HomeMy WebLinkAboutWoodRodgersTO#5 Final WOOD
,
SERVICESTASK ORDER NO. 5
CONSULTING
This Task Order is made and enteredinto as of the 20th day_ f August, 2021 by and between South
Tahoe Public Utility District, hereinafter referred to as " ! s, Inc.,
hereinafter referred s " ".
In consideration of the mut r i , covenants, conditions r ss in the Master
Agreement ru s specifically her i r set forth, the partieshereby
agree s .
1. PURPOSE
purposeThe i Order No. 5 is to provideProfessional i iServices
for 's Herbert-Walkup WaterlineReplacement Project located in the iSouth
CountyLake Tahoe, I Dorado, California,
Scope2. SCOPE OF WORK
The is outlinedin CONSULTANT'sro s l dated August 6, 2021, and further
outlined in said Proposal s tasks 1.1-1.3. Saidi cope of Work and Cost Proposal are
markedattached hereto, Exhibit" ", and incorporated hereinthis reference
is Task Order.
STAFFING
Michael E, Long, PLS/CFedS, _Director shall be the responsible per i
charge of the completion the services r r this Task Order,
shall not change staffingwithout r val by DISTRICT. Any changes shall provide for
equivalent qualifications as far as practical.
TIME OF PERFORMANCE
Services this s Order No. 5 shall commence on or about August 20, 2021, and will be
completed r before October
5 PAYMENT
Payment to CONSULTANT for s iperformed under this Task Order _ . shall be i
accordance i 's Cost Proposal (attached s part of Exhibit ") for the
person(s) assigned to the projecttask.
The cost ceiling r this TaskOrder shall be Thirty-Eight Thousand Four Hundred Sixty Dollars
( 3 , II not be exceededc s provided in Articlethe Master Agreement.
1
6. LABOR CODE REQUIREMENTS
_
All State-_of Californiar v iliin laws mustcomplied i in the performanceo
related i Order. These include, r t limited , Labor Code Sections
through .
. INSURANCE COVERAGE
CONSULTANT's Errors & Omissions coverage shall be $1,000,000 aggregate with a
deductible of not more than $100,000 for the duration of this Task Order.
8. EFFECTIVE T
This Task Order No. 5 will become effective upon execution by both parties, and shall serve as
a Notice to Proceed upon execution by DISTRICT.
IN WITNESSWHEREOF, this Agreement is executed by the General Manager and Clerk of the
Board of the South Tahoe Public UtiI4 District, and Consultant has caused this Agreement to b
executed the day and year first above written.
SOUTH " PUBLIC UTILITYDISTRICT
Ad ust 20 2021
J f t L.
P.F,,, . A, Approval Date
GENERAL A IA FFrFNGI NEER
ATTEST: _
Fla NNE GU Y, CLER FBOARD----
WOOD
, INC
d 4AT'HAN R . 1IF PRESIDENT „v. „ Dated
EXHIBIT
August 6,201
Brent Goli osi,Associate Engineer
South e Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe,CA 96150
:( 3 )544-6474
Subject:
WaterlineHerbert Walkup rvey
El Dorado County,CA
Dear Brent,
Wood Rodgers, Inc. is phased to respond to your request for surveying and mapping services for the Herbert
Walkup Waterline Survey project located in unincorporated El Dorado County, CA.We have provided below the
scope of work which is based upon the Request for letter Proposal dated July 2 ,2021,as we understand it.
The estimated labor hours are one-hundred eight-eight (188). We are available after Notice to Proceed to
complete the project within the estimated time frame (early October) provided notice to proceed being issued
August 20,2021. Staffing resources will be provided from both our Reno and Sacramento offices.
1. Surveying&MappingServices
1.1. Control Survey
Wood Rodgers will establish and measure a survey control network for the project site.The horizontal control
shall be based on published data provided by National Geodetic Survey and the North American Datum of
198 (NAD 3), California Zone 11. The vertical control shall be based on published data provided by the
National Geodetic Survey and the North American Vertical Datum of 1988 ( AVD 88). In addition to
establishing primary GPS control points, temporary control points will be established every 1,000 LF and
control coordinate information will be included with deliverables.
1.2. Right-Of-Way Mapping
Mood Rodgers will perform right-of-way mapping for the project site. Wood Rodgers will locate record
monuments and use record information such as record reaps,deeds,and title documentation for the project
site and adjacent parcels to determine the location of the existing right-of-ways. This will also include the
record street centerline,existing easement,and lot information, No monuments will be seta Existing fences
will be located and related to the common property lines.We will analyze calculated and measured distances
and compare them to record data. All record easements identified on a current preliminary title report will
e plotted that are adjacent to road RWe (Assumed Preliminary Title Reports and all referenced information
is provided by the client)
1®3m Topographic Survey
Wood Rodgers will provide a topographic survey for the project site.An aerial survey will be utilized to collect
aerial imagery and HDAR data.One(1)foot contour intervals will be generated from the bare earth classified
LIIDAR data. A 3D TIN surface will be provided as a Civil 3D drawing file (DWG), Existing conditions and 2D
planimetric features shall be located and will include but not be limited to:
Existing sidewalk,curb and gutter,center and fog;lines,trees(B"dbh or greater),brush
and vegetation areas(50 ftz or greater),bushes larger than 3`diameter within 5'of water
service shut off valve box or water meter,bear boxes/trash enclosures,boulders(include
approximate diameter), rock slope protection,fences,edge of pavement(including roadway and
EXHIBIT
Herbert Walkup Waterline Survey
August 6,2021
Page 2 of S
driveways),dirt trails and all visible above ground surface features and all utilities,within an
extending 5' behind the Right-of-Way along all streets within the project area.
