Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025.12.04 Attachment to Agenda Item 6d
1 RESOLUTION NO. 3324-25 2 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT AUTHORIZING AND DIRECTING ITS STAFF 3 TO REQUEST THE REVOCATION OF CERTAIN SURFACE WATER RIGHTS 4 WHEREAS, the South Tahoe Public Utility District ("STPUD") currently holds water 5 rights A018021, A018030, A018031, A018038, A018039, and A019629, originally 6 acquired from Tahoe Paradise Water Company, allowing for diversions from the Upper Truckee River, Coyote Creek, and an unnamed tributary to Saxon Creek; 7 and 8 WHEREAS, STPUD has never developed facilities to divert, treat, or distribute water 9 under these water rights, and intake, treatment, and distribution infrastructure do 10 not exist; and 11 WHEREAS, due to water quality, quantity, and environmental constraints, it is not 12 cost-effective or practical to exercise these water rights, and the District is instead 13 pursuing a water right under A023393 to Lake Tahoe for 10,808 acre-feet; and 14 WHEREAS, in accordance with Water Code and State Water Resources Control 15 Board regulations, STPUD may request the revocation of water rights that are no longer used and for which the reservoir or diversion facilities are incapable of 16 storing or diverting water; 17 NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of South Tahoe Public 18 Utility District hereby: 19 (1) Authorizes and directs the Staff to submit to the State Water Resources Control 20 Board six (6) Requests for Revocation of Water Rights (A018021, A018030, A018031, 21 A018038, A018039, and A019629) on behalf of the District, true and correct copies of which are attached hereto as exhibits 1 through 6. 22 23 (2) Requests full revocation of these water rights on the grounds that the reservoirs or diversion facilities no longer exist or are incapable of storing or diverting water 24 and no water is used under these rights. 25 (3) Waives Districts hearing and notice rights otherwise required for the processing 26 of the requests for resolution stated herein. 27 (4) Directs Staff to take any and all actions necessary to effectuate the revocation 28 of these water rights. WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3324-25 was duly and regularly adopted and passed by the Board 1 of Directors of the South Tahoe Public Utility District at a Regular meeting held on the 4th day of December, 2025, by the following vote: 2 3 AYES: 4 NOES: 5 ABSENT: 6 7 Shane Romsos, Board Vice President South Tahoe Public Utility District 8 9 ATTEST: 10 Melonie Guttry, Executive Services Manager/ Clerk of the Board 11 South Tahoe Public Utility District 12 Attachments 13 Exhibit 1: A018021 14 Exhibit 2: A018030 Exhibit 3: A018031 15 Exhibit 4: A018038 Exhibit 5: A018039 16 Exhibit 6: A019629 17 18 19 20 21 22 23 24 25 26 27 28 Resolution No.3324-25 Page 2 December 4,2025 Exhibit 1 0, �5OURCea STATE OF CALIFORNIA SURIM4 co THE RESOURCES AGENCY STATE WATER RESOURCES CONTROL BOARD Wa sibM DIVISION OF WATER RIGHTS r d&0 License For Diversion and Use of Water • C'Q�IFORN�P 18021 13526 �� �� APPLICATION PERMIT LICENSE TAHOE PARADISE WATER AND GAS COMPANY THIS IS TO CERTIFY, That P. O. BOX '11117,- TAHOE' PARAD ISEp` CAI.I FORN IA 95705 HAS made proof as of JU NE 10, 1971 (the date of inspection) to the satisfaction of the State Water Resources Control Board of a right to the use of the water of AN UNNAMED CREEK IN EL DORADO COUNTY tributary for SAXON CREEK THENCE TROUT CREEK THENCE LAKE TAHOE for the purpose of DOMEST IC USE under Permit 13526 of the Board and that the right to the use of this water has been perfected in accordance with the laws of California, the Regulations of the Board and the permit terms, that the priority of this right dates from FEBRUARY 28, 1958 and that the amount of water to which this right is entitled and hereby confirmed is limited to the amount actually beneficially used for the stated purposes and shall not exceed TWENTY—SEVEN HUNDREDTHS (0.27) CUBIC FOOT PER SECOND, TO BE DIVERTED FROM JANUARY 1 TO DECEMBER 31 OF EACH YEAR. THE MAXIMUM AMOUNT DIVERTED UNDER THIS LICENSE SHALL NOT EXCEED 124 ACRE—FEET PER YEAR. THE POINT OF DIVERSION OF SUCH WATER 13 LOCATED: SOUTH 14°35157" EAST 821 .41FEET FROM N1/4 CORNER OF SECTION 33, T12N, RUE, MDB&M, BEING WITHIN NW1/4 OF NE1/4 OF SAID SECTION 33. A DESCRIPTION OF LANDS OR THE PLACE WHERE SUCH WATER 15 PUT TO BENEFICIAL USE 13 AS FOLLOWS: WITHIN SECTIONS 19, 28, 29, 30, 31, AND 32, T12N, R18E, MDB&M; SECTIONS 5, 61 AND 81 TUN, R18E, MDB&M, AS SHOWN ON MAP FILED WITH STATE WATER RESOURCES CONTROL BOARD. THE TOTAL AMOUNT OF WATER APPROPRIATED BY DIRECT DIVERSION UNDER THIS LICENSE TOGETHER WITH THAT DIVERTED UNDER PERMITS 13527, 13528, 13529 AND 13530 (APPLICATIONS 18030) 18031, 18038 AND 18039) SHALL NOT EXCEED 345 ACRE—FEET IN ANY CALENDER MONTH OR 21360 ACRE—FEET IN ANY YEAR. • WRCB 16-1 (3.73) 11460-989 8-79 1.500(D OSP J^ Licensee shall allow representatives of the Board and other-parties, as may be authorized from time to time by the Board,reasonable access to project works to determine compliance with the terms of this license. All rights and privileges under this license, including method of diversion, method of use and quantity of water diverted are subject to the continuing authority of the Board in accordance with law and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said water. ; IF ----------------- Reports shall be filed promptly by licensee on appropriate forms which will be provided for the purpose from time to time by the Board. _ lands- lace o use hereon p p of diversion The right hereby con ono.the version.a date r is restricted right Jy fume t � Ovate tot point or points herein specified,and tot p f, ribed. This license is ranted and v subject to the following_ g licensee accepts all rights he conf�rmed�subject f ng provisions of the Water Code: Section 1625. Each license shall be in such form and contain such,terms as,may be prescribed,by the Board. Section 1626. All licenses shall be under the terms and conditions of this division (of the Water Code). Section 1627.` A license 'shall'be effective for su-ch time as the water attuA}1y appropriated under it is used for a useful and ' beneficial purpose inconformity with this division I(of the Watet Code) but no longer. Section 1628. Every license shall include the enumeration of conditions therein which in substance shall include all of the provisions of this article and the statement that any appropriator of water to whom-a license is issued takes the license subject to the conditions therein expressed. _ - r " Section 1629. Every licensee if he accepts a license does so under the conditions precedent that no-value whatsoever in excess of the actual amount paid to the State therefor shall at any time be assigned to or claimed for an license granted or issued udder the provisions;of this division (of tie,Water Code), or,for aoY Vghts granted or acquired uncy}e;the provisions•of this.division (,of the Water Code), in respge�ct to--th regu tion y any comp tent ubli,`authority of the services or tthhe price of the setvic6s-to`be-rendered by'any h6etisee�or fiy the holder of Any rightvgranted or acquired under theC provisions,of this division (of the Water Code) or in respect to any valuation for purposes of sale to orpurchase,whether through condemnation proceedings or otherwise, by the State or any city,city and county,municipal water district, irrigation district,lighting'district, or any political subdivision of the State, of the rights and property of any licensee, or the possessor of any rights granted, issued,or acquired under the provisions;of-,this divxsjon,(;of the Water,Qgde). ,, Section 1630: At any,time-after the expiration of twenty=ydars'after,the-_granting of-a,license„the State,.or any city, c�iy and county,municipal water_district, irrigation,district, lighting district, or any political subdivision of the State-shad have the right to purchase the works and property occupied"and used under'the license and the 'works'built or constructed for the enjoyment of the rights granted under the-license. Section 1631. In the event that the State, or any city, city and county, municipal water district, irrigation district, lighting district, or political subdivision of the State so desiring to purchase and the owner of the works and property cannot agree upon the purchase price, the price shall be determined in such manner as is now or may hereafter be provided by law for determining the value of property taken in eminent domain proceedings. Dated: '`�i' 19 1976 STATE*WATER RESOURCES CONTROL BOARD Ui• � �0 Chie f,Division o /10 Odr Exhibit 2 t FILE IN DUPLICATE For full information concerning the filling out of this form refer to Article 4 of Rules and Regulations Pertaining to Appropriation of Water] STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application No.-----IMQ-------Filed -----Mreh_64_195_8_s----------------- (Applicant must not fill in the above blanks) APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER l ee _rs Water Cam Notice of AstignOnt Meet) I► - -- - - --------------- - - - - - -- - - --- - -- --- -------- - _— Name of applicant or applicants of---------------I±qyg -------------------------------------------------------------------------------------------------------------------County of ------ Address State of------California_____________________________________________________________do hereby make application for a permit to appropriate the following described.unappropriated waters of the State of California, SUBJECT TO VESTED FJGHTS: Source, Amount, Use and Location of Diversion Works 1. The source of the proposed appropriation is---------wed----S�-try' -------------------------------------------------------------------------------- Give name of stream,lake,etc.,if named;if unnamed state nature of source and that it is unnamed located in-----n_DQ -----------------County, tributary to------UP_Fer__ C1L0e__EYeL------------------------------------------- 2. The amount of water which applicant desires to appropriate under this application is as follows: (a) For diversion to be directly applied to beneficial use-----------------3*e0------_---—_--------------------------------------cubic feet per 1 cubic foot per second equals 40 statute miner's inches or 646,317 gallons per day second,to be diverted from---------- ----d y_--1------------------------------to------------3 ea-e—e blex-_1.---------------------of each year. Beginning date Closing date (b) For diversion to be stored and later applied to beneficial use------------------------------------------_--------_---—____—___acre-feet 1 acre-foot equals 321,951 gallons per annum, to be collected between--------------------------------------------------------and_------------------------------------------- -----_of each season. Beginning date - Closing.dap NOTE.—Answer (a) or (b) or both (a) and (b)as may be necessary.If amount'under (a) is less than.02 f cubic foot per second,state in gallons per day.Neither the amount nor the season may be increased after application is filed.If underground storage is proposed a special supplemental form will be supplied by the State Water Rights Board upon request. 3. The use to which the water is to be applied is---------------------Domestic-------------------------------------------------------------------- __----_-- Domestic,irrigation,power,municipal,mining,industrial,recreational ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------purposes. 4. The point of diversion is to be located----165_'___0'j_r____' '_'__E__�II__ t.-_ _W-4onller-of__swt.on— State bearing tad distance or coordinate distances from section at quarter section comer --------------3C-o—` M-- BS being within the---- --Of ---- ---- -- —-- - --- -- ---------------- ----------------------------------------- State 40-sere subdivision of public land survey or projection thereof of Section--30-------, T-----.12N____, R._18E-------s ------ & M., in the County of----------F-I-I)o_XAOQ------------------- S. The main conduit terminates in------ ----------------of Sec-----------.