12/21/2018 SECTION 00 4100
WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS
2
DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION -
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Cod
sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department
industrial Relations. I
Contractor DIR Registration Number: 00 000,nq 44
.
LIST OF SUBCONTRACTORS.
The Bidder shall list in the space provided, the name and the location of the place of business of
each Subcontractor who will perform work or labor or render service to the prime
CONTRACTOR in or about the construction of the work or improvement, or a Subcontractor
licensed by the State of California who, under subcontract to the prime CONTRACTOR,
specially fabricates and installs a portion of the work or improvement according to detailed
drawings contained in the plans and specifications, in an amount in excess of one-half of one
percent of the prime contractor's total bid or, in the case of bids or offers for the construction of
streets or highways, including Midges, in excess of one-half of one percent of the prime
CONTRACTOR'S total bid or ten thousand dollars ($10,000), whichever is greater. The Bidder
shall list the Subcontractor's License Number and, in accordance with Labor Code Section
1725.5 and 1771.1, the Subcontractor's Department of Industrial Relations Registration
Number. The Bidder shall also list the portion of the work that will be done by each
Subcontractor under this Contract. The prime CONTRACTOR shall list only one SUB-
CONTRACTOR for each portion as is defined by the prime contractor in his or her bid- Failure to
list subcontractors with portions of the Work in excess of the minimum amounts listed above
constitutes a declaration by the CONTRACTOR that it is qualified and able to self -perform the
work. Any CONTRACTOR found to be unqualified or unable to self -perform any part of the
Work not listed below may be disqualified. The Bidder's attention is directed to the provisions of
Section 00 73 00, Supplemental Conditions, Part 2-06, entitled Subcontracts.
12/21/2018 SECTION 00 4100
WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS
3
12/21/18 SECTION 00 41 00
WATER METER INSTALLATION PROJECT PHASE 5 BID FORM
6
�' � �. �
'�' * "
�^ a-
� _ � � �
� � � � �
t�:^ �
* � * � � � ,�
:�
.. �_ � « � - � m a k �
� t�
;� m * r . _ �
r
�-
���
® ! a � - �
a. �. w r
"� r ��
/ � _..
4 � �.�
•
x
��
� s � � � � � �
a» a
�...,.0
as q.: $" � t
y ]R1 �
,� ;
N
aC8 @
� ..� �..•
...... n .. _„ ... -..: a
,, � ', �.
�' .. � r
'� 1 i,
r
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validi of that o�t�ment.
State of California
Countyof Amador
On February 6,2019 —beforeme, Kristi A. Winter, Notary
(insert name and title of the officer)
� MMM
12/21/18 SECTION 00 4100
WATPP Mr=TER INSTALLATION PFZOJE:GT PHASE 5 BID FORMS
10
KNOW ALL MEN BY THESE PRESENTS,
That Vinciguerra Construction As Priri i al, ,and Great American insurance Gom an as Surety, are held and
firmly bound unto SOUTH TAHOE E PU13LIC UTILITY DISTRICT, hereinafter called "OWNER,"
its the surn of 10% Of Total Amount Bid dollars, (Not less than 10
percent of the total amount of id
*
*
*
4k
orce and effect,
FURTHERMORE, Sure, for value received, hereby stipulates and agrees that no change,
extension of time, dlt+eration or addition to the terms of the Contract Documents shall in � its
obligation under tide bond, and Surety dues hereby waive notice o such changes_
In the event suit is brought upon this bond by said OWNER and OWNER prevails, Surety shall
Pay all cOsU incurred by said OWNER in such suit, including attOmey`s fees and costs.
SIGNED AND SEALED, this stn day df,
Vinci uerra Constru ion
(Prin i 1)
(Ciwn�r}
(Si natu for Principal) ('itie)
Sure Car t*merican tnsujt-a "e Gom an
- . µ Attorney In Fact
IZ,21148
WATER METER INSTALLATION pROj T _ FriSECTION 00 41 on
Bilk FORM
GREAT AMERICAN INSURANCE COMMMY0
Administrative !., OHIO 45202 ..'' 4 l 1. t.
The number of persons authorized by
this power of attorney is not more than TWO
No. 0 21040
POWER OF ATrORNFY
t W ALit MEN B'YTHESE PRESENT'S- That the GREATAMERICAN INSURANCECOMPA Y, a corporation organized and existing under
and by virtue of the laws of the State of Ohio;, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than
one is named, its true and lawful attomey-in-fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bounds;
undertakings and contracts of suretyship, or ether written obligations in the nature thereof, provided that the liability of the said Company on any such bandy
undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.
