Loading...
HomeMy WebLinkAboutTO#11 Final 2021 1109 LUMOS & ASSOCIATES, INC. TASK ORDER NO. 11 CONSULTING SERVICES This Task Order is made and entered into as of the 9th day of November 2021 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Lumos and Associates, Inc., hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated November 20, 2014, and as specifically hereinafter set forth, the parties do hereby agree as follows: 1. PURPOSE The purpose of this Task Order is to authorize and direct CONSULTANT to provide land surveying services to conduct four Plan and Profile Section Surveys of DISTRICT'S sewer pipeline crossing at Tallac Creek located in the County El Dorado, California. 2. SCOPE OF WORK The scope of work for these services is contained in CONSULTANT's written proposal dated November 5, 2021. Said written proposal is attached hereto, marked as Exhibit"A", and incorporated herein by this reference as part of this Task Order. 3. STAFFING Rick Byrem, P.L.S., WRS, Project Manager shall be the responsible person in charge of the completion of the services performed under this Task Order. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. TIME OF PERFORMANCE Tasks included in this task order shall commence on November 9, 2021, and shall be completed on or before December 15, 2022. 5. PAYMENT Payment to CONSULTANT for services performed under this Task Order shall be as provided in Article IV of the November 20, 2014, Master Agreement and shall not exceed the amount of Eight Thousand Three Hundred Dollars ($8,300.00) unless the scope of work is changed, and an increase is authorized by DISTRICT. 6. INSURANCE COVERAGE CONSULTANT's Errors&Omissions coverage shall be$1,000,000 aggregate with a deductible of not more than $100,000 for the duration of this Task Order. 1 7. EFFECTIVE DATE This Task Order No. 11 will become effective upon execution by both parties and shall serve as Notice to Proceed upon execution by DISTRICT. IN WITNESS WHEREOF,this Agreement is executed by th Maltagerand Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Agreement to be executed the day and year first above written. South Tahoe Public Utility District ® November 9 2021 J . Ryan. Approval Date Engineering e r Atte t elonie—Guiq,—CIerk-6f1Board LUMOS AND ASSOCIATES, INC. .4 a By. November 11, 2021 Greg Phillips, Survey Manager Date P.L.S. License No. 7936 2 Carson City - Fallon - Lake Tahoe-Reno .L ; nc. /A Lake Tahoe 25 Kingsbury Grade,Suite A 1 P.O. Box 3570 LUMOS tatellne, Nevada 89449 ASFMr,1AYT,,-B 775.588.6490 November 5, 2021 LA21.998 Mr. No Bergsohn, PG, CHG South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Via email: ibergsohn@stpud.dst.ca.us Sub" m Land Survey Proposal for Sfteam Channel Afoaft aring T !!ac Cieek El Dorado County, C Dear Ivo: Lumos and Associates, Inca is pleased to provide you with this proposal for land surveying services to compile stream cross-section and profile data at the sewer pipeline crossing at Tallac Creek. Erg"Ergied, The proposed project is within the service area of the South Tahoe Public Utility District (STPUD) in the South Lake Tahoe area of El Dorado County, California. It is our understanding that the purpose of this project is to continue the monitoring of cross-section and profile data surveys initially conducted by Insite Land Surveys, Inc., at four existing locations. We propose the following Scope of Services for the project. f Proiect ScoRg Task 1 - Control Recovery&InitialObservations Lumos and Associates, Inc. (LUMOS) will perform a field survey to recover and verify the location of the existing control points last referenced by Insite Land Surveys, Inc. in July of 2016 per the attached exhibit from Insite. Upon completion of the control recovery, a set of data will be collected for the four existing section lines A-A', B-B', C-C'and D-D'. All survey data for this project will be reported in California State Plane Coordinates, Zone 2, 1983 NAD horizontal datum and NAVD88 vertical datum. LUMOS will add the new survey data to the District's Crossing Profile workbook to monitor any profile changes. Changes in profiles exceeding five feet of lateral stream bank erosion or 2 feet of vertical change in stream bed elevation will be flagged for reporting by the District to LRQCB. Task 2— Stream Cross-Section Monitoring LUMOS will perform subsequent observations of the four established section lines, as stated above, at intervals of approximately 120 days and at the direction and approval of the District. All methods and specifications stated under Task 1 above will be followed for the subsequent observations. Hourly tes, Not to Exceed —Task : $2,600.00 Task 2: $1,900.00 each occurrence L�NIar�NLnq"iPrapesals I�7�2t Pr�pcsah A7!'498 TallacCr�,ek,Sevn°r Line Crossing',prcposal L2tt2r(Fxhlbit a) \<1 9�,,�8,docx September 21,221 Page 2 Schedule— Upon acceptance of this proposal, LU OS will complete the control recovery and initial observations within 2 weeks of your notice to proceed, weather permitting.. All work will be performed under the direction of a California licensed Professional Land Surveyor, license number L- 12 . Thank you for allowing Lumos and Associates to provide you with this proposal. Please do not hesitate to call me if you have any questions. Sincerely, Rick Byrem, PLS CA L- 129 Survey ProjectManager-Tahoe Office Cc: Greg Phillips,PLS,WRS,Director-Surveying Division Michael Craven, PLS,Staff Surveyor-Tahoe Office