----, T.-_-=------------- R.-___----------- ------------------B. & M. State 40-acre subdivision of U.S.Government survey or projection,thereof Description of Diversion Works NOTE.—An application cannot be approved for an amount grossly in excess of the estimated capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) (a) Diversion will be made by pumping from--------------------- ----------------------------------------------------------------------- Sump,offset well,unobstructed channel,etc. (b) Diversion will be by gravity,the diverting dam being_____________________________________________._-__-feet in height (stream bed to level of overflow)_--------------------------------feet long on top; and constructed of----------------------------------------------------------------------- Concrete,earth,brush,etc. (c) The storage dam will be----------------------------------feet in height (stream bed to spillway level);------------------_------------feet long on top; have a freeboard of--------------------------------feet, and be constructed of----------------------------------------------------_______�� Concrete,earth,etc. 7. Storage Reservoir----------------------------------------------------------------------------------------- Name The storage reservoir will flood lands in---------------------------------------------------------------------------------- -------------_ _—_---__---- Indicate section or Sections,also 40-acre subdivisions unless shown upon map It will have a surface area of------------------------------------acres,and a capacity of------------------------------------acre-feet. 1W In case of insufficient space for answers in form,attach extra sheets at top of page 3 and cross reference. FORM I 8. Conduit System (describe main conduits only) Done, water will be ptuped directly into mains (a) Canal,ditch,flume: Width on top (at water line)_______—_____________feet; width at bottom______________________________ Cross out two not used feet; depth of water-----_--------—_-_____feet; length---------------------------feet; grade_-------------------------feet per 1,000 feet; materials ofconstruction--------------------------------------------------------------------------------------------------------------------------- --------------------------------------- Earth,rock,timber,etc. (b) Pipe line: Diameter---------------------------inches; length----------------------------------feet; grade----------------------------------feet per 1,000 feet; total lift fall from ,_intake to outlet------------------------feet; kind-- --------------------------------------------------------------------------------- Riveted steel,concrete,wood-stave,etc. NoTa-If a combination of different sizes or kinds of conduit is to be used,attach extra sheets with complete description,also show location of each clearly on map. 9. The estimated capacity of'the diversion conduit or pumping plant proposed is-----1 __Cx_@__________________________________________ State cubic feet per second or gallons per minute The estimated cost of the diversion works proposed is--------- ------------------------------------------------------------------------------------------ Give only cost of intake, or headworks, pumps, storage reservoirs and main conduits described herein Completion Schedule 10. Construction work will begin on or before------------------ June-lj _962----------------------------------------------- Construction work`will be completed on or before---------------- _ -------aTw&_des.-_1 -;------------------------------------------------ The-water will be completely applied to the proposed use on or before---J UM__;.j*---1%5----------------__---.____-__________-______-_______ Description of Proposed Use 11. Place of Use. fe-----aupplemixt:---------------------------------------------------------------------------------------------------- State 40-acre subdivisions of the public land survey.,If area is unsurve"d indicate the location-u.if lines of the public land ----------------------------------------------------------- survey were projected. In the case of irrigation we state the number of acres to be irrigated in each 40-acre tract, if space permits. If space does not permit listing of all ------------------------------------------------------------------ -------------------------------------------—--------------------------------- 40-acre tracts,describe area in a general way and show detail upon map. - Do(es) applicant(s) own the land whereon use of water will be made?---------20------_----------- jointly?-------------------------- LAIC joint owners should include their names as applicants and sign application at bottom of third page. Yes or No Yes or No ___ _s2Y 1 d_is tinder_,�i�#, il-#t4 T13h4� $�B61M8 --V w. _p a n =spany- ;If applicant does not own land whereon we of water will be made,give name and address of owner and state what arrangements have been made with him. 12. Other Rights.Describe all rights except those on file with the State Water Rights Board under which water is served to the above named lands. Nature of Right Year of First Use Use made in recent years Season-of Use Source of Other Supply (riparian,appropriative,purchased water,etc.) including amount if known - 1. 2. 3. 4. Attach supplement at top of page 3 if necessary. 13. Irrigation Use. The area to be irrigated is------------------------------------------------------------------------=--------------------------------------acres. State net acreage to be irrigated The segregation of acreage as to crops is as follows: Rice-------__________________________------acres; alfalfa-_____-------___------------------acres; orchard-------- - - =------------acres; general crops--------—------------------------------acres; pasture-----------------------—------------acres. NorE.—Can should be taken that the various statements as to acreage are consistent with each other,with the statement in Paragraph 11,and with the map. The irrigation season will Begin about—-------------------------------------------------------and end about---------------------------------------------------------- Beginning date Closing date 14. Power Use. The total fall to be utilized is---------------------------------------------------------.-----------------_-----------------------------------feet. Difference between nozzle or draft tube water level and first free water surface above The maximum amount of water to be used through the penstock is_:____-___----------------------A__---------�___-cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is---—----_------------ ----------------______--_horsepower. Second feet X fall_s.s Theuse to which the power is to be applied is------------------------------------------------------------------------------------------------------------------------------- For distribution and sale or private we,etc. The nature of the works by means of which power is to be developed is-------------------------------------------------------------------------------_.._.. Turbine,Pelton.what.etc..-. The size of the nozzle to be used is___--------------------inches. The water will be returned to----------------------- in------------------ willnot -------------------------------------------- ---------------------------------------_.of Name stream State40-sere subdivision - Sec-------------------------s T. - - -, R• t B. &M. t s r RECEIVED NOTICE OF ABIGNMENT TO TtL � l3�sa� Supplement to Paragraph 11 SWV of Section 19; S1- of NE' of Section 21 • SE; of Section 21; V n.T of S14 and S'v'41 of LT1.1 of Section 22- id- of N?du and ITIVI41 of Si�'1 of Section 27• 1421 S11- and N- of .SE-� of Section 25; 1,1120 SEu and ►S� of avTE of Section 29; Section 30; ?d and SE��- of Section 31; and W of Section 32, all in T12N, RISE, Pr;DB&.M; V1 of Section 5; NE! and E: of SE4 of Section 6; E2 of NE and Ez of SE1 of Section 7; 1'12 of Section S; `�J2, tv of ?,T and W of SE-1- of Section 17; and N: of Nid and i�'I�T—� of NE'1 of Section 20; all. in TlIN, RISE, riDB.;r�i; Ez of M?y of Section- 25; NEI of Section 25; and the NE;} of Section 36, all in T12N, R17E, MDB . CONFORMUNG TO Supplement to Paragraph 11 A place of use 2s follows: SG71 of Section 19; SE- and Sa of NE4 of Section 20; W2 of SWu and sw of NW4 of Section 22; � of Nw and NV of SW,i—, of Section 27; N2, Swdµ and N1 of SEu of Section ^c8; W2, SE and S2 of NEB of Section 29; Section 30; N2, and SEA of Section 31; and W2 of Section 32, all in T12N, R18E, MD of Section 5; TF. and E2 of SE4L of Section 6; E1 of NEl and E2 of .SEu of Section 7; W1 of Section 8; W2, of NE,—� and 672 of SE—. of Section 17; and Nz of NWu and NW of NE4� of Section 20; all in T111N, R18E, MDB&M; SE' of Section 25 and SE1 of Section 36, both in T12N, R17E, MDB&M. ' �+ CONFORMING TO ORDER Exhibit 3 r s r FILE IN DUPLICATE For full information concerning the filling out of this form refer to l (Article 4 of Rules and Regulations Pertaining to Appropriation of Water) STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application No.-_--18031 __Filed.----------Iftrch_6, 1958, ---- _at--�:19_-P.-M. - - --------- (Applicant must not fill in the above blanks) APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER Nora of Wipmeni ('Over) Is ----------------Meyers_Water-Comny--------------------------------------------------------------------------------------------------------------- Name of applicant or applicants of------------------------)ft7er&---------------------------------------------------------------------------------------------------------County of---- --Sl_Dorado_ Address State of------------ f02'T► a------------------------------------------------------- do hereby make application for a permit to appropriate the following described unappropriated waters of the State of California,SUBJECT TO VESTED RIGHTS: Source, Amount, Use and Location of Diversion Works 1. The source of the proposed appropriation is...............Upper Truckee River Give name of stream,lake,etc.,if named;if unnamed state nature of source and that it is unnamed located in------El Ikbra40 -------------County, tributary to -Lake T&hoe - - ------------------------------------ ------------------- 2. The amount of water which applicant desires to appropriate under this application is as follows: (a) For diversion to be directly applied to beneficial use_______3-:40_-------------------_-------------------------------------cubic feet per l cubic foot per second equals 40 statute miner's inches or 646,317 gallons per day second,to be diverted from---- ------.alas UaXY---I---------------------------------to--------- _31.---------------------of each year. Beginning date Closing date (b) For diversion to be stored and later applied to beneficial use------_----_______________________________________________—____acre-feet I acre-foot equals 321,811 gallons per annum, to be collected between-----------------------------------------------------and------------—-----------------------------_----of each season. Beginning date Closing dam NoTE.-Answer (a) or (b) or both (a) anal (b) as may be necessary.If amount under (a) is less than.025 cubic foot per second,state in gallons per day.Neither the amount nor the season may be increased after application is filed.If underground storage is proposed a special supplemental form will be supplied by the State Water Rights Board upon request. 3. The use to which the water is to be applied is-------------------..__Doze stic Domestic,irrigation,power,municipal,mining,industrial,recreational -------------------------------------------------------------------------------------------------------------------------------------------------------------_.purposes. 4. The point of diversion is to be located- �§'__55_'__W 1320.E _feet from NE corner of Section 31., State bearing and distance or coordinate distances from section or quarter section earner. -- ;- - --------------- ---- ----------- ----_--_- being within the--- --QL ----_------ State 40-acre subdivision of public land survey or projection thereof of Section----_U-----, T. I----- R.