Name Address Limit of lower
ROBERT MANASSERO BOTH OF BOTH
VICKI JONES JACKSON, GALA=ORNIA $100,000,001
This Power ofAttomey revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS IA114EREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunto affixed this 8TH day of JUNEi 1 2018
.Attest GREAT AMERICAN INSURANCE COMPANY
W �
Assistant 5ecrerary £Jruisia'auP S'e»ror Vwe Fresident..
STATE OF OHIO, COUNTY OF HAMILTO 3 - ss: DAVI7 C. KfTCHIN (877-377-2405)
On this 8TH day of JUNE 2018 - before me personally appearcd DA'VID C. KITCHIN; to me
known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior "Vice President of the Bernd Division of (treat
American Insurance Company, the Company described in and which executed the above instrument, that he knows the seal of the said Company; that the seal
affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -maws of said Company, and that he signed his
name thereto by like authority:,
This Power ofAttorney is granted by authority of the foil owing resolutions adopted by the Board of Directors of Great American Insurance Company
by unanimous written consent dated June 9, 2008.
RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents Divisional Vice Presidents and Divisoncal assistant Pice
Presidents, or any one of their, be and hereby is authorized front time to time, to appoint one or more Atiorneys-tat-Fact to execute on behaljof the Company,
as surety, any and all bonds, undertakings and contracts ofsurety=ship, or other written obligations in the nature thereof to prescribe their respective duties and
the respective limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the
Company may be affixed by faacsimile to any power of attorney or certificate of either given far the execution ofany band 'un dertalang, contract of suretyship.
or other written obligation in the nature thereof, such signature and seat when 5o used being hereby adopted by the Company as the original signature of such
officer and the original seal of the Company. lobe valid and binding upon the Company with the same force and effect at though manually almd.
CERTIFICATION
1, STEPHEN C. BERAHA, Assistant Secretary of 0reat American Insurance Company, do hereby certify that the foregoing power ofAttorney and
the Resolutions of the Board of Directors ofJune 9, 2008 have not been revoked and are now in full forte and effect.
Signed and sealed this 6th dayof February 2019
A
�L
Assistant Secreiary.
SI rr29AF (06/15)'
Surety's address in California for service or process:
t
Great American insurance Company
1255 Treat sivd., Suite 810
Walnut Greek GA 94597
A noiary public r other c r completing � WrO08te Ver tiies only the identity of the individual signedthe
docrirnent to
which thisCeMcate is attaChed, and not the ti r fiitrim, a==V, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF Amador )SS"
On February 6, 2019 before tree, Kristi A. Winter, Notary� personally
appeared Wa ne Vinciguerra o "
proved to rrte on the basil of satisfactory
evrden to be the person(s) whose names) i lare subscribed to the within instrument as the
representative of the Surety acknowledged to me that he/she executed the same in his/her
authorized capacity, and subscribed the name of the Great American Insurance ccomeany (Surety)
thereto and his/her own name as the representative of the Surety.
I certify under penalty of pe ury under the lags of the State of California that the foregoing
paragraph is true and co
WITNESS my hand and, official seal.
WNMR w .._
Notary Publi, J and for said State
t
owwfol
SEAL C y`
MY m. 7 2419
Commission expires:
NOTE,. A copy of the Power -of -Attorney to foal representatives of the bonding, company must
be attached hereto.
IZOV18
WATER METER INSTALLA71O PROJECT - Si= S S9CTION no 41 00
dl:FQ
12
Ato'KNOWLEDGMENT OF INSURANCEREQUIREMENTS
this DocqMMt Must ft Eljllygxec d ft Contractor
nd:agrhrrr` With Lho laid
The following insurance requirements have been adopted by The Barth Tahoe hlic Ut11it
District hereinafter d si hat d the "OWNER, 11 and shall be applicableto this a ntract,
Insu an duir m nt atrmm ry
The, CONTRACTOR shall furnish, prior to Notice to Proceed, Insurance certificates and
Endorsements for the WaterMeter Installation Project Phase 5 as set for In Section
0, Part 2.08.D and Section 00 73 00, Supplementary Conditions, Part 2.01. No otherInsurance
documents shall be accepted in substitution of, nor in addition to,, those set forth in Section 00
20 fir, Instructions for Procurement, Insurance requirements and coverage ra will be in
accordance With Section, 00 73 00, Supplementary Conditions, Part 2,01
The CONTRACTOR shall not commence work under this Contract until all insurance required
under this heading is obtained in a form aooeptable to OWMER, nor shall the CONTRACTOR
allow any Subcontractor to commence work on s subcontract until all insurance required of :the
Subcontractor has been obtained.
