Loading...
HomeMy WebLinkAboutDBE Outreach Invitation Proofs_RedactedVinciguerra Construction, Inc. Project Name: 2026 Pioneer Trail Waterline Project • Awarding Agency: South Tahoe Public Utility District Log details • This document contains a single copy of the bid invitation emailed to each company with an email address listed on their certification. The same email was sent to all companies, which is why we have provided the single email proof. ® This document contains a copy of each fax notice sent to solicited companies with a fax number listed on their certification, �4= .� • M Subject Line: [ Bid Invite 12026 Pioneer Trail Waterline Project Reply To Ernail: wvineiguerra@aft.net Vinciguerra Construction, Inc. is seeking qualified DBEs, MBEs WBEs, SBA MBEs, SDBs and invites you to bid on the following contract. PROJECT NAME: 2026 Pioneer Trail Waterline Project BID DUE DATE: 04/23/2026 at 02:00 (local time) AWARDING AGENCYIOWNER: South Tahoe Public Utility District PROJECT LOCATION: South Lake Tahoe, El Dorado, CA South Tahoe Public Utility Distdct - 2026 Pioneer Trail Waterline Project, South Lake Tahoe, CA. The site of the work is located in South Lake Tahoe, CA, within the Pioneer Trail right-of-way between Marshall Trail and Susquehanna Drive. The work to be performed consists of: the installation of approximately 8700 linear feet of 16-inch diameter Class 250 ductile iron waterline pipe, and additional 500 linear feet of 12-inch and 8-inch diameter pipe, three pressure reducing valve stations, 11 hydrants, completion of five interties, 48,000 square feet of paving, temporary traffic control and stormwater pollution prevention plan compliance measures. Vinciguerra Construction, Inc. is seeking quotes for all qualified subcontractors and suppliers including cerfifie-V DBE, UDBE, WBE, MBE, $BE Firms for the following items of work included but not limited to: Erosion Control/Revegetation Materials furnish & placement, Surveying, SWPPP, Dewatering, Waterworks Supplies & Appurtenances (Water Main Piping, Pipe Fitting's, Gate Valves, Valve Boxes, Fire Hydrants, and Water Service Valves), Sheeting, ShDring. & Bracing, Traffic Control, Construction Area Signs, Excavation/Earth Work, Sawcutfing, Asphalt Milling, Asphalt Concrete; furnish & placement, Aggregate Base; furnish & placement, Import Soil; furnish & Placement, Concrete-, furnish & placement, Pavement Striping, and Trucking. Disadvantaged Business watamwe (DRE) arficioation i t icum;nts are available for free download If interested, conta t: Austin Vinciguerra inriatipma Construction 11 —9