Loading...
HomeMy WebLinkAboutBid Less Grant Forms, Sub and Eq List _Redacted rim a M-0 0" 4,0411110. M, 11. w, All representations made by Bidder in this Bid are made under penalty of perjury. DATED: BIDDER: Col)sr-. BY - Signature( TITLE: 12/21/2018 SECTION 00 4100 WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS 2 DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION - Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Cod sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department industrial Relations. I Contractor DIR Registration Number: 00 000,nq 44 . LIST OF SUBCONTRACTORS. The Bidder shall list in the space provided, the name and the location of the place of business of each Subcontractor who will perform work or labor or render service to the prime CONTRACTOR in or about the construction of the work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the prime CONTRACTOR, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including Midges, in excess of one-half of one percent of the prime CONTRACTOR'S total bid or ten thousand dollars ($10,000), whichever is greater. The Bidder shall list the Subcontractor's License Number and, in accordance with Labor Code Section 1725.5 and 1771.1, the Subcontractor's Department of Industrial Relations Registration Number. The Bidder shall also list the portion of the work that will be done by each Subcontractor under this Contract. The prime CONTRACTOR shall list only one SUB- CONTRACTOR for each portion as is defined by the prime contractor in his or her bid- Failure to list subcontractors with portions of the Work in excess of the minimum amounts listed above constitutes a declaration by the CONTRACTOR that it is qualified and able to self -perform the work. Any CONTRACTOR found to be unqualified or unable to self -perform any part of the Work not listed below may be disqualified. The Bidder's attention is directed to the provisions of Section 00 73 00, Supplemental Conditions, Part 2-06, entitled Subcontracts. 12/21/2018 SECTION 00 4100 WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS 3 12/21/18 SECTION 00 41 00 WATER METER INSTALLATION PROJECT PHASE 5 BID FORM 6 �' � �. � '�' * " �^ a- � _ � � � � � � � � t�:^ � * � * � � � ,� :� .. �_ � « � - � m a k � � t� ;� m * r . _ � r �- ��� ® ! a � - � a. �. w r "� r �� / � _.. 4 � �.� • x �� � s � � � � � � a» a �...,.0 as q.: $" � t y ]R1 � ,� ; N aC8 @ � ..� �..• ...... n .. _„ ... -..: a ,, � ', �. �' .. � r '� 1 i, r A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validi of that o�t�ment. State of California Countyof Amador On February 6,2019 —beforeme, Kristi A. Winter, Notary (insert name and title of the officer) � MMM 12/21/18 SECTION 00 4100 WATPP Mr=TER INSTALLATION PFZOJE:GT PHASE 5 BID FORMS 10 KNOW ALL MEN BY THESE PRESENTS, That Vinciguerra Construction As Priri i al, ,and Great American insurance Gom an as Surety, are held and firmly bound unto SOUTH TAHOE E PU13LIC UTILITY DISTRICT, hereinafter called "OWNER," its the surn of 10% Of Total Amount Bid dollars, (Not less than 10 percent of the total amount of id * * * 4k orce and effect, FURTHERMORE, Sure, for value received, hereby stipulates and agrees that no change, extension of time, dlt+eration or addition to the terms of the Contract Documents shall in � its obligation under tide bond, and Surety dues hereby waive notice o such changes_ In the event suit is brought upon this bond by said OWNER and OWNER prevails, Surety shall Pay all cOsU incurred by said OWNER in such suit, including attOmey`s fees and costs. SIGNED AND SEALED, this stn day df, Vinci uerra Constru ion (Prin i 1) (Ciwn�r} (Si natu for Principal) ('itie) Sure Car t*merican tnsujt-a "e Gom an - . µ Attorney In Fact IZ,21148 WATER METER INSTALLATION pROj T _ FriSECTION 00 41 on Bilk FORM GREAT AMERICAN INSURANCE COMMMY0 Administrative !., OHIO 45202 ..'' 