s
1, JVa ne Vinci a rra ' , the Owner
Of (Insert, Title)
Vinci u�;rra Construction
(fume of Company, of Corporation or Owner)
certify that the Insurance it m, ents Summary has been real and understood and that as
material consideration of our bid ark able to provide the document and r spedfied.
alnarure ---esident Secretary,
Manage nor representative
cat : February 6. 2019
1 /21/18 SECTION 00 41 00
WATER METER iN5TALLATION PROJECT= PHASE 5 SiD FORMS
14
CERTIFICAMN BY CONTRACTOR'S INSURANCE BROKER
_ThisDocument- tt t b ttlt o nt qtofs
insurance Broker and tjhmhf d Alh the Bid
Robert Manassera Manasspro Insurnnno r.nmnnnu am an authorizedre t €v I
tHRWAGUM S nwm at* ormtoge aame)
The Travelers Pro e Casual Co ®f America, Great American Insurance Gom a ty,This company is the insurance,
broker
ttmuranw ompany)
f Vinci uerra Construction ("Contractor),
(C�ntraci�r}
y my signature blur, d orby attesf to the trtoring.
t t have reviewed the insurance requirements for the South Twits Public Ufilfty
District's titer MOter Installation r , of Pb ("Prot ctn)g including the requirements set
forth in Sian € 0 73 dig, SuppfemeritW Conditions, Part 2.01 of the Contract Documents.
The Contractor is eligible to be insiured for the policies necessary to satisfy the
insurance requirernertts for the Project_
Tits certification Is not intended to b ndi 6J, c nd Aces not modify and/or after the
terms and conditions of the insurafi-6e, policies issued to Co tractto ,
Date: Fetarua s 2t319
(Signature Of r resritatl
o,r i H,Travelers Pra e Casual Ctr Qf America Greai American Insurance Company
notary public r other officer completing tt•tis rtl to ver es unly the identity individual who signed
document which th rtlf€ t attached, and notthe twthf`UIness, a ar, $ r valid offhat s f ;
State of California �
CQUnty Of Amador
On February £,, 2019 before M "' ffristi A. Winter, Notary
ers0nat3y red
Robert r Manasse�o t t f1 on Me basis s i factor ? evidence', to
be
the p t 3 moose- name's'
ae'sx isiare's erased tc ` n ti £ti instrument and acknowledged fs e that
held ltey e eeut the m in ttis#Ix�rltl�s;ir a�ttltt�r etf a ity(l s�, and that by I�ls tiar/flt lr
eX n to s r n the ilnstrt<trnertt i ie rs +eft ), sir ` ntlt upon haff ref which the e nt t acted,
. e� the instrument.
I certify under PENALTY OF PERJURE* under the lags of the Mete Of California t t the foregcin
Paragraph Is true and correct,
WITLESS tray hand and official seal. t
ra
Notary Publi
is
c la AN""Coulft
WATER R METER INSTALLATION PROJECT — PHAI5 'ST1 N'PO 44 00
ID FORMS
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
a who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document:
z State of California
County of A m a d r r
Can February6 26i
before me Kristi A. Winter, Notary
(insert name and title of the officer)
personally appeared Wayne Vinciguerra
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/shelthey executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. ISTI A. wpm
-
t
carom
T , f1
Signature (Seal)
4
'1r
12/21/18 SECTfON cif) 41 00
WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS
1
...............
shall not exceed 1w percent
CONTRACTOR submit for payment of all • the funds under this item Until derhobilization has
been completed.
kill,
• •6
base maximum depth of 60", fittings, all horizontal and vertical adjustments as necessary to
install and connect new meter to the existing water service on both sides of the meter, tracer
wire, exposure of the water service valve to determine service depth and orientation, bedding,
backfill, compaction, testing. All piping, fittings, and meters to be disinfected and visually tested
for leaks prior to backfill.