-I.8S'-------a ------------X.D.---B. & M., in the.County of--------- - El Drado — S. The main conduit terminates in--------------------------------of Sec.----------------, T-------------'---s R•---------------s ----=--—- ---B: & M. State 40-acre subdivision of U.S.Government survey or projection thereof Description of Diversion Works NOTE.—An application cannot be approved for an amount grossly in excess of the estimated capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) (a) Diversion will be made by pumping from---------------------SUMP--------------------------------------------------------------- -------- sump,offset well,unobstructed channel,etc. (b) Diversion will be by gravity,the diverting dam being-----------------------------------------_---------feet in height (stream bed to level of overflow)_______________________________feet long on top; and constructed of------------------------------------_---_------_----_------_-_- Concrete,earth,brush,eta. (c) The storage dam will be----------------------------------feet in height (stream bed to spillway level);--------------------------------feet long on top; have a freeboard of--------------------------------feet, and be constructed of----------------------------------------------------_----_____�_ Concrete,earth,etc. 7. Storage Reservoir----------------------------------------------------------------------------------------------------------------------------------------------- -- Name The storage reservoir will flood lands in------------------------------------------------------------------------------------------------- ----- Indicate section or sections,also 40-acre subdivisions unless shown upon map It will have a surface area of------------------------------------acres, and a capacity of------------------------------------acre-feet. W In case of insufficient space for answers in form,attach extra sheets at top of page 3 and cross reference. FORM 1 8. Conduit System (describe main conduits only) None, Water will be pumped directly into bins (a) Canal,ditch,flume: Width on top (at water line) width at bottom-----------------------------— Cross out two not used feet; depth of water--------__—___----------feet; length-------------------------__feet; grade__-------------------------feet per 1,000 feet; materials ofconstruction------------------------------------------------- ---------------—----------------------------------------------------------------------------------------------- Earth,rock,timber,etc. (b) Pipe line: Diameter-------------------------inches; length----------------------------------feet; grade----------------------------------feet per ll 1,000 feet; total fa from intake to outlet------------------------feet; kind-------------------------------------------------------------------------------------------- lift Riveted steel,concrete,wood-stave,etc. NoTE.—If a combination of different sizes or kinds of conduit is to be used, attach extra sheets with complete description, also show location of each dearly on map. 9. The-estimated capacity of the diversion-conduit or pumping plant proposed is---------3QD__CYS--------------------------______-__ State cubic fat per second or Sallow per minuet The estimated cost of the diversion works proposed is___----—__: ---------------------------------------------------------------------------- Give only cost of intake, or headworks, pumps, stonae reservoirs and maia conduits described herein Completion Schedule 10. Construction work will beginon or before-------_--------------------- - ------------------------------------------ Construction work will be completed on or before---------------- :______-_ --------------June--1;---1�1----------------------------------•----•--�- The water will be completely applied to the proposed use.on or before--------- L---]9_63------------------------------------------------ Description of Proposed Use 11. Place of Use: -_______ See Supplement. ---- -- - - -------- ----- ---------- State 40-acre subdivisions of the public land survey. If area is uneurveyed indicate the location a if lines of the public land --------_------------------ ------------------------------ survey were projected. In the case of irrigation use state the number of acres to be irrigated in each 40-acre tract, if space permits. If space does not permit listiog of all ---------------------------------------------------- -------------------------------------------- - ----—-------—---—------------------- 40-acre tracts,describe area in a general way and show detail upon map: - Do(es) applicant(s) own the land whereon use of water will be made?----------_.._N�------------- Jointly?_________YeS-______________ Yea or No Yes or No kit joint owners should include,their names as applicants and sign application at bottom of third page. Most of! #, _ �,ac under_9t3on_to woe paradise Homes, the__W.rent_-QQn_RUy1 If applicant does.not own land whereon use of water will be made,give name and address of owner and state what arrangements have been made with him. - - 12. Other Rights. Describe all rights except those on file with the State Water Rights Board under which water is served to the above named lands. Nature of Right Year of First Use Use made in recent years Season of Use Source of Other Supply (riparian,appropriative,purchased water,etc.) including amount if known 1. 2. 3. 4. Attach supplement at top of page 3 if necessary. 13. Irrigation Use. The area to be irrigated is---------------------------------------------------------------------------------------------------------------- _______-________________-____________acres. State net acreage to be irrigated The segregation of acreage as to crops is as follows: Rice----------------------------------------acres; alfalfa_------------_-------------------__acres; ----acres; general crops----------------------------------------acres; pasture----------------------------------------acres. NoxE.--Care should be taken that the various statements as to acreage are consistent with each other,with the statement in Paragraph 11,and with the map. The irrigation season will begin about-----------------------------------------—-------------and end about---------------------------------------------------------- Beginning date Closing date 14. Power Use. The total fall to be utilized is-------------------__-------------------- --------------------------------------------------------------------feet. - Difference between nozzle or draft tube water level and first free water surface above The-maximum amount.of water to be used through the penstock.is---------------------------------------_---------__----cubic feet per.second. The maximum,theoretical horsepower capable of being generated,by the works is----_-----------------_------------—__----------horsepower. Second feet X fall_is The use to which the power is to be applied is-------------------------_ ---------------------- -------------------------------------------------------------------------------- For distribution and sale or private we.etc. The nature of the works by means of which power is to be developed is-----------------------------------------------------------------------------------___ ... - - Turbine,Patton wheel,,etc. The size of the nozzle to be used is------------------------inches. The water will be returned to_____ — — -- m - - ----.Of will not Name stream State 40-acre subdivision aSec-------------------------- T---------------------- R.------------------------• -----------------------B. &M. a " �' v��EtvED NOTICE OF ASSI%IMENT 10 Supplement to Paragraph 11 S14 of Section 19; S1 of NE- of Section 21 SE4 of Section 21; v.,2 of S11 and S:T,� of N1W4 of Section 22- WTZ of NWT,' and Mftll of SWJ,-, of Section 27• 111- S,,44 and N! of SE-�� of Section 28; Wd,, SEj and S2 of M- of Section 29; Section 30; Nz and SE-,- of Section 31; and W of Section 32, all in T12 J, RISE, XDBUM; W2 of Section 5; NEI, and E2 of SE! of Section 6; Ez of NE� and EZ of SEA of Section 7; W�T2 of Section 8; W'j2, WT, of NE-L and W? of SE-j of Section 17, and NZ of NWJ4 and Nn4' of NEl of Section 20; all in MIN, RISE, DIDB&r111; EZ of NW%T of Section 25; NE,z-,- of Section 25; and the NE,} of Section 36, all in T12N, R1'7E, TOB&M. f -;4CONFORMUNG TO Onp, OF Supplement to Paragraph 11 A place of use as follows: St•�;�, of Section 19; SEu and S7 of NE4 of Section 20; W2 of SWu and SWI of NVT=. of Section 22; 4 of Nw and NW4 of SW4 of -- Section 27; Nz, SW, and N1 of SEZ of Section 28; W-, SE;, and S2 of NEu of i i _ Section 2 — Section 1• and W of S 3 , and E— of Sec i 0• a S ' n Section N 3 2 Sectlo 29 S 3 , �. all in T12N, R18E, NDIDB&M;2W�157 of Section: 5; NE1 and E2 of SE' of Section 6; E� of NE1 and E2 of SE,1 of Section 7; W7 of Section 8; Td-2, W2 of NE,— and W- of SE,—�� of Section 17; and N2 of NWu and NW-4 of NE of Section 20; all in. TllN, R18E, NMB&M; SEu of Section 25 and SE1 of Section 36, both in T12N, R17E, ICBM. CONFOWAING TO ORDER OF,-- G'Z it i FORM 61-A IMI'ORRANT [Please Read Carefully] 1. Note the terms and conditions of this per7nit. Construction work must be prosecuted, and the water applied to the beneficial uses intended with due diligence. Annual reports of progress will be expected from you upon forms which will be furnished for the purpose. When the water has been fully applied to the beneficial uses intended the Water Code requires that you notify the State Water Rights Board thereof. 2. Neither this application nor the permit is a water right, but if the terins and conditions of the permit are observed a water right can be obtained through beneficial use of the water--the extent of the right to be determined by a field inspection which will be made by a representative of the State Water Rights Board. 3. No change in point of diversion, or place of use or character of use, can be made under this application and permit without the approval of the State Water Rights Board. 4. If the rights wider this permit are assigned immediate notice to that effect with the name and address of the new owner should he forwarded to the State Water Rights Board, Sacramento, California. S. Please advise inzvnedmtely of any change of address. Until othersvise advised communications will be sent to the address used in the letter transmitting this permit. )613G 3-60 2M CFO APPLICANT MUST NOT FILL IN BLANKS BELOW PERMIT No. 13 528 This is to certify that the application of which the foregoing is a true and correct copy has been considered and approved by the State Water Rights Board SUBJECT TO VESTED RIGHTS and the following limitations and conditions: 1. The amount of water,appropriated shall be limited.to the amount which can be beneficially used, and shall not exceed 3 cubic feet per second to be diverted from January 1 to December 31 of each year. 11 2. The maximum amount herein stated may be reduced in the license if investigation so warrants. ( 0OOQo06) 3. Actual construction work shall begin on or before July 1, 1962, ' ° and shall thereafter be prosecuted with reasonable diligence,and if not so commenced and prosecuted this permit may be revoked(WOO 07) 4. Said construction work shall be completed on or before December 1, 1968. ro00 �©�J S. Complete application of the water to the proposed use shall be made on or before December 1., 1970.