shall be liable for all remedial work including repair of all failures by removing the deteriorated coating, cleaning the surface, and recoating with the same system in accordance with this Section. The District may allow surface preparation of small failures (areas less than 1 sq ft.) by cleaning to bare metal in accordance with appropriate SSPC-SP standards, however, the method of repair is at the sole discretion of the District. F. The District will prepare a schedule for remedial work completion, to be no more than thirty (30) calendar days after the submittal of the inspection report to the Contractor. Upon failure of the Contractor to commence remedial work within ten calendar days after the starting date established by the District, the District may at its option, retain another Contractor to perform the remedial work. The Contractor shall be liable for actual cost of all such remedial work plus a 20 percent District administrative cost. G. The Contractor shall bear the expense of all warranty inspections of the remedial work required by the District. The Contractor shall disinfect the reservoir after the inspection and repairs. PART 2 PRODUCTS 2.01 EXTERIOR COATING SYSTEM A. The District provides the following protective coatings manufacturers, as specified herein, as a standard of quality, or equal. 1. EXT-FULL (Exterior Full Coating System) a. Full Prime Coat 1) Sherwin Williams Macropoxy 646 2) Carboline Carboguard 891 VOC 3) Amerlock 2 4) Tnemec Series L69 Hi Build Epoxoline 5) Approved equal b. Full Finish Coat 1) Sherwin Williams Sherloxane 800 2) Carboxane 2000 Addendum 1 3) Ameron PSX 805 Satin Siloxane * #359 4) Tnemec Series V700 Low VOC HydroFlon 5) Approved equal FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 11 B. Color: to be selected by the District from the manufacturer's palette of standard colors or to match existing District owned tanks. All finish colors shall be colored at the factory as a dry grind only, no quick colors shall be accepted. 2.02 ABRASIVES A. The contractor shall use abrasive grit for field blast cleaning conforming to the following: 1. Iron alumina silicate with a MOHs hardness of 7.8 to 8.2 capable of producing the required surface profile. Approved products include Kleenblast as made available by Kleen Blast, 30028 Industrial Parkway, Hayward, CA 94544. 2. Garnet abrasive with less than 0.1% respirable crystalline silica and no heavy metals. Approved products include Barton Garnet as made available by Kleen Blast, 30028 Industrial Parkway, Hayward, CA 94544. PART 3 EXECUTION 3.01 GENERAL A. The Contractor shall be solely responsible for all claims resulting from dust and over-spray control from the coating and surface preparation operations or any damage or nuisance to property or persons. B. The Contractor shall dispose of any residual waste from surface preparation operations in compliance with all Federal, State, and Local regulations. C. The tank shall be out-of-service during the performance of the work. 3.02 QUALITY CONTROL A. The Contractor shall provide adequate lighting, without shadows, during all phases of work to ensure that work is performed as specified and that the entire work area is illuminated. B. The Contractor shall use properly functioning equipment capable of performing the task required herein. C. The Contractor shall provide ground supported scaffolding and lighting (SSPC Guide 12), as determined by the Inspector, to facilitate visual and instrument inspection by the Inspector of each phase of the work and of the completed work, as so placed as directed to minimize glare and shadows. Work will be rejected if proper lighting is not achieved for a proper inspection. All scaffolding shall be equipped with stairways, no exterior ladders. D. The Contractor shall provide personnel to move scaffolding and furnish other assistance to District Inspectors as required. E. The District Coating Inspector will examine surfaces after abrasive blast cleaning to verify that all deposits of contaminants have been removed as per surface clean as FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 12 per ISO 8502-3 (Class 2). The Contractor shall blow down and vacuum all surfaces prior to District inspection. F. All operating equipment shall be placed into secondary containment to prevent accidental spills. G. The Contractor shall verify cleanliness of all spray application equipment prior to, or no later than, time of mixing coating material. H. The Contractor shall measure wet film thickness per ASTM D4414 during coating application of coating to ensure adequate coating thickness, taking at least one measurement for each 100 square feet of application area. The Contractor shall measure dry film thickness after each coat using a non-destructive magnetic dry film thickness gauge. I. The Contractor shall verify at a minimum of two times daily that air supply is free of oil and moisture contamination (ASTM D-4285). The Contractor shall use effective oil and water separators in all main compressor airlines and shall be placed as close as practicable to the equipment. Prior to using compressed air, the Contractor shall test the quality of air downstream of the separators at suitable outlets by blowing the air on clean white blotter for 2 minutes to check for any contamination, oil, or moisture. J. The Contractor shall perform the following daily: measure air temperature, humidity, relative humidity, and metal surface temperature, and determine dew point and relative humidity prior to abrasive blasting or painting. The Contractor shall provide portable temperature and humidity recorders to provide continuous permanent data for blasted steel areas of the reservoir to be coated and, repeat measurements and determination of dew point as often as the District Inspector deems necessary but not less often than every four hours at the start of preparation operations and run constantly until final cure. K. The Contractor shall maintain a written record of measurements and dew points, and time that measurements were taken, keep such record on-site, and make records available to Inspector and/or District Inspector on request. L. The Contractor shall furnish 1 roll of Testex tape for 1.5 to 4.5 mils profiles X-course and course tape for 0.8 - 2.5 mils profiles prior to the start of abrasive blasting. The Inspector and/or District Inspector may evaluate surface preparation using field abrasive blasting standards, and Testex tape. Evaluation may include inspection of blasted surfaces for dust and abrasive residue, using clear adhesive coated tape per ISO 8502-3. Evaluation will be made immediately prior to coating application. M. The Inspector and/or District Inspector may, but is not required to, also measure coating thickness, at random locations, after each coat. SSPC —PA 2 (Level 2) is only to be used for the calibration of dry film thickness gauges. This is a minimum maximum dry film thickness specification. Dry film thickness readings will not be averaged. All inspection equipment shall be supplied by the Contractor. All equipment shall have current calibration certificates. The District reserves the right to use their own equipment at any time. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 13 N. The District Coating Inspector will evaluate cleanliness of coated surface immediately prior to application of a subsequent coat. 3.03 LIMITING ENVIRONMENTAL CONDITIONS A. The Contractor shall apply coatings only when conditions are within the limits prescribed by the manufacturer. B. The Contractor shall not abrasive blast or apply coating when air temperature is less than five degrees above the dew point and on the rise for a minimum of six hours unless the dehumidification equipment will be operating. 1. The Contractor shall measure relative humidity and dew point using a sling psychrometer in conjunction with U.S. Department of Commerce Weather Bureau Psychrometric Tables. Elcometer 319 Dew Point meter, or equal, may also be used. C. The Contractor shall complete any blasting, coating and testing operations within the duration of time as specified. D. The Contractor shall provide all environmental controls required to protect the work and provide the environmental conditions required to perform the work at no additional cost to the District. 3.04 DEHUMIDIFICATION AND VENTILATION A. The Contractor shall provide and use dehumidification and temperature control equipment during the course of the Work. When the Work on the tank is subject to extended periods of low temperature or high humidity during the project, the Contractor shall be expected to maintain the established production schedule despite these potentially adverse conditions by providing all labor, equipment and materials necessary to maintain a controlled environment in the area where Work is to be performed. The substrate and atmospheric conditions within the controlled environment, with respect to temperature and relative humidity, shall be maintained within the limits established by the manufacturer of the selected coating system to ensure proper application and curing of the coating. If the conditions are not in the specified ranges stated by the manufacturer, the Contractor shall use the following: B. Humidity Control — Desiccant or Direct Expansion Refrigeration dehumidification will be used to control the environment in the space 24 hours a day during blast cleaning, coating application and until final coating cure. Equipment will conform to the following requirements: 1. Equipment— Desiccant dehumidifiers will be a solid desiccant design having a single rotary desiccant wheel capable of fully automatic continuous operation. No liquid, granular, or loose lithium chloride drying systems will be accepted. The use of direct expansion (DX) refrigeration type dehumidifiers with reheat may be considered if the expected ambient temperature will remain above 60°F. Heating the space changes relative humidity only and does not change FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 14 the dew point temperature. Heat alone, therefore, is not a substitute for dehumidification, unless substrate temperature is high enough to meet the dew point differential. The dehumidification system may consist of a combination of desiccant and refrigerant equipment. 2. Air Changes —The air change rate for maintaining the required spread of 10°F between inside surface temperature and inside space dew point temperature with a maximum relative humidity of 60% in the space will depend upon the type of equipment to be used and the time of year during the application. There shall be 1 to 4 air changes per hour, depending on the air volume of the space to be controlled, to hold the desired degree of cleanliness of the surface. C. Temperature Control —Auxiliary cooling or insulation may be necessary to maintain the surface temperature at an acceptable level for the coating manufacturer's application parameters. This auxiliary equipment must be approved for use by the supplier of the dehumidification equipment and will meet the following requirements. 1. Refrigerant type systems must be installed in the process air supply duct between, and/or blended with, the dehumidifier as close to the work space as possible. 2. Only electric, indirect fired combustion, or steam coil auxiliary heaters will be used. No direct-fired space heaters will be allowed during the blasting, coating, or curing phases. 3. The space to be controlled will be sealed off as well as possible, allowing air to escape the work space away from the point where the dehumidified air is being introduced. If it is necessary to filter the air escaping the space, the filtration system must be designed so that it does not interfere with the dehumidification equipment's ability to control the dew point and relative humidity of the work space. 3.05 PREPARATION FOR COATING A. A heavy-duty, fire retardant, seamless, shrink-wrap polyethylene sheet treated with UV inhibitors containment system shall be utilized for abrasive blasting and spray coating applications on the exterior of the tank. The containment system shall comply with SSPC Guide 6 Class 1A and shall not allow fugitive dusts or coating particulates to leave the immediate work area. The Contractor shall provide and use a dust containment system that shall consist of a 12,000 cfm, or higher, mobile industrial dust collector. Approved dust collector products include DC12000 as manufactured by Industrial Vacuum Equipment Corporation, or HWSC approved equal. B. The Contractor shall prepare surfaces to be coated in accordance with the coating manufacturer's instructions but not less than specified herein. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 15 C. Prior to abrasive blasting or other mechanical surface preparation, the Contractor shall clean all surfaces to be coated in accordance with SSPC-SP 1. This work shall include, without limitation, removal of all visible and invisible oil, grease, dirt, salts, welding residues, and other surface contaminants, regardless of quantity or extent. Cleaning shall include inspection of all surfaces using ultraviolet (black-light) methods to identify the presence of oils and greases not visible under normal lighting. All detected contamination shall be completely removed prior to abrasive blasting. Slag, weld spatter, and weld-metal accumulations shall be removed by chipping, scraping, or grinding in accordance with NACE SP-0178 prior to abrasive blasting. No additional compensation or time extension will be provided for cleaning of surfaces that are heavily contaminated, greasy, or otherwise dirty prior to surface preparation. D. The Contractor shall examine all surfaces to be coated and shall correct all surface defects prior to application of any coating material. E. Surfaces which are not to receive protective coatings shall be protected, using drop cloths and other protective measures as necessary, during surface preparation, cleaning, and coating operations. All hardware, lighting fixtures, switch plates, machined surfaces, couplings, shafts, bearings, nameplates on machinery, and other surfaces not to be painted shall be removed, masked or otherwise protected. The working parts of all mechanical and electrical equipment shall be protected from damage during surface preparation and coating operations. F. Cleaning and coating shall be so programmed that dust and other contaminants from the cleaning process shall not fall on wet, newly-coated surfaces. 3.06 EXT-FULL (FULL COATING) PREPARATION A. The Contractor shall remove existing coating on all surfaces identified for full recoat (i.e. the tank roof, knuckle, walls, ladders, piping, appurtenances, etc.). B. All new and existing sharp edges and welds shall be rounded or chamfered and all burrs, surface defects, and weld splatter shall be ground smooth prior to blast cleaning surface preparation profiling per SSPC SP3 and NACE RP0178. Sharp edges shall be rounded to a 1/8-inch radius. C. After the existing coating is removed the contractor shall abrasive blast all existing surfaces including new uncoated pipe modifications, conduit, or other improvements shall be prepared per SSPC SP6 and meet the manufacturer's recommended profile. D. The Contractor shall prepare surfaces around appurtenances such as piping, metallic conduit boxes, electrical conduit, valves, pipe supports, pipe clamps, and sample ports. E. For every 1,000 square feet, or less, of steel or iron surface blasted, the surface profile shall be tested with the use of Press-o-Film as manufactured by Testex, Elcometer 122 Testex Replica Tape, or other NACE RP0287 approved equal, at locations to be determined by the Inspector. The replica tape thickness shall be FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 16 measured using a dial micrometer manufactured by Testex, Elcometer 124 Thickness Gage, or other ASTM D4417 Type C approved equal. For each test area, one replica tape test shall be performed. For each test area, the one replica tape thickness value shall be recorded and must be within 10% of the coating manufacturer's recommended profile. If the surface profile does not meet the manufacturer's recommended profile, two additional tests will be performed within a 12-inch diameter of the initial test. If the values are not satisfactory, the Contractor shall reblast the affected areas. F. Prior to using compressed air, quality of air downstream of the separators shall be tested at suitable outlets by blowing the air on clean white blotter for 2 minutes to check for any contamination, oil, or moisture per ASTM D4285. G. Provide lighting, and manpower to move lighting and scaffolding as determined by the Engineer, to facilitate visual and instrument inspection by the Engineer of each phase of the work and of the completed work. Place as directed to minimize glare and shadows. H. Blast Cleaning (profiling). The type and size of abrasive shall be selected to produce a surface profile that meets the coating manufacturer's recommendation for the particular coating and service conditions. I. The abrasive shall not be reused unless otherwise approved by the third party inspector. J. The Contractor shall comply with the applicable federal, state, and local air pollution control regulations for blast cleaning. K. Compressed air for air blast cleaning shall be supplied at adequate pressure from well-maintained compressors equipped with oil/moisture separators and air dryers that remove at least 95 percent of the contaminants and shall be tested per ASTM D4285 by the Engineer. L. Surfaces shall be cleaned prior to painting of all dust and residual particles by dry air blast cleaning, vacuuming, or other approved methods. Testing shall be performed per ISO-8502-3 to verify surface cleanliness. Enclosed areas and other areas where dust settling is a problem shall be vacuum cleaned. M. Spent abrasive blast media and removed coating materials shall be tested to classify these wastes as hazardous or non-hazardous shall be performed by a laboratory that complies with and is certified under the Environmental Laboratory Accreditation Program (ELAP). Toxic Characteristic Leaching Procedure (TCLP) testing shall be performed for each heavy metal listed under 40 CFR§261.24. N. For spot repairs, all surfaces and edges of the existing sound coating material surrounding bare metal and spot-cleaned areas shall be feathered to a smooth transition using sandpaper to eliminate loose and/or abrupt edges. The CONTRACTOR shall power tool clean small repair areas less than 1 sq. ft. according to SSPC SP11 to meet the manufacturer's recommended profile. An MBX Bristleblaster or equivalent shall be used to perform power tool cleaning per FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 17 SP11. The existing coating shall be abraded a minimum of 3 inches beyond the edge of the bare steel. Abrasive blasted surfaces shall require a minimum of 6 inches of lightly abraded existing coating. O. For spot repairs, all sharp edges and welds shall be rounded or chamfered and all burrs, bare steel, and weld splatter shall be ground smooth per NACE SP0178 and SSPC SP2 and SP3. 