Bid Item 4 shall include the complete installation of one meter on the exisfirig single service
valve or the complete installation of one meter on an existing double service connection of
which the other half of the existing double service connection does not receive a new meter. Bid
Item 5 shall include the complete installation of one meter on one side of a double service
connection; Bid Item 5 is applicable to installations including two meter installations Within a
single excavation.
Ali meter installations shall include the installation of a valve box for each water service Valve.
The Valve box may be new (as provided by the District at the identified staging area shown on
Plan Sheet G3) or an existing valve box may be reinstalled at the direction of the Districfs field
representative. The Contractor is responsible for the removal from the project area and disposal
of existing valve boxes not reinstalled. Valve boxes may be Christy F08i G05� B09, B1017 or
e�qual.
Addonal bid items are detailed below which will be used to compensate contractor for various
additional installation conditions, where applicable and approved by the District, including traffic -
rated installations, patch paving, groundwater dewatering, additional excavation depth, service
valve replacement, and unknown conditions.
loll Ifl, MN�-
relocation, including backfill, aggregate base, compaction, m6tal frame as provided by the
District, formed concrete collar� traffic -rated lid as provided by the Distridt� temporary plating,
and temporary asphalt, as required.
Bid item 6 will be paid in addition to the payment of a base me�ter installation under Bid Item 4 or
5 as applicable, as shown on Detail VD! of the Plans. Additional depth of ekbavation,
groundwater dewatering, and patch paving shall be paid for under separate bid items as
detailed in this section, as applicable and approved by the District.
i- YKMIMPI 7-11MRRM TWOWORW
price shall be valid for an actual quantity plus or minus 100% of the estimated quantity indicated
on the Bid Form,
The CONTRACTOR'S payment for this Itern shall be by the Square Foot. The CONTRACTOR's
unit price shall be valid for an actual quantity plus or minus 1001/6 of the estimated quantity
indicated • the Bid Form.
MOTNTINTo ME 0
Details 1/1311 and 3/D! of the Plans.
Bid Item shall include additional fittings and other work detailed below as required at one or both
sides of the meter connection. Excavations deeper than 76" shall be paid for on a time -and -
materials basis under Bid Item 17, Contingency Work.
Bid Item shall include adequate sheeting, shoring and bracing or equivalent methods for
protection of life and limb, planning, designing, engineering, furnishing, constructing and
removing temporary sheeting, shoring and any other work necessary to conform to the
requirement of any permits, OSHA and the Construction Safety Orders of the State of California,
pursuant to the provisions of Section 6707 of California Labor Cade, and all labor, tools,
materials and appurtenances complete in place per the plans and specifications.
Bid item shall include additional labor, materials, tools, equipment and incidentals, to connect
one or both sides of the new water meter to the deeper existing water service line. Bid item to
include all fittings & pipe required to make up the vertical change in elevation between the new
meter and the existing curb stop and the existing service line going to the property. Bid Item
shall include excavation to the depth of 76", sand bedding, new aggregate base or native
backfifl (as required by plans & specifications), transporting materials, tracer wire, compaction,
disinfection, protectionfrepair of existing services and utilities encountered during installation,
complete and in place. All piping, fittings, and meters to be disinfected and visually tested for
leaks prior to backfill.
The CONTRACTOR'S payment for this item shall be by the Each. The CONTRACTOR's unit
price shall be valid for an actual quantity plus or minus 100% of the estimated quantity indicated
on the Bid Form.
12/21118 SECTION 00 41 00
WATER METER INSTALLATION PROJECT - PHASE 5 BID FORMS
20
ra N WsToTA. on m m R
and pavers. Placement of the meter pit andlor water service valve box shall consider paver
layout to minimize required cuts and minimize pieces smallerthan one-third of a full paverAll
cuts shall be made in a workmanlikie manneri with exposed edges beveled and/or chamfered t 1 0
approximate uncut pavers, with resulting joi' o larger than 3/16".
The CONTRACTORS payment for this item shall be by the Square Foot. The CONTRACTOR's
unit price shall be valid for an actual quantity plus or minus 100% of the estimated quantity
indicated on the Bid Form.
