Loading...
HomeMy WebLinkAboutTO#10 Final METERS6 LUMOS & ASSOCIATES, INC. TASK ORDER NO. 10 CONSULTING SERVICES This Task Order is made and entered into as of the 15th day of October 2021 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Lumos and Associates, Inc., hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated November 20, 2014, and as specifically hereinafter set forth, the parties do hereby agree as follows: 1. PURPOSE The purpose of this Task Order is to authorize and direct CONSULTANT to provide land surveying services to replace property corner monuments that have been distributed or removed by DISTRICT's Water Meter Installation Project, Phases 1- 513, located in the City of South Lake Tahoe, County of El Dorado, California. Z SCOPE OF WORK The scope of work for these services is contained in CONSULTANT's written proposal dated September 21, 2021. Said written proposal is attached hereto, marked as Exhibit"A", and incorporated herein by this reference as part of this Task Order. 3. STAFFING Rick Byrem, P.L.S., WRS, Project Manager shall be the responsible person in charge of the completion of the services performed under this Task Order. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4: TIME OF PERFORMANCE Tasks included in this task order shall commence on October 15, 2021 and shall be completed on or before December 31, 2021. 5. PAYMENT Payment to CONSULTANT for services performed under this Task Order shall be as provided in Article IV of the November 20, 2014, Master Agreement and shall not exceed the amount of Four Thousand Dollars ($4,000.00) unless the scope of work is changed, and an increase is authorized by DISTRICT. 6.: INSURANCE COVERAGE CONSULTANT's Errors&Omissions coverage shall be$1,000,000 aggregate with a deductible of not more than $100,000 for the duration of this Task Order. 1 7. EFFECTIVE DATE This Task Order No. 10 will become effective upon execution by both parties and shall serve as Notice to Proceed upon execution by DISTRICT. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Agreement to be executed the day and year first above written. South Tahoe Public Utility District October 15, 2021 n A. Thi , E., B.A. Approval Date Genera anager/ Engineer _n Attest. Melonie Guttry, Clerk of Boar LUMOS AND ASSOCIATES, INC. w October 18, 2021 Greg Phillips, Survey Manager Date P.L.S. License No. 7936 2 EXH I BIT Carson City-Fallon - Lake Tahoe- Reno www.L mos s.c i Lake Tahoe 225 Kingsbury Grade,Suite A I P.O. Box 3570 LUMOS Stateline, Nevada 89449 &A13,q0C1ATFS 775.588.6490 September 21, 2021 LA21.634 Mr. Jason Brand South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Via email: jbrand@stpud.dst.ca.us Subject.- Land Survey Proposal for Pippeity Corner Replacemeipts South Tahoe Public Utility District,South Lake rah , C Dear Jason: Lumos and Associates, Inca is pleased to provide you with this proposal for land surveying services to replace multiple property corner monuments that have been disturbed or removed by the District's water meter project. k Bln ffs n��n+�; The proposed project is within the service area of the South Tahoe Public Utility District (STPUD) in the South Lake Tahoe area of El Dorado County, California. It is our understanding that the scope of work for this project will be to ultimately replace as many as 163 such property corners currently identified by STPUD as needing replacement. We propose the following Scope of Services for the project. ft9Jr&,ScoDe—Initial Project Property Corner Replacement-Group 1 Lumos and Associates, Inc. (LUMOS) will perform a field survey to replace five specific property corners along Skyline Drive in Tahoe Paradise Unit No. 14. The corners to be replaced are identified on the spreadsheet provided by STPUD as having APN numbers 081072014, 081072011, 081072005, 081083002 and 081081003. One corner at each location, as specified on said spreadsheet, will be replaced and monumented in accordance with the requirements of the California Land Surveyors Act. Upon completion of the field work, a single Record of Survey drawing will be prepared for review by the El Dorado County Surveyor and for recording with the El Dorado Recorder to allow for the most accurate record of each individual property corner replacement. These initial corners have been identified to serve as a "pilot"project for the replacement of these specific corners only. Upon completion of the initial project, review by both LUMOS and STPUD will occur to evaluate the cost and the procedures involved for the purpose of addressing additional work. Lump for Group 1: , . EXHIBIT A EXHIBIT A September 21,2021 Page 2 Schedule Based upon our current workload, LUMOS will be able to complete the field survey, including placement of the new lot corners, no later than Friday, November 5, 2021. Submittal of the final Record of Survey to the El Dorado County Surveyor for review will occur within approximately 30 days thereafter. All work will be performed under the direction of a California licensed Professional Land Surveyor, license number L-9129. Thank you for allowing Lumos and Associates to provide you with this proposal. Please do not hesitate to call me if you have any questions. Sincerely, Rick Byrem, PLS CA L-912 Survey Project Manager-Tahoe Office Cc:Trevor Coolidge,PE,Senior Engineer,South Tahoe PUD Greg Phillips,PLS,WRS,Director-Surveying Division Michael Craven, PLS,Staff Surveyor-Tahoe Office www.Lurnos1nc.com EXHIBIT A