3.07 EXTERIOR COATING SYSTEM A. EXT-FULL (Full Coating) 1. Apply the coating system in accordance with the coating manufacturer's published product data sheet and written application instructions to achieve the following total dry film thickness (DFT): a. Minimum total DFT: 8.0 mils b. Maximum total DFT: 10.0 mils c. Apply in one or more coats as required. Maximum DFT per coat shall not exceed the manufacturer's written recommendations. d. Submit manufacturer's application instructions showing proposed number of coats and target DFT. 2. Apply EXT-FULL (Full Coating) is to be applied to the following tank(s) surfaces: a. Stateline Tank#1: Exterior Roof, Exterior Knuckle, Exterior Shell, Exterior Appurtenances including Ladder, Guardrails, Cabinets. b. Stateline Tank#2: Exterior Roof, Exterior Knuckle, Exterior Shell, Exterior Appurtenances including Ladder, Guardrails, Cabinets. B. The color and sheen (Satin) shall be submitted to the District and approved in writing by the District prior to Contractor ordering material. 1. The Contractor shall submit color chips at least 3-inches by 5-inches in dimension within five (15) days prior to the start of application of the exterior top coat. The Contractor shall order final coating materials only after receiving written approval from the District Engineer. Failure to obtain the District's approval prior to ordering shall not be cause for additional compensation. C. The tank Coating Inspector shall inspect film thickness with a non-destructive dry film thickness gauge (e.g., Elcometer 456). The dry film coating thickness shall be measured in accordance with SSPC PA2 and a Level 2 thickness requirement. The Contractor shall provide to the District upon request U.S. Department of Commerce, Bureau of Standards calibration plates to verify accuracy. 3.08 APPLICATION A. The Contractor shall apply all coatings in accordance with the manufacturer's latest written recommendations and the best state of the art techniques that will result in a finish that is free of runs, sags, pinholes, dry spray, orange peel, be in even in color and appearance. The exterior welds shall be stripe coated with the epoxy primer prior to the application of the finish coat. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 18 B. Remove dust, blast particles, and other debris from blast cleaned or previously coated surfaces by dusting, sweeping, or vacuuming. Allow ventilator fans to clean airborne dust to provide good visibility of working area prior to coating applications. C. The Contractor shall bring all materials to the job site in the original factory sealed containers. The Contractor shall not use any material until the Engineer has inspected the contents and obtained the information from the containers or labels. All materials shall be mixed as full kits only. Materials shall only be thinned with the manufacturer's recommended thinners and will be thinned as required to adjust for viscosity for temperature variations, proper atomization and flow. Thinning shall not exceed the Local and State V.O.C. limits. Any catalyzed material remaining at the end of each day shall be properly discarded. The entire primer application shall be complete before the finish coat is applied. D. In order to prevent the degradation or contamination of cleaned surfaces, the first coat of paint shall be applied immediately after the surfaces have been cleaned and approved by the Engineer. Succeeding coats shall be applied before contamination of the under surface occurs. E. Stir, strain, and keep coating materials at a uniform consistency during application. Apply each coating evenly, at the specified film thickness, to achieve a finish free of pinholes, drops, brush marks, ridges, waves, sags, runs, and other evidence of poor workmanship. Bolt threads, nuts, edges, corners, crevices, and joints shall receive special attention to ensure thorough surface preparation and adequate thickness of coating material per SSPC PA Guide 11. Edges, corners, joints and other protrusions shall be coated and shall be 100% holiday free. Use a different shade or tint on succeeding coating applications to indicate coverage where possible. Finished surfaces shall be free from defects, pinholes, runs, drips, holidays or blemishes. Care shall be exercised to prevent coatings from being spattered onto surfaces that are not to be coated. Surfaces, from which material cannot be removed, shall be recoated, as required, to produce a finish satisfactory to the Engineer. F. The Contractor shall verify the wet film thickness with a notched gauge in conformance with ASTM D4414. Wet film thickness readings shall be recorded a minimum of every 200 square feet. G. Where dry film thickness is specified, the "total dry film thickness" (DFT) is considered to be a minimum on flat surfaces, sharp corners, and edges. Apply coating systems to the specified minimum dry-film thickness as measured from above the peaks of the surface profile. The Contractor shall apply additional coats as necessary to achieve the specified total thickness. H. All coatings shall be applied in a "CROSS HATCH" manner recommended by the manufacturer to achieve a pinhole free barrier, which will be verified by high voltage spark testing. I. Areas of any coat with visual contaminants such as vegetation/insects, dirt, hose marks, or similar blemishes shall be sanded and cleaned prior to the following coat. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 19 J. Each coat of paint shall be allowed to either dry or cure for the amount of time recommended by the coating manufacture before successive coats of paint are applied. K. All successive coats of paint shall be applied within the re-coat threshold time as recommended by the manufacturer. L. Coating procedures and recoat/topcoat cycles are critical for exterior coating application. It is imperative that the coating manufacturer's recommendations be strictly followed. Any deviation from printed literature must be approved in writing by the manufacturer prior to starting alternate procedures. If minimum/maximum recoat times are not stated in the coating manufacturer's standard product literature, the Contractor must supply such information to the Engineer, prior to starting the coating application, or supply a written statement from the coating manufacturer that limitations for recoat times do not apply to the coating specified on the project. M. When overlapping transitions between sections of coating applied on different days, abrasive blast or mechanically abrade an 18-inch wide strip of the previously applied coating, measured from the leading edge, to remove all gloss. Vacuum prior to application of primer and/or fresh topcoat material feathered at least 12 inches into the abraded area. Avoid application onto glossy or untreated areas of the existing coating. N. The finished coating application shall be protected from damage during curing and shall be cured as recommended by the manufacturer, prior to returning the affected area to service. O. Finish coats shall be applied over the prepared substrate in a single application, which may consist of several increments, achieved by multiple passes of the spray gun all applied within the recommended recoat window. Each pass shall be applied in a manner that will produce an even film, control exothermic reaction heat and minimize out-gassing effects. If out-gassing effects are significant, the topcoat may be applied in separate lifts within the recoat window, or during the night, or by troweling the coated surfaces immediately after the coating is applied. P. The coating shall be smooth and free of sharp protrusions. It shall not exhibit any cracking, delaminations, orange peeling, blisters, off-ratio discoloring, sticky areas, bubbles, craters, or pinholes. If there is evidence of those defects after the manufacturer-recommended cure-to-handle time, the Inspector shall conduct a Solvent Rub Test in accordance with ASTM D5402 after 7 days of curing. The test area shall be evaluated for appearance, hardness, or any color transfer to the cloth. If there is no change to the coating after the test, it will be considered cured. If it does not pass, the defective areas shall be rejected, removed, and reapplied by the Contractor at no additional cost to the District. Q. For spot repairs, the new coating shall overlap the existing coating that has been abraded with power tools by a minimum of 2 inches. The new coating shall overlap the existing coating that has been abraded with abrasive blasting by a minimum of 3 inches. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 20 3.09 CURING OF COATINGS A. The Contractor shall provide curing conditions (i.e. ventilation and dehumidification) in accordance with the conditions recommended by the coating material manufacturer or by this section, whichever is the highest requirement, prior to placing the completed coating system into service. B. Curing shall include providing ventilation at a rate of at least one complete air change every four hours. C. Equipment shall have a time recorder that provides a cumulative record of operating time. D. If the coating exhibits discoloration, bubbling, or sticky areas, the Contractor shall, in the presence of the Inspector, conduct a Solvent Rub Test in accordance with ASTM D5402 after 7 days of curing. The test area shall be evaluated for appearance, hardness, or any color transfer to the cloth. If there is no change to the coating after the test, it will be considered cured. If there is a visible change, the coating shall be removed and reapplied. 3.10 CONTRACTOR/ COATING INSPECTOR INTERACTION & COMPLIANCE A. Inspection 1. The District has retained a coating inspection firm to oversee all quality control related to coating operations. The tank inspector will report directly to the District Engineer and shall act with the Engineer's authority in all matters related to tank construction. The Inspector will be an N.A.C.E. Certified Coating Inspector, who will inspect any or all phases of work to be performed as outlined herein. The tank inspector shall be an addition to the District Inspector; authority shall be limited to tank related work only. The District Inspector shall remain the primary observer for all work on the project. The tank inspector shall work for and report to the District. The Contractor shall not rely upon the tank inspector for documentation of environmental conditions and assuring compliance with plans and specifications. 2. The Contractor shall notify the District Engineer in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. 3. The Coating Inspector shall examine all materials, tools, and equipment to be used in the blasting and coating operations and shall have the authority to direct the Contractor to remove, replace, or repair any materials, tools, or equipment found not to be in conformance with the Contract Documents including the approved shop drawings and manufacturer's recommendations. The tank inspector will also observe the Contractor's safety activities throughout blasting and coating operations and the Contractor shall immediately rectify any deficiencies noted in that observation. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 21 observe any safety efforts of the Contractor by the Tank Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Tank Inspector. The Contractor shall indemnify, defend, and save harmless the District and the Tank Inspector from all liability associated therewith. 4. The SSPC-Vis1 pictorial surface standards along with dry film and wet film thickness gauges will be used by the Coating Inspector to determine acceptability of the paint application. 5. The inspection devices listed below, or approved equivalents, shall be provided by the Contractor to the Inspector as required in good working condition and with calibration data prior to beginning any Work. These items shall remain available until final acceptance of the coating applications per the parameters listed below: a. Film Thickness Testing —The Inspector shall determine where and how often to test for film thicknesses. It shall be measured in accordance with SSPC PA 2 with a Level 2 thickness restriction. No measurements shall be made until at least 8 hours after application of the coating. A theoretical thickness shall also be calculated from the quantities of materials applied. The instruments shall have the capability of measuring 25% over the specified coating thickness and shall produce an actual reading and shall not be estimated. No measurements shall be made until at least 8 hours after application of the coating. The following testing instruments are acceptable. 1) Wet film gauge: Notched gauge approved by ASTM D4414 2) Metallic Surfaces— On ferrous and non-ferrous metals, the dry film coating thickness shall be using one of the following: 3) PosiTestor 6000 4) Elcometer Model 456 6. Prepared surfaces and all coating system component applications shall be inspected prior to each succeeding application. The procedure for collecting representative thickness data shall be as follows: a. The Inspector shall determine where and how often to test for film thicknesses, and as a minimum the requirements of SSPC-PA 2 with a Level 2 thickness restriction and calibration will be followed. b. At each inspection point, a minimum of three gauge readings shall be taken, moving the gauge 1 to 3 inches for each new gauge reading. c. Discard any unusually high or low gauge reading that cannot be repeated consistently. Take the average (mean) of the three gauge readings as the spot measurement. The average spot measurement shall meet or exceed the specified dry film thickness for each application per the Level 2 thickness requirement. d. The Contractor shall perform hardness testing after each application in the presence of the Inspector. 7. The Contractor shall afford the tank inspector all reasonable facilities and assistance in monitoring the coating and priming operations. The Contractor shall provide weekly copies of their daily work reports to the tank Coating Inspector. Such reports shall include, but not be limited to, the day and date of work performed, the relevant weather conditions, the type and amount of work performed, all work related to the safety of the operation, and personnel assigned to work actually performed. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 22 8. To facilitate adequate inspection of all surfaces, the Contractor shall provide scaffolding or rigging necessary for the Coating Inspector to perform dry film thickness readings, and visual holiday inspection as required by these specifications and reference standards. The Contractor shall provide personnel to move scaffolding or rigging at the instructions of the Engineer. 9. The tank Coating Inspector shall have authority to direct the Contractor to suspend operations when environmental conditions fall outside the manufacturer's recommended parameters. The Contractor shall comply with these directions and shall not proceed until the tank Coating Inspector determines environmental conditions are sufficient to proceed. Failure to suspend coating operations as directed or restarting work without the direction of the tank Coating Inspector shall be cause for rejection of work so performed. 10. The Contractor shall immediately remove and replace all such work in accordance with these Project Special Provisions and directions of the tank inspector. No additional compensation will be allowed for work resulting from failure to comply with the tank inspector or for surfaces not otherwise conforming to the provisions of these Project Special Provisions. B. Coating inspector authority 1. The tank Coating Inspector shall have authority to direct the Contractor to suspend operations when environmental conditions fall outside the manufacturer's recommended parameters. 2. The Contractor shall comply with directions and shall not proceed until the tank Coating Inspector determines environmental conditions are sufficient to proceed. Failure to suspend coating operations as directed or restarting work without the direction of the tank Coating Inspector shall be cause for rejection of work so performed. 3. The Contractor shall immediately remove and replace all such work in accordance with these Project Special Provisions and directions of the Coating Inspector. 4. No additional compensation will be allowed for work resulting from failure to comply with the tank inspector or for surfaces not otherwise conforming to the provisions of these Project Special Provisions. C. Safety 1. The Contractor shall provide a safe work environment at all times. In the event the Coating Inspector notes any safety deficiencies, the Contractor shall immediately rectify noted deficiencies. 2. The Contractor shall be fully responsible for compliance with all safety measures, hazardous and toxic materials regulations, and site security. Observation of or failure to observe any safety deficiencies of the Contractor by the Coating Inspector shall not relieve the Contractor of this responsibility nor shall any liability transfer from the Contractor to the District or the Coating Inspector. 3. The Contractor shall save harmless the District and the Coating Inspector from all liability associated therewith. D. Inspection assistance FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 23 1. To facilitate adequate inspection of all surfaces, the Contractor shall provide scaffolding or rigging necessary for the Coating Inspector to perform dry film thickness readings, and visual holiday inspection as required by these specifications and reference standards. 2. The Contractor shall provide personnel to move scaffolding or rigging at the instructions of the Coating Inspector. E. Notification 1. The Contractor shall notify the Coating Inspector in advance (48 hours minimum) of all surface preparation or paint application in order to perform a preliminary examination and provide acceptance of the surface preparation and each coat prior to application of the next coat. F. Acceptability for paint application 1. The SSPC-Vis1 pictorial surface standards along with dry film and wet film thickness gauges will be used by the Coating Inspector to determine acceptability of the paint application. 2. The Contractor shall provide necessary testing equipment to perform the above-mentioned tests. G. Reporting 1. The Contractor shall afford the Coating Inspector all reasonable facilities and assistance in monitoring the coating and priming operations. 