NNUMMUtimmm
aoeqJM__st1RUjff7j__KLwT11
planning, designing, engineering, furnishing, constructing, and removing temporary sheeting�
shoring and bracing, and any other Work necessary to conform to the requirements of any
permits, OSHA and the Construction Safety Orders of the State of California, pursuant to the
provisions of Section 6707 of California Labor Code, and all labor, tools, materials and
appurtenances complete in place per the plans and specifications, and excluding suc work
which is specifically included in Bid Items 9 and 10 only (the increased excavation depth bid
items).
lt� m 1 t1i I i I
Bid Item 17 - Contingency Work - Paid for on a Time -and -Materials Basis: The District has
included a lump sum amount on the bid form to compensate the Contractor on a Time and
Material Basis, only upon the approval of the Engineer, for work completed to address certain
variations in field installation conditions which have not been adequately or specifically identified
in the plans and specifications provided to the Contractor for bidding, or provided for in other bid
items above. These items may include but are not limited to the following:
I ) Rock excavation and removal from site;
2) Excavation below 76" depth;
3) Tree protection per Detail 41D2 of the Plans;
4) Replacement of private improvements at the direction of the District;
5) Installation of sewer riser and sewer G5 box at uncovered clean outs;
6) Expanded excavation and other work to accommodate an extended install location
based on field conditions, beyond the 36" horizontal distance included in the base
meter installation bid item, and shown on Detail VD1 of the Plans;
7) A/C patch paving thicker than 3",
8) Seal coat;
9) Concrete driveway restoration;
10) Replacing the service line from the service valve back to the main; and
11) Other additional work approved by the District.
Contractor shall draw upon the allotted amount through the submittal and District -approval of
documented costs for materials, equipment, crew and subcontractors as per the specifications,
specifically Section 00 72 00 Part 2.10, Extra Work. If the total amount is exceeded as the
project progresses, the additional time and material costs will be addressed as a changed
condition. Time and material work under this item shall include all work required to address the
unknown conditions. The District shall not be obligated to pay Contractor the entire allotted
12/21/18 SECTION 00 41 00
WATER METER INSTALLATION PROJFGT - rt-1A0IZ,:i 51D FORMS
22
The CONTRACTOR'S payment for this item shall be on a Time and Materials basis upon the
approval of the Engineer.
END OF SECTION
12121118 SECTION 00 4100
WATER METER INOTALLATfON rRoJEC'T- MAE 5 BID FORMS
23
CONSTRUCTION OF
! X
M
SOUTH LAKE TAHOE PUBLIC UTILITY DISTRICT
BTIJIS-UXEUIZE�WRPr �1-- Jong.rr r r. .M r r r r -. •
following bid
12J21[18 SFCTION 00 41 00
WATER METER 1%I3TALLATION f'RQJEQT'- PHASE 5 BID;FORM
24
Description
•
.. -Price
a t
-
�vtiti t
416 EA
6.
Add for Traffic -Rat d lnst llaticns
250 EA
7.
'„ Asphalt Patch Paving
2000,SF
Add f6t,Gtoundwater Dewatering
40 E
Iricre. sed Excavation Depth far Non -traffic installs: 61" tc ,
g
7 'bleep
185 EA
Increased Excavation Depth fair Traffic -rated installs; 61"
10.
to 76" Deep
;
, 00 EA
11,
Water Service VOIve replacement, 3/4" Single:
'190EA
12,
Water Service Valve Replacement, Y4 Do6ble
60 EA
11-
Watery ervice Valve In -Line, W1,
. .-
190 EA
14,
Freeze water Service for Value Replacement
60 EA
16
Pavef Driveway Restoration
160 SF
16.
Sheeting, Shoring,, and Bracing gar Equivalent
I i_S
Contingency," , orb— Paid fear cnr e Time -and -Materials
�117_
Basis
$200,000 $200,000
1 E5
12121/18
WATER
METUR IN37FALLATI N VKC)JEcT- PHASE 5
SECTION 00 41 00
BID FORM
25'
CONTRACT DOCUMENTS
FOR
Water Meter Installation Project Phase 5
AND
J;
South Tahoe Public Utility District
South Lame Tahoe, California
February 8, 2019
GENERAL NOTE&- The Mandatory Pre -Bid Meeting was held on;Thursday, January 3, 2019.
