Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Summary
Item Description Unit of Measure Quantity Gregg Drilling, LLC BID SCHEDULE A: Tanglewood Well Site 1 Mobilization and Demobilization LS 1 $72,000.00 $98,578.01 $50,000.00 $60,000.00 2 Noise Mitigation LS 1 $121,926.00 $142,039.57 $200,000.00 $115,000.00 3 Conductor Casing LF 50 $54,000.00 $58,081.50 $250,000.00 $50,000.00 4 Borehole Drilling LF 500 $225,000.00 $131,305.00 $250,000.00 $300,000.00 5 Formation Sampling EA 50 $16,000.00 $100.00 $25,000.00 $25,000.00 6 Plumbness and Alignment Testing LF 500 $7,500.00 $5,600.00 $10,000.00 $10,000.00 7 Geophysical Surveys LF 500 $6,500.00 $8,270.00 $10,000.00 $10,000.00 8 Install Long-Screened Test Well LF 500 $40,500.00 $12,260.00 $150,000.00 $40,000.00 9 Furnish and Install Graded Gravel Pack LF 445 $11,125.00 $20,309.80 $111,250.00 $13,350.00 10 Furnish and Install Annular Seal LF 55 $19,250.00 $16,245.35 $19,250.00 $22,000.00 11 Surface Completion for Monitoring Well LS 1 $1,000.00 $18,153.09 $10,000.00 $5,000.00 12 Waste Disposal CY 26 $54,600.00 $48,780.68 $65,000.00 $78,000.00 13 Well Development HR 44 $37,400.00 $111,776.28 $44,000.00 $44,000.00 14 Temporary Discharge System LF 200 $5,000.00 $18,076.00 $20,000.00 $20,000.00 15 Test Pump, Motor, Inflatable Packers, and Sounding Tube LS 1 $16,000.00 $28,422.78 $45,000.00 $22,150.00 16 Pump Operational Support for Well Testing HR 40 $34,000.00 $38,865.20 $40,000.00 $20,000.00 17 Site Erosion Control LS 1 $7,000.00 $11,524.05 $50,000.00 $5,000.00 18 Traffic Control LS 1 $6,500.00 $12,890.38 $50,000.00 $10,000.00 19 Documentation LS 1 $2,000.00 $100.00 $3,000.00 $5,000.00 Subtotal $737,301.00 $781,377.69 $1,402,500.00 $854,500.00 20 Mobilization and Demobilization LS 1 $72,000.00 $88,441.20 $50,000.00 $60,000.00 21 Noise Mitigation LS 1 $121,926.00 $160,430.27 $75,000.00 $115,000.00 22 Conductor Casing LF 50 $54,000.00 $58,081.50 $250,000.00 $50,000.00 23 Borehole Drilling LF 400 $224,800.00 $107,576.00 $200,000.00 $240,000.00 24 Formation Sampling EA 40 $12,800.00 $80.00 $20,000.00 $20,000.00 25 Plumbness and Alignment Testing LF 400 $8,000.00 $4,500.00 $8,000.00 $8,000.00 26 Geophysical Surveys LF 400 $10,000.00 $8,268.00 $8,000.00 $8,000.00 27 Install Long-Screened Test Well LF 400 $58,000.00 $10,344.00 $120,000.00 $32,000.00 28 Furnish and Install Graded Gravel Pack LF 345 $8,625.00 $15,659.55 $86,250.00 $10,350.00 29 Furnish and Install Annular Seal LF 55 $19,250.00 $16,245.35 $19,250.00 $22,000.00 30 Surface Completion for Monitoring Well LS 1 $1,000.00 $18,153.09 $10,000.00 $5,000.00 BID SCHEDULE B: Cattlemans Well Site 2025 TEST WELL PROJECT 1 32 Well Development HR 36 $30,600.00 $91,607.04 $36,000.00 $36,000.00 33 Temporary Discharge System LF 50 $1,250.00 $10,972.00 $5,000.00 $5,000.00 34 Test Pump, Motor, Inflatable Packers, and Sounding Tube LS 1 $16,000.00 $28,422.78 $45,000.00 $22,150.00 35 Pump Operational Support for Well Testing HR 40 $34,000.00 $38,865.20 $40,000.00 $20,000.00 36 Site Erosion Control LS 1 $7,000.00 $11,524.05 $50,000.00 $5,000.00 37 Traffic Control LS 1 $6,500.00 $6,178.60 $50,000.00 $10,000.00 38 Documentation LS 1 $2,000.00 $100.00 $3,000.00 $5,000.00 Subtotal $738,151.00 $720,972.31 $1,135,500.00 $745,500.00 Total $1,475,452.00 $1,502,350.00 $2,538,000.00 $1,600,000.00 2