2. The Contractor shall provide weekly copies of daily work reports to the tank Coating Inspector. Such reports shall include, but not be limited to, the day and date of work performed, the type and amount of work performed, all work related to the safety of the operation, and personnel assigned to work actually performed. 3.11 DISPOSAL OF EXISTING COATINGS AND SPENT ABRASIVE BLAST MEDIA A. The Contractor shall dispose of spent abrasive blast media and removed coating materials in accordance with a District approved disposal plan. B. The Contractor shall coordinate and pay all costs for sampling and testing of spent abrasive blast media and removed coating materials in order to document waste class. Minimum sampling and testing requirements are listed previously in this Section. C. Prior to removal of hazardous wastes off-site, the Contractor shall allow adequate time for District to review laboratory test results, as well as the time required to obtain a Hazardous Waste Generator's U.S. EPA ID Number, if required the District will provide the Contractor with written notice to dispose of all or a portion of the spent abrasive blast media and/or removal coating materials as hazardous waste, if so determined by the District that such disposal is required. D. The Contractor shall be responsible for all costs associated with accumulating, transporting, and disposing of spent abrasive blast media and removed coating materials. FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 24 3.12 REPAIRS A. If an area is found to have an improper finish, insufficient film thickness or other deficiencies; the Contractor shall clean, prepare, and topcoat the coating surface per the manufacturer's recommendations to obtain the specified finish and coverage. Work shall be free of runs, bridges, shiners, laps, or other imperfections. B. Damaged or defective coating shall be removed by the Contractor and shall be prepared per the specified water and abrasive blast cleaning to meet the clean surface requirements before recoating. 3.13 CLEAN-UP A. Upon completion of the work, the Contractor shall make a detailed inspection of all work. B. The Contractor shall be solely responsible for all paint over-spray or fugitive dust fallout claims. C. The Contractor shall remove all spattering, spits, and blemishes. D. The Contractor shall dispose of any residual waste from surface preparation operations in compliance with all Federal, State, and Local regulations. The Contractor shall ensure that all openings are covered and protected to prevent over- spray from entering the Reservoir. The Contractor will be responsible for all costs in the event of contamination of the water inside the Reservoir. E. Upon completion of the work, the Contractor shall restore the site to the original condition, including removing all trash and other debris from the site. END OF SECTION FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 25 THIS PAGE LEFT INTENTIONALLY BLANK FEBRUARY 2026 SECTION 09 97 13.23 2026 STATELINE TANKS EXTERIOR COATING FOR WELDED STEEL RESERVOIR RECOATING PROJECT-Addendum No.1 26 ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2026 STATE LI N E TANKS RECOATING PROJECT South Tahoe Public Utility District South Lake Tahoe, California February 23, 2026 1 THE FOLLOWING CHANGES SHALL BE MADE TO THE BID SET: SPECIFICATIONS Section 00 10 00 — Invitation to Bid Page 2 Paragraph 11 REPLACE: "A mandatory Pre-Bid Conference will be held at the South Tahoe Public Utility District, Board Room, 1275 Meadow Crest Drive, South Lake Tahoe, California on FEBRUARY 24TH at 10:00AM. Any bidder absent from the Pre-Bid Conference shall have their bid disqualified as nonresponsive. A tour of the site of work will be conducted as part of the Pre-Bid Conference if weather conditions allow." WITH: "A mandatory Pre-Bid Conference will be held at the South Tahoe Public Utility District, Conference Room 2, 1275 Meadow Crest Drive, South Lake Tahoe, California as well as virtually via Microsoft Teams on FEBRUARY 24TH at 10:00AM. Any bidder absent from the Pre-Bid Conference shall have their bid disqualified as non-responsive. To join remotely via Microsoft Teams, the Meeting ID is 266 883 950 368 15 and the Passcode is 6gK9ir7c or you may join with the following link: https://teams.microsoft.com/meet/26688395036815?p=XTIJjDzaUkd9Jd0 T5b." PLANS No changes are made to the plans. This Addendum No. 2, pages 1 through 6, shall become part of the Contract, and all provisions of the Contract shall apply therein. The date and time for the Bid Opening has not changed. The time provided for the completion of the Contract has not changed. SOUTH TAHOE PUBLIC UTILITY DISTRICT February 23, 2026 rsG0634144- 0041Brent Goligoski, P.E. Senior Engineer Ph. (530) 543-6209 C 90322 C1V1� r 2 SECTION 00 10 00 SOLICITATION INVITATION TO BID The South Tahoe Public Utility District (STPUD or District) invites sealed bids by electronic submission only for the construction of the 2026 STATELINE TANKS RECOATING PROJECT ("Project"). Electronic Bids will be received until 2:00PM, TUESDAY, MARCH 3RD, 2026. Hard copy original Bid Bond (or other acceptable form of bid security) MUST be delivered to District in advance of the Bid deadline. Bids submitted after this time will not be accepted by the electronic bidding system. All bids that have been timely received will be publicly opened and the content read aloud at the STPUD offices, Conference Room 1, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. All interested parties are invited to attend. Bids shall be valid for 60 calendar days after the bid opening date, as required in the Bid Form. The site of the work is located on DISTRICT property (APN 029-260-029 and APN 029-260-027), surrounded by California Tahoe Conservatory property and situated within Van Sickle Bi-State Park, near the City of South Lake Tahoe, in the County of El Dorado, California. The work to be performed consists of: Full interior and exterior recoating, including removal of existing coatings, of two potable water storage tanks which store approximately 1.25-million-gallons and 2.25-million-gallons each; modification to existing ladders and fall protection systems; demolition and replacement of cathodic protection systems, replacement of miscellaneous tank hardware, minor earthwork, and site restoration. A copy of the Contract Documents are on file and may be examined at the South Tahoe Public Utility District Offices, 1275 Meadow Crest Drive, South Lake Tahoe, California. In order to download the Contract Documents and receive addendums and notifications when issued, Bidders must register as a vendor at the District's Vendor Portal: http://www.planetbids.com/portal/portal.cfm?CompanylD=21516 Electronic bids will also be submitted through this website. Paper bids will not be accepted. Contract Documents are available for free download on the District's Vendor Portal. For assistance in downloading these documents or registering as a vendor contact Star Glaze, Contracts Specialist at (530) 543-6205. All bids are to be submitted electronically as required in Section 00 20 00 Instructions for Procurement. Paper bids will NOT be accepted. Hard copy original Bid Bond must be delivered to the District in advance of the bid deadline. After electronic bidding, each bidder shall submit their original Bid Forms to South Tahoe Public Utility District at 1275 Meadow Crest Drive, South Lake Tahoe, California by 2:00PM, THURSDAY, MARCH 5T",2026. Questions or comments regarding this Project must be submitted electronically via our electronic bidding system and must be received by the District no later than :OOPM,WEDNESDAY, FEBRUARY FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 2 1 25TH, 2026 Addenduml 1I:00PM, TUESDAY, FEBRUARY 21T*' 026 Addendum ,. Questions received after the date indicated will not be accepted. Questions submitted via telephone call,email or faxes will not be accepted. Responses from the District will be communicated via the electronic bidding system. A mandatory Pre-Bid Conference will be held at the South Tahoe Public Utility District,Board RoomConference Room 2, 1275 Meadow Crest Drive,South Lake Tahoe,California as well as virtually via Microsoft Teams on FEBRUARY 24TH at 10:00AM Addendum 1 FEBRUARY 17TH at 10:00 AM. Any bidder absent from the Pre-Bid Conference shall have their bid disqualified as non-responsive. A tour of the site of work will be conducted as part of the Pre-Bid Conference if weather Conditions allow,To join remotely via Microsoft Teams,the Meeting ID is 266 883 950 368 15 and the Passcode is 6gK9ir7c or you may join with the following link: https://teams.microsoft.com/meet/26688395036815?p=XTIJjDzaUkd9Jd0T5b. Addendum 2 In accordance with the provisions of California Public Contract Code section 3300,the South Tahoe Public Utility District has determined that bidders shall possess a valid C33 contractor license at the time of bid opening, the Contract is awarded, and for the duration of the Contract, provided the subcontractor responsible for Bid Items 2, 5, 6, 7, 8, 10, 13, 14, and 15 holds a valid Class A contractor's license, as outlined in Section 00 20 00, Part 3.01 of the project specifications. Failure to possess the specified license shall render the bid non-responsive and shall act as a bar to awarding the contract to any bidder not possessing said license at the time of award. Contractors or subcontractors responsible for the surface preparation and application of protective coatings shall also possess valid Association for Materials Protection and Performance (AMPP) QP1 accreditation. This project is subject to prevailing wage requirements. Pursuant to Labor Code section 1773, the District has obtained the prevailing rate of per diem wages and the prevailing rate for holiday and overtime work in the locality in which the work will be performed for each craft,classification,or type of worker needed. Not less than the determined rates shall be paid to all workers employed in the performance of the contract. Such rates of wages are on file with the Department of Industrial Relations and in the office of the District and are available to any interested party upon request. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the Bidder's and its subcontractors' current registration with the Department of Industrial Relations to perform public work. Bidder shall certify that Bidder and all listed subcontractors are currently and validly registered with the Department of Industrial Relations and shall include its registration number on its bid. If awarded a Contract, the Bidder and its subcontractors of every tier shall maintain active registration with the Department of Industrial Relations for the duration of the Project. It shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements. The California Air Resources Board ("CARB") implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations ("Regulation")which are effective on January 1, 2024 and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/froa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 2 2 applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the duration of the Project. Bidders must provide, with their Bid, a completed and signed copy of the Fleet Compliance Certification included in Section 00 41 00 Bid Forms.At the District's request,within 48 hours after the Bid Opening, Bidder must submit copies of Bidder's and all listed subcontractors' most recent, valid Certificate of Reported Compliance ("CRC")issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non- responsive. Pursuant to the provisions in Section 6707 of the California Labor Code, each Bid submitted in response to this Invitation to Bid shall contain adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders for the State of California. Pursuant to Section 22300 of the California Public Contract Code, the successful bidder may substitute securities for any moneys withheld by the District to ensure performance under the Contract as specified in Section 00 20 00. Each bid shall be accompanied by cash, a certified or cashier's check, or bid bond secured from a surety company satisfactory to the District, the amount of which shall not be less than ten percent (10%)of the submitted bid price or as detailed in Section 00 20 00, Bid Security, Part 2.05, made payable to the South Tahoe Public Utility District as bid security. The successful bidder will be required to furnish the District with a faithful performance bond and a labor and material payment bond each in an amount equal to 100% of the Contract Price, prior to execution of the Contract. All bonds are to be in the forms set forth herein, secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Public Contract Code§3400(b), if the District has made any findings designating certain materials products, things, or services by specific brand or trade name without alternative, such findings and the materials, products, things, or services and their specific brand or trade names will be set forth in Section 01 60 00, Product Requirements, of the Contract Documents. The South Tahoe Public Utility District reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards to the lowest responsive, responsible bidder in the best interest of the District. If alternate bid items are called for in the Contract Documents, the lowest bid will be determined on the basis of the base bid only. \(\/\,n1W-- 0-6Q4,16 Megan Colvey, P.E. Director of Engineering/District Engineer SOUTH TAHOE PUBLIC UTILITY DISTRICT END OF SECTION FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 2 3 THIS PAGE LEFT INTENTIONALLY BLANK FEBRUARY 2026 SECTION 00 10 00 2026 STATELINE TANKS SOLICITATION - INVITATION TO BID RECOATING PROJECT—Addendum 2 4 ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2026 STATE LI N E TANKS RECOATING PROJECT South Tahoe Public Utility District South Lake Tahoe, California February 27, 2026 1 GENERAL NOTES: The Questions and Answers shown on Planet Bids have been attached to this Addendum, 11 pages. THE FOLLOWING CHANGES SHALL BE MADE TO THE SPECIFICATIONS: Section 01 73 00 — Project Execution Part 2.02.A — Work Involving Existing System ADD: "3. Both Stateline Tanks must remain fully operational between November 1 and March 1 of any year. The winter season between November 1 and March 1 is the highest period of demand on the water supplied by these tanks due to local snow making operations. a. If weather and access allow, Stateline Tank #2 may be taken out of service after March 1, 2027 to begin rehabilitation activities." THE FOLLOWING CHANGES SHALL BE MADE TO THE PLANS: None This Addendum No. 3, pages 1 through 21 , shall become part of the Contract, and all provisions of the Contract shall apply therein. The date and time for the Bid Opening has not changed. The time provided for the completion of the Contract has not changed. SOUTH TAHOE PUBLIC UTILITY DISTRICT February 27, 2026 e Brent Goligoski, P.E. z3`� C. Senior Engineer `t Ph. (530) 543-6209 C 90322 .s}eIV11. �,p OF CAUL 2 SECTION 01 73 00 PROJECT EXECUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Procedures and requirements for determining acceptable conditions for construction. 2. Procedures and requirements for working in coordination with the existing system. 3. Administrative and procedural requirements for executing the work. PART 2 EXECUTION 2.01 COMMENCEMENT AND PROGRESS OF THE WORK AND TIME OF COMPLETION A. The Contractor shall begin work within ten (10) days after receiving the Notice to Proceed and shall diligently prosecute the work to completion as specified in the Contract Documents. 2.02 WORK INVOLVING EXISTING SYSTEM A. All work shall be executed while the existing system is in operation, unless otherwise indicated in the Contract Documents. Operation of the existing system shall not be jeopardized or materially reduced in efficiency as a result of the execution of Work. 1. The CONTRACTOR's activities and actions shall in no way impact the quality of the potable water or jeopardize the District's operating permit for its water and sewer systems. The District's operating permits will be made available to the CONTRACTOR for review at the District's headquarters. 2. The Stateline Tanks #1 and #2 will be taken off-line to perform the Work, but never at the same time. At least one of the two Stateline Tanks must be fully operational, to provide potable water to the District's customers, during the entire duration of the Project. CONTRACTOR to provide seven (7) days written notice to request shutdown and draining of each tank and to request the return to service. Delays to the project as a result of not providing adequate notice to take tanks on and off-line will not result in added contract days. a. The Contractor is to provide any additional devices needed to provide a safe working environment while this tank is offline. The inlet and outlet piping will be isolated using a single existing gate FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 1 or butterfly valve with no redundant isolation provided by the District. 3. Both Stateline Tanks must remain fully operational between November 1 and March 1 of any year. The winter season between November 1 and March 1 is the highest period of demand on the water supplied by these tanks due to local snow making operations. &a. If weather and access allow, Stateline Tank #2 may be taken out of service after March 1, 2027 to begin rehabilitation activities. Addendum 3 B. The Contractor shall request shutdowns of any portion or all of the existing system by the District at least seven (7) days in advance of the scheduled shutdown. Likewise, the Contractor shall notify the District of pending demolition of any structure at least 48 hours (two working days) in advance of the scheduled demolition. No shutdown or demolition shall occur without obtaining prior District approval. C. The Contractor shall be responsible for any fines, penalties, or other actions levied against the District during construction that are a direct result of the Contractor's acts or omissions. Contractor shall defend and indemnify the District against any such fines, penalties or other actions, as provided in Section 00 73 00, Part 2.02. 2.03 CONSTRUCTION STAKES, LINES, AND GRADES A. The Work shall be executed in accordance with the lines and grades indicated in the Contract Documents. Distances and measurements, except elevations and structural dimensions, shall be made on horizontal planes. B. The Engineer will provide the Contractor with drawings showing benchmarks and reference points as it deems necessary to establish lines and grades required for the completion of the site work specified in the Contract Documents. The Contractor shall make or furnish all surveys and set all construction stakes necessary for the completion of the work. All construction staking shall be performed by a California Registered Land Surveyor. Survey records will be provided to the District at the request of the Engineer in accordance with Section 01 33 00, and at the completion of the project in accordance with Section 01 77 00 C. Stakes and marks set by the District or Engineer, if any, shall be carefully preserved by the Contractor. The Contractor shall be charged for the cost of replacing or restoring the stakes and marks which are destroyed or damaged by his operation. This charge will be deducted from any monies due or to become due to the Contractor under the Contract Change Order. 