HomeMy WebLinkAboutContract 2025 0723_RedactedTHIS Contract is made and entered into this 23rd day of July 2025, by and between Gregg Drilling, LLC
hereinafter referred to as "Contractor," and South Tahoe Public Utility District, El Dorado County, California,
hereinafter referred to as "District".
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged, the District
and the Contractor agree as follows:
1. That the Contractor will furnish all labor, materials, equipment, tools, transportation, services,
appliances, and appurtenances for the construction of the STPUD 2025 Test Well Project, (the
99project") in accordance with the Contract Documents therefore, adopted by the Board of Directors of
the above District, as prepared in part by Best Environmental Subsurface Sampling Technologies, Inc.
at 50 Tiburon St. STE 7 San Rafael, CA.
2. That the District will pay the Contractor progress payments and the final payment in accordance with
the method set forth in the Contract Documents with warrants drawn on the appropriate fund or funds
as required, according to the prices as bid and accepted, based upon the Contract Documents, as
follows:
Total Bid - $1,475,452,00. One Million Four Hundred Seventy -Five Thousand Four Hundred Fifty -Two
Dollars and Zero Cents.
3. Contractor agrees to complete said work within 250 calendar days, following the issuance of the Notice
to Proceed (or approved extensions thereof and to the entire satisfaction of the District before final
payment is made. Contractor also agrees that all construction activities requiring excavation, earthwork
or soil material removal shall occur between July 1, 2025 and October 15, 2025, 167 calendar days) in
accordance with requirements of the Tahoe Regional Planning Agency (TRPA) and to the entire
satisfaction of the DISTRICT before final payment is made.
Time is of the essence for this Contract. By its signature hereunder, Contractor agrees the time for
completion set forth above is adequate and reasonable to complete the Work.
Ill
4. In accordance With Government Code section 53069.85, Contractor will pay the DISTRICT the sum set
forth in Part 2.04, Contract Time, and Liquidated Damages, of Section 00 72 00, General Conditions, of
these Contract Documents, for each and every calendar day of delay beyond the time prescribed in the
Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture.
In the event this is not paid, the Contractor agrees the DISTRICT may deduct that amount from any
money due or that may become due the Contractor under the Contract. This Article does not exclude
recovery of other damages specified in the Contract Documents.
I III I j IFIII!!Il lillill rill 11 111
MMM�M IS
which such rates shall be made available at the District's offices or may be obtained online Ill
6. That the Contractor shall carry California Workers Compensation Insurance and require all
1 71 MR ROOM
the State of California.
7. The Contractor shall, prior to the execution of the Contract, furnish certificates and endorsements
1111;!il EIMEM,� r r r�
512311 11112115211 !111 ll I 111TRII! 111111 R I z �!! I �I MTO 0 TIM, TEOTTIUM
8 This Formal Contract reference includes the Contract Documents, which includes the following:
Solicitation — Notice Inviting Bids
Instructions to Bidders
Information Available to Bidders
Electronic Bid Schedule
Bid Form
Formal Contract
Faithful Performance Bond
Payment (Labor and Materials) Bond
Project Definitions
General Conditions
Supplementary Conditions
General Requirements
Technical Specifications
Addenda
Plans and Drawings
Approved and fully executed Change Orders
Any other documents contained in or incorporated into the Contract, except as otherwise indicated.
1117211�1 I I � I Ill I
I Till 13
I , IIIIIIIIIIIIIIIET"IlIll-
PA
Contract Documents are intended to be complementary. Work required by one of the Contract Documents and
not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the
parties. Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents,
IN WITNESS WHEREOF, the said CONTRACTOR and the South Tahoe Public Utility District have caused the
names of said parties to be affixed hereto, each in duplicate, the day and year first above written.
Contractor
By
Title
Address for Giving Notice:
Cruzo:al :as 4, , R I
SOUTH TAHOE PUBLIC UTILITY DISTRICT
By 7 /-� VD &
Address for Giving Notic-
i■�r-
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to
be insured against liability for workers' compensation ❑r to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this contract.
CONTRACTOR:
BY:
TITLE:
rd