(60ol W5) 6. Progress reports shall be filed promptly by permittee on forms which will be provided annually by the State water Rights Board until license is issued. QDDO/0) 7. All rights and privileges under this permit including method of diversion,method of use and quantity of water diverted are subject to the continuing authority of the State Water Rights Board in accordance with law.and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said water. `0 do Po/Z� 8. Permittee shall'allow representatives of the State Water Rights Board and other parties, as may be authorized f om time to time by said Board, reasonable access to project works to determine compliance with the terms of this permit. (00MD 10 9. The total amount of water appropriated by direct diversion under this application and Applications 18021, 18030, 18038, and 18039 shall not exceed 345 acre-feet in any calendar month or 2,360 acre-feet in any year. cdwa1/4) 10. Permittee shall bypass the following quantities of water into the natural stream bed of the Upper Truckee River at all times: (a.) During the months of April, May, and June, 75 cubic feet per second or the total flow of the stream, whichever is less: (b) During July, a flow decreasing gradually from 75 cubic feet per second or the total flow of the stream, whichever is less, to 15 cubic feet per second or the total flow of the stream, whichever is less. The reduction caused by the permittee shall not be greater than 5 cubic feet per second in any one 1.day. ' (c) During the remainder of the year, 15 cubic feet per second or the total flow, whichever is less. �DI 0+00) This hermit is issued and Permittee takes it subject to the following provisions of the Water Code: Section 1390. A permit shall be effective for such time as the water actually appropriated under it is used for a useful and beneficial purpose in con- formity with this division (of the Water Code),but no longer. Section 1391. Every permit shall include the enumeration of conditions therein which in substance shall include all'of the provisions of this article and the statement that any appropriator of water to whom a permit is issued takes it subject to the conditions therein expressed. 1 Section 1392. Every permittee,if he accepts a permit,does to under the conditions precedent that no value whatsoever in excess of the actual amount '( paid to the State therefor shall at any time be assigned to or claimed for any permit granted or issued under the provisions of this division (of the Water Code),or for any rights granted or acquired under the provisions of thisidi3ton (of the Water Code),in respect to the regulation by any competent public authority of the services or the price of the services to be rendered by.any Permittee or by the holder of any rights granted or acquired under the provisions of this division (of the Water Code)or in respect to any valuation for purposes of sale to or purchase,whether through condemnation proceed- ings or otherwise,by the State or any city,city and county,municipal water district,irrigation district,lighting district,or any political subdivision of the State,of the rights and property of any permittee,or the possessor of any rights granted,issued,or acquired under the provisions of this division (of the Water Code). APR , 2 q 1962 Dated: STATE WATER RIGHTS BOARD I L. K. Ei11 Executive ..Officer 1 S. Municipal Use. This application is made for the purpose of serving.-_____--_•___-___•______________________________________________--.__..____. Name city orcities,.town or towns.Urban areas only ,. ---------------------------------------------------------------__--------------------------------------having a present population of------------------------------------------ estimated average daily consumption during the month of maximum use at the end of each five-year period until the full amoUht applied for is put to beneficial use is as follows: �_ - - --- --- -- - - - - _ - —------------------------------------------------------------_-- 1.6. Mining Use: The name of the rinining property to be:served is:------_-_---:_-:---------• •__-- -----_�-----..-_-------_--- — Name of claim - ---— ---- -- ------------ ---------------and the nat: of the mines is_ -- - . Gold placer,quartz,etc. Themethod of utilizing the water is----------------------------------------------------------------------------------------------------------------------------------------------- It is estimated that the ultimate water requirement for this project will be__ ------___ Cubic feet per second,gallons per minute.State basis of estimate The water will be polluted by chemicalsr otherwise.-----------------------------_.,___--__----------------------------------------------------------------- o will not Explain nature of pollution,if any and it will be returned to-------------------------------- -----------------------------------of -------------------------------------.ill.------------------------------ will not Name stream State 40-acre subdivision Sec----------- ---------, T. - -- --r R. a B...,&t.M. 17. Other Uses. The nature of the use proposed is _DOmestie ser*iee•to_a gross_area of Induiiriaf,ricreational;doinertic,stockwatering,Stb culture,etc. ---- State basis of determination of amount needed, -_:fit--3s__esil7�tted_ YiL ., he 6x'e8 tA_be_-sz'vd__Wi11______ Number of persons;reiidegceggarea of-dorn0tic Ihwas and gardens,number and kind of stock,type .— ��� _�ver�'� --�pulaton-o�__'��_4_�--pets©ns_-r�guirin�l.�--cubic-Yeet__per second�. ladusorial use,and unit requirements -------------------- - --- r—-------------------- — __—_., -' --`-----' - -- ^_--------'------_-__—'-__-----_—.__..._—�___----- General 18. Are the maps as required by the,Rules and Regulations filed with Application? _-_-:_3reS.__------------------------- If not, Yes or No state specifically the time required for filing same--------------------------------------------------------------------------- ----------------- — 19. Does the applicant own the land at the proposed point of'diversion?--.:__-.__..Y1Cd_ -------r_-_, If not, give name and Yes or No ` Land is under option address of owner and state what steps have been taken to secure right of access thereto________________________________._________—______.___ to Tahoe Paradise Homes, the parent Co^manr. _ 20. What is the name of the post office most used by those living near the proposed point of diversion? __Meyers, California - --- 21. What are the names and addresses of claimants of water from the source of supply below the proposed point of diversion? none known -- ---_ - -- ---—--------------------------- --------------------- --------------------- —---- -- - — - - - /s/ Jim A. E. Wilson, President Meyers Water Company. [SIGNATURE OF APPLICANT]_ - - - - -- - --------- ------------------------------------- Exhibit 4 FILE IN DUPLICATE For full information concerning the filling out of this form refer to Article 4 of Rules and Regulations Pertaining to Appropriation of Water) I STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application No.__ A9 -------Filed--____--March 13t--1958s_____________at--3.55_P•_M. (Applicant most not fill in the above blanks) APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER Not;-e of Assignment ('Over) Meyers Water ComlMY—�---—----- ----- -- —---- -- ----------- Name of applicant of_— -----—Meyers —��__ _ --------------------------------County of— El Dorado — Address State of_--__ California do hereby make application for a permit to appropriate the following described unappropriated waters of the State of California, SUBJECT TO VESTED RIGHTS: Source, Amount, Use and Location of Diversion Works 1. The source of the proposed appropriation —___— Give name of stream,lake,etc.,if named;if unnamed state nature of source end that it is oanamed located in__— 'RI IDDM.A___County, tributary to------Take TabDe___________—____ 2. The amount of water which applicant desires to appropriate under this application is as follows: (a) For diversion to be directly applied to beneficial use___________! __ ---_—_cubic feet per I cubic foot per second equals 40 statute miner's inches or 646,317 gallons par day second, to be diverted from_—___sl_§4�1 ------ December_ of each year. Beginning date Closing date (b) For diversion to be stored and later applied to beneficial use-----_____-2W --acre-feet 1 acre-foot equals 321,911 gallons per annum,to be collected between_-_ each season. Beginning date Closing date No'fE—Answer (a) or (b) or both (a) and (b) as may be necessary.If amount under (a)is less than.025 cubic foot per second,state in gallons per day.Neither the amount nor the season may be increased after application is filed.If underground storage is proposed a special supplemental form will be supplied by the State Water Rights Board upon request. 3. The use to which the water is to be applied is___--__ Domestic_ Domestic,irrigation,power,municipal,mining,industrial,recreational ---— ----- -- ----------------- - -- --------- _—__—--- purpose• 522° 1 E 200e0E3 feet from NW corner of Section 4. The point of diversion is to be located _—__�__�—_—__—_____—____— _ State bearing and distance or coordinate distances from section or quarter section corner 8, '3'llNs WE, 11DB&M, being within the I Of S e State 40-acre subdivision of public land survey or projection thereof of Section__8—_.,T.—!A—_,R._18E—, MAIt___B.&M.,in the County of —E1 I)Or S. The main conduit terminates in SW*0_f$*_— of Sea—_�9______,T. 12N &M. State 40-acre subdivisioa of U.S.Government survey orprojecdon thereof Description of Diversion Works NOTE.—An application cannot be approved for an amount grossly in excess of the estimated capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) (a) Diversion will be made by pumping from-------SUMP Sump,offtet well,unobstructed channel,etc. (b) Diversion will be by gravity,the diverting dam being______________________—_____—_—_feet in height (stream bed to level of overflow);__ --__-_feet long on top;and constructed of_-_—_____-- Concrete,earth,brush,eta (c) The storage dam will be 25________feet in height (stream bed to overflow level);_ 3.84 feet long on top; have a freeboard of______.4___—feet, and be constructed of____e Concrete,earth,etc. 7. Storage Reservoir---1H srh Tom_—___--_—_--__ Name The storage reservoir will flood lands in_—S*of Section 8 of Section 17l_ Indicate section or sections,also 40acre subdivisions un ell shown upon map WE.. NDBW(• It will have a surface area of— 30 __ acres,and a capacity of-- 200 acre-feet. 01F'In cue of insufficient space for answers in form,attach extra sheets at top of page 3 and cross reference. FORM 1 1 S. Conduit System (describe main conduits only) (a) Canal,ditch, flume: Width on top (at water line) —feet; width at bottom Cron -- Cron out ewe ant used , feet; depth of water feet; length feet;grade feet per.1,000 feet; platel?ials of construction r Barth,rock,timber.ate. (b) Pipe line:Diameter 10 inches; length 12s 5W - feet;grade 6 feet per 1,000 feet; total f lift — twt from intake to outlet 75 feet;kind__ Riveted ttal.concrete,wood-stave,ate. Nara:.—If a combination of different sizes or kinds of conduit is to be used,attach extra sheets with complete description,also show location of each clearly on map 9. The estimated capacity of the diversion conduit or pumping plant proposed is 3.0 Cfs $am cubic feet pa Mend a<galloas per minute The estimated cost of the diversion works proposed is $82j.000 Give only cost of intake, or headworks. pumps. smrap mervoin and sasia =adults described herein Completion Schedule 10. Construction work will begin on or before_ June 1, 1961 Construction work will Ibe completed on or before_ June 1, 1962 The water will be completely applied to the proposed use on or before June 1, 1964 Description of Proposed Use 11. 'Place,of Use. See Supplement _ Stan 40-sere subdivisions of the public land survey. If arts is onsurveyed indicate the location as if lines of the public land survey were projected.In the cue of irrigation ues steer the number of sera to be irrigated in each 40aere tract, if space permits. If space does not permit lisping of all 40-acre tracts,describe area in a Ran"way and show detail upon map. Do(es) applicants) own the land whereon use of water will be made?.- No Jointly? Yes Yes or No To or No Most of land is under option by Tahoe Paradise Hopes„ the Parent comMy. If applicant does not own land whereon use of water will be made,give name and address of owner and state what arrangements have ban made with him. 12. Other Rights. Describe all rights except those on file with the State Water Rights Board under which water is served to the above named lands. Nature of Right Year of First Use Use made in recent years Season of Use Source of Other Supply (riparian,appropriative,purchased water,etc.) including amount if known 1. 