2.04 SITE WORK A. The Contractor shall establish such control and reference points as it may need and as will be required to properly lay out the Work. Monuments for principal control points shall be set by the Contractor and shall be protected by the Contractor from disturbance. If the monuments are disturbed, any FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 2 work that is governed by these monuments shall be held in abeyance until the monuments are re-established by the Contractor. The accuracy of all the Contractor's stakes, alignments, and grades is the responsibility of the Contractor. However, the Engineer has the discretionary right to check the Contractor's stakes, alignments and grades at any time. Where such discretion is to be exercised by the Engineer, he will notify the Contractor of his intention, stating the time at which the checking will commence. Any part of the work in progress, the results of which are predicated directly upon the Contractor's stakes, alignments, or grades to be checked, shall be held in abeyance until the Engineer has notified the Contractor that the checking has been completed. 2.05 LOCATING AND REPAIRING UNDERGROUND UTILITIES A. Except as provided by Government Code Section 4215, the Contractor shall be responsible for the removal, relocation and protection of all public and private utilities, including irrigation facilities in the nature of utilities, located on the site of the construction project if and to the extent that the same are identified in the Contract Documents, and the Contractor shall not be entitled to any extension of time or claim for damages for extra compensation in connection therewith. B. If and to the extent that such utilities or facilities are not identified in the Contract Documents, as between the Contractor and the District, the District will be responsible for the cost of their removal, relocation, or protection, to the extent required by law, but the Contractor shall immediately notify the District and the Utility in writing upon their discovery and shall perform any such work in conformance with applicable provisions of Section 00 72 00, General Conditions, if so directed by the Engineer and in such situation the Contractor shall not be responsible for liquidated damages for delay in completion of the project caused by the failure of the District or the owner of the utility to provide for such removal or relocation. If the Contractor, while performing the Contract, discovers utility or irrigation facilities not identified by the District in the Contract Documents, he shall immediately notify the Engineer and the utility in writing. C. In accordance with Government Code Section 4215, the Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating existing main or trunk line utility facilities not indicated in the Contract Documents with reasonable accuracy, and for the equipment on the project necessarily idled during such work; provided that the Contractor shall first notify the Engineer before commencing work on locating, repairing damage to, removing, or relocating such utilities. FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 3 2.06 WORK SEQUENCE AND CONSTRAINTS A. The District envisions the work being completed in the following sequence. The Contractor may propose an alternate sequence for District review and acceptance when he submits his initial construction schedule. 1. Pre-Mobilization Submittals a. Submit material data, shop drawings, schedules, safety plans, and other project documentation for review and approval. The majority of the product submittals are expected to be processed prior to mobilization. 2. Schedule A: Stateline Tank#1: a. Mobilize to site and install erosion control devices and implement BMPs. b. Perform any clear and grub or grading work needed for access to tank or designated staging areas. c. Request shutdown and draining of Stateline Tank#1; Stateline Tank#2 must remain in service. d. Remove remaining water from the bottom of tank, clean tank as needed e. Protect existing appurtenances (i.e. level floats, antennas, cables, vents, etc.). f. Demolish existing cathodic protection system and perform tank repairs as needed. g. Perform modifications to exterior ladder and any other modifications or repairs requiring hot work on interior or exterior of Tank#1. h. Inspection blast any areas of concern and perform as-needed repairs. i. Perform any destructive Work related to the installation of the new cathodic protection system that may potentially damage the newly applied coating system. Install all attachment points for cathodic protection system. j. Perform surface preparation (cleaning and abrasive blasting). k. Perform coating, testing, and touch-up for the new interior coating system (Full Interior Recoat). I. Perform remaining nondestructive work related to the installation of the new cathodic protection system. Perform any touch up as a result of damaging new coating during installation of cathodic protection system, if necessary. m. Protect Stateline Tank#2 and surrounding environment from potential abrasive blast media and/or coating contamination that may occur during exterior blasting and coating of Stateline Tank #1 by building a temporary full containment structure around Stateline Tank#1. n. Remove existing safety climb system and any temporary appurtenances. o. Perform surface preparation, coating, testing, and touch-up for the new exterior coating system (Full Exterior Recoat). FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 4 p. Reinstate any previously protected appurtenances. Install new safety climb systems. q. Clean and disinfect Stateline Tank#1. r. Schedule for District staff to refill Stateline Tank#1 and return to service. s. Ensure all existing equipment that was to be protected (i.e. level floats, communications equipment, etc.) is working as before. t. Disassemble temporary full containment structure. u. Perform temporary site stabilization/winterization prior to Intermediate Milestone #1 deadline. v. Demobilize for winter. 3. Schedule B: Stateline Tank#2: a. Mobilize to site and install erosion control devices and implement BMPs. b. Perform any clear and grub or grading work needed for access to tank or designated staging areas. c. Request shutdown and draining of Stateline Tank#2; Stateline Tank#1 must remain in service. d. Protect existing appurtenances (i.e. level floats, antennas, cables, vents, etc.). e. Demolish existing cathodic protection system and perform tank repairs as needed. f. Perform any modifications or repairs requiring hot work on interior or exterior of Tank#2. g. Inspection blast any areas of concern and perform as-needed repairs. h. Perform any destructive Work related to the installation of the new cathodic protection system that may potentially damage the newly applied coating system. Install all attachment points for cathodic protection system. i. Perform surface preparation (cleaning and abrasive blasting). j. Perform coating, testing, and touch-up for the new interior coating system (Full Interior Recoat). k. Perform remaining nondestructive work related to the installation of the new cathodic protection system. Perform any touch up as a result of damaging new coating during installation of cathodic protection system, if necessary. I. Protect Stateline Tank#1 and surrounding environment from potential abrasive blast media and/or coating contamination that may occur during exterior blasting and coating of Stateline Tank #2, by building a temporary full containment structure around Stateline Tank#2. m. Remove existing safety climb system and any temporary appurtenances. n. Perform surface preparation, coating, testing, and touch-up for the new exterior coating system (Full Exterior Recoat). o. Reinstate any previously protected appurtenances. p. Clean and disinfect Stateline Tank#2. FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT-Addendum 3 5 q. Schedule for District staff to refill Stateline Tank#2 and return to service. r. Ensure all existing equipment that was to be protected (i.e. level floats, communications equipment, etc.) is working as before. s. Disassemble temporary full containment structure. t. Perform site restoration and stabilization prior to Intermediate Milestone #2 deadline. u. Demobilize for end of project. B. The work shall be subject to the following scheduling constraints: 1. The District expects to issue Notice to Proceed in early April 2026 and requires that the Contractor mobilize to the Project site by May 15th, 2026, as weather allows, and begin Project work promptly following, to ensure timely Project completion by the contract completion date. If weather allows access, Contractor will be allowed to mobilize immediately after Notice to Proceed. Note that TRPA restricts activities to be performed prior to May 1 including all parking and staging to occur on paved surfaces. 2. Tank#1 or Tank#2 must remain in service at all times. 3. Each tank will only be removed from service once to perform the rehabilitation work. 4. The Project and associated Contractor's Project schedule are subject to the constraints imposed by the Project Intermediate Milestones outlined in Section "00 72 00, Part 2.04 Contract Time and Liquidated Damages". The Contractor shall adequately consider these intermediate milestones and prepare the Project schedule and allocate sufficient labor forces for timely completion of these intermediate milestones accordingly. C. The project schedule and Contractor's performance of the work will be impacted by Tank start-ups and shutdowns according to "Section 01 73 00, Part 2.02 Work Involving the Existing System." The Contractor will plan and prepare the project schedule accordingly to allow for Tank shutdowns, draining, startups, and filling. The Contractor shall be aware that there may be change orders involved with this Work. The Engineer has made every reasonable attempt to determine the extent and location of all existing facilities within the project area. However, the inexact nature of existing knowledge and as-built plans may require change orders to reflect changed conditions. All change orders shall be handled using the procedures contained in the General Conditions of the Contract Documents. 2.07 CONTRACTOR'S MEANS AND METHODS A. Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor's means and methods deviate from commonly used industry standards. FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 6 2.08 CLEAN-UP A. Throughout the period of construction the Contractor shall keep the Work site free and clean of all rubbish and debris, and shall promptly remove from the site, or from property adjacent to the site of the Work or from public access roads, all unused and rejected materials, surplus earth, concrete, plaster, and debris, excepting select material which may be required for refilling or grading. The Contractor shall assure that buildings, grounds, and public properties are maintained free from accumulations of waste materials and rubbish from the Work. B. The Contractor shall provide containers for collection and disposal of waste materials, debris, and rubbish. C. If applicable, remove concrete, concrete wash, stucco splatter, gunite overspray, and all other waste and debris prior to final grading and landscaping. 2.09 SYSTEM START-UP A. Upon completion of all tank interior coating applications, tank to be washed and disinfected per typical AWWA C652 requirements. The preferred method is Method 2. Disinfection activities shall be performed in the morning hours to allow District operations staff to fill the tank and isolate it during the afternoon. District lab staff will obtain samples from the filled tank and test for chlorine, turbidity, and bacteria to be compared to background levels. B. Coordinate schedule for start-up of various equipment and systems with the Engineer seven days prior to planned start-up of each component. C. At Engineer's request, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment or system installation prior to start-up, and to supervise placing equipment or system in operation. END OF SECTION FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 7 THIS PAGE LEFT INTENTIONALLY BLANK FEBRUARY 2026 SECTION 01 73 00 2026 STATELINE TANKS PROJECT EXECUTION RECOATING PROJECT—Addendum 3 8 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 1.1 Can a door sheet be cut to access the Yes. Please see Specification Section 33 16 2/9/2026 interior for coating activities? 13, 3.07 (Temporary Shell Openings) and Section 33 16 13, 1.04, B.21 (Submittals) for more information related to cutting door sheets. 1.2 Can both exteriors be worked No.The tank shall be out of service during 2/9/2026 simultaneously? performance of the exterior coating work per Section 09 97 13.23, 3.01.Additionally, Tank#1 or Tank#2 must be in service at all times, per 01 73 00, 2.06, B.2. 1.3 In the V&A provided report, section 2.3.2, it Table 2.3.2 displays the California TTLC 2/9/2026 shows that the lead PPM was measured at Limits, not the results of the sampling. 1000 PPM. In the paragraph below the table Please see Section 3.5, on page 26 of the it states, "If the California lead concentration V&A report, "Coating Sample Testing" for limit of 600 ppm (0.06% by weight) is the lab results. Lead concentrations were exceeded, it will require lead abatement very low. Barium levels were elevated but procedures per CCR Title 8" Please confirm below the TTLC limit. that this project shall be treated as a lead abatement project. 1.4 In section 09 97 13.23 2.01,The exterior The Carboline PSX700 product was listed in 2/9/2026 coating system shows Carboline PSX700, error. Please replace Carboline PSX700 with PSX700 is a PPG product, Is this meant to be Carboxane 2000.This change to the project Carboxane 2000? specification will be made by addendum. Page 1 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 1.5 If the contractor submits acceptable The District's basis of design for this project 2/9/2026 contained steel abrasive blasting units, will assumes full containment for all exterior the containment still be a requirement? abrasive blasting operations. Contractors shall prepare their bids accordingly. The District will consider alternative surface preparation or containment systems if the Contractor can demonstrate, through submitted documentation and/or field demonstrations that the proposed system provides equal or greater control of spent abrasive, debris, and emissions, achieves the specified surface preparation standard, and meets all applicable environmental and safety requirements. Any proposed alternative system must be submitted for review and written approval by the District prior to use. Acceptance of an alternative system is at the District's sole discretion and shall not be assumed. This clarification will be made by addendum. 2.1 Can the QP1 certification be waived instead No, the District will not waive the QP1 2/17/2026 requiring quality references and proof of Certification requirement for this project. ability to perform the work required for this project. QP1 requirement will number of bidders able to bid the project. Page 2 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 2.2 FIC RFI 3—Above-Grade Work Outside Tank interior work and other above-grade 2/17/2026 Seasonal Window Reference: Section 00 52 work,that does not cause ground 00, 113; Section 00 72 00, §2.04 Section 00 disturbance, will be allowed prior to May 1 52 00, 113 restricts excavation, earthwork, provided required environmental and soil material removal to May 1 through protections are utilized. All vehicles and October 1. Section 00 72 00, §2.04 heavy equipment must remain on paved references excavation or work that would surfaces unless approved by TRPA with disturb existing ground. Please confirm appropriate erosion control devices.The whether interior blasting, coating, contractor will be required to maintain all containment erection, and other above- environmental conditions (temperature, grade work not involving ground disturbance humidity, etc.) at no additional cost to the are permitted outside the May 1—October District. Snow removal will be the seasonal window, provided no responsibility of the contractor. All work associated with Schedule A and Schedule B shall be completed by the applicable Intermediate Milestone deadline of October 1 of the respective construction year, as specified in Section 00 72 00, §2.04(B). 2.3 FIC RFI 2—Seasonal Restriction Clarification All excavation and any work that disturbs 2/17/2026 Reference: Section 00 52 00, 113; Section 00 existing ground shall be completed no later 72 00, §2.04 Section 00 52 00, 113 limits than October 1 of each construction year. excavation activities to May 1 through Ground disturbance includes tracking or October 1. Section 00 72 00, §2.04 states parking equipment on soil or vegetated that excavation or ground disturbance shall areas. not commence until May 1 and shall be completed by October 15. Please confirm which date governs—October 1 or October 15—and clarify what specific activities are included within the definitions of "excavation, earthwork, soil material removal," or "ground disturbance." Page 3 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 2.4 FIC RFI 1— Notice to Proceed Timing The District anticipates awarding the 2/17/2026 Reference: Section 00 20 00, 112.09; Section Contract on March 19, 2026 upon approval 00 72 00, §2.04(A) Section 00 20 00, 112.09 by the District's Board of Directors.The states that the Notice to Proceed will be Notice to Proceed will be issued issued upon receipt of executed contract immediately following the Contractor's documents, bonds, and insurance. Section submission and approval of all required 00 72 00, §2.04(A) states that the 586- documents.The Contractor will be allowed calendar-day Contract Time begins from the to mobilize immediately after Notice to date specified in the Notice to Proceed. Proceed.The May 1 through October 1 work Please confirm the anticipated timing for window is specifically related to excavation issuance of the Notice to Proceed following and earthwork activities. Please reference award. Will NTP be issued immediately upon Section 01 73 00, 2.06, B regarding the execution, or aligned with the seasonal work District's expectations. window identified in Section 00 52 00? 