Existing water service valves and meters,even if located outside oft e right-of-way.
Show all existing fire hydrants.
• Rim and all invert elevations of sewer/storm sewer/storm drain main in each direction andspecify pipe
size in all manholes,catch basins and inlets.Include inner diameter or dimensions for each
structure. Provide a utility detail sheet for each structure.
• Locate any Underground Service Alert(USA) underground utility mark outs and evidence of
recent trench locations such as newly installed Natural Gas,Traffic Signal Loops,Electrical,
Telephone,or TV Cable utilities.
Locate all overhead utility poles and guy`wires,power vaults,transformers,and above ground
cabinets, private power features or lighting within 5 feet outside of right of way,
Street Aress's for parcels on both sides oft e subject streets.
Project accuracy ill conform to general accepted professional specifications established by the ASP S
Positional Accuracy Standards for Digital Geospatial Data(2014).
Client will be responsible to coordinate the Underground Service Ale (USA) request for underground utility
ark outs and evidence of recent trench locations such as newly installed Traffic Signal Loops, Electrical,
Telephone or TV Cable utilities, prior to commencement of field survey activities.
Totali t ,
Wood Rodgers proposes to perform the above listed scope of work as identified above a Lump Sum basis for an
estimated fee of$38,460 subjectto the followingconditions:
Deliverables
• Wood Rodgers will provide preliminary deliverable in.DWG and.PDF format for review by STPUD prior to
submitting final deliverables.The AutoCAD.DWG shall utilize standardized STPUD layering.
• Provide survey point ASCII file in PNEZD comma delimited format.
• 3-inch orthomosaic image in JPEG200 format.
S eclal Conditions or Items needed:
• The Client shall be responsible for preparing and providing any documents that permit the right of entry
onto public property needed to facilitate the requested survey.
• The Client will be responsible to coordinate the Underground Service Alert(USA)request for underground
utility mark outs and evidence of recent trench locations such as newly installed Traffic Signal Loops,
Electrical,Telephone or TV Cable utilities, prior to commencement of field survey activities.
• The Client will provide current Preliminary Title Reports and all title exceptions and record maps.
EXHIBIT A
EXHIBIT A
Herbert Walkup Waterline Survey
August 6,2021
Page 3 of 5
Exhibit"A"Wood Rodgers Invoicing,Payment&Liability Policies,and Exhibit"B",the hourly rate Fee Schedule for
Time and Materials work and for Client requested changes are included as part of this contract.
Our proposal is based on knowledge of the project at its current status. The client is responsible for payment of
all agency fees.Copying,Blueprinting and Reprographics will be billed at cost. Deliveries will be billed as T&M.
Thank you for the opportunity to work with you. We are confident we will provide the quality and timeliness of
professional surveying services needed to make this a successful project.Should you have any questions or require
additional information,please contact our office.
Sincerely, IN AGREEMENT WITH THE ABOVE TERMS:
Wood Rodgers Inc.
M�A By:
ichael E. Ldµ /CFedS
Principal/Survey Director Company:
Name:
Title: re
EXHIBIT A
EXHIBIT
Herbert Walkup Waterline Survey
August 6,2021
Page 5 of 5
EXHIBIT" "
01 "we
SACRAMENTO FEE SCHEDULE
EffectiveJanuary ,2021
CLASSIFICATION STANDARD RATE
Principal Engineer/Geologist/Surveyor/Planner/GIS/ *II 255
Principal Engineer/Geologist/Surveyor/Planner/GIS/ 1 225
Associate Engineer/Geologist/Surveyor/Planner/GIS/ * 111 $210
Associate En ineer/Geologist/Surveyor/Planner/GIS/ *II $200
Associate n ineer/Geologist/Surveyor/Planner/GIS/ *1 $190
Engineer/Geologist/Surveyor/Planner/GIS/ *111 $180
Engineer/Geologist/Surveyor/Planner/GIS/ *II $17
Enmeer/Geologist/Survey or/Planner/GIS/ *1 $155
Assistant n ineer/Geologist/Surveyor/Planner/GIS/ * $120
CAD Technician III $155
CAD Technician II $135
CAD Technician I $120
Project Coordinator $135
Administrative Assistant $100
1 Person Survey Crew 215
2 Person Survey Crew 315
3 Person Survey Crew 5
Consultants,Outside Services, aterils irect Charges Cost Plus 1
Overtime Work Rate Plus
*LA=Landscape Architect
Blueprints,reproductions,and outside graphic services will be charged at vendor invoice. Automileage will
e charged at the IRS standard rate,currently 5 .0 cents per mile.
Fee Schedule subject to change January 1,2022.