HomeMy WebLinkAboutTO#24 PURCHASING_Surveying for HP and ICRs - signed LUMOS & ASSOCIATES, INC.
TASK ORDER NO. 24
CONSULTING SERVICES
This Task Order is made and entered into as of the 30th day of September 2025 by and
between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and
Lumos and Associates, Inc., hereinafter referred to as "CONSULTANT".
In consideration of the mutual promises, covenants, and conditions as addressed in the
Master Agreement dated November 21, 2024, and as specifically hereinafter set forth, the
parties do hereby agree as follows:
1. PURPOSE
The purpose of this Task Order is to authorize and direct CONSULTANT to provide
professional surveying services to support District's operations at Harvey Place and
Indian Creek Reservoirs in and around Markleeville, Alpine County, California.
2. SCOPE OF WORK
The scope of work for these services is further described in CONSULTANT's
Proposal dated September 19, 2025. Said Proposal is incorporated herein as Exhibit
"A" and by this reference is made a part of this Task Order.
3. STAFFING
Staffing will consist of Greg Phillips, P.L.S., WRS, Surveying Division Director,
Project Principal; Michael Craven, P.L.S., P.E., Surveying Group Manager; and
Greg Lindsey, Project Coordinator. CONSULTANT shall not change staffing without
approval by DISTRICT. Any changes shall provide for equivalent qualifications as
far as possible and practical.
4. TIME OFPERFORMANCE
Tasks for these professional services will commence on verbal notice to proceed
from Adrian Combes, Director of Operations for South Tahoe Public Utility District on
or about October 1, 2025, and shall be completed on or about December 1, 2025.
5. PAYMENT
Payment to CONSULTANT for services performed under this Task Order shall be as
provided in Article IV of the aforementioned, Master Agreement and shall not
exceed the amount of Nine Thousand Five Hundred Dollars ($9,500) unless the
scope of work is changed, and an increase is authorized by DISTRICT.
1
6e INSURANCE COVERAGE
CONSULTANT's Errors&Omissions coverage shall be$1,000,000 aggregate with
a deductible of not more than $100,000 for the duration of this Task Order.
7. EFFECTIVE DATE
This Task Order No. 24 will become effective upon execution by both parties and
shall serve as a Notice to Proceed upon execution by DISTRICT.
IN WITNESS WHEREOF, this Agreement is executed by the General Managerand
the Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has
caused this Agreement to be executed the day and year first above written.
South Tahoe Public Utility District
Paul Hughes General Manager
Attest SFAL
Melonie Guttry, Clerk of Board
°
''der •-...
dddrdd+"IY1plTDdk�iY Y4%5t11Y4 `����
LUMOS AND ASSOCIATES, INC.
Aiaifis
By:
Greg Phillips, Survey Division Director
P.L.S. License No. 7936
2
Boise - Carson City - El Dorado Hills s Fallon Lake Tahoe - Reno* Roseville
Lake Tahoe
312 Doria Court, Suite 202 1 PO Box 890
LUMOS Zephyr Cove, Nevada 89448
ASSOCIATES 775.588.6490
Exhibit"A
September 19, 2025 Proposal #LA25.698
Mr. Adrian Combes, P.E.
Director of Operations
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
(530) 543-6258
Via email: co es s u .us
RE Proposal for Professional Surveying Services
Harvey Place &Indian Creek Dam Monitoring, Alpine County, California
Dear Adrian:
Lumos & Associates, Inc. (Lumos) appreciates the opportunity to submit this proposal to provide
professional surveying services to support your operations at the Harvey Place and Indian Creek
reservoirs in Alpine County. It is our understanding that both dams (and their auxiliary dams) have
been monitored for settlement periodically over their lifespan. Monuments were established when
the dams were constructed and Lumos has been provided with the most recent survey results and
corresponding data spreadsheet.
Based upon review of the data, only elevations of the monuments have been tracked and no data
was provided on the horizontal locations of the monuments.