The sign -in sheet and presentation from that meeting has been posted for Contractor referenc
on Planet Bids. -1
1111 - 0- -
1111-11 et I It-, H L-J Igo I; It; I a) I I ggm; I ga A W;I�#laid= i'sis #1# lll&-iii[�gir I I DO LO mi I I A JI 11-71 = RVA
1 Section 00 41 00, Bid Form
Bid Item Descriptions
REPLACE: Bid Item I description, in its entirety
WITH: Bid Item I - Mobilization and Demobilization: includes, but is not
limited to obtaining of bonds, insurance and financing, movement of
equipment, materials and personnel to and from the job site,
supervision, certificates, permits, submittals and RFIs, utilities, site
maintenance, cleanup, dust control, replacement of pavement
striping disturbed by construction, blackout of all USA markings,
removal of all USA markers (flags, spins, and nails), and work
incidental to the project but not specifically identified under the
remaining items, and costs incurred prior to beginning work and
after completion of work on the various contract items. The cost for
this item shall not exceed 10 percent (10%) of the total bid without
documented justification, nor shall the CONTRACTOR submit for
payment of all of the funds under this item until demobilization has
been completed.
The CONTRACTOR's payment for this item shall be by the Lump
Sum
2. Section 00 4100, Bid Form
Bid Form
REPLACE: Bid Form in its entirety.
WITH: Bid Form (attached).
3. Section 00 74 00, Grant Conditions
Part 2.02.E
at
CHANGE, and its review of weekly payroll data to verify that contractors or
subcontractors are paying the appropriate wage rates,"
TO: "... its review of weekly payroll data to verify that contractors or
subcontractors are paying the appropriate wage rates, and its
review of apprentice and trainee programs, if applicable."
REPLACE: Part 2.10 in its entirety'.
WITH:
`2.10 CULTURAL RESOURCES
A. If required as a condition of the District's contract for funding, the Contractor
shall abide by the following:;
1. If archaeological features or materials are unearthed during any
phase of project activities, all work in the immediate vicinity of the
find shall halt until Recipient has contacted the State and the
significance of the resource has been evaluated. Any mitigation
measures that may be deemed necessary must have the approval
of the State, and shall be implemented, pursuant to the Secretary
of the Interior's Standards and Guidelines for Archaeology and
Historic Preservation, 48 CFR 44716, by a qualified archaeologist
representing the Recipient prior to the resumption of construction
activities.
2 If human remains are exposedby activity related to the project,
the Recipient must comply with California State Health and Safety
Code, Section 7050.5, which states that no further disturbance
shall occur until the County Coroner has made the necessary
findings as to origin and; disposition pursuant to California Public
Resources Code, Section 5097.98.
5. Section 00 78 00
Davis Bacon Wages Attachment
General Decisions
REPLACE:
CE:
General Decision Number. CA180003 01/0512018 C ; (6 pages)
General Decision Number: CA180006 01105/2018 CA (4 pages)
General Decision Number: CA180009 12/07/2018 CA9 (45 pages)
General Decision number; CA1800030 12/07/2018 CA30 (48 pages)
WITH:
General Decision Number: CA190003 01/04/2019 CA3 (6 pages - Attached)
General Decision Number: CAI 90006 01/04/2019 CA6 (4 pages - Attached)
General Decision Number: CA190007 0210112019 CA7 (52,pages - Attached)
General Decision Number: CAI 90019 02/01/2019 CA19 (55 pages -Attached)
6. Following Appendix
ADD:
Appendix C El Dorado County Right of Way >Encroachment Permit and Standard
Permit` Conditions (attached)
THE FOLLOWING IN CHANGES ARE TO BE MADE TO THE PLANS:
(Not Used)`,
This Addendum No. 1, pages 1 through 4, plus attachmbnt� (76 sheets) shall become part of
the Contract and all provisions • the Contract shall apply therein.
The date and bme for the Bid Opening has not changed. The tirne provided for the completion of
the Contract has not changed.
CONSTRUCTION
WATER METER INSTALLATION
PHASE
FOR
SOUTH LAKE
TAHOE
y * PUBLIC DISTRICT
BID SCHEDULE: (Refer to Bid Descriptions for a mor6 detailed description for each of the
following bid ':i
W3[7
The Total Bid shall be generated from the above bid items by adding together the total
amount for each bid item, in accordance with the requirements of Section 00 20 00, Part
2.06.8. The sum of all the bid item athounts shall be the bidder's bid and inserted, both
in words and numerically, in this section.
111 ij�i; 1 01 1 a Z i MR M,= M I,
UILAAM0 OTO I r-MIAMU 10 1N4. LU1Jr-LJ r1r-Mr- rUM INrUMMAk I IUM 11UMt1U1-.)r-Zp UNLT.-
END OF BID SCHEDULE
END OF SECTION