2.5 Is it the expectation of the district that the No. 2/17/2026 rafters be wedged to allow for blasting, coating and inspection activities on the top of the rafters and bottom of the roof plate that makes contact with the rafter? 3.1 Will the bonds be allowed to be split No.The bonds must be for the full contract 2/27/2026 between the two construction seasons and amount and be maintained for the full released during the winter months when no duration of the contract. Similarly, all work is occurring? insurance requirements must be maintained for the full duration of the contract. 3.2 What is the contractor responsible for The District provides the Procore 2/27/2026 regarding payment for facilities and subscription per specification section 01 32 hardware/software for training on the 20 Part 1.01.6.2 and the contractor will be Procore system? responsible for providing their staff with the computer hardware described in part 1.07. It is the contractor's responsibility to provide hardware for Procore training of their staff. There is no cost for the training software as it is publicly available through Procore's website with can be accessed through multiple freely available web browsers. 3.3 Is the owner responsible for isolating the See specification section 01 73 00 Part 2/27/2026 offline tank via inlet/outlet piping? 2.02.A.2 regarding tank isolation. Page 4 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.4 Is robotic or wet blasting permitted for the The means and methods of blasting 2/27/2026 project? equipment are up to the contractor, provided they meet the requirements of the specification for surface preparation and dust containment. The District will consider alternative surface preparation or containment systems if the Contractor can demonstrate, through submitted documentation and/or field demonstrations that the proposed system provides equal or greater control of spent abrasive, debris, and emissions, achieves the specified surface preparation standard, and meets all applicable environmental and safety requirements. Note that on past projects, wet blasting alone has not been sufficient to meet the containment requirements. 3.5 Is containment required? If so, what class See specification section 01 50 00 regarding 2/27/2026 containment will be required? Temporary Facilities and Controls for general containment requirements. See the coating specifications for specific requirements regarding containment of coating materials, equipment staging, and dust collection and containment systems. 3.6 Please confirm that there are no antennas There are no antenna's on the tanks, 2/27/2026 on the tanks. however there is a security camera and lights which must be protected.There is an antenna on the building between the two tanks which must also be protected from overspray. 3.7 For bid items#6 and #13—can you clarify See Plan Sheet C-1 for manway and vent 2/27/2026 the size of the vents for the vent screen sizes and quantity.The nuts and bolts replacements, how many entry hatch (hardware) on the manways shall be gaskets need to be replaced per tank and replaced. what entry hatch hardware is being replaced? Page 5 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.8 Who will the owner be using as a third-party The District has not yet entered into a 2/27/2026 inspector? contract with the third-party inspection firm. As mentioned at the pre-bid, in 2025 Construction Materials Engineers, Inc. (CME) was utilized and we anticipate utilizing CME again, but this has not been confirmed.The District may use any inspector who meets the qualifications described in the coatings specifications. 3.9 Is it possible to eliminate the use of Procore No. Procore will be utilized as specified. 2/27/2026 Web Based Construction Document Note that the Procore subscription is paid by Management as specified in Section 01 32 the District. 20 and replace it with A Microsoft sharepoint site? 3.10 Do you have an anticipated start date? Refer to section 00 72 00 Part 2.04.E which 2/27/2026 anticipates Notice to Proceed will be issued prior to May 1, 2026. However, if the bidding and award process goes quickly and weather allows,the contractor may begin work in April 2026 with the appropriate staging and erosion control. 3.11 Is there any coatings work required to the No coatings work is expected on the building 2/27/2026 building between the two tanks? between the two tanks.This building shall be protected from overspray during tank coating activities. 3.12 Who will remove the loose soils within 5 FT The contractor is expected to perform all 2/27/2026 of the tank shell? work shown on the plans. 3.13 Who will provide the Vegetation protection The contractor is expected to provide all 2/27/2026 Fencing and sediment control Barriers? erosion control and other BMP materials. 3.14 Will there be electric and water service Standard wall outlets are available in the 2/27/2026 available for use on site? building located between the two tanks and may be used for minor loads such as lighting and small tools; it is anticipated that the contractor will supply a generator for welding, blasting, climate control, and other significant demands.There is a fire hydrant on-site which may be used for domestic water supply, note that the water pressure will be relatively low considering it's elevation relative to the tanks on-site. Page 6 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.15 IC RFI 12—Section 09 97 13.13, 1.04 C— The District has not yet entered into a 2/27/2026 Third-Party Inspection Section 09 97 13.13, contract with the third-party inspection firm. Paragraph 1.04 C states that the District has As mentioned at the pre-bid, in 2025, retained a third-party coating inspection Construction Materials Engineers, Inc. (CME) firm. Please confirm: The name of the third- was utilized and we anticipate utilizing them party inspection firm. Whether the again, but this has not been confirmed. inspector will be onsite full time during Inspection during surface preparation will be surface preparation and coating operations. intermittent and performed by a Whether advance notice is required for combination of third-party staff and District inspection hold points and, if so, the staff with the final inspection prior to required notification period. coating performed by the third party inspector. We anticipate that the third-party inspector will be on-site full time during coating operations. Refer to specification 09 97 13.13 and 06 97 13.23, Part 1.04.D in both sections, regarding notification. 3.16 FIC RFI 11 - Missing Specification Section 31 There are no backfill activities called for on 2/27/2026 20 00 Sheet C-1 includes the notes the plans or anticipated on this project, only "PERFORM SITE GRADING" and "CLEAR AND removal of existing soils. See Section 32 94 GRUB AROUND TANKS AS NEEDED FOR 00 regarding Revegetation including EQUIPMENT ACCESS. Section 02 41 00, Part preparation of subsoil, soil amendments, 3.10 D. references backfill and finish grading mulch, and seed requirements. per Section 31 20 00. Section 31 20 00 does not appear in the provided specification set. Please provide Section 31 20 00 or confirm the applicable earthwork requirements for this project. Page 7 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.17 FIC RFI 10- Section 01 73 00, 2.06(C) Refer to Section 00 72 00 Part 2.09 2/27/2026 Section 2.06(C) states that the Contractor's regarding Changes in the Work. Change schedule "will be impacted by Tank start-ups Orders may include extension of the and shutdowns" and that "the inexact Intermediate Milestones and/or total nature of existing knowledge and as-built Contract Time proportional to their impact plans may require change orders to reflect to the critical path. changed conditions." If discovery of changed conditions requires additional Work that impacts the critical path and delays an Intermediate Milestone, will Contract Time be extended accordingly? Further, will Liquidated Damages be suspended for delays attributable to documented changed conditions while the change order is being processed? Please clarify how the District intends to administer Contract Time and Liquidated Damages under these circumstances. 3.18 FIC RFI 3—Above-Grade Work Outside Yes, above grade work will be permitted 2/27/2026 Seasonal Window Reference: Section 00 52 outside the May 1 -October 1 window. 00, ¶3; Section 00 72 00, §2.04 Section 00 However, both tanks must remain fully in 52 00, 113 restricts excavation, earthwork, service from November 1 through March 1 and soil material removal to May 1 through to support local snow making activities. See October 1. Section 00 72 00, §2.04 Addendum #3 clarifying this restriction. references excavation or work that would disturb existing ground. Please confirm whether interior blasting, coating, containment erection, and other above- grade work not involving ground disturbance are permitted outside the May 1—October seasonal window, provided no soil disturbance occurs. Page 8 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.19 FIC RFI 9 —Seasonal Shutdown and The TRPA grading season restrictions apply 2/27/2026 Liquidated Damages Exposure Reference: to soil disturbance. As discussed at the pre- Section 00 52 00, 113; Section 00 72 00, bid meeting, all equipment must remain on §2.04(B) and §2.04(D) Section 00 52 00, 113 paved surfaces and no ground disturbance restricts excavation, earthwork, and soil can occur from October 1 through May 1 , disturbance to May 1 through October 1. however, other construction activities can Section 00 72 00, §2.04 establishes begin prior to May 1 with proper staging and Intermediate Milestones requiring return to environmental protections. Liquidated service by October 1, with assessment of Damages will begin on October 1 if the tank Liquidated Damages for delay at the rate has not been returned to service, however, identified therein. Please confirm whether if the tank is not yet in service, work may the applicable TRPA permit prohibits all continue with proper staging and construction operations after October 1, environmental protections. including interior abrasive blasting, coating application, curing, containment, and disinfection activities. If all work must cease after October 1 and the tank cannot legally be completed or returned to service until the following construction season, please confirm whether Liquidated Damages will continue to accrue during the seasonal shutdown period (s).This clarification is requested to fully understand potential milestone and Liquidated Damages exposure associated with seasonal permit limitations. 3.20 FIC RFI 8—Additional Insured Endorsement "Section 00 73 00 §2.01(0) requires the 2/27/2026 Form Equivalency Reference: Section 00 73 Contractor's Commercial General Liability 00, §2.01(0) Section 00 73 00 specifies ISO policy to be endorsed using ISO form CG 20 endorsement forms for Additional Insured 10 11 85, or both CG 20 10 10 01 and CG 20 status. Please confirm that equivalent 37 10 01, or an equivalent approved by the endorsement forms providing primary and District. non-contributory coverage and completed Any proposed equivalent endorsement must operations coverage will be acceptable if the provide coverage at least as broad as the exact ISO edition numbers specified are not specified ISO forms, including ongoing and available from the Contractor's insurance completed operations coverage, and shall be carrier. subject to review and approval by the District. Other versions of ISO forms CG 20 10 or CG 20 37 alone will not be considered equivalent, consistent with the Contract Documents." Page 9 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.21 FIC RFI 7— Environmental Liability Coverage Confirmed. 2/27/2026 Scope Clarification Reference: Section 00 73 00, §2.01(0) Section 00 73 00, §2.01(0) requires Environmental Liability Insurance with limits of$2,000,000 per occurrence and aggregate for pollution arising out of hazardous materials. Please confirm that the required Environmental Liability coverage applies solely to pollution or hazardous materials generated or introduced by the Contractor in performance of the Work, and does not extend to pre-existing environmental conditions or contamination at the project site. 3.22 FIC RFI 6— Excusable Delay for Testing and Correct, if there are District controlled 2/27/2026 Inspection Reference: Section 00 72 00, delays beyond the timelines detailed in the §2.04(C) Please confirm that delays in specifications,those will be considered laboratory analysis, District inspection excusable. Contractor to account for the scheduling, or other District-controlled various anticipated timelines in their return-to-service activities beyond the schedule including but not limited to those stated timeframes shall be considered specified in Section 00 72 00, §2.04(C) and excusable delay and not subject to Section 09 97 13.13, §3.11. assessment of milestone Liquidated Damages. 3.23 FIC RFI 5— Definition of Return to Service Return to service will occur when the tank is 2/27/2026 Reference: Section 00 72 00, §2.04(B) and no longer isolated from the District's water §2.04(C) Please define the specific criteria distribution system, after disinfection, tank that constitute "return to service" for filling, and testing including receiving purposes of Intermediate Milestones 1 and acceptable results of the testing. 2, including whether written acceptance, water quality test results, or other District action is required. Page 10 of 11 Questions and Answers during Bid Period for 2026 Stateline Tanks Recoating Project Set Question Answer Release Date 3.24 FIC RFI 4— License Requirement Clarification Confirmed. 2/27/2026 Reference: Section 00 10 00— License Requirement Section 00 10 00 requires the prime contractor to hold a C33 (with QP-1) license, provided certain bid items are performed by a subcontractor holding a valid Class A license. Please confirm that a C33 prime contractor with QP-1 accreditation satisfies the licensing requirement, provided the specified bid items are performed by a properly licensed Class A subcontractor. Page 11 of 11 General Manager Paul Hughes • 1950 • Directors ya`�� W$�� Nick Haven South Joel Henderson ` I U b l i c Utility District KellY Sheehan Nick Exline 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Laura Hendrickson, P.E., Associate Engineer MEETING DATE: March 19, 2026 ITEM - PROJECT NAME: 2026 Advanced Metering Infrastructure Water Meter Installation Project REQUESTED BOARD ACTION: 1) Adopt the Project Plans and Specifications for the 2026 Advanced Metering Infrastructure Water Meter Installation Project per California Government Code 830.6; 2) Find Sensus meters as the sole-brand per Public Contracting Code Section 3400(c) reason 2; and 3) Authorize District staff to advertise for construction bids for the 2026 AMI Water Meter Installation Project. DISCUSSION: The 2026 Advanced Metering Infrastructure (AMI) Water Meter Installation Project represents the final phase of installing water meters for all District customers. California Assembly Bill 2572 requires all urban water suppliers to install meters on all service connections, and completion of this Project will bring the District into compliance with that requirement. This Project will install meters at seventy-two (72) remaining properties that do not currently have meters. Many of these services are located in the Loop Road area and along Roger Avenue, where some services are connected through backyards, with additional locations distributed throughout the District's service area. The District has previously completed six phases of meter installation projects, all of which utilized Sensus meters. For this final phase, District staff recommends that the Board find Sensus as the sole-brand allowable meter to match equipment already in use throughout the District's water system, as permitted under Public Contract Code Section 3400(c). The Project is partially funded by a Bureau of Reclamation grant totaling $483,437. The Engineer's Estimate for the Project is $967,800. District staff anticipate advertising for bids on March 27, 2026, with a recommendation for award to be brought to the Board at the May 21, 2026, meeting. Laura Hendrickson Page 2 March 19, 2026 Staff requests that the Board adopt the Project design Plans and Specifications, find Sensus meters as the sole-brand allowable meter, and authorize staff to advertise for bids for the 2026 Water Meter Installation Project. SCHEDULE: Upon Board Approval COSTS: $967,800 (Engineer's Estimate) ACCOUNT NO: 20.30.8279 BUDGETED AMOUNT AVAILABLE: $599,971 (FY2026); Additional funds to be allocated in Fiscal Year 2027 IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): Yes ❑ No ❑ N/A ATTACHMENTS: Design Plans and Specifications (under separate attachment) CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES *--' NO General Manager Paul Hughes 1950 • W Directors �� $t� South Tahoe Shane Romsos Joel Henderson public Utility District KeIIY Sheehan NicK Exline 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Laura Hendrickson, P.E., Associate Engineer MEETING DATE: March 19, 2026 ITEM- PROJECT NAME: 2026 Facilities HVAC Upgrades REQUESTED BOARD ACTION: 1) Approve the proposed Scope of Work by Integrated Project Solutions for 2026 Facilities HVAC Upgrades; and 2) Authorize the General Manager to execute a Professional Services Agreement and Task Order No. 1 with Integrated Project Solutions in the amount of $128,650. DISCUSSION: The District operates several facilities with aging HVAC and mechanical systems that are approaching or have exceeded their expected service life. The Customer Service Building, Wastewater Operations/Laboratory Building, and Biosolids Building all rely on original equipment that has become increasingly difficult to maintain and operate. Key issues include chillers that rely on R-22 refrigerant, boilers that are no longer fully functional or lack redundancy, non-operational HVAC controls, and aging ventilation systems in the Bio Building that are critical for maintaining appropriate air balance and odor control. Several interim measures have been implemented by staff to maintain operations; however, a comprehensive evaluation and design effort is needed to identify long-term solutions that improve reliability, maintainability, and operational performance. In response to these needs, the District released a Request for Proposals (RFP) seeking professional engineering services to evaluate existing HVAC systems and develop recommended improvements for the affected facilities. The Scope of Work includes assessment of existing equipment, evaluation of control systems, development of replacement and modernization alternatives, and preparation of designs and cost estimates in anticipation of construction