2. 3. 4. Attach supplement at top of page 3 if necessary. 13. Irrigation Use. The area to be irrigated is— _ —^. — —acres. Staff net acreage tobee irrigated The segregation of acreage as to crops is as follows: Rice _--_—_—_____—acres; alfalfa — acres; orchard acres; general crops acres; pasture acres. Nat$.---Care should be taken that the various statements as to acreage are consistent with each other,with the statement in Paragraph 11,and with the map The irrigation season will begin about___ -and end about Beginning date Closing data 14. Power Use. The total fall to be utilized is __ --feet. Difference betwem axle or draft tabs water level and first free water surface abase The maximum amount of water to be used through the penstock is--- cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is— horsepower. Second fat X fall r 8.0 The use to which the power is to be applied is— For distribadon and sale or private me,am. The nature of the works by means of which power is to be developed Turbine,Mom wheel,etc. The size of the nozzle to be used is inches. The water will be returned to_—__ �— ___ in _of will not Name stream State 40aen sabdivisim Sec.--- ,T.—_ ,R. --- _____B.&M. t + a a y - T"'d� RECHVED NOTICE OF ASSWMENT TO � � 3say ! • r Supplement to Paragraph 11 SWl of Section 19; S1 of JJEA of Section 21 SE4 of Section 21; V2 of Si and SV'u of �Ttv 4 of Section 22 VIA of NW! and PH- of SWI of Section 27• 2I2, S'°J} and Nz of SE! of Section 28; 1-?:z�s SE (and S-31-F of i� -4 ,of Section 29; Section 30; ?vTz and SE,' of Section 31; and 1�J2 of Section 32, all in _T12N, RIM, DIDBw.M; W:2 of Section 5; NE-j, and r2 of SE!� of Section 6; E2 of NE and E of SEA of Section 7; 14 of Section 8; �12, 1JA of N and W- of SE of Section 17; and 17-2 of NL1,l and NI-1-1 u of NE-1 of Section 20; all in MIN, R18E, MDB.: I; F of N14 of Section 25; NE-u of `Section 25; 'and the NE,, of Section 36, all. in T12N, R17E., VIDB&M. Sup-olemen- to Paragraph 11 A place of use as follows: SW—,I; of Section 19; SE,1—y and S2 of NE,1—j of Section 20; W2 of SW-L and SW2 of NW4 of Section 22; W2 of NW- and NN74 of SW-1 of 1 T 1 1 1 1• 1 SEl and S1 of NEl of Section 27; N2, S "-µ and N— of SE! of Sec Lion e8; W2, ,, 2 ,, Section 29; Section 30; N2, and SE2 of Section 31; and W2 of Section 32, all in T12N, R18E, MDB&M; W2 of Section 5; NE,1--, and E2 of SEA of Section 6; E of NE; and E2 of SE�1 of Section 7; W2 of Section 8; TA w2 of NE,1--, and vit of SE,j—, of Section 17; and N2 of NW117 and MT of NE I,, of Section 20; all in T11N, R18E, MMB&M; SE,1 of Section 25 and SEu of Section 36, both in T12N, R17E, MDB&M. CONFORIAING TO ORDER FORM 51-A IMPORTANT [Please Read Carefully] i. Note the terms and conditions of this permit. Construction work must be prosecuted, and the water applied to the beneficial uses intended with due diligence. Annual reports of progress will be expected from you upon forms wvhich will be furnished for the purpose. When the water has been fully applied to the beneficial uses intended the Water Code requires that you notify the State Water Rights Board thereof. 2. Neither this application nor the permit is a water right, but if the te,rrns and conditions of the pervnit are observed a ivater right can be obtained through beneficial use of the water—the extent of the right to be determined by a field inspection which will be made by a representative of the State Water Rights Board. 3. No change in point of diversion, or place of use or character of use, can be made under this application and permit without the approval of the State Water Rights Board. 4. If the rights under this perznit are assigned immediate notice to that effect, with the name and address of the new- owner should be forwarded to the State Water Rights Board, Sacramento, California. 5. Please advise iininediately of any change of address. Until otherwise advised cotr,munications will be sent to the address used in the letter transmitting this permit. 1613C 3.60 2M 5c0 M............... ,., PERMIT No. 13529 This is to certify that-the application of.whichthe foregoing is a'trve,and correct copy has been considered and approved by the State Water Rig hts``Board SUBJECT TO VESTED,RIGHTS and the following limitations and conditions: 1. The amount of water appropriated shall. be :1i1tsd to the amount which can be beneficially used and shall not exceed 3 cubic feet per second: by direct diversions and 200 acre-feet peryann= by storage to be diverted and collected from Janawy 1 December 31 of each year. 2. The maximum amount herein stated may be reduced in tAe license if investigiti©n so warragts. (00000DO 3. Actual construction work shall begin on or before July 1, 1962,' and shall thereafter be prosecuted with reasonable diligence, and if not so commenced arnt�66��7) prosecuted, this permit may be revoked. l 4. Said constililction work shall-be cozapleted`on or before.December 1, 19684>019Cr�09) 5. Complete application of the water to the proposed use shall bq made on or(,),?,C30q) before December 1, 1970. 6. Progress reports shall be filed promptly by permittee on forms which will (b�oO00tD� provided annually by the State Water Rights Board until license is issued. 7. All rights and privileges under this permit including method of diversion, method of use and quantity of water diverted are subject to the continuing authority of the State Water Rights Board in accordance with law and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or(00C)6rj22) unreasonable method of diversion of said water. 1 8. The total amount of water appropriated by direct diversion under this application and Applications 18021, 18030, 18031 and 18039 shall not exceed 345 acre-feet i any calendar month or 2,360 acre-feet in any year. �C10 9. Pe'rmittee shall bypass the following quantities of water into the natural stream bed of the Lipper Truckee River at all times: (a) During the months of April, May, and June, 75 cubic feet per second or the total flow of the stream, whichever is less. (b) During July, a flow decreasing gradually from 75 cubic feet per second or the total flow of the stream, whichever is less, to 15 cubic feet per second or the total flow of the stream, whichever is less. The reduction caused by the permittee shall not be greater than 5 cubic feet per second in any one day. (c) During the remainder of the year, 15 cubic feet per second or the total flow, , whichever is less. (D(µ 0 foO) 10. In accordance with Water Code `Section 1393, permittee shall clear the site., of the proposed reservoir of all structures, trees, and vegetation which would interfere with the use of the reservoir for water storage and recreational purposes. (017 "f)0r) 11. A separate application for the approval`of plans and specifications for construction of the dam shall be filed with, and approved by, the Department of Water Resources prior to commencement of construction of the dam described tinder this approved wa er right application. f 0 p 12. Permittee shall allow representatives of the State Water Rights Board and other parties, as may authorized from time to time by said Board, reasonable access to project works to determine compliance with the terms of this permit. (01900 �7�J This permit is issued and permittee takes it subject to the following provisions of the Water Code: Section 1390. A permit shall be effective for such time as the water actually appropriated under it is used for a useful and beneficial purpose in con- formity with this division (of the Water Code),but no longer. Section 1391. Every permit shall include the enumeration of conditions therein which in substance shall include all of the provisions of this article '. and the statement that any appropriator of water to whom a permit is issued;takes.it subject to the conditions therein expressed. Section 1392. Every permittee,if he accepts a permit,does so under the conditions precedent that no value whatsoever in excess of the actual amount paid to the State therefor shall at any time be assigned to or claimed for any permit granted or issued under the provisions of this division (of the Water Code),or for any rights granted or acquired under the provisions of this division (of the Water Code), in respect to the regulation by any competent public authority of the services or the price of the services to be rendered by any permittee or by the holder of any rights granted or acquired under the provisions of this division (of the Water Code) or in respect to any valuation for purposes of sale to or purchase,whether through condemnation proceed- ings or otherwise,by the State or any city,city and county,municipal water district, irrigation district,lighting district,or any political subdivision of the State-,of the rights and property of any permittee,or th possessor of any rights granted,issued,or acquired under the provisions of this division (of the Water Code). #k,g 2 4 1962 l Dated: STATE WATER R UiTs BOARD x^ '"► �� 1 F I S. Municipal Use. This application is made for the purpose of - Name city or cities,town or towns.Urban areas only c ---------------- —____ -- ----------------____-- having a present population of__ _-_ The estimated average daily consumption during the month of maximum use at the end of each five-year period until the full amount applied for is put to beneficial use is as follows-, 16. Mining Use. The name of the mining property to be served is-----_-_-___________--_----__-__-- -- -- --- Name of claim --_- ---.___- ..--and the nature of the mines is-----.____.__—__---_____ -- ---_------- Cold placer,quarts,etc. The method of utilizing the water is-------------------------------------------------------------- �- -- —------------- It is estimated that the ultimate water requirement for this project will -- ... . Cubic feet per second,gallops per minote.State basis of estimate The water win not be polluted by chemicals. or otherwise__--__- ----__. -_ ---- ------- - -_--_----_----_--- --__-_ Explain nature of pollution if any � will and it. will not be returned to...... --------------------____--------in-------------------- —__—_�_—_____-.-------�._of Name stream State 40-acre subdivision Sec.---- T. & M. ---__�_.___, , DomestiIndustcs service-to ask ee az ea of 17.r Qther Uses. The nature of the use proposed is__-__ _ --.-�---------- ---- ,domestic, Watering,fish culture,etc. State basis of determination of amount needed. __ It-_is cstid ated_that'the_area to be served will Number of persons,residences,area of domestic lawns and gardens,number and kind of stock,type have a errerit lal pulatioh of'28,OCD persons regu ring14.5 CU feet per second. industrial use,And unit requirements. , z t General 18. Are the snaps as required by the Rules and Regulations filed with Application?-`- not, YW6 No state specifically'the time required-for filing same--_ 19.`Does the applicant-own the land at the proposed'point-of diversion?____J,2_0 -__:_,If not;give name and Yes or No address of owner and state Ywhat,Ste ps have been taken to secure right of access.thereto___�Q @�'. .Oil �^54 Lh]s1 gdc `gsneho M. is a Bibl c Vtil y.an! has power of A1inent� D®ma3n. 20. .What is the name off the post office-most used by those living near the proposed point of diversion? - ;p C:aJJ fo-rni61 21. What are the names and addresses of'claiini its of water from the source of supply below the'proposed point of diversion?` Not MWVR - /s/ tTila A "S. Wilson, President Meyers Water Company [SIGNATLJRS OF APPLICANT _—._�__ —.� — --- Exhibit 5 r FILE Ilv DUPLICATE For full information concerning the filling out of this form refer to Article 4 of Rules and Regulations Pertaining to Appropriation of Water] STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application No. 18039---------Filed-----Msrch_l �_1 -----------------at__3.5g_Pt.