4 l 1. t. The number of persons authorized by this power of attorney is not more than TWO No. 0 21040 POWER OF ATrORNFY t W ALit MEN B'YTHESE PRESENT'S- That the GREATAMERICAN INSURANCECOMPA Y, a corporation organized and existing under and by virtue of the laws of the State of Ohio;, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named, its true and lawful attomey-in-fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bounds; undertakings and contracts of suretyship, or ether written obligations in the nature thereof, provided that the liability of the said Company on any such bandy undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of lower ROBERT MANASSERO BOTH OF BOTH VICKI JONES JACKSON, GALA=ORNIA $100,000,001 This Power ofAttomey revokes all previous powers issued on behalf of the attorney(s)-in-fact named above. IN WITNESS IA114EREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 8TH day of JUNEi 1 2018 .Attest GREAT AMERICAN INSURANCE COMPANY W � Assistant 5ecrerary £Jruisia'auP S'e»ror Vwe Fresident.. STATE OF OHIO, COUNTY OF HAMILTO 3 - ss: DAVI7 C. KfTCHIN (877-377-2405) On this 8TH day of JUNE 2018 - before me personally appearcd DA'VID C. KITCHIN; to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior "Vice President of the Bernd Division of (treat American Insurance Company, the Company described in and which executed the above instrument, that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -maws of said Company, and that he signed his name thereto by like authority:, This Power ofAttorney is granted by authority of the foil owing resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated June 9, 2008. RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents Divisional Vice Presidents and Divisoncal assistant Pice Presidents, or any one of their, be and hereby is authorized front time to time, to appoint one or more Atiorneys-tat-Fact to execute on behaljof the Company, as surety, any and all bonds, undertakings and contracts ofsurety=ship, or other written obligations in the nature thereof to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by faacsimile to any power of attorney or certificate of either given far the execution ofany band 'un dertalang, contract of suretyship. or other written obligation in the nature thereof, such signature and seat when 5o used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company. lobe valid and binding upon the Company with the same force and effect at though manually almd. CERTIFICATION 1, STEPHEN C. BERAHA, Assistant Secretary of 0reat American Insurance Company, do hereby certify that the foregoing power ofAttorney and the Resolutions of the Board of Directors ofJune 9, 2008 have not been revoked and are now in full forte and effect. Signed and sealed this 6th dayof February 2019 A �L Assistant Secreiary. SI rr29AF (06/15)' Surety's address in California for service or process: t Great American insurance Company 1255 Treat sivd., Suite 810 Walnut Greek GA 94597 A noiary public r other c r completing � WrO08te Ver tiies only the identity of the individual signedthe docrirnent to which thisCeMcate is attaChed, and not the ti r fiitrim, a==V, or validity of that document. STATE OF CALIFORNIA COUNTY OF Amador )SS" On February 6, 2019 before tree, Kristi A. Winter, Notary� personally appeared Wa ne Vinciguerra o " proved to rrte on the basil of satisfactory evrden to be the person(s) whose names) i lare subscribed to the within instrument as the representative of the Surety acknowledged to me that he/she executed the same in his/her authorized capacity, and subscribed the name of the Great American Insurance ccomeany (Surety) thereto and his/her own name as the representative of the Surety. I certify under penalty of pe ury under the lags of the State of California that the foregoing paragraph is true and co WITNESS my hand and, official seal. WNMR w .._ Notary Publi, J and for said State t owwfol SEAL C y` MY m. 7 2419 Commission expires: NOTE,. A copy of the Power -of -Attorney to foal representatives of the bonding, company must be attached hereto. IZOV18 WATER METER INSTALLA71O PROJECT - Si= S S9CTION no 41 00 dl:FQ 12 Ato'KNOWLEDGMENT OF INSURANCEREQUIREMENTS this DocqMMt Must ft Eljllygxec d ft Contractor nd:agrhrrr` With Lho laid The following insurance requirements have been adopted by The Barth Tahoe hlic Ut11it District hereinafter d si hat d the "OWNER, 11 and shall be applicableto this a ntract, Insu an duir m nt atrmm ry The, CONTRACTOR shall furnish, prior to Notice to Proceed, Insurance certificates and Endorsements for the WaterMeter Installation Project Phase 5 as set for In Section 0, Part 2.08.D and Section 00 73 00, Supplementary Conditions, Part 2.01. No otherInsurance documents shall be accepted in substitution of, nor in addition to,, those set forth in Section 00 20 