Loading...
HomeMy WebLinkAbout7b Cusick_2026_TK_Sewer_Rehabilitation_NOA BOARD AGENDA ITEM 7b TO: Board of Directors FROM: Brendan Cusick, Senior Engineer Brent Goligoski, Engineering Manager – Capital Projects MEETING DATE: May 21, 2026 ITEM – PROJECT NAME: Tahoe Keys Sanitary Sewer Rehabilitation Project REQUESTED BOARD ACTION: (1) Adopt Addendum No. 1 to the design Plans and Specifications pursuant to California Government Code Section 830.6; (2) Find minor irregularities in the bid from Express Sewer & Drain, Inc. to be immaterial and waive immaterial irregularities; and (3) Award Contract for the 2026 Tahoe Keys Sanitary Sewer Rehabilitation Project to the lowest responsive, responsible bidder, Express Sewer & Drain, Inc., in the amount of $1,139,450. DISCUSSION: On April 2, 2026, the Board adopted the Plans and Specifications and authorized staff to advertise for construction bids for the 2026 Tahoe Keys Sanitary Sewer Rehabilitation Project (Project). The District’s previous condition assessment identified sewer mains along 8 of the 11 streets as being most at risk of failure and recommended rehabilitation utilizing Ultraviolet Cured-in-Place Pipe (UV CIPP). This trenchless technology provides the District with a corrosion resistant solution to extend the service life of these sewers for another 50 years or longer. The proposed Project involves lining approximately 7,332 linear feet of 6-inch pipe, 594 linear feet of 12-inch pipe, and 614 linear feet of 14-inch pipe as well as reinstating approximately 241 customer laterals. A mandatory pre-bid conference was held on April 15, 2026, with eight contractors in attendance. The bid opened at 2:00 p.m. on Thursday, April 30, 2026. The District received three bids ranging from $1,139,450 to $2,209,420. The total Engineer’s Estimate for this Project was $725,851. The discrepancy between the Engineer’s Estimate and bids received can mostly be attributed to the unit bid price to line the 6-inch sewer being 3 times higher than estimated. A summary of the bid, along with staff recommendations is attached. The attached Addendum No. 1 was prepared by District staff to modify the Plans and Specifications throughout the bid period to address questions posed by bidders. This General Manager Paul Hughes Directors Nick Haven Shane Romsos Joel Henderson Kelly Sheehan Nick Exline Brendan Cusick May 21, 2026 Page 2 Addendum clarified requirements regarding alternative materials, installation procedures, approved equal products and answered other minor questions. The anticipated Project schedule is as follows: • Board Approve Construction Contract Award May 21, 2026 • Notice to Proceed and Project Start June 2026 • Active Construction July 6, 2026 • Construction Completion October 15, 2026 SCHEDULE: Notice to Proceed as soon as possible, Construction in 2026 COSTS: $1,139,450 ACCOUNT NO: 10.30.8461 (TKLIN1) BUDGETED AMOUNT AVAILABLE: $1,972,154.35 (Fiscal Year 2026) IDENTIFIED CAPITAL IMPROVEMENT PROJECT (CIP): ☒ Yes ☐ No ☐ N/A ATTACHMENTS: Memorandum regarding bid results; Addendum No. 1 to the design Plans and Specifications (attached separately) ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO