Loading...
HomeMy WebLinkAboutBid SummaryItem Description Unit of Measure Quantity Gregg Drilling, LLC BID SCHEDULE A: Tanglewood Well Site 1 Mobilization and Demobilization LS 1 $72,000.00 $98,578.01 $50,000.00 $60,000.00 2 Noise Mitigation LS 1 $121,926.00 $142,039.57 $200,000.00 $115,000.00 3 Conductor Casing LF 50 $54,000.00 $58,081.50 $250,000.00 $50,000.00 4 Borehole Drilling LF 500 $225,000.00 $131,305.00 $250,000.00 $300,000.00 5 Formation Sampling EA 50 $16,000.00 $100.00 $25,000.00 $25,000.00 6 Plumbness and Alignment Testing LF 500 $7,500.00 $5,600.00 $10,000.00 $10,000.00 7 Geophysical Surveys LF 500 $6,500.00 $8,270.00 $10,000.00 $10,000.00 8 Install Long-Screened Test Well LF 500 $40,500.00 $12,260.00 $150,000.00 $40,000.00 9 Furnish and Install Graded Gravel Pack LF 445 $11,125.00 $20,309.80 $111,250.00 $13,350.00 10 Furnish and Install Annular Seal LF 55 $19,250.00 $16,245.35 $19,250.00 $22,000.00 11 Surface Completion for Monitoring Well LS 1 $1,000.00 $18,153.09 $10,000.00 $5,000.00 12 Waste Disposal CY 26 $54,600.00 $48,780.68 $65,000.00 $78,000.00 13 Well Development HR 44 $37,400.00 $111,776.28 $44,000.00 $44,000.00 14 Temporary Discharge System LF 200 $5,000.00 $18,076.00 $20,000.00 $20,000.00 15 Test Pump, Motor, Inflatable Packers, and Sounding Tube LS 1 $16,000.00 $28,422.78 $45,000.00 $22,150.00 16 Pump Operational Support for Well Testing HR 40 $34,000.00 $38,865.20 $40,000.00 $20,000.00 17 Site Erosion Control LS 1 $7,000.00 $11,524.05 $50,000.00 $5,000.00 18 Traffic Control LS 1 $6,500.00 $12,890.38 $50,000.00 $10,000.00 19 Documentation LS 1 $2,000.00 $100.00 $3,000.00 $5,000.00 Subtotal $737,301.00 $781,377.69 $1,402,500.00 $854,500.00 20 Mobilization and Demobilization LS 1 $72,000.00 $88,441.20 $50,000.00 $60,000.00 21 Noise Mitigation LS 1 $121,926.00 $160,430.27 $75,000.00 $115,000.00 22 Conductor Casing LF 50 $54,000.00 $58,081.50 $250,000.00 $50,000.00 23 Borehole Drilling LF 400 $224,800.00 $107,576.00 $200,000.00 $240,000.00 24 Formation Sampling EA 40 $12,800.00 $80.00 $20,000.00 $20,000.00 25 Plumbness and Alignment Testing LF 400 $8,000.00 $4,500.00 $8,000.00 $8,000.00 26 Geophysical Surveys LF 400 $10,000.00 $8,268.00 $8,000.00 $8,000.00 27 Install Long-Screened Test Well LF 400 $58,000.00 $10,344.00 $120,000.00 $32,000.00 28 Furnish and Install Graded Gravel Pack LF 345 $8,625.00 $15,659.55 $86,250.00 $10,350.00 29 Furnish and Install Annular Seal LF 55 $19,250.00 $16,245.35 $19,250.00 $22,000.00 30 Surface Completion for Monitoring Well LS 1 $1,000.00 $18,153.09 $10,000.00 $5,000.00 BID SCHEDULE B: Cattlemans Well Site 2025 TEST WELL PROJECT 1 32 Well Development HR 36 $30,600.00 $91,607.04 $36,000.00 $36,000.00 33 Temporary Discharge System LF 50 $1,250.00 $10,972.00 $5,000.00 $5,000.00 34 Test Pump, Motor, Inflatable Packers, and Sounding Tube LS 1 $16,000.00 $28,422.78 $45,000.00 $22,150.00 35 Pump Operational Support for Well Testing HR 40 $34,000.00 $38,865.20 $40,000.00 $20,000.00 36 Site Erosion Control LS 1 $7,000.00 $11,524.05 $50,000.00 $5,000.00 37 Traffic Control LS 1 $6,500.00 $6,178.60 $50,000.00 $10,000.00 38 Documentation LS 1 $2,000.00 $100.00 $3,000.00 $5,000.00 Subtotal $738,151.00 $720,972.31 $1,135,500.00 $745,500.00 Total $1,475,452.00 $1,502,350.00 $2,538,000.00 $1,600,000.00 2