fir, Instructions for Procurement, Insurance requirements and coverage ra will be in accordance With Section, 00 73 00, Supplementary Conditions, Part 2,01 The CONTRACTOR shall not commence work under this Contract until all insurance required under this heading is obtained in a form aooeptable to OWMER, nor shall the CONTRACTOR allow any Subcontractor to commence work on s subcontract until all insurance required of :the Subcontractor has been obtained. s 1, JVa ne Vinci a rra ' , the Owner Of (Insert, Title) Vinci u�;rra Construction (fume of Company, of Corporation or Owner) certify that the Insurance it m, ents Summary has been real and understood and that as material consideration of our bid ark able to provide the document and r spedfied. alnarure ---esident Secretary, Manage nor representative cat : February 6. 2019 1 /21/18 SECTION 00 41 00 WATER METER iN5TALLATION PROJECT= PHASE 5 SiD FORMS 14 CERTIFICAMN BY CONTRACTOR'S INSURANCE BROKER _ThisDocument- tt t b ttlt o nt qtofs insurance Broker and tjhmhf d Alh the Bid Robert Manassera Manasspro Insurnnno r.nmnnnu am an authorizedre t €v I tHRWAGUM S nwm at* ormtoge aame) The Travelers Pro e Casual Co ®f America, Great American Insurance Gom a ty,This company is the insurance, broker ttmuranw ompany) f Vinci uerra Construction ("Contractor), (C�ntraci�r} y my signature blur, d orby attesf to the trtoring. t t have reviewed the insurance requirements for the South Twits Public Ufilfty District's titer MOter Installation r , of Pb ("Prot ctn)g including the requirements set forth in Sian € 0 73 dig, SuppfemeritW Conditions, Part 2.01 of the Contract Documents. The Contractor is eligible to be insiured for the policies necessary to satisfy the insurance requirernertts for the Project_ Tits certification Is not intended to b ndi 6J, c nd Aces not modify and/or after the terms and conditions of the insurafi-6e, policies issued to Co tractto , Date: Fetarua s 2t319 (Signature Of r resritatl o,r i H,Travelers Pra e Casual Ctr Qf America Greai American Insurance Company notary public r other officer completing tt•tis rtl to ver es unly the identity individual who signed document which th rtlf€ t attached, and notthe twthf`UIness, a ar, $ r valid offhat s f ; State of California � CQUnty Of Amador On February £,, 2019 before M "' ffristi A. Winter, Notary ers0nat3y red Robert r Manasse�o t t f1 on Me basis s i factor ? evidence', to be the p t 3 moose- name's' ae'sx isiare's erased tc ` n ti £ti instrument and acknowledged fs e that held ltey e eeut the m in ttis#Ix�rltl�s;ir a�ttltt�r etf a ity(l s�, and that by I�ls tiar/flt lr eX n to s r n the ilnstrt<trnertt i ie rs +eft ), sir ` ntlt upon haff ref which the e nt t acted, . e� the instrument. I certify under PENALTY OF PERJURE* under the lags of the Mete Of California t t the foregcin Paragraph Is true and correct, WITLESS tray hand and official seal. t ra Notary Publi is c la AN""Coulft WATER R METER INSTALLATION PROJECT — PHAI5 'ST1 N'PO 44 00 ID FORMS ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual a who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document: z State of California County of A m a d r r Can February6 26i before me Kristi A. Winter, Notary (insert name and title of the officer) personally appeared Wayne Vinciguerra who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/shelthey executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ISTI A. wpm - t carom T , f1 Signature (Seal) 4 '1r 12/21/18 SECTfON cif) 41 00 WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS 1 ............... shall not exceed 1w percent CONTRACTOR submit for payment of all • the funds under this item Until derhobilization has been completed. kill, • •6 base maximum depth of 60", fittings, all horizontal and vertical adjustments as necessary to install and connect new meter to the existing water service on both sides of the meter, tracer wire, exposure of the water service valve to determine service depth and orientation, bedding, backfill, compaction, testing. All piping, fittings, and meters to be disinfected and visually tested for leaks prior to backfill. Bid Item 4 shall include the complete installation of one meter on the exisfirig single service valve or the complete installation of one meter on an existing double service connection of which the other half of the existing double