__Me (Applicant must not All in the above blanks) APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER Notice of Assignment ('Over) _—hers Water ComTnv_ -- ------------ ------------------------------ Name of applicant of------- Meenrs ----- — --------------------_-County of—_ 1__Do_mdQ_— Address State of-_ California -_— ,do hereby make application for a permit to appropriate the following described unappropriated waters of the State of California, SUBJECT TO VESTED RIGHTS: Source, Amount, Use and. Location of Diversion Works 1. The source of the proposed appropriation is__—Upp r- ckee--Itiyer—_--_--____—____ Give name of stream,lake,etc.,if named;if unnamed state nature of source and that it is unnamed located in-- E1 DOredt>--_—County, tributary to----Lake-T; hoe--------------------- ------- 2. The amount of water which applicant desires to appropriate under this application is as follows: a For diversion to be directly applied to beneficial use___-_-___-_____3 _— O y PP� ------- --- cubic feet per 1 cubic foot per second equals 40 statute miner's inches or 646,317 gallons per day second, to be diverted from-__—_January 1__---------___—______to-.....__�eember 3.1 _ of each year. Beginning date Closing date (b) For diversion to be stored and later applied to beneficial use_____ acre-feet 1 acre-foot squab M,811 gallon per annum to be collected between_- e7anary 1_-------end___— December 31 _--jof each.season. Beginning date Closing date NOTE. Auswer (a) or (b) or both.(a) and (b) as may be necessary.If amount under (a)is less than.023 cubic foot per second,state in gallons per day.Neither the amount nor the season may be,increased,after application is filed.If underground storage is proposed a,special supplemental form will be supplied by the State Water Rights Board upon request 3. The use to which the water is to be applied is---- Domestic Domestic,irrigation,power,municipal,mining,industrial,recreational ----- - - ------- - ----------------- Purpoaea. 4. The point of diversion is to be located_ _5'___r20'_E!_1li2Q;Let, fr= corner of Section 5, State bearing sad distance or coordinate distances from section or quarter action turner T11N, R18E, KB +I being within the— , __ _ — _—__ - State 40-acre subdivision of public land survey or projection thereof of Section-2- T.___l!_,R._ 18 --__1 •B.&M.,in the County of— 17 Dorado S. The main conduit terminates in of Sec.__2.9_____,T.--12N__,R..�$F�—_,__.M.__D __B. &M. State 40-acre subdiTision of U.S.Government survey or projection thereof Description of Diversion Works NOTE.—Au application cannot be approved for as amount grossly in excess of the estimated Capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) (a) Diversion will be made by pumping Sump,*eat wall,unobstructed chanad,Oct. (b) Diversion will be by gravity,the diverting dam being___ —__________--___--feet in height (stream bed to level of overflow);__— feet long on top;and constructed Concrete,earth,brush,etc. (c) The storage dam will be— 2____—_—___feet in height (stream bed to overflow level);___-210 feet long on top;have a freeboard of___-10 -�--feet,and be constructed of--_—g$Z:th Concrete,earth,etc. 7. Storage Reservoir--- LOW 1A ke —__ ------_—__-- --- Name The storage reservoir will flood lands in Sib of Sy-Lot e +ion�Si_ of NWX_ FAnd S, f_' -of _ Section 8, TU3,, Rift, ND .state section or sections,also 40-acre subdivisions unless shown upon map It will have a surface area of—_,32— acres,and a capacity of_ M acre-feet. W In case of insufficient space for answers in form,attach extra sheets at top of page 3 and cross reference. FORM I 8. Conduit System (describe main conduits only) (a) Canal,ditch, flume:Width on top (at water line) feet; width at bottom — Cron gut two as oped fat; depth of water feet; length— ___feet.; grade feet per 1,000 feet; materials of construction �I Barth,rock,timber,etc. (b) Pipe line:Diameter---1-0 +riches; length- 85W —feet; grade_--6 feet per 1,000 feet;total fall from intake to outlet—�_—feet;kind— Ttansite Riveted steel,concrete,wood-save,M. Nara.—If a combination of different sizes or kinds of conduit is to be used,attach extra sheets with complete description,also show location of each Clearly on map. 9. The estimated capacity of the diversion conduit or pumping plant proposed is 3-0 cf s Saes cable feet per second or gallons per miaote The estimated cost of the diversion works proposed is $55a o00 Give only cat of intakes, or hedwarlu, pampa. .tonq resarvoire and ataia conduits daeribed herein Completion Schedule 10. Construction work will begin on or before___ June 1., 1961 Construction work will be completed on or before dune 1.-1,96P T— The water will be completely applied to.the proposed use on or before-----Tun,,- 7 - 1964 Description of Proposed Use 11. Place of Use. See Supplement State 40-sere subdivisions of the public land survey. If area is unsurveyed indicate the location as if lines of the public It" survey were projected.In the can of irrigation use sate the number of sera to be irritated in each 40acm tract, if space permits. if space does not permit lisdus of all 40-acre tracts,describe area In a son"way and show detail upon map. Does) applicants) own the land whereon use of water will be made?- —_No Jointly?_ Yes Yes or No Yes or No Most_of land is under option to Tahoe Paradise Homes_„_ the Parent compmy. If applicant does not own land whereon use of water will be made,give name and address of owner and state what srrangements have ban made with him. 12. Other Rights. Describe all rights except those on file with the State Water Rights Board under which water is served to the above named lands. Nature of Right Year of First Use Use made in recent years Season of Use Source of Other Supply (riparian,appropriative,purchased water,etc.) including amount if known 1. 2. 3. 4. Attach supplement at top of page 3 if necessary. 13. Irrigation Use. The area to be irrigated --acres. State net acresse to be irrigated The segregation of acreage as to crops is as follows: Rice___ _--acres; alfalfa ____acres; orchard-_ acres; general crops --acres; pasture acres. Nors.—Care sb"ld,bee taken that the various statements as to acreage are consistent with each other,with the statement in Paragraph 11,and with the map The irrigation season will begin about _ —and end about - Beginning date chins elan 14. Power Use. The total fall to be utilized is _ -feet. Difference betiraa meek or draft sib water level and fiat free water surface above The maximum amount of water to be used through the penstock is cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is_ horsepower. Second fat X fall i es The use to which the power is to be applied --- Fa distribution and sale or private seer sm The nature of the works by means of which power is to be developed is. -- Turbine,Psiten wheal,tee. The size of the nozzle to be used is inches. The water will be returned to-- of will not Name stream State 40acre subdivision A.&N. f �{ `L' KECEIVED NONCE QE ASSIGNMENT TO 7� �s p i 3s3D 4 i i Supplement to Paragraph 11 Sty# of Section 19; S�- of NTE� of Section 21 - - SE; of Sect-_on 21.; �•:t of S;, and 5 :,; of N`W of Section 22° I'llo`, Nw-,T and I�IT�9u of SW-1- of Section 27° T �, S J and N2 of SE-1 of Section 28; W-L SE and Sy of NEB of `Section 29; Section 30; NT2 and SE-�i,- of Section 31; and 1-7- of Section 32, all in T12N, R18E, ,DIDB&M; W2 of Section 5; lx'E andE2 of SE of Section 6; E2 of NE and E2 of SEA of Section 7; W1 of Section 8 ,J2, 1 of NE1 and W-1 of SE-,1- of Section 17; and N2 of Ntd} and N11 of NE of Section 20; all in T11N, RISE, MDBwM; E2 of hT?•yi1} of Section• 25; NEu of Section 25; and the NE, of Section 36, all in T12N, R17E, MDB&M. -<3NF0RMWG 7O CRI)R `OF l 3 Supplement to Paragraph 11 A place of use as follows: SW of Section 19; SE and S' of NEV of Section 20; W2 of SWu and SW of NW- of Section 22; � of NW�� and NWu of Sw- of Section 27; N2, SW4 and N1 of SE! of Section 28; W-, SEI and S2 of NEV of Section 29; Section 30; N2, and SE,� of Section ,31; and W- of Section,32, all in T12N, Rl8E, MDB&M; W of Section 5; NE11; and E2 of SE4 of Section 6; E of-NE1 and E2 of SEj of Section 7; W1 of Section 8; TA W of NEu and W- of SE of Section 17; and N2 of NW,--r and Wt of NE± of Section 20; all in T11N, R18E, MUB&M; SE,1 of Section 25 and SE1 of Section 36, both ±.n T12N, R17E, MDB&M. CONFORPri1NG TO ORDER OF / �Zt FORM 61-A IMPORTANT T [Please Read Carefully] 1. Note the terms and conditions of this permit. Construction worts must be prosecuted, and the water applied to the beneficial uses intended with due diligence. Annual reports of progress will be expected from you upon forms which will be furnished for the purpose. When the water has been fully applied to the beneficial uses intended the Water Code requires that you notify the State Water Rights Board thereof. Z. Neither this application nor the permit is a water right, but if the terms and conditions of the permit are observed a water right can be obtained through beneficial use of the stater—the extent of the right to be determined by a field inspection which will be made by a representative of the State Water Rights Board. 3. No change in point of diversion, or place of use or character of arse, can be made under this application and permit Without the approval of the State Water Rights Board. h. If the rights under this permit are assigned immediate notice to that e:fect with the name and address of the new owner should be forwarded to the State Water Ril,hts Board, Sacramento, California. 5. Please advise imnzediatel)> of any change of address. Until otherwise advised communications will be sent to the address used in the letter transmitting this permit. 1F130 3-&0 2M SPO PERMIT No. 13530 This is to certify that the application of which the foregoing is a true and correct copy has been considered and approved by the State Water Rights Board SUBJECT TO VESTED RIGHTS and the following limitations and conditions: 1. The amount of water appropriated shall be limited to the amount which can be benefically used and shall not exceed 3 cubic feet per second by direct diversion and 200 acre-feet per annum by storage to be diverted and collected from January 1 to December 31 of each year. r%o000 5) 2. The maximum amount herein stated may be reduced in the license if investigation 1 so warrants. (0 coo 0006) 3. Actual construction work shall begin on or before July 1, 1962, and shall there- after be prosecuted with reasonable diligence, and if not so commenced and prosecuted, this permit maybe revoked. ro o 000Ui) 4. Said construction work shall be completed on or before December 1, 1968.