Bid Summary
Advertised on July 28, 2022 Bid Opening on September 20, 2022 10:00 AM (PDT) Item Description Unit of Quantity Vinciguerra Flowline MKD Construction, Farr Construction 1 Mobilization and Demobilization (Not to exceed 10% of Bid Schedule A, excluding this item)LS 1 $200,000.00 $131,749.00 $416,000.00 $29,910.00 2 Waterline Erosion Control LS 1 $30,000.00 $170,631.00 $146,800.00 $89,920.00 3 Groundwater Dewatering LS 1 $1.00 $11,984.00 $25,000.00 $768,810.00 4 Traffic Control LS 1 $50,000.00 $73,093.00 $273,900.00 $637,280.00 5 Sheeting, Shoring, and Bracing or Equivalent Method LS 1 $25,000.00 $32,686.00 $20,000.00 $61,230.00 6 8-Inch C900 DR 18 Water Main LF 7427 $1,299,725.00 $1,292,298.00 $1,396,276.00 $2,190,965.00 7 3/4-Inch Single Service on New Main EA 123 $393,600.00 $661,248.00 $750,300.00 $497,289.00 8 1-Inch Single Service on New Main EA 4 $16,000.00 $21,876.00 $44,800.00 $13,900.00 9 3/4-Inch Single Service on Existing Main EA 20 $80,000.00 $183,060.00 $198,000.00 $83,660.00 10 As-Directed Pothole EA 15 $750.00 $12,525.00 $18,000.00 $31,470.00 11 3/4-Inch Base Meter Installation EA 3 $13,500.00 $11,946.00 $8,700.00 $13,170.00 12 Add for Traffic Rated Meter Installation EA 1 $500.00 $378.00 $2,700.00 $743.00 13 Fire Hydrant Installation on New Main EA 11 $154,000.00 $182,369.00 $151,800.00 $163,713.00 14 Fire Hydrant Installation on Existing Main EA 2 $32,000.00 $49,914.00 $31,400.00 $40,374.00 15 Tie-In #1 - Meadow Crest/Chinquapin (Sheet P1)LS 1 $5,000.00 $15,769.00 $6,300.00 $9,774.00 16 Tie-In #2 - Clear Creek/Chinquapin (Sheet P2)LS 1 $7,500.00 $15,431.00 $7,100.00 $10,679.00 17 Tie-In #3 - Muir/Chinquapin (Sheet P3)LS 1 $7,000.00 $15,431.00 $7,100.00 $10,679.00 18 Tie-In #4 - Meadow Crest/Chinquapin (Sheet P4)LS 1 $7,000.00 $15,431.00 $7,100.00 $10,679.00 19 Tie-In #5 - Genoa/Black Bart (Sheet P6)LS 1 $20,000.00 $37,551.00 $27,300.00 $36,363.00 20 Tie-In #6 - Genoa/Chinquapin (Sheet P7)LS 1 $7,000.00 $15,431.00 $7,000.00 $10,543.00 21 Tie-In #7 - Ormsby/Hank Monk/Black Bart (Sheet P8)LS 1 $35,000.00 $41,634.00 $35,800.00 $42,089.00 22 Tie-In #8 - Hank Monk (Sheet P10)LS 1 $7,000.00 $15,431.00 $7,100.00 $10,679.00 23 Tie-In #9 - Snowshoe Thompson/Hank Monk (Sheet P11)LS 1 $7,000.00 $15,431.00 $7,100.00 $10,679.00 24 Tie-In #10 - Horace Greeley/Hank Monk (Sheet P13)LS 1 $5,000.00 $14,909.00 $6,300.00 $9,744.00 25 Tie-In #11 - Ormsby/Black Bart (Sheet P16)LS 1 $20,000.00 $37,197.00 $26,000.00 $33,020.00 26 Cut, Cap, and Abandon In Place Water Mains and Valves EA 8 $8,000.00 $24,728.00 $8,800.00 $87,040.00 27 Repair Damaged 4" Sewer Lateral EA 20 $18,000.00 $64,680.00 $94,000.00 $52,960.00 28 Non-Excavatable Rock Removal CY 10 $1,000.00 $6,780.00 $6,200.00 $27,060.00 29 Replace Concrete Valley Gutter SF 20 $2,000.00 $3,220.00 $1,020.00 $8,520.00 30 4-Inch Trench Patch (PG64-28)SF 15000 $165,000.00 $158,250.00 $195,000.00 $270,000.00 31 2-Inch Mill and Overlay (PG64-28 PM)SF 38500 $144,375.00 $246,785.00 $227,150.00 $269,500.00 32 3-Inch Miscellaneous Patch Paving SF 1800 $36,000.00 $36,252.00 $23,400.00 $46,800.00 $2,796,951.00 $3,616,098.00 $4,183,446.00 $5,579,242.00 33 As-Needed Water System Improvements LS 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 34 As-Needed Sewer System Improvements LS 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 35 Mobilization and Demobilization (Not to exceed 10% of Bid Schedule C, excluding this item)LS 1 $25,000.00 $6,108.00 $60,200.00 $4,487.00 36 Waterline Erosion Control LS 1 $5,000.00 $19,470.00 $29,600.00 $9,603.00 37 Groundwater Dewatering LS 1 $500.00 $4,305.00 $5,000.00 $40,030.00 38 Traffic Control LS 1 $5,000.00 $7,255.00 $29,100.00 $12,906.00 39 Sheeting, Shoring, and Bracing or Equivalent Method LS 1 $2,500.00 $2,468.00 $2,000.00 $33,222.00 40 Layout Potholing LS 1 $3,000.00 $14,210.00 $4,600.00 $48,572.00 41 8-inch Restrained C900 DR14 Water Main LF 809 $161,800.00 $164,227.00 $173,935.00 $162,609.00 42 3/4-Inch Single Service on New Main EA 13 $46,800.00 $69,810.00 $133,900.00 $44,109.00 43 1-Inch Single Service on New Main EA 1 $4,000.00 $5,474.00 $9,900.00 $3,475.00 44 3/4-Inch Base Meter Installation EA 1 $4,500.00 $3,982.00 $4,100.00 $5,938.00 45 Add for Traffic Rated Meter Installation EA 1 $500.00 $378.00 $2,700.00 $743.00 46 Fire Hydrant Installation on New Main EA 1 $14,000.00 $16,843.00 $14,300.00 $14,398.00 47 Tie-In #1 – Ham/Hwy 50 (Sheet P19)LS 1 $9,000.00 $18,997.00 $7,200.00 $17,756.00 48 Tie-In #2 – Ham/Glenwood (Sheet P19)LS 1 $15,000.00 $26,246.00 $9,800.00 $27,520.00 49 Cut, Cap and Abandon in Place Water Mains and Valves EA 2 $2,000.00 $3,082.00 $1,600.00 $6,238.00 50 4-Inch Trench Patch (PG64-28)SF 1500 $16,500.00 $22,500.00 $22,500.00 $30,000.00 51 2-Inch Mill and Overlay (PG64-28 PM)SF 6700 $25,125.00 $66,330.00 $44,220.00 $73,700.00 52 3-Inch Miscellaneous Patch Paving SF 4000 $80,000.00 $72,000.00 $48,000.00 $56,000.00 53 3-Inch Virgin AB for Dirt Road Area SF 4000 $8,000.00 $16,000.00 $12,000.00 $28,000.00 $428,225.00 $539,685.00 $614,655.00 $619,306.00 $3,425,176.00 $4,355,783.00 $4,998,101.00 $6,398,548.00 2023 Black Bart Waterline Replacement Project