beginning in the fall of 2026. The District received one proposal from Integrated Project Solutions (IPS). Staff reviewed the proposal and determined that the firm has relevant experience with HVAC systems in complex facilities and demonstrated an understanding of the operational Laura Hendrickson March 19,2026 Page 2 requirements of the District's buildings. IPS's proposed approach will provide the technical evaluation needed to guide replacement and modernization efforts. Scope of work tasks include data collection, alternatives analysis, design, construction documents, and construction services for a total not to exceed $113,650 and as- needed services related to unforeseen circumstances encountered within the scope of this project for$15,000. Completion of this evaluation and design effort will provide the District with a clear path forward for replacing aging HVAC and mechanical systems and improving reliability and operational performance at key facilities. Future requested Board actions will include authorization to bid and award to the lowest responsible, responsive bidder for the construction of HVAC improvements. Staff recommend that the Board authorize the General Manager to execute a Professional Services Agreement and Task Order No. 1 with Integrated Project Solutions. SCHEDULE: March 2026- December 2026 COSTS: $128,650 ACCOUNT NO: 10.30.8267 ($284,000), 20.30.8266 ($212,000) BUDGETED AMOUNT AVAILABLE: $496,000 IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): Yes D No ❑ N/A ATTACHMENTS: Integrated Project Solutions Proposal CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water/Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES A NO DU?H TAN° I PS • t950 . -4/C UTILITY DOI s INTEGRATED PROJECT SOLUTIONS PROFESSIONAL SERVICES PROPOSAL FOR ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES SUBMITTED TO: Laura Hendrickson, P.E., Associate Engineer South Tahoe Public Utility District lhendrickson@stpud.us FEBRUARY 25, 2026 Authorization Offeror Information The following person is authorized personnel of Company Name: Integrated Project Solutions Integrated Project Solutions to negotiate with the Add: 1255 Treat Blvd, Ste 300, Walnut Creek, STPUD in connection with this RFP. CA 94597, United States Phone: +1 208 596 3391 Email: info©intprojectsolns.com Khaled Abdel-Rahim EIN#: 883640442, CAGE: 9DY29, Phone: +1 208 596 3391 UEI: UPHDZJ25SRP8 E-mail: khaledintprojectsolns.com Signature: https://www.intprojectsolns.com ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES Table of Contents TRANSMITTAL LETTER 2 FIRM EXPERIENCE 3 FIRM OVERVIEW 3 TECHNICAL CAPACITY AND MULTIDISCIPLINARY EXPERTISE 3 REPRESENTATIVE RELEVANT PROJECTS(PAST FIVE YEARS) 3 FIRM'S APPROACH TO PROJECT 6 PROJECT UNDERSTANDING 6 TASK 1—DATA COLLECTION,EVALUATION,AND ALTERNATIVES ANALYSIS 7 TASK 2—DESIGN(60%AND 90%) 8 TASK 3—FINAL BID-READY CONSTRUCTION DOCUMENTS 9 TASK 4—BIDDING AND CONSTRUCTION SERVICES 9 QUALITY ASSURANCE/QUALITY CONTROL PROCESSES 10 ENGINEERING MANAGEMENT AND PROJECT CONTROLS 11 SAFETY THROUGH DESIGN 11 RISK MANAGEMENT APPROACH 12 CONSTRUCTION ADMINISTRATION AND CLOSEOUT 12 PROJECT TEAM 13 KEY PERSONNEL 13 STAFFING COMMITMENT AND AVAILABILITY 14 ORGANIZATION CHART 15 COST ESTIMATE 15 ANNEX 1—PROJECT SCHEDULE 17 Professional Services Proposal I PS Page 1 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES TRANSMITTAL LETTER Dear Ms. Hendrickson: Integrated Project Solutions (IPS) is pleased to submit our Technical Proposal for the South Tahoe Public Utility District's 2026 Facilities HVAC Upgrades Project.We understand this effort represents a critical modernization of aging HVAC infrastructure serving the Customer Service Facility and the Biosolids Building—facilities essential to daily operations, regulatory compliance, and occupant comfort. IPS recognizes the District's priorities, including replacement of end-of-life R-22 chillers, restoration of boiler redundancy and snow melt functionality, modernization of outdated controls systems, and stabilization of temperature and pressure control within the Biosolids Building to maintain proper odor containment. We also understand the importance of phased implementation, risk-based prioritization, grading season constraints, and completing design by June 2026 to support an August 2026 construction start. Our proposal is structured to directly address these objectives. Beginning with detailed field verification and operational assessment, IPS will develop a comprehensive alternatives and risk analysis that evaluates lifecycle cost, redundancy, constructability, controls integration, and sequencing. We will present clear phasing options to help the District prioritize improvements while minimizing disruption to ongoing operations. IPS brings extensive experience delivering HVAC retrofits and controls modernization projects in occupied public facilities and wastewater environments. Our multidisciplinary team emphasizes early coordination among mechanical, electrical, and controls systems to reduce redesign risk, mitigate long-lead equipment impacts, and maintain schedule certainty. Our approach is specifically designed to support the District's aggressive timeline while delivering bid-ready, constructible documents. IPS has reviewed the District's Standard Master Services Agreement (Attachment C) and confirms our ability to comply with its terms and insurance requirements without exception. Mr. Khaled Abdel-Rahim, PE, Principal of IPS, is authorized to represent and contractually bind the firm and may be reached at (208) 596-3391 or khaled@intprojectsolns.com . Thank you for the opportunity to submit our proposal. IPS looks forward to partnering with the District to deliver a resilient, cost-effective HVAC modernization program that supports reliable operations for years to come. Sincerely, Khaled Abdel-Rahim, PE Principal Integrated Project Solutions (IPS) Professional Services Proposal I PS Page 2 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES FIRM EXPERIENCE Firm Overview Integrated Project Solutions (IPS) is a multidisciplinary engineering consulting firm specializing in HVAC system modernization, boiler and chiller plant replacement, controls upgrades, and mechanical infrastructure retrofits for public agencies and mission-critical facilities throughout California. IPS delivers technically sound, constructible, and operationally reliable solutions for occupied civic, utility, and wastewater facilities. The 2026 Facilities HVAC Upgrades Project requires replacement of aging chillers and boilers, modernization of controls systems, restoration of system redundancy, and stabilization of air balance and pressure control within a biosolids processing environment. IPS has direct experience delivering comparable HVAC and process-environment upgrades in active facilities where reliability, phasing, regulatory compliance, and schedule certainty are essential. IPS routinely serves as Prime Consultant, providing complete engineering services and construction- phase support. Technical Capacity and Multidisciplinary Expertise IPS maintains in-house capability in: • Mechanical engineering(HVAC systems, AHUs, boilers, chillers, hydronic systems) • Electrical engineering(power distribution, controls integration, BAS/DDC coordination) • Structural engineering(equipment supports and anchorage) • Architectural coordination • Project management and cost estimating • Commissioning and construction support This integrated delivery model ensures disciplined coordination across mechanical, electrical, and controls systems—critical for facilities such as the Customer Service Facility and Biosolids Building where air balance, redundancy, and operational continuity must be maintained. Representative Relevant Projects (Past Five Years) The proposed Project Manager, Lead Mechanical Engineer, and Lead Electrical Engineer have worked together on the Laguna Treatment Plant Boiler Replacement and County Main Jail HVAC Upgrades projects, providing a proven, cohesive team for the District: 1. Laguna Treatment Plant Boiler Replacement Owner: City of Santa Rosa/Santa Rosa Water(Pubic Agency) Role: Prime Consultant Dates: May 2024—present Professional Services Proposal I PS Page 3 of 17 •J INTEGRPTEO PROJECT 50 WTIOxS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES Reference: Chris Balanesi, PE—Associate Civil Engineer Contact: (707) 543-3914; cbalanesi@srcity.org IPS lead the full design for the replacement of aging boiler infrastructure supporting critical wastewater operations. The project includes hydronic system modernization, controls integration, and construction sequencing within an active facility. Contract includes Construction Administration Relevance to STPUD: • Replacement of legacy heating systems serving process environments • Phased construction to maintain uninterrupted operations • Integration of new mechanical systems into existing control platforms • Utility and regulatory coordination • Used 3D Modeling to accurately document existing conditions and resolve clashes in the design phase, minimizing risk during construction. • Integration and updating of obsolete existing boiler controls systems to City controls infrastructure (Siemens) 2. County Main Jail HVAC Upgrades Owner: County of Santa Cruz (Public Agency) Role: Prime Consultant Dates:April 2025—Mar. 2026 Reference: Michael Hettenhausen, AICP, Capital Projects Project Manager Contact: (831) 566-0265; Michael.Hettenhausen@santacruzcountyca.gov IPS designed replacement of hot-water air handling units, make-up air systems, kitchen exhaust systems,VFDs, and DDC controls within an occupied correctional facility. Relevance to STPUD: • AHU replacement in active facility • Controls modernization and system integration (Delta Controls) • Detailed phasing and operational continuity planning • Construction support and commissioning • Required extensive site assessment of existing conditions, including using TAB services for a site survey, which IPS provided using a local sub-contractor. 3. Lab 4151 Environmental Cooling System Owner: Intel Semiconductor(via Skanska USA) Role: Design Engineer/Consultant Dates: May 2022—September 2022 Reference:John-Thomas Buscarino, Project Executive Contact: (917)494-9754;johnthomas.buscarino@skanska.com Professional Services Proposal I PS Page 4 of 17 INTEGRPTEO PROJECT 50 WTIOxS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES IPS designed a chilled water system with redundant pumping and advanced controls for a mission- critical laboratory facility. Relevance to STPUD: • Central plant cooling system design • Redundancy strategies for critical operations • Accelerated schedule delivery • Mechanical-electrical coordination 4. Feather River Academy Energy Infrastructure (DSA-Regulated) Owner: Feather River Academy via Alco Building Solutions (Sutter County School District) Role: Prime Design Consultant Dates:August 2025—March 2026 Reference: Farhan Sheikh, COO Contact: 657-445-5306; fsheikh@alcobuildingsolutions.com IPS provided full multidisciplinary design and regulatory coordination for a DSA-regulated campus infrastructure project. Relevance to STPUD: • Public-sector regulatory coordination • Multidisciplinary integration • Risk management and agency review process navigation 5. Commercial Kitchen Expansion (Accelerated, Occupied Facility) Owner: Live Solutions (General Contractor) Project: Cook Unity Kitchen Expansion—Los Angeles, CA Role: Prime Consultant Dates: February 2025—September 2025 Reference:Anthony Turgman -CEO Contact: (415) 830-0644; anthony@livesolutionsnow.com IPS provided full A/E design and supported construction of a '5,000 sq. ft. expansion for a ^20,000 sq. ft. commercial kitchen.The project included new HVAC and Exhaust systems, electrical upgrades, and plumbing design.The project included integration into existing systems, and required the construction to take place concurrently with operations.The project required procurement of long-lead equipment, phased construction, and accelerated delivery.The project design required consideration of the Relevance to STPUD: • Phased mechanical upgrades in an occupied environment Professional Services Proposal I PS Page 5 of 17 INTEGRPTEO PROJECT 50 WTIOxS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES • Management of long-lead equipment procurement risk • Accelerated design and delivery under tight schedule constraints Summary of Relevant Experience Collectively,these projects demonstrate IPS's: • Experience as Prime Consultant for public-sector HVAC and infrastructure projects • Proven delivery of AHU, boiler, and central plant replacements in occupied facilities • Ability to manage long-lead equipment, phased construction, and schedule risk • Experience integrating mechanical systems with controls platforms • Strong coordination across disciplines, agencies, and stakeholders • Construction-phase services including commissioning and as-built documentation • This experience directly supports IPS's qualifications to successfully deliver the South Tahoe Public Utility District's 2026 Facilities HVAC Upgrades Project with a focus on reliability, constructability, phased implementation, and timely completion.The PM, Lead Mechanical, and Lead Electrical Engineer of this project FIRM'S APPROACH TO PROJECT Integrated Project Solutions (IPS)will deliver the 2026 Facilities HVAC Upgrades Project through a structured, risk-informed, and implementation-focused approach that prioritizes operational continuity, system reliability, constructability, and schedule certainty. Our methodology is aligned directly with the District's four-task scope and the requirement to complete design by June 2026 in advance of an August 2026 construction start. Project Understanding IPS understands the District's Key Issues to be Addressed are: • End-of-life R-22 chillers serving the Customer Service and OPS Buildings,with obsolete refrigerant and increasingly unreliable operation. • Loss of boiler redundancy and degraded snow melt performance due to underground piping leaks. • Recurring fan coil and hydronic piping leaks contributing to elevated maintenance burden and risk of unplanned outages. • An outdated and nonfunctional controls system in the Biosolids Building, limiting temperature control, air balance, odor containment, and alarm/monitoring capabilities. • The need to sequence ground-disturbing work within the May 1—October 15 grading season while completing mechanical and electrical upgrades during the following fall/winter period. Professional Services Proposal I PS Page 6 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES These improvements must be executed while maintaining ongoing facility operations and minimizing disruption to staff and plant processes. Task 1 — Data Collection, Evaluation, and Alternatives Analysis 1.1 Project Kickoff and Field Verification IPS will initiate the project with a detailed kickoff meeting and site investigation involving District engineering, maintenance, operations, and electrical staff. Field verification will confirm: • Existing equipment capacities and operating condition • Available space constraints within chiller enclosure and boiler rooms • Hydronic distribution routing and leakage concerns • Current BAS/control architecture and communication limitations • Biosolids Building air balance and pressure relationships This effort ensures design decisions are grounded in verified existing conditions, reducing redesign risk. 1.2 Technical Evaluation and Risk Analysis IPS will develop a structured alternatives matrix evaluating: • Equipment replacement options (air-cooled vs. alternative chiller types) • Boiler replacement strategies (high-efficiency condensing, redundancy restoration) • Snow melt repair alternatives (selective piping replacement vs.full loop reconstruction) • Controls modernization strategies (full BAS replacement vs. phased migration) • Biosolids AHU rehabilitation vs. replacement Each alternative will be evaluated using weighted criteria including: • Operational risk • Regulatory impact • Redundancy and resilience • Constructability • Lifecycle cost • Maintenance burden • Implementation complexity IPS will prepare a Draft Alternatives and Risk Analysis Report for District review,followed by a refined Final Alternatives Report incorporating feedback. 1.3 Phasing Strategy Development Given the District's grading season constraints (May 1—October 15), IPS will develop phasing options that: • Separate ground-disturbing work from mechanical/electrical upgrades Professional Services Proposal 1 I PS Page 7 of 17 •J INTEGRPTEO PROJECT 50 WTIOxS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES • Allow winter execution of interior mechanical improvements • Maintain HVAC service during transition periods • Sequence the most critical risk items first Value-Added Analyses In addition to the baseline alternatives and risk evaluation, IPS will provide the following value-added analyses: • Early coordination with District electrical staff to confirm available service,feeder, and breaker capacity for new chillers, boilers, and HVAC equipment, reducing the risk of late electrical redesign. • Constructability and operations walk-throughs with O&M staff to review proposed alternatives, validate tie-in locations, and identify opportunities to minimize downtime and after-hours work. • Evaluation of temporary HVAC and controls strategies to maintain acceptable indoor conditions and air balance in the Biosolids Building during equipment and controls cutovers. • Phasing concepts that separate ground-disturbing work from interior mechanical/electrical improvements while targeting the highest-risk assets first, consistent with the District's grading season constraints. Task 2 — Design (60% and 90%) IPS will employ a milestone-driven design process focused on coordination and constructability.At the District's request, IPS can provide targeted 3D modeling of the most congested areas—such as the shared chiller enclosure, boiler rooms, and key Biosolids HVAC zones—to better visualize tie-ins, coordinate new piping/ductwork with existing infrastructure, and further reduce construction conflicts, for an additional fee. 2.1 60% Design Deliverables will include: • Basis of Design narrative • Mechanical calculations (load,ventilation, hydronic capacity) • Equipment schedules • Plans and sections showing spatial integration • Preliminary sequence of construction • Preliminary cost estimate A structured 60% review workshop will be conducted to confirm alignment before advancing. 2.2 Interdisciplinary Coordination At both design milestones, IPS will perform: • Mechanical/electrical coordination for power,feeders, and controls • Structural review for equipment supports and anchorage Professional Services Proposal I PS Page 8 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES • Access and maintenance clearance validation • Constructability review focused on tie-ins and downtime minimization Design will be developed using CAD/BIM platforms to reduce conflicts and improve clarity. 