It is our understanding that based on the previously observed settlement,the frequency of monitoring
surveys needs to be every 6 months. We propose to provide an initial task for the first round of
monitoring that allows for site familiarization and gaining a better understanding of the prior survey
work. Once we have completed the initial round, Lumos will prepare a fixed fee for each subsequent
monitoring effort.
Task 100 —Initial Site Visit&First Monitoring
Lumos will review the plans provided and survey data and develop a survey plan. A crew will be
dispatched to recover the existing monuments and measure their elevations relative to project
benchmarks. The elevations will be established using a digital level.
Lumos will reduce the data and update the provided spreadsheet. The results of the survey will be
documented in a memo to the district and stamped by a California Licensed Land Surveyor.
Fees
Due to the uncertainties in the first round of monitoring, a T&M based approach will be most
equitable for all parties. Therefore, Lumos will conduct work on this task on a T&M basis in
accordance with our current fee schedule (attached) up to a limit of$9,500.
September 19,2025
Page 2
LA25.698
Fees will include El Dorado County prevailing wage rates paid to all field crew members for time on
site. The hourly rate for a 2-person prevailing wage field crew is: $395 / hour.
Schedule
Lumos is prepared to begin work on this project within 2-3 weeks of our notice to proceed. We
anticipate needing an additional 2 weeks to complete the field survey, reduce the data, and
prepare the results.
Thank you again for allowing Lumos&Associates to provide you with this proposal. Please do not
hesitate to call me if you have questions.
Sincerely,
Michael Craven, P.L.S., PE (OR&wn)
Group Manager- Survey Division
CC: Greg Phillips, P.L.S.,WRS—Director Survey Division
www.Lumoslnc.com nc.
4/x Standard Fee Schedule
LUMOS January 1, 2025
Engineer r
Director $330
..... w ... _ _.
Group Manager 315
m w�. ,,... _.. ... __ r
Senior Project Manager—Special Projects 285
m,....... - _ � .,.. . .,e w.,
Assistant/ Project/ Senior Project Manager 240/270J285
Staff/ Project/Senior Hydrogeologist 215/230/240
_ ... _. .
Staff/ Pro............. ,., ... __..e _. „
Assistant/ Project/Senior Project Coordinator 170/210/225
Project/ Senior Project r �
_t Designer 190/200
Engineering Technician I/ II/III 120/160/175
Construcition Per Hourl
Director m $330
_.
Materials Engineering Manager 285
Assistant/Project/Senior Project e n
Manager 240/270/280/Z80
Staff/ Project/Senior Geotechnical Engineer 220/230/245
v_
Construction Services Supervisor/ Engineer 195/210
_. .,,.�. _ �_ . __. �. ...
Assistant/ Project/ Senior project Coordinator 170/210/225
Geotechnician 190
_._
Inspector/ Senior Inspector(includes nuclear gauge) 180/190
Construction Technician I/II/ III 145/155/165
Materials Technician I/II/ III (includes nuclear gauge) 115/145/155
Administrative Technician 105/115/125
1Per Hour
Director $330
Group Manager 315
Assistant/ Project/Senior Project Manager 240/270/280
Staff/ Project/Senior Surveyor 220/230/245
Assistant/ Project Senior Project Coordinator 170/210/225
�. .. , _ ..... F.... _ __u m�. . _ _ ._.�.,�
Photogrammetrist j Photogrammetry Manager 170/205
GIS Analyst 170
Surveying Technician I/II/ III 120/160/175
Party Chief 210
I i ti r ices Per Hourl
Administrative Support $145
Copy&Print Services Cost+ 15%
Mileage(per mile) 0.90
• Fees for prevailing wage rate projects are available upon request.
• Map filing,checking,consulting,and other fees paid on behalf of the client shall be billed at cost plus fifteen percent(15%).
• Overtime hours will be billed at 1.5 times the standard rate where applicable.
• Survey and Field crew billing rates include standard field survey equipment and truck up to 30 mile radius,after which mileage rates
apply
• Fees for depositions and testimony will be billed at two(2)times the standard billing rates
These ratesapply to services rendered r December 31,2025.Services provided after
this date will be invoiced co r i to the Standard Fee Schedule in effect at that time.
cn