(0000006) 5. Complete application of the water to the proposed use shall be. made on or before December 1, 1970. �000,!PoDJ) 6. Progress reports shall be filed promptly by permittee on forms which will be provided annually by the State Water Rights Board until license is issued. `00000/0) 7. All rights and privileges under this permit including method of diversion, method of use and quantity of water diverted are subject to the continuing authority of the State Water Rights Board in accordance with law and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said water. (000001z) 8. The total amount of water appropriated by direct diversion under this application and Applications 18021, 18030, 18031 and 18038, shall not exceed 345 acre-feet in any calendar month or 2,360 acre-feet in any year. . G0060114) 9. Permittee shall bypass the following quantities of water into the natural stream bed of the Upper Truckee River at all times (a) During the months of April, May, and June, 75 cubic feet per second or the total Flow of the stream, whichever is less. (b) During July, a flow decreasing gradually from 75 cubic feet per second or the total flow of the stream, whichever is less, to 15 cubic feet per second or the total flow of the stream, whichever is less. The reduction caused by the permittee shall not be greater than 5 cubic feet per second in any one day. (c) During the remainder of the year, 15 cubic feet per second or the total flow, whichever is less. Ca/-0400) 10. In accordance with Water Code Section 1393, permittee shall clear the site of the proposed reservoir of all structures, trees,,, and vegetation which would interfere with the use of the reservoir for water,storage, and recredticnal purposes- Cm2-oo o) 11. A separate application for the approval. of plans and specifications for construction of the dam shall be filed with, and approved by, the Department of Water Resources prior to commencement of construction of the dam described under this approved water right application. ((960c 44) 12. Permittee shall allow representatives of the State Water Rights Board and other parties, as may be authorized from time to time by said Board, reasonable access t project works to determine compliance with the terms of this permit. Qcoo G This permit is issued and permittee takes it subject to the following provisions of the Water Code: Section 1390. A permit shall be effective for such time as the water actually appropriated under it is used for a useful and beneficial purpose in con- formity with this division (of the Water Code),but no longer. Section 1391. Every permit shall include the enumeration of conditions therein which in substance shall include all of the provisions of this article and the statement that any appropriator of water to whom a permit is issued takes it subject to the conditions therein expressed. Section 1392. Every permittee,if be accepts a permit,does so under the conditions precedent that no value whatsoever in excess of the actual amount paid to the State therefor shall at any time be assigned to or claimed for any permit granted or issued under the provisions of this division (of the Water Code),or for any rights granted or acquired under the provisions of this division (of the Water Code),in respect to the regulation by any competent public authority of the services or the price of the services to be rendered by any permittee or by the holder of any rights granted or acquired under the provisions of this division (of the Water Code) or in respect to any valuation for purposes of sale to or purchase,whether through condemnation proceed- ings or otherwise,by the State or any city,city and county,municipal water district, irrigation district, lighting district,or any political subdivision of the State,of the rights and property of any permittee,or the possessor of any rights granted, issued,or acquired under the provisions of this division (of the Water Code). APR 2 4 �96 STATE WATER RIGHTS BOARD 2 Dated: �' ad• ..�; `4 v y w Executive Officer a S U`T 1, ACI ATTACH EXTRA. SHEETS HERE 15. Municipal Use. This application is made for the purpose of �.- Name city or cities,town or towns.Urban asses only -------------- a present population of-- The estimated average daily consumption during the month of maximum use'at the end of each five-year period until the full amount applied for is put to beneficial use is as follows: 16. Mining Use. The name of the mining property to be served Name of claim .and the nature of the mines is__ ----_�-----_ — —=---- ---- --- Gold placer,quartz.etc. The method of utilizing the water ijs.___—_---------_-----;_-----__--- ------ --------- ------------ It is estimated that'ihe ultimate water reguxrement for this project will be _-,;� Cubic fe.par second,gtilf,.a pet minute:state basis of estimate The water Will be polluted by chemicals or otherwise-- -____ ------- ------_-------____�..__�----_--�_---_- will not Explain asture 0f pollution,if any will and it be returned to------_ --In-----.<._------,_._____.___�—.__---._____—_.of will not Name stream State 40-acre subdivision Sec._ T. R. ___-, ___-__ [-—__ B. & M. 17. Other Uses. The nature of the use proposed"is_--_-])—o got:.q__�� Industrial,recreational,domestic,stockwatering.fish culture,sm. State basis of determination of amount needed. -_fit__ __va_i=tgdwtbat_&bbe area to_ e__s_eTYed__Vi_ ._--_. Number of persons,residences,area of domestic lawns and gardens,number and kind of stock,type ,e industrial use,and unit requirements. General 18. Are the maps as required by the Rules and.Regulations filed with_.Application?—��3�e$_—__—__�____. If not, Y.or No, state specifically the time required for filing same__—_ — - — --- 19. Does the applicant own'the land at the-proposed point of diversion?__- no —_- .If not,give name and Yea or No address of owner and state what steps have been taken to,secure right of access thereto__Geode J. Ifanlonn _10 2 'Coloma Road,_Rancho Cordova_-TAuDlicant is A_p4bji_Utility and has_power of eminent. 'Domain. 20'. What is the name of the post office most,used by those living near the proposed point of diversion? 21. That are the' names and addresses of claimants of water from the source of supply below the proposed point of diversion?�.-_-V4?-t:_k"Q11Ma --------------- __-____-_____ . - --- _/s/ Jim A.' Z, Wilson, President Meyers Water Company. [SIGNATURE OF APPLICANT,_____._—_-___ --- Exhibit 6 9 FILE IN DUPLICATE For full information concerning the filling out of this form refer to � Article 4 of Rules and Regulations Pertaining to Appropriation of Water STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application Noe____l9_629______-Filed._---__.____July 28L 1960-_____________at__2:22_ P!M. (Applicant must not fill in the above blanks) APPLICATION TO APPROPRIATE UNAPPROPRIATED WATER. AMENDED APPLICATION RECEIVED September 12, 1960 Notice of Asignmen# (OW) I, —---________Meyers Water _C__amlpan ,__o California_Corp oration Name of applicant or applicants of------------------ -��.� $__ • ►t e e -- —-- --- - � 'MentQ---------------County of_—E1_Di2o Ad9 — Address State of------------ California do hereby make application for a permit to appropriate the ------------------------------- following described unappropriated waters of the State of California, SUBJECT TO VESTED RIGHTS: Source, Amount, Use and Location of Diversion Works 1. The source of the proposed appropriation is--------------Coy_Ote.__Creek_________-..--------------.------.----._____..___-----------------_-_— Give name of stream,lake,etc.,if named;if unnamed state nature of source and that it is unnamed located in------- _IZ4 SZ_________--County, tributary to--------1 ppex14e----- 2. The amount of water which applicant desires to appropriate under this application is as follows: (a) For diversion to be directly applied to beneficial use---------------2± 3---------------------------------------------------cubic feet per I cubic foot per second equals 40 statute miner's inches or 646,3I7 gallons per day ____-to_________December 31 ______________-of each year. second, to be diverted from__________Jan—uar�r_1_____________—_____ _ __ _ _ y Beginning date Closing data - (b) For diversion to be stored and later applied to beneficial use----------______1d_± __-____-__—-----------_—--------_-acre-feet 1 acre-foot equals 325,811 gallons per annum,to be collected between-------October_1 _-_and_-..........June 1 ____------_--_of each season. Beginning date Closing date NOTE.—Answer (a) or (b) or both (a) and (b) as may be necessary. If amount under (a) is less than.025 cubic foot per second,state in gallons per day.Neither the amount nor the season may be increased after application is filed.If underground storage is proposed a special supplemental form will be supplied by the State Water Rights Board upon request. 3. The use to which the water is to be applied is---------------domestic _____________-_______,________ Domestic,irrigation,power,municipal,mining,industrial,recreational -----------------------------------------------------------------------------------------------—-------—---------------------- -- ----- ----------------- purposes. -- t • 8° - W 00 from the 1 corner of Section 2 } 4. The point of diversion is to be located---_---_ ------------ ----------------- -------------------��— State bearing and distance or coordinate distances from section or quarter section corner beingwithin the------------Nl-Qf-Zk---------------------------------------------------------- -- - ----- State 40-acre subdivision of public land survey or projection thereof of Section----�-5-------I T------Al2_N-__, R-----172------ -------____M__D__ B. &M., in the County of--- El Dorado 1 1 5. The main conduit terminates in___Mi-4--__of__M4_____of Sec-------30------ T.__1_2_N_-------- R.-I8t------_, ------Mit_-D___-B. & M. State 40-acre subdivision of U.S.Government survey or projection thereof Description of Diversion Works NOTE.—An application cannot be approved for an amount grossly in excess of the estimated capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) (a) Diversion will be made by pumping from-------------------------- --------------------------------------------------__— Sump,offset well,unobstructed channel,etc. (b) Diversion will be by gravity, the diverting dam being________________-__________________-________-__feet in height (stream bed to level of overflow)_________________________________feet long on top; and constructed of-----------------------_-____—__________—_—_—_ __— Concrete,earth,brush,etc. (c) The storage dam will be____________.1.2.----------------feet in height (stream bed to spillway level) ___________feet, and be constructed of__________concrete_and earth long on top; have a freeboard of______________ --- ----- Concrete,earth,etc. 7. Storage Reservoir---------------_=0$jood Reseryo r - ------------------------------ ---- --- Name The storage reservoir will flood lands in..________..U. S. Forest Service Area Indicate section or sections,also 40-4cre subdivisions unless shown upon map It will will have a surface area of______________________l3_-_.._____acres, and a capacity of--_____Z04_____________________acre-feet. If reservoir has a •apacity of 25 acre-feet or more fill in the following: Diameter of outlet pipe----------------------inches; length------_-------_------feet; 'fference in elevation from spillway level to highest point of outlet pipe----------------------feet; fall in pipe------—-------------feet. W In case of insufficient space for answers in form,attach extra sheets at top of page 3 and cross reference. 8. Conduit System (describe main conduits only) (a) Canal,ditch,flume: Width on top (at water line)None Proposed _feet; width at Cross out two not wed feet; depth of water__________________feet; length_ feet; grade __—______feet per 1,000 feet; materials of construction_______ — Earth,rock,timber,etc. (b) Pipe line: Diameter_ _12 inches; length-4500 _feet; grade —169 —_feet per 1,000 feet; total fall intake to outlet___36o feet; kind__double d1PPed and wrapT7ed welded steel Riveted swJ.concrete,wood+cave.«o.not 1esS than 10 gUage NoTE.—If a combination of different sizes or kinds of conduit is to be used,attach extra sheets with complete description,also show location of each clearly on map. 9. The estimated capacity of the diversion conduit or pumping plant proposed ___—_____------_-------_-----— State cubic fat per second or gallons per minute The estimated cost of the diversion works proposed is__A_ lQ?s��ee 00 Give only cost of intake, or hesdworks, pumps, storing reservoirs and nuia conduits described herein Completion Schedule 10. Construction work will begin on or before___— Dg( ber_ l�196 Construction work will be completed on or before ___^�4-Mb-er--3l,s__146.7,__ _ The water will be completely applied to the proposed use on or before_____ Description of Proposed Use 11. Place of Use. ----------Se4--s_uu element---------------- --- ---- - -- ---------------------- -- State 40-acre subdivisions of the public land survey. If area is unsurveyed indicate the location as if lines of the public land survey were projected. In the case of irrigation we state the number of acres,to be irrigated in each 40-acre tract, if space permits. If space does not permit listing of all 40-acre tracts,describe area in a general way and show detail upon map. Do(es) applicants) own the land whereon use of water will be jointly?