2.3 90% Design The 90%submission will incorporate District comments and include: • Fully coordinated drawings • Technical specifications (Division 23 and related sections) • Detailed sequence of construction • Updated cost estimate Internal QA/QC review will be completed prior to submittal to ensure completeness and code compliance. Task 3 — Final Bid-Ready Construction Documents IPS will prepare complete bid-ready documents including: • 22x34 plan set (AutoCAD/BIM and PDF) • Technical specifications • Final construction cost estimate • Final sequence of construction Documents will incorporate the District's Division 0 and 1 front-end requirements. Prior to release, IPS will conduct a final constructability and clarity review to reduce potential RFIs and change orders. Task 4 — Bidding and Construction Services IPS will remain actively engaged through construction to ensure design intent is achieved. Services include: • Pre-bid conference attendance • RFI response and clarification support • Submittal and re-submittal review • Change order evaluation and cost validation • Commissioning and startup participation • As-built drawing preparation Our construction-phase approach focuses on maintaining air balance integrity, confirming control sequences, and validating system performance. Professional Services Proposal I PS Page 9 of 17 INTEGRATED PROJECT 50 WTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES Controls Modernization Strategy Given the Biosolids Building's outdated and unsupported control system, IPS will prioritize: • Evaluation of full BAS replacement vs. migration strategy • Integration of new chillers, boilers, and AHUs into a unified control platform (BMS) • Restoration of monitoring and alarm capability • Verification of pressure relationships and airflow balance Controls upgrades will be coordinated with electrical and IT stakeholders to ensure long-term reliability and maintainability. IPS will develop pressure-zoning and odor-control sequences for the Biosolids Building and prepare targeted functional performance tests to verify air balance, pressure relationships, alarms, and seasonal changeover, ensuring odor containment is restored and maintained Commitment to Operational Continuity and Maintainability IPS designs solutions that prioritize: • Equipment redundancy where feasible • Clear maintenance access • Energy efficiency aligned with California code • Practical, maintainable system configurations The result will be a modernized HVAC system that improves reliability, reduces maintenance burden, and supports long-term operational resilience. Quality Assurance/Quality Control Processes The Integrated Project Solution's Design Quality Management Plan (DQMP) is applied on all our projects. The DQMP structure includes quality management and interdisciplinary reviews by an independent team of subject matter experts and senior discipline-specific engineers, architects, and support personnel. As work begins,our design quality control manager will implement the DQMP for the project and confirm final documents are coordinated and completed in accordance with the DQMP.The assigned project manager, acting as the task order manager,will assemble the required project team based on the scope of work and establish clear lines of communication with our team and the government team. Working with the quality control manager,the project manager will schedule internal DQMP reviews and external reviews with the client and stakeholders, along with managing the comment database, if required. Our program is highly effective and provides interdisciplinary reviews by professional engineers, architects, and support personnel at various milestones throughout execution of the project. Design quality control tasks are separately scheduled, identified and monitored within the accounting system. Professional Services Proposal I PS Page 10 of 17 INTEGRPTEO PROJECT 50 WTIOxS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES The project manager will coordinate these items with the team to assure that the project design quality control plan is consistent with corporate procedures,the statement of work and the client's expectations. Our design quality assurance/quality control tasks, or QTs, are integrated, scheduled, and monitored into each design contract and in concurrence with each design phase. How these are integrated is shown in our design process map in this proposal. Our QTs are: Conceptual and preliminary design review by an independent project quality control review team QT- of senior staff members Review of design notes,drawings and specifications by the project manager,team leaders and QT-2 design team at various milestones throughout the design Final review of design notes, drawings,and specifications by an independent project quality control review team of senior staff members. Review of"rough draft"specifications by an independent QT-3 team in our specifications department Final review of drawings,specifications, and cost estimates by the review team in the company's QT-4 quality control department. Engineering Management and Project Controls Integrated Project Solutions (IPS)will manage the design effort through clearly defined engineering leadership and disciplined project controls. Each engineering discipline will be led by a designated Discipline Lead responsible for technical accuracy, coordination, and timely delivery of assigned tasks. Discipline Leads will: • Coordinate design, detailing, and specifications within their discipline • Participate in regular project coordination meetings • Track and resolve technical questions and design issues • Support interdisciplinary coordination and constructability reviews • Assist the Project Manager with progress tracking and milestone deliverables The Project Manager will maintain overall responsibility for scope, schedule, budget, staffing, and coordination with City staff.This structure ensures accountability, efficient decision-making, and consistent communication throughout the project. Safety Through Design IPS places a strong emphasis on Safety Through Design, integrating safety considerations into every phase of the design process.The objective is to deliver a design that supports safe construction, safe operation, and long-term maintainability of the facility. Safety considerations include: Professional Services Proposal I PS Page 11 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES • Identification of potential construction and operational hazards during design • Evaluation of equipment access, lifting requirements, and maintenance clearances • Review of material handling, egress, and service access for maintenance personnel • Incorporation of applicable safety codes and best practices IPS will work collaboratively with City staff to identify safety concerns early and,where feasible, design out or mitigate risks through layout, equipment selection, and detailing. Risk Management Approach IPS employs a proactive risk management approach focused on early identification and mitigation of risks that could impact scope, schedule, cost, or quality. Key risks for this project—particularly long-lead AHU procurement and schedule constraints tied to Summer 2026—will be addressed early and monitored throughout design and construction. Risk management activities include: • Identification of technical,schedule, and coordination risks during early design • Evaluation of AHU options and lead times to support informed decision-making • Ongoing coordination with City staff to address emerging issues • Documentation and tracking of risks and mitigation measures IPS continually seeks opportunities to streamline workflows, optimize resource allocation, and improve design efficiency, reducing the likelihood of delays or cost overruns while maintaining quality. Construction Administration and Closeout IPS will remain actively engaged during construction to protect the City's interests and support successful project delivery. Construction-phase services will be focused, responsive, and aligned with the project's scope. Services include: • Participation in pre-construction and kickoff meetings • Periodic site observations to verify conformance with contract documents • Timely review of RFIs, submittals, and shop drawings • Support for evaluation of change requests • Coordination of testing, startup, and commissioning activities As construction nears completion, IPS will assist with punch list development,final inspections, and system demonstrations to ensure the AHUs are fully operational and meet performance requirements. Closeout support includes review of record drawings, O&M manuals, warranties, and commissioning documentation to provide the City with a complete and organized project record. Professional Services Proposal I PS Page 12 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES PROJECT TEAM South Tahoe Public Utility District can rely on Integrated Project Solutions (IPS)to deploy a focused, experienced, and highly coordinated team for the 2026 Facilities HVAC Upgrades Project. IPS will serve as the Prime Consultant and single point of accountability, leading all mechanical, electrical, structural, and controls coordination while maintaining direct communication with District staff throughout all phases of the project. The proposed team has extensive experience delivering HVAC system replacements, boiler and chiller plant upgrades, controls modernization, and phased improvements in occupied public and utility facilities.Team members have successfully completed projects involving central plant replacement, air handling unit upgrades, and system integration within operational environments requiring continuity of service. An organizational chart illustrating reporting relationships between IPS staff and District stakeholders is included in this proposal.The Project Manager will serve as the District's primary point of contact. Key Personnel Project Manager/ Principal-in-Charge: Khaled Abdel-Rahim, PE Mr. Abdel-Rahim will serve as Project Manager and Principal-in-Charge and will be the District's primary liaison. He will be responsible for overall project leadership, including scope management, schedule control, budget oversight, and coordination with District engineering, maintenance, and operations staff. He will lead the kickoff meeting, alternatives analysis workshops, and 60%/90%design reviews, ensuring alignment with the District's phasing objectives and June 2026 design completion target. Mr. Abdel- Rahim will actively monitor schedule risks, including long-lead equipment procurement and grading season constraints, and will implement mitigation strategies as needed. He will also oversee quality assurance and ensure compliance with applicable codes and District standards. Mr. Abdel-Rahim has over 13 years of experience delivering municipal and infrastructure projects throughout California. Lead Mechanical Engineer: Naaji Saad, PE, LEED AP Mr. Saad will be responsible for technical execution of HVAC system evaluation and replacement design. His responsibilities include field investigation, load verification, equipment selection, hydronic system evaluation, boiler and chiller replacement design, and coordination of airflow and pressure control strategies for the Biosolids Building. Mr. Saad has over 30 years of experience specializing in HVAC tenant improvement projects and retrofits. Professional Services Proposal I PS Page 13 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES He will lead development of the Alternatives and Risk Analysis, ensuring recommendations address redundancy, maintainability, constructability, and lifecycle performance. Mr.Saad will also support bidding and construction, including submittal review, RFIs, and commissioning support. Lead Electrical Engineer: Aleksei Isen, PE Mr. Isen will provide electrical engineering services including power distribution evaluation,feeder capacity verification, coordination of new chiller and boiler loads, and controls integration. He will work closely with the mechanical team to ensure seamless BAS modernization and restoration of monitoring and alarm functionality. Mr. Isen will participate in site investigations, milestone reviews, and construction-phase support. Cost Estimator/ Project Controls: Mir Amini, PMP Mr. Amini will prepare cost estimates at the Alternatives, 60%, 90%, and Final design milestones. His involvement ensures that phasing decisions and equipment selections remain aligned with budget expectations. He will assist in evaluating change orders and validating contractor pricing during construction. Staffing Commitment and Availability All proposed personnel are available for immediate mobilization upon contract award. IPS has structured staff allocations to support completion of design by June 2026, including milestone-driven internal reviews to maintain schedule adherence.All proposed key staff are committed and available to support this project from March through June 2026,with the Project Manager engaged roughly one to two days per week and the Lead Mechanical Engineer as the primary day-to-day technical resource during alternatives development and 60/90 design. The Lead Electrical Engineer, Cost Estimator, and CAD/BIM designer will provide focused support at each major milestone (Alternatives, 60%,90%, and Final), ensuring timely delivery without overcommitting any team member relative to their existing workloads. The IPS team operates under a proactive communication model, including: • Regular coordination meetings with District staff • Internal interdisciplinary coordination sessions • Milestone quality control reviews prior to submittal This approach ensures responsiveness,technical consistency, and accountability throughout the project lifecycle. Integrated Project Solutions is committed to providing a stable, accessible, and highly qualified team dedicated to the successful delivery of the District's 2026 Facilities HVAC Upgrades Project. Resumes will be provided upon request. Professional Services Proposal I PS Page 14 of 17 INTEGRATED PROJECT 50 WTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES Organization Chart gOVTH TA MOT�A MO.P ��UTILIT`/mg"' PROJECT MANAGEMENT Khaled Abdel-Rahim,PE Principal in-charge/PM PRIME CONSULTANT—IPS Abdel Q.Tarabieh,AIA Phil Beatty,PE Isaac Simkin,LEED,PE Lead Architect Lead Electrical Engineer Lead Mechanical Engineer Naji Saad,LEED,PE Aleksei Isen,PE Tawab Kamawal,PE Sr.Mechanical Engineer Sr.Electrical Engineer Sr.Structural Engineer Mir Amini,PMP Neil Pietrok,PE Elena G.D'Hondt Construction Manager Lead Civil Engineer Sr.Designer All our engineers are registered as professional engineers with the California Board of Professional Engineers. Only names of discipline leads and senior personnel are shown in this organizational chart COST ESTI MATE Integrated Project Solutions (IPS) proposes to provide engineering services for the South Tahoe Public Utility District's 2026 Facilities HVAC Upgrades Project on a Time-and-Materials basis with a Not-to- Exceed cost ceiling of$113,650, consistent with the requirements of the RFP. The proposed not-to-exceed fee does not include 3D modeling;if, after initial field verification, the District elects to pursue targeted 3D modeling of select congested areas, IPS will prepare a brief scope and fee for authorization via Task Order amendment. Assumptions Supporting Fee • Two (2) major field investigations • One (1) Draft and one (1) Final Alternatives Report • 60% and 90% review meetings • Up to four(4)construction meetings • Standard submittal review effort (assumes one primary contractor) • No hazardous materials testing included • No extensive structural retrofit beyond typical equipment anchorage • No geotechnical investigation included Professional Services Proposal I PS Page 15 of 17 INTEGRATED PROJECT SOLUTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES Additional services outside this scope would be authorized via Task Order amendment per the District's Master Services Agreement. TASK 1—DATA COLLECTION,REVIEW&ALTERNATIVES ANALYSIS STAFF Hours Rate Subtotal PRINCIPAL/PM 20 $195 $3,900 SR. MECHANICAL ENGINEER 32 $187 $5,984 SR. ELECTRICAL ENGINEER 12 $187 $2,244 MECHANICAL ENGINEER 40 $170 $6,800 TASK 1 SUBTOTAL 104 $18,928 TASK 2—DESIGN(60%AND 90%) PRINCIPAL/PM 20 $195 $3,900 SR. MECHANICAL ENGINEER 56 $187 $10,472 SR. ELECTRICAL ENGINEER 40 $187 $7,480 MECHANICAL ENGINEER 72 $170 $12,240 ELECTRICAL ENGINEER 40 $170 $6,800 COST ESTIMATOR 24 $170 $4,080 SR. CIVIL/STRUCTURAL ENGINEER 24 $187 $4,488 ADMIN SUPPORT 12 $115 $1,380 TASK 2 SUBTOTAL 288 $50,840 TASK 3—FINAL BID-READY CONSTRUCTION DOCUMENTS PRINCIPAL/PM 16 $195 $3,120 SR. MECHANICAL ENGINEER 24 $187 $4,488 SR. ELECTRICAL ENGINEER 16 $187 $2,992 MECHANICAL ENGINEER 36 $170 $6,120 ELECTRICAL ENGINEER 24 $170 $4,080 COST ESTIMATOR 12 $170 $2,040 SR. CIVIL/STRUCTURAL ENGINEER 12 $187 $2,244 ADMIN SUPPORT 6 $115 $690 TASK 3 SUBTOTAL 146 $25,774 TASK 4—BIDDING&CONSTRUCTION SERVICES PRINCIPAL/PM 8 $195 $1,560 SENIOR MECHANICAL ENGINEER 24 $187 $4,488 ELECTRICAL ENGINEER 12 $170 $2,040 MECHANICAL ENGINEER 30 $170 $5,100 ADMIN SUPPORT 8 $115 $920 TASK 4 SUBTOTAL 116 $14,108 REIMBURSABLE EXPENSES(ESTIMATED) ITEM Estimated Cost TRAVEL(SITE VISITS, MEETINGS) $2,500 PRINTING/REPRODUCTION $1,200 POSTAGE/DELIVERY $300 TOTAL REIMBURSABLES $4,000 Professional Services Proposal I PS Page 16 of 17 INTEGRGTED PROJECT 50 WTIONS ENGINEERING SERVICES FOR 2026 FACILITIES HVAC UPGRADES ANNEX 1 — Project Schedule This schedule supports the District's required June 2026 design completion and positions the project for timely bidding and construction mobilization within the allowable grading season window. Task/Milestone ar Apr May Jun Aug Project Kickoff ■ Task 1—Data Collection&Site Investigation • • Alternatives& Risk Analysis(Draft&Final) ■ Milestone: Final Alternatives Selection • Task 2—60%Design Development • • 60%Submittal&Review • Task 2—90%Design Development ■ ■ 90%Submittal&Review • Task 3—Final Bid-Ready Documents ■ Milestone: Final Construction Documents Complete • Bidding Phase ■ Pre-Bid Conference • Bid Evaluation&Award ■ Milestone:Construction NTP Issued • Professional Services Proposal I P Page 17 of 17 J INTEGRATED PROJECT SOLUTIONS General Manager Paul Hughes • 1950 • Directors ya`�� W$�� Nick Haven South Joel Henderson ` � I Ublic Utility District Sheehan Nick Exline _ I 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Ryan Lee, Customer Service Manager MEETING DATE: March 19, 2026 ITEM- PROJECT NAME: Liability Claim Against South Tahoe Public Utility District Received from Charter Communications REQUESTED BOARD ACTION: Reject the Claim against South