service connection does not receive a new meter. Bid Item 5 shall include the complete installation of one meter on one side of a double service connection; Bid Item 5 is applicable to installations including two meter installations Within a single excavation. Ali meter installations shall include the installation of a valve box for each water service Valve. The Valve box may be new (as provided by the District at the identified staging area shown on Plan Sheet G3) or an existing valve box may be reinstalled at the direction of the Districfs field representative. The Contractor is responsible for the removal from the project area and disposal of existing valve boxes not reinstalled. Valve boxes may be Christy F08i G05� B09, B1017 or e�qual. Addonal bid items are detailed below which will be used to compensate contractor for various additional installation conditions, where applicable and approved by the District, including traffic - rated installations, patch paving, groundwater dewatering, additional excavation depth, service valve replacement, and unknown conditions. loll Ifl, MN�- relocation, including backfill, aggregate base, compaction, m6tal frame as provided by the District, formed concrete collar� traffic -rated lid as provided by the Distridt� temporary plating, and temporary asphalt, as required. Bid item 6 will be paid in addition to the payment of a base me�ter installation under Bid Item 4 or 5 as applicable, as shown on Detail VD! of the Plans. Additional depth of ekbavation, groundwater dewatering, and patch paving shall be paid for under separate bid items as detailed in this section, as applicable and approved by the District. i- YKMIMPI 7-11MRRM TWOWORW price shall be valid for an actual quantity plus or minus 100% of the estimated quantity indicated on the Bid Form, The CONTRACTOR'S payment for this Itern shall be by the Square Foot. The CONTRACTOR's unit price shall be valid for an actual quantity plus or minus 1001/6 of the estimated quantity indicated • the Bid Form. MOTNTINTo ME 0 Details 1/1311 and 3/D! of the Plans. Bid Item shall include additional fittings and other work detailed below as required at one or both sides of the meter connection. Excavations deeper than 76" shall be paid for on a time -and - materials basis under Bid Item 17, Contingency Work. Bid Item shall include adequate sheeting, shoring and bracing or equivalent methods for protection of life and limb, planning, designing, engineering, furnishing, constructing and removing temporary sheeting, shoring and any other work necessary to conform to the requirement of any permits, OSHA and the Construction Safety Orders of the State of California, pursuant to the provisions of Section 6707 of California Labor Cade, and all labor, tools, materials and appurtenances complete in place per the plans and specifications. Bid item shall include additional labor, materials, tools, equipment and incidentals, to connect one or both sides of the new water meter to the deeper existing water service line. Bid item to include all fittings & pipe required to make up the vertical change in elevation between the new meter and the existing curb stop and the existing service line going to the property. Bid Item shall include excavation to the depth of 76", sand bedding, new aggregate base or native backfifl (as required by plans & specifications), transporting materials, tracer wire, compaction, disinfection, protectionfrepair of existing services and utilities encountered during installation, complete and in place. All piping, fittings, and meters to be disinfected and visually tested for leaks prior to backfill. The CONTRACTOR'S payment for this item shall be by the Each. The CONTRACTOR's unit price shall be valid for an actual quantity plus or minus 100% of the estimated quantity indicated on the Bid Form. 12/21118 SECTION 00 41 00 WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS 20 ra N WsToTA. on m m R and pavers. Placement of the meter pit andlor water service valve box shall consider paver layout to minimize required cuts and minimize pieces smallerthan one-third of a full paverAll cuts shall be made in a workmanlikie manneri with exposed edges beveled and/or chamfered t 1 0 approximate uncut pavers, with resulting joi' o larger than 3/16". The CONTRACTORS payment for this item shall be by the Square Foot. The