-----_No_ _-- Yes or No Yes or No All joint owners should include their names as applicants and sign application at bottom of third page. If applicant does not own land whereon use of water will be made,give name and address of owner and state what arrangements have been rude with him. 12. Other Rights.Describe all rights except those on file with the State Water Rights Board under which water is served to the above named lands. none Nature of Right Year of First Use Use made in recent years Season of Use Source of Other Supply (riparian,appropriative,purchased water,etc.) including amount if known 1. 2. 3. 4. Attach supplement at top of page 3 if necessary. 13. Irrigation Use. The area to be irrigated - - - ----------- ---__ - State net acreage to be irrigated The segregation of acreage as to crops is as follows: Rice------------------------------------acres; alfalfa__-________-----_-------------acres; orchard----_------_----------------------—acres; general NoTE.—Care should be taken that the various statements as to acreage are consistent with each other,with the statement in Paragraph 11,and with the map. The irrigation season will begin about-----------__-------______----- end about______________ Beginning date Closing date 14. Power Use. The total fall to be utilized is---------------------------------------------------------------------------------------------------------feet. Difference between nozzle or draft tube water level and first free water surface above The maximum amount of water to be used through the penstock is-----------------------------------------------------cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is---------------------------_----------_----------horsepower. Second feet X fall i 8.8 The use to which the power is to be applied is_-_________________________________ ________________________-____________ ------------------------------------------------------ - For distribution and sale or private use,etc. The nature of the works by means of which power is to be developed is-------------------------------------------------------------------------------------_ Turbine,Pelton wheel,etc. The size of the nozzle to be used is------------_---------inches. The water will be returned to - in will not Name stream State 40-acre subdivision s- v Sec.--------------------_ T------------------------- R.------------------- B. &M. e f RECEIVED NOTICE Of ASSIGNMENT Tn C�� P fi SW 1 of Section 19; S 1 of NE 1 of Section 21 ` SEA of• Section 21; W2 of SWj and SWu of NWu of Section 22• W2 of NWI and NWu of SWI of Section 27• N29 SWI and NZ of SEu of Section 28; W29 SE and S2 of NEu of Section 29; Section 30; N2 and SE! of Section 31; and W2 of Section 32, all in T12N, 1118E, MDB&M; W2 of Section 5; NEB and E2 of SE! of Section 6; E2 of NE,—� and E2 of SE,' of Section 7; W2 of Section 8; W2s W2 of NE2 and W2 of SEu of Section 17; and N2 of NWu and NW,—� of NEB of Section 20; all in T11N, R18E, MDB&M; E2 of NWI of Section 25; NE2 of Section 25; and the NEV of Section 36, all in T12N, R17E, MDB&M: $�_ rE IN THIS SPA ATTACH EXTRA SHEETS HERE 15. Municipal Use. This application is made for the purpose of serving----------------IJlgh_SeY'V Ce ,Q 'e�1___________________ Name city or cities,town or towns.Urban areas only -- -----------Me-yers,---Cal]fOamia---------------------------------------having a present population of-------------Q---—------------ The estimated average daily consumption during the month of maximum use at the end of each five-year period until the full amount applied for.is put to beneficial use is as follows: 16. Mining Use. The name of the mining property to be served is---------------------------------- Name of claim -------------------------------------------and the nature of the mines is---------------------------___ Gold placer,quartz,etc. The method of utilizing the water is—------_-----,----------------------------------------------------_ It is estimated that the.ultimate water requirement for this project will Cubic feet per second,gallons per minute.State basis of estimate The wate will r will not be polluted by chemicals or otherwise____________________________________________________________—__________—_________—_ Explain nature of pollution,if any Will and it be returned to---------- ---------------—m -- -- -- --- -------------------- of will not Name stream State 40sere subdivision Sec.----------- ----r T. —--- --—, R.-----------------s ----------------—-----B. &M. 17. Other Uses. The nature of the use proposed is......................._..... domestic Industrial,recreational,domestic,ttockwatering,fish culture,etc. State basis of determination of amount needed. -------Domestic -_1280_acres--a :L3L dwelling—per acre and Number of persons,residences,area of domestic lawns and dens,number and kind of ateek; pe l+-------------------------------persons per dwelling using 100 gallons per capita per day (•5) (4.0) (1280 (100) ----------------------------------------------- ---- -- industrial use,and unit requirements 1792,000, gpd - estimates build up 33% by 1965, or 590,000 gpd = 66% by 1970 'or 1,250,000 gpd = 100% by 1975 or 1,792,000 gpd = The estimated requirements are about 200,000 gpd above the 2.33 efs• requested, it is planned to make up the difference of these peak day demands from the 101+ A.F. storage requested. General 18. Are the maps as required by the Rules and Regulations filed with Application?-----__----- If not, Yes or No state specifically the time required for filing same___------------------------_----------_----------____----_________—___ _- 19. Does the applicant own the land at the proposed point of diversion?_______________ If not, give name and Yes or No address of owner and state what steps have been taken to secure right of access thereto-------U---$.__Forest Service Department of Agricultures U. S. Government, Application being submitted 20. What is the name of the post office most used by those living near the proposed point of diversion? Meyers, El Dorado County, California --_- 21. What are the names and addresses of claimants of water from the source of supply below the proposed point of diversion?______Trlackee_�aQrigation�istrictZ__Fallori�Churchill_Co., Nevada Sierra Pacifies Pawpr Cmpany 220 South __Nevada Washoe County Water rnnSPrxatJ on Di�c_tri ---------------—- -=-----------_------- [SIGNATURE OF APPLICANT_—/S Geore C•_BaronVice President,President, Meyers Water Co., a California Corporation APPLICANT MUST NOT FILL IN BLANKS BELOW PERMIT No. ,1 4 335 This is to certify that the application of which the foregoing is a true and correct copy has been considered and approved by the State Water Rights Board SUBJECT TO VESTED RIGHTS and the following limitations and conditions: 1. The amount of water appropriated shall be limited to the amount which can be beneficially used, and shall not exceed 2.33 cubic feet per second by direct diversion to be diverted year-round and 104 acre- feet per annum by storage to be collected from about October 1 of each year to about June 1 of the succeeding year. The instantaneous rate of diversion under the permit ' may exceed 2.33 cfs, provided that the amount of water appropriated by direct diversion shall not exceed 143 acre-feet in any month (equivalent to a continuous flow of 2.33 cfs.). 2. The maximum amount herein stated may be reduced in the license if investigation warrants. 3. Actual construction work shall begin on or before July 1, 1966, and shall thereafter be prosecuted with reasonable diligence,and if not so commenced and prosecuted this permit may be revoked. (v-t.'v dam'"0 7 4. Said construction work shall be completed on or before December 1, 1969. (orv-D cm1V Ff) S. Complete application of the water to the proposed use shall be made on or before December 11 1970.(V-" 6. Progress reports shall be filed promptly by permittee on forms which will be provided annually by the State Water Rights Board until license is issued. (OW D v-c/o 7. All rights and privileges under this permit including method of diversion,method of use and quantity of water diverted are subject to the continuing authority of the State Water Rights Board in accordance with law and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said water. 8. Permittee sball allow representatives of the State Water Rights Board and other parties, as may be authorized from time to time by said Board,reasonable access to project works to determine compliance with the terms of this permit.(rrV C-0 9. The perinittee shall release at all times into the natural channel of Coyote Creek immediately belotir Coyote Dam a flow of 0.255 cubic foot per second, or the( I q 0 0 b 0) natural flow, whichever is less, to maintain fishlife. `�� 10. Permittee shall install and maintain an outlet pipe of adequate capacity in his dam as near as racticable to the bottom of the natural stream channel or provide other means sallsfact�ry to the State Water Ri is Board in order that water entering the reservoir or collected in the reservoir curing and after the current-storage season may be released into the downstream channel to the extent necessary to satisfy downstream prior rights and/or to the extent that appropriation of said water is not authorized under this permit. (0-0 S 1P 0(13 11. Permittee shall install and maintain suitabl easuring devices (a) upstream from the high-water elevation of his reservoir and 1b, immediately below his torage dam in order that accurate measurement can be made f the quantity of water flowing i to and out of said reservoir. v-V 6 aC'11(e 12. In accordance with the requirements of Water Code Section 1393, permittee shall clear the site of the proposed reservoir of all structures trees, and other vegetation which would interfere with the use of the reservoir for water storage and recreational poses* (oizar! o 13. A, separate application for approval of plans and specifications for construction of the dam described-in this approved water right application shall be filed with and approved by the Department of Water Resources prior to commencement of construction o the dam. Cv3br�r� 8 14. The total amount of water % ropriated byy d rec diversion under permits issueddd ursuant' to Applications 18021, -1 , 18031, 1�30 , 1 039, and 19629 shall not exceed �+5 acre-feet in any calendar month, and total diversions under said permits shall no� exceed 2,760 acre-feet in any year. (D-cro 011 This permit is issued and permittee takes it subject to the following provisions of the Water Code: Section 1390. A permit shall be effective for such time as the water actually appropriated under it is used for a useful and beneficial purpose in con- formity with this division(of the Water Code),but no longer. Section 1391. Every permit shall include the enumeration of conditions therein which in substance shall include all of the provisions of this article and the statement that any appropriator of water to whom a permit is issued takes it subject to the conditions therein expressed. Section 1392. Every permittee,if he accepts a permit,does so under the conditions precedent that no value whatsoever in excess of the actual amount paid to the State therefor shall at any time be assigned to or claimed for any permit granted or issued under the provisions of this division (of the Water Code),or for any rights granted or acquired under the provisions of this division (of the Water Code), in respect to the regulation by any competent public authority of the services or the price of the services to be rendered by any permittee or by the holder of any rights granted or acquired under the provisions of this division (of the.Water Code) or in respect to any valuation for purposes of sale to or purchase,whether through condemnation proceed- ings or otherwise,by the State or any city,city and county,municipal water district,irrigation district,lighting district,or any political subdivision of the State,of the rights and property of any permittee,or the possessor of any rights granted,issued,or acquired under the provisions of this division (of the Water Code).Dated: UY 6 1964 STATE WATER RIGHTS BOARD L. K. Hill Executive Officer � 91455 7-63 SM Q SPO