Tahoe Public Utility District for losses allegedly sustained by Charter Communications. DISCUSSION: The Claimant, Charter Communications, filed a Claim against the District on February 10, 2026, for alleged damage to a buried cable line and conduit. The Claimant alleges that on July 8, 2025, District crew excavated outside of the work area described in the Underground Service Alert (USA) dig ticket created by the District's Underground Repair Water crew and dug through a buried cable line. The Joint Powers Insurance Authority (JPIA) has reviewed this Claim and recommends that the District reject the Claim on the grounds that staff confirmed that the District's excavation did occur within the work area the District delineated at the site. The dig ticket contains a polygon roughly outlining the work area, but the definitive delineation of the proposed dig area is marked by white paint on the street at the dig location. The buried cable line that the District's water crew damaged was located within the area delineated by the white paint, and there were no utility marks indicating buried assets near the excavation. The District can reject a Claim, allow a Claim, reject or allow a Claim in part, or compromise a Claim. If the District does not take action on the Claim within the six- month timeframe, the Claim is deemed rejected on the last day of that period. Once the Claim is deemed rejected, the Claimants may file a lawsuit. If written notice is not given that the Claim was rejected or deemed rejected, a two-year statute of limitations applies to the Claim. In contrast, rejection of the Claim coupled with a notice of rejection triggers a shorter six-month limitations period in which to file a lawsuit. Staff recommends that the District reject the Claim. Ryan Lee Page 2 March 19, 2026 SCHEDULE: Upon Board Action COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): ❑ Yes ❑ No N/A ATTACHMENTS: Claim for Damages CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES /14- NO CHIEF FINANCIAL OFFICER: YES ! D NO PHOENIX LOSS CONTROL February 10, 2026 South Tahoe Public Utility District Claims/Accounts Payable 1275 Meadow Crest Dr South Lake Tahoe. CA 96150 Claim Number: 251171580 Date of Damage on/about: 7/8/2025 2:00:00 PM Location of Damage at/near: 1632 Player Court player dr South Lake Tahoe, CA 96150 Amount Owed: $9,374.66 Our company is handling the recovery interests of CHARTER COMMUNICATIONS. You,your company, or your subcontractor damaged Charter Communications facilities while at the above location, discovered on/about 7/8/2025 2:00:00 PM. Please email Becky Fairbanks at for additional documentation. Based on the information provided by the client,we have found you to be liable for this damage to Charter Communications facilities. Please forward any information that may dispute our findings, or payment in full,within 15 days of receipt of this correspondence. If you are insured, you may consider turning this matter over to your insurance carrier, otherwise payment is due within 15 days of this letter and invoice. Pay online with a bank account/eCheck/ACH or credit card/debit card (convenience fee may vary between providers)by visiting https://cts.phxloss.com/pay. Checks, Certified Money Orders, or Cashier's checks should be made payable to Charter Communications and sent to: Charter Communications P.O. Box 959352 Saint Louis, MO 63195-9352 Please reference our claim number at the top of your check. If you have questions or require additional information, please contact me at the number listed below during normal business hours. Sincerely, Becky Fairbanks Claims Mana er, Phoenix Loss Control, Inc. Phone: Email: Damage Claim Report PHOENIX LOSS CONTROL Claim#: 251171580 Client: Charter Communications Initial Damage Call Date of Report: 7/8/2025 Market: NORTHWEST Damage Date/Time on/about: 7/8/2025 2:00:00 PM Office: 1608 Sierra Nevada (CA) Damage Location at/near Address 1: 1632 Player Court Cross Streets: player dr City: South Lake Tahoe State: CA Zip: 96150 County: El Dorado County Damage Information Detail of Loss/Damage: underground conduit and cable damaged Activity Type Damage By Facility Type Water Unknown/Other Buried CablelConduit/Duct Line Damager Contact: Claims/Accounts Payable Bill This Address?Yes Company: South Tahoe Public Utility District Address 1: 1275 Meadow Crest Dr Address 2: City: South Lake Tahoe State: CA Zip: 96150 Phone:5305446474 Locate Company: Utiliquest Bill This Address? No Locate Ticket#: 2025061200444 Locate Claim#: 758475Locates Accuracy: Page: 1 of 1 PHOENIX LOSS CONTROL Phone: 904-204-9156 Email: becky_fairbanks@phoenixlosscontrol.com South Tahoe Public Utility District First Notice Date Claims/Accounts Payable 1/28/2026 1275 Meadow Crest Dr Claim# South Lake Tahoe, CA 96150 251171580 Phone: 5305446474 Client Charter Communications QTY Description Unit Price Total 1.00 .625 Splice $13.57 $13.57 1.00 17V2P Tap $23.45 $23.45 340.00 CABLE-.625 $0.74 $251.60 340.00 Composite New UG?2"capacity, 1'-999' $25.60 $8,704.00 1.00 HEAT SHRINK $10.96 $10.96 1.00 Investigations Fee $91.87 $91.87 1:25 Maintenance Tech-Regular Time $75.52 $106.99 2.00 Pin connector.625 $6.11 $12.22 1:00 Service Truck Roll Out-Day-Regular Time $160.00 $160.00 Sub-Total $9,374.66 Payments $0.00 Balance $9,374.66 Please remit payment of balance within 15 days of this notice. Thank You! Damage Address at/near: 1632 Player Court player dr South Lake Tahoe, CA 96150 Please reference your claim number: 251171580 on checks or correspondence. Please visit https://cts.phxloss.com/pay to pay online with a credit card, debit card, or bank account(eCheck). You will be asked to provide your claim number. Make your check, money order, or cashier's check payable to: Charter Communications P.O. Box 959352 Saint Louis, MO 63195-9352 If you have any questions or would like to pay by another method, please reach out to your Phoenix representative listed on this invoice. Permanent repairs may be estimated and are subject to change pending actual costs. Damage Investigation Report INVESTIGATION#: 758475 INVESTIGATOR: 221.Manuel Chavez EXCAVATOR RESPONSIBILITY: B04-DUG BEYOND REQUESTED AREA DATE MAILED: 1/14/2026 DATE FAXED: LOCATING COMPANY RESPONSIBILITY: SENT TO: Becky Fairbanks-PLC OTHER RESPONSIBILITY: REPORTED DAMAGE INFORMATION CLIENT DAMAGED: CHARTER COMMUNICATIONS CLIENT CLAIM ID: Phoenix Claim#:251171580 LINE SIZE: Feeder CLIENT MAP: DAMAGE LOCATION: 1632 Player Court CITY: South Lake Tahoe MAP PAGE/AREA: 3852D11959B COUNTY: El Dorado MAP GRID: STATE: CA NOTIFIED BY CONTACT: Steve Newe DATE DAMAGE DISCOVERED: 7/8/2025 NOTIFIED BY COMPANY: Phoenix Loss Control LOCATING COMPANY NOTIFIED: 7/9/2025 8:03 AM PHONE: Email EXCAVATOR INFORMATION EXCAVATION COMPANY: South Tahoe Public Utilities D EXCAVATOR TYPE: EQUIPMENT TYPE: EXCAVATION TYPE: TICKET INFORMATION LOCATE REQUESTED: Y TICKET NUMBER: 2025061200444 DATE REQUSTED: 6/12/2025 8:19 AM LOCATE PERFORMED BY: 221.Larry Cervantes DATE COMPLETED: 6/13/2025 9:22 AM OFFICE: 221-SAC SITE INFORMATION PAINT MARKS PRESENT: Yes CLARITY OF MARKS: MARKS WITHIN TOLERANCE: Yes TOLERANCE MEASUREMENT(inches): TRACER WIRE WAS INTACT: AREA WAS MARKED IN WHITE: LOCATE AREA MARKED ON: Dirt WAS FACILITY POT HOLED: No DISTANCE FROM DAMAGE TO NEAREST FACILITY: WHO DID THE EXCAVATION FOR THE REPAIR: ARRIVAL TIME: DEPARTURE TME: ESTIMATE DAMAGE TIME: INVESTIGATOR NARRATIVE: DAMAGE NOTIFICATION INFORMATION: > Utiliquest was notified byPhoenix Loss Control on 7/9/2025 of a damage that occurred 7/8/2025 ROOT CAUSE: >The root cause for this damage is B04—dug beyond requested area DAMAGE INFORMATION: >On 7/8/2025 for USA#2025061200444 South Tahoe Public Utilities District were doing Water- Existing Assets Work when they damaged a charter feeder line outside of the requested area of dig per USA marks on site and pre excavation photos WHERE THE DAMAGE OCCURRED: >The damage occurred at address 1632 Player Court south lake tahoe ca TECHNICIAN'S RESPONSE TO USA TICKET: >tech responded to locate on 6/13/2025 and located the requested dig area OBSERVATIONS OF DAMAGE SITE UPON ARRIVAL: >On site I found that the damaged charter line was 50'outside of the visible marks on site. INVESTIGATOR ACTIONS: > N/A CONTRACTOR INFORMATION AND STATEMENTS: > NA CLIENT REPAIR INFORMATION: Damage Details Jan 14,2026, 1:42:47 pm Page 1 of 6 INVESTIGATION#: 758475 > NA RECOMMENDATION CODE: > B04—dug outside of requested area per marks on site. DISCUSSIONS REPAIR TECHNICIANS: REPAIR STATUS: REPAIR PERSON: REPAIR CONTACT INFO: REPAIR COMMENTS: EXCAVATOR COMPANY: EXCAVATOR PERSON: EXCAVATOR CONTACT INFO: EXCAVATOR COMMENT: ADDITIONAL PERSON 1: CONTACT INFORMATION 1: COMMENTS 1: ADDITIONAL PERSON 2: CONTACT INFORMATION 2: COMMENTS 2: CONCLUSIONS EXCAVATOR RESPONSIBILITY CODE: B04 B04-DUG BEYOND REQUESTED AREA EXCAVATOR RESPONSIBILITY TYPE: EXCAVATOR RESPONSIBILITY DESCRIPTION: EXCAVATOR RESPONSIBILITY DETAILS: EXCAVATOR RESPONSE(IF ANY): LOCATING COMPANY RESPONSIBILITY CODE: LOCATING COMPANY RESPONSIBILITY TYPE: LOCATING COMPANY RESPONSIBILITY DETAILS: OTHER RESPONSIBILITY CODE: OTHER RESPONSIBILITY TYPE: OTHER RESPONSIBILITY DETAILS: APPROVAL Investigation Approved: Yes Approved Date: 07/21/2025 11:23:40 am Approved By: 221.Vernon Dozier Damage Details Jan 14,2026, 1:42:47 pm Page 2 of 6 2025061200444 Received date Jun 12,2025,8:19 am Due date Jun 16,2025,5:01 pm Underground Service Alert of Northern & Central California 811 // 800-642-2444 www.usanorth811.org Please be advised the person below has requested a locate of underground assets in your jurisdiction. You are required to respond within the required time frame and reference the Ticket Number, Sequence Number and the User Reference(where supplied). [REFERRAL DETAILS] MESSAGE VERSION NO 1.0.10 FROM= USA NORTH 811 TICKET MEDIUM= WEB UTILITY ID= 21863 STATION CODE- ATTDNORCAL UTILITY NAME= ATT Distribution - California TO Damage Prevention JOB N0= 3580701 TICKET NO 2025061200444 TICKET REVISION N0= 000 PREVIOUS TICKET NO- PREVIOUS TICKET REV N0= SEQUENCE NO 27082383 TRANSMISSION ID= 1014 SUBMITTED DATE- 2025-06-12T08:19:13-07:00 WORK BEGIN DATE= 2025-06-16T17:01:00-07:00 LEGAL START DATE- 2025-06-16T17:01:00-07:00 TICKET EXPIRATION= 2025-07-10T23:59:59-07:00 WORK DURATION= 1 day or less EMERGENCY= false TICKET STATUS- Original TICKET TYPE= Normal WORK TYPE- Utilities - Distribution WORK ACTIVITY= Water - Existing Assets Work DELINEATED METHOD- White Paint EXCAVATION METHOD= Backhoe/trackhoe/excavator/mini ex PAVEMENT ONLY false VACUUM EXCAVATION= true ANTICIPATED DEPTH- Unknown EXCAVATION SIZE= 3498 Sq Ft RESPONSE REQUIRED= true PROJECT OWNER= South Tahoe Public Utilities District PERMIT- JOB NO/NAME= 1632 player ct BORING= false EXPLOSIVES= false STATION LIST= LIBUTL, SWGSLT, SLTPUD, CHASOT, ATTDNORCAL [CALLER DETAILS] EXCAVATOR ID= 11240 NAME- Frank Abbondandolo COMPANY= South Tahoe Public Utilities District STREET ADDRESS- 1275 Meadow Crest Dr CITY/TOWN/PLACE= South Lake Tahoe STATE- CA ZIPCODE= 96150 EXCAVATOR TYPE- Municipality EXCAVATOR INDUSTRY= PHONE- 530-208-8809 MOBILE= 530-208-8809 EMAIL= fabbondandolo@stpud.us LANGUAGE= English [LOCATION DETAILS] ADDRESS/LOCATION= 1632 Player Ct CITY/TOWN/PLACE= South Lake Tahoe COUNTY- El Dorado County STATE= CA NEARBY CROSS STREET- player dr STREET/SIDEWALK= true SUBDIVISION/LOT= ONSITE CONTACT NAME= frank abbondandolo ONSITE CONTACT PHONE- 5302088809 ZIPCODE= 96150 LATITUDE= 38.867371 LONGITUDE= -119.994946 EXCAVATOR REMARKS- Install a new blow-off on the left-hand side of 1632 Player Ct. when facing TICKET EDIT REASON= ATT OCC IDENTIFIER= USAN CLLI Code= STAHCA13 ATT TICKET ID= 712812771 OCC TICKET ID= 2025061200444-000 MAP URL= [https://ics.att.com/fiberlocate/33893929/eyJOeXAiOiJKV1QiLCJhbGciOiJSUZI1NilsIngldC161kNOdjBPSTNSd3FsSEZFVm5hb01Bc2hDSDJYRSISImtpZC161kNOd jBPSTNSd3FsSEZFVm5hb01Bc2hDSDJYRSJ9.eyJhdWQiOiJhcGk6Ly9mNWM50GUx0003YWVjLTQyMDAtYjcwOSlhNzUyNDBiZjQSZGEiLCJpc3Mi0iJodHRwczovL3NOcy53aW5kb3dzLm51dC91NzQxZDcxYylj Nm12LTQ3YjAtODAzYy0wZjNiMzJiMDc1NTYvIiwiaWFOIj oxNzQ5NzQyOTQzLCJuYmYiOjE3NDk3NDI5NDMsImV9cC16MTc00TcONjg0MywiYWlvIj oiazJSZ11KaCtwMGlwUUg3TExUOVZjNFZuODIyTkFRPT0i LCJhcHBpZCI6ImM5ODI2YjQyLTc90DctNDYxNC1hOTIwLWU3Yj I1NGVjMGIxNSISImFwcGlkYWNyljoiMSlslmlkcCl6lmhOdHBzOi8vc3RzLndpbmRvd3MubmVOL2U3NDFkNzFjLWM2YjYtNDdiMC09MDNjLTBm M21zMmIwNZU1Ni8iLCJvaWQiOiIxOTU9oDdkZS01ZGQOLTRmNjQtOWE30CO3ZGIxMTgyNTA3N2UiLCJyaC161jEuQVNjQUhOZEI1N2JHcOV1QVBBODdNcklxVmhpT3lmWHN1ZOJDdHdtblVrQ19TZG9uQUFBbkFB LiISInJvbGVzljpblmZpbGVlcGxvYWQiXSwic3ViljoiMTk10Dg3ZGUtNWRkNC00ZjYOLTlhNzgtN2RiMTE9MjUwNzdlliwidGlkljoiZTCOMWQ3MWMtYzZiNi00N2IwLTgwM2MtMGYzYjMyYjA3NTU2TiwidXRp IjoiRF1YV290NENNVX1pRDJVU2hPdE9BQSISInZlci161jEUMCISInhtcl9mdGQiOiJUNX1kQ3dONTRLU3JsbmN£NkdFb1ZOMm9CSmJac2xuYzclVUE9QOh2N3VNQmRYTnViMOowYUMxa2MyMXoifQ.A6CV 9EMC cK7dWgW1FiBMgWh3RZhm01 M2USSlnbupWd3U6NHXPTo-alPwwnvEUi8kKo0SdRciYOWQUB£g2wOMx1_HpCSEVp g8DIv7B08P9 1AlyLhlobnk757vAHzzm£vQnDNDVHw7pLlotw83iFwhAwwROLgZj PzV86UHs j206TVLduXaYcHvO oxhApehYRPrEpTQjuAgZrSWsgQHC1YABbTel8KjzT BphzBxVluRUW-tw-WZIPOLjV-9ibVKRZXJ7Gs6YkRXoCv5EYtPBU30FHQ8VAQ6aycJjkcxx3JluHRE3nidw18FNe0oHG63jQ9 s9wliQwAJTDFA] Client HI PROFILE€tatifS8DUIT Qty Marked When Closed High Profile Closed Assigned To Plat Number ATTDNORCAL Marked 1 6/13/2025 9:22 am p 221.Larry Cervantes STAHCA13 CHASOT Marked 1 6/13/2025 9:22 am 221.Larry Cervantes Note Entered: 6/12/2025 7:18:06 PM Charter: South Lake (CHASOT): Locate was reassigned to 12907/221.Larry Cervantes, requested by DYNUTIL\GC0132, updated by TKDJ on 6/12/2025 7:18:06 PM. Note Entered: 6/12/2025 7:18:06 PM AT&T(ATTDNORCAL): Locate was reassigned to 12907/221.Larry Cervantes, requested by DYNUTIL\GC0132, updated by TKDJ on 6/12/2025 7:18:06 PM. Ticket Details Jan 14,2026, 1:42:48 pm Page 3 of 6 Camera 07-09-2025 130031 090.JPG D At ate tachbd'1/9�20i5 1:G0`34 �PD P 2R Z019 t125) ", f i y r 7 y .<Y.�� �`'eX t �'` �" F i7a� r S:�-�rgt‘• y * . - • • • • • -p • • �{� _ • .` yr{•- R L `•.' , •�. •l ,l - • • _ �• e f .�.t . Damage Attachments Jan 14,2026, 1:42:48 pm Page 4 of 6 758475GOOGLE SKETCH EDIT.jpg JP-11 .. , - -N _1.,:itt . - - - ' :"'• ''4 4 . DAMAGE POINT - _.-5-. ':. 14, - REQUESTED DIG AREA 11 .. •-,-:.,:.- -- „,,-; -. 't:4( :,. _ 1 lik- 1"\(, *P*W. -4E1' iii:. *._. At'$1 1 0''-.- ' . N: ilVir . 4'..,. 41:11. -. '. 1 ., • ..• 141 GOOGLE SKETCH EDIT Damage Attachments Jan 14,2026, 1:42:49 pm Page 5 of 6 758475SKETCH EDIT.jpg / I __ m�7 1 / ., DAMAGE POINT Q• cLAtara "anal fa ta.C44CALl :�fa SKETCH EDIT Damage Attachments Jan 14,2026, 1:42:49 pm Page 6 of 6 Normal 2025061200444-000 1632 Player Ct, South Lake Tahoe, CA 96150 • t. . •.* 5 t • A tit Atr,f, A,"• Ns : , - • .t -4t4 — • _ ' . 4f • 595, • —"stiVt "If 4A1,'t44: 1'63 rOt A.!• • s • 10 ' a• • -A 1' 4 .1 ' • 41 ".-• pg.• • • . •s • • : • - 1627 *- ' • °0 •Map data 02025 Imagery 02025 Asrbus, 11x a r Tech ri o'c'gRs O Ticket details Information about the worksite and type of work involved Ticket details Work site address 1632 Player Ct, South Lake Tahoe, CA 96150 Status New Ticket created on 06/12/2025 - 08:19:13 am Last updated/cancelled date 06/12/2025 - 08:19:27 am Ticket type Normal Type of work Utilities - Distribution CI Work activity Water- ExistingAssetsNork Exca,ationmethud 8ackhne/trackhpe/excavator/nniniex Projected excavation depth UDkOoVYD / Horizontal/directional»onng No Explosives/blasting No / wm,k to Begin Date 06/10/2025 ' 05:01:00pnn Work Legal Start Date 06/16/2025 ' 05:01:00pnn ' -- -------- - ' Work Expiration oave(TicuetExpiration) 07/10/2025 - 11:59:59pno Project duration 1 day orless Permit No Permit required Permit Number - /ob#ywame 1O32 player ct ' Project Owner mProperty Owner Utility Facility Operator(D0D-DlUDi[ip3lity/[Ounh) Name of Utility/Authority South Tahoe Public Utilities District Site Contact Name frank abbondandolo Site Contact Mobile Phone How is the area pre-marked(delineated)? White Paint Nearest cross street player dr Subdivision Name/Lot Number Will excavation occur in the street,sidewalk or parkstrip? Yes My excavation will ONLY be within the pavement surfaces. No Will vacuum excavation equipment be used? Yes Remarks-Additional information Install a new blow-off on the left-hand side of 1632 Player Ct.when facing Ticket Action Reason Affected Members ggi Your Underground Service Alert of Northern &Central California Ticket has been submitted! Soon you will receive an email with your ticket attached as a PDF. If you do not receive a confirmation email for this ticket, please contact the call center by dialing 8-1-1 or 800-642-2444. It is your responsibility to confirm all details listed on your ticket are accurate and complete. If any information or details are incorrect, please contact 811 or login online to amend your ticket or submit a new ticket with the correct information. At the bottom of your ticket will be a list of the utility owners being notified to respond to your request. If there are utility owners missing from your request, please contact 811 to confirm the correct digsite was identified for your ticket. Remember- Do not proceed with your work until ALL utility owners listed have either marked the location of their facilities, OR provided you information about the location of their assets, OR have provided you with a clearance to dig. For more information, education, or training please visit our website - https://www.undergroundservicealert.org Responses Received 5/ 5 ATTDNORCAL ATT Distribution - California (Phone: 8882903111 Emerg... Responses Latest Response Received 2 010 06/13/2025 + Multi-utility Notification Sent CHASOT Charter Communications-South Lake Tahoe (Phone: 720... Responses Latest Response Received2 010 06/13/2025 E2 Communication - Distribution Notification Sent LIBUTL Liberty Utilites LLC (Phone: 5305461722 Emergency: 844... Responses Latest Response Received 2 010 06/13/2025 - Multi-utility Notification Sent SLTPUD South Tahoe Public Utilities District (Phone: 5305446474 .., Responses Latest Response Received + Multi-utility Notification Sent 2 004 06/12/2025 SWGSLT Southwest Gas Corporation - California (Phone: 6025014... Responses Latest Response Received 3 010 06/17/2025 6 Gas - Distribution - pipe Notification Sent General Manager Paul Hughes ya44ex • 1950 • W_$�� Directors Southahoe Nick Haven SaneZons/ Joel Henderson I Ublic Utility District Kelly Sheehan Nick Exline 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 12a TO: Board of Directors FROM: Paul Hughes, General Manager MEETING DATE: March 19, 2025 ITEM- PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Section 54956.9(d)(1) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Yolo County Superior Court Case CV 2021-1686, Alpine County vs. South Tahoe Public Utility District; et al. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): ❑ Yes ❑ No N/A ATTACHMENTS: N/A CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES / r NO CHIEF FINANCIAL OFFICER: YES y NO