CONTRACTOR's unit price shall be valid for an actual quantity plus or minus 100% of the estimated quantity indicated on the Bid Form. NNUMMUtimmm aoeqJM__st1RUjff7j__KLwT11 planning, designing, engineering, furnishing, constructing, and removing temporary sheeting� shoring and bracing, and any other Work necessary to conform to the requirements of any permits, OSHA and the Construction Safety Orders of the State of California, pursuant to the provisions of Section 6707 of California Labor Code, and all labor, tools, materials and appurtenances complete in place per the plans and specifications, and excluding suc work which is specifically included in Bid Items 9 and 10 only (the increased excavation depth bid items). lt� m 1 t1i I i I Bid Item 17 - Contingency Work - Paid for on a Time -and -Materials Basis: The District has included a lump sum amount on the bid form to compensate the Contractor on a Time and Material Basis, only upon the approval of the Engineer, for work completed to address certain variations in field installation conditions which have not been adequately or specifically identified in the plans and specifications provided to the Contractor for bidding, or provided for in other bid items above. These items may include but are not limited to the following: I ) Rock excavation and removal from site; 2) Excavation below 76" depth; 3) Tree protection per Detail 41D2 of the Plans; 4) Replacement of private improvements at the direction of the District; 5) Installation of sewer riser and sewer G5 box at uncovered clean outs; 6) Expanded excavation and other work to accommodate an extended install location based on field conditions, beyond the 36" horizontal distance included in the base meter installation bid item, and shown on Detail VD1 of the Plans; 7) A/C patch paving thicker than 3", 8) Seal coat; 9) Concrete driveway restoration; 10) Replacing the service line from the service valve back to the main; and 11) Other additional work approved by the District. Contractor shall draw upon the allotted amount through the submittal and District -approval of documented costs for materials, equipment, crew and subcontractors as per the specifications, specifically Section 00 72 00 Part 2.10, Extra Work. If the total amount is exceeded as the project progresses, the additional time and material costs will be addressed as a changed condition. Time and material work under this item shall include all work required to address the unknown conditions. The District shall not be obligated to pay Contractor the entire allotted 12/21/18 SECTION 00 41 00 WATER METER INSTALLATION PROJFGT - rt-1A0IZ,:i 51D FORMS 22 The CONTRACTOR'S payment for this item shall be on a Time and Materials basis upon the approval of the Engineer. END OF SECTION 12121118 SECTION 00 4100 WATER METER INOTALLATfON rRoJEC'T- MAE 5 BID FORMS 23 CONSTRUCTION OF ! X M SOUTH LAKE TAHOE PUBLIC UTILITY DISTRICT BTIJIS-UXEUIZE�WRPr �1-- Jong.rr r r. .M r r r r -. • following bid 12J21[18 SFCTION 00 41 00 WATER METER 1%I3TALLATION f'RQJEQT'- PHASE 5 BID;FORM 24 Description • .. -Price a t - �vtiti t 416 EA 6. Add for Traffic -Rat d lnst llaticns 250 EA 7. '„ Asphalt Patch Paving 2000,SF Add f6t,Gtoundwater Dewatering 40 E Iricre. sed Excavation Depth far Non -traffic installs: 61" tc , g 7 'bleep 185 EA Increased Excavation Depth fair Traffic -rated installs; 61" 10. to 76" Deep ; , 00 EA 11, Water Service VOIve replacement, 3/4" Single: '190EA 12, Water Service Valve Replacement, Y4 Do6ble 60 EA 11- Watery ervice Valve In -Line, W1, . .- 190 EA 14, Freeze water Service for Value Replacement 60 EA 16 Pavef Driveway Restoration 160 SF 16. Sheeting, Shoring,, and Bracing gar Equivalent I i_S Contingency," , orb— Paid fear cnr e Time -and -Materials �117_ Basis $200,000 $200,000 1 E5 12121/18 WATER METUR IN37FALLATI N VKC)JEcT- PHASE 5 SECTION 00 41 00 BID FORM 25' CONTRACT DOCUMENTS FOR Water Meter Installation Project Phase 5 AND J; South Tahoe Public Utility District South Lame Tahoe, California February 8, 2019 GENERAL NOTE&- The Mandatory Pre -Bid Meeting was held on;Thursday, January 3, 2019. The sign -in sheet and presentation from that meeting has been posted for Contractor referenc on Planet Bids. -1 1111 - 0- - 1111-11 et I It-, H L-J Igo I; It; I a) I I ggm; I ga A W;I�#laid= i'sis #1# lll&-iii[�gir I I DO LO mi I I A JI 11-71 = RVA 1 Section 00 41 00, Bid Form Bid Item Descriptions REPLACE: Bid Item I description, in its entirety WITH: Bid Item I - Mobilization and Demobilization: includes, but is not limited to obtaining of bonds, insurance and financing, movement of equipment, materials and personnel to and from the job site, supervision, certificates, permits, submittals and RFIs, utilities, site maintenance, cleanup, dust control, replacement of pavement striping disturbed by construction, blackout of all USA markings, removal of all USA markers (flags, spins, and nails), and work incidental to the project but not specifically identified under the remaining items, and costs incurred prior to beginning work and after completion of work on the various contract items. The cost for this item shall not exceed 10 percent (10%) of the total bid without documented justification, nor shall the CONTRACTOR submit for payment of all of the funds under this item until demobilization has been completed. The CONTRACTOR's payment for this item shall be by the Lump Sum 2. Section 00 4100, Bid Form Bid Form REPLACE: Bid Form in its entirety. WITH: Bid Form (attached). 3. Section 00 74 00, Grant Conditions Part 2.02.E at CHANGE, and its review of weekly payroll data to verify that contractors or subcontractors are paying the appropriate wage rates," TO: "... its review of weekly payroll data to verify that contractors or subcontractors are paying the appropriate wage rates, and its review of apprentice and trainee programs, if applicable." REPLACE: Part 2.10 in its entirety'. WITH: `2.10 CULTURAL RESOURCES A. If required as a condition of the District's contract for funding, the Contractor shall abide by the following:; 1. If archaeological features or materials are unearthed during any phase of project activities, all work in the immediate vicinity of the find shall halt until Recipient has contacted the State and the significance of the resource has been evaluated. Any mitigation measures that may be deemed necessary must have the approval of the State, and shall be implemented, pursuant to the Secretary of the Interior's Standards and Guidelines for Archaeology and Historic Preservation, 48 CFR 44716, by a qualified archaeologist representing the Recipient prior to the resumption of construction activities. 2 If human remains are exposedby activity related to the project, the Recipient must comply with California State Health and Safety Code, Section 7050.5, which states that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and; disposition pursuant to California Public Resources Code, Section 5097.98. 5. Section 00 78 00 Davis Bacon Wages Attachment General Decisions REPLACE: CE: General Decision Number. CA180003 01/0512018 C ; (6 pages) General Decision Number: CA180006 01105/2018 CA (4 pages) General Decision Number: CA180009 12/07/2018 CA9 (45 pages) General Decision number; CA1800030 12/07/2018 CA30 (48 pages) WITH: General Decision Number: CA190003 01/04/2019 CA3 (6 pages - Attached) General Decision Number: CAI 90006 01/04/2019 CA6 (4 pages - Attached) General Decision Number: CA190007 0210112019 CA7 (52,pages - Attached) General Decision Number: CAI 90019 02/01/2019 CA19 (55 pages -Attached) 6. Following Appendix ADD: Appendix C El Dorado County Right of Way >Encroachment Permit and Standard Permit` Conditions (attached) THE FOLLOWING IN CHANGES ARE TO BE MADE TO THE PLANS: (Not Used)`, This Addendum No. 1, pages 1 through 4, plus attachmbnt� (76 sheets) shall become part of the Contract and all provisions • the Contract shall apply therein. The date and bme for the Bid Opening has not changed. The tirne provided for the completion of the Contract has not changed. CONSTRUCTION WATER METER INSTALLATION PHASE FOR SOUTH LAKE TAHOE y * PUBLIC DISTRICT BID SCHEDULE: (Refer to Bid Descriptions for a mor6 detailed description for each of the following bid ':i W3[7 The Total Bid shall be generated from the above bid items by adding together the total amount for each bid item, in accordance with the requirements of Section 00 20 00, Part 2.06.8. The sum of all the bid item athounts shall be the bidder's bid and inserted, both in words and numerically, in this section. 111 ij�i; 1 01 1 a Z i MR M,= M I, UILAAM0 OTO I r-MIAMU 10 1N4. LU1Jr-LJ r1r-Mr- rUM INrUMMAk I IUM 11UMt1U1-.)r-Zp UNLT.- END OF BID SCHEDULE END OF SECTION