HomeMy WebLinkAboutBid SummaryItem
T & S
KG Walters
Construction
Corporation
dba Resource
Development
Initial
Engineer's
Revised
Engineer's
1
insurance, and cleanup. (Note: this lump sum figure cannot
exceed 10 percent of the total amount of Bid Schedule B
LS 1 150,000.00$ 175,000.00$ 105,000.00$ 150,000.00$ 150,000.00$
2
Secondary Clarifier No. 2 Rehabilitation work including
demolition work, launder covers, concrete rehabilitation
work, and installation of new RAS piping, electrical and
instrumentation work, and all ancillary work associated with
these facilities, complete as shown and as specified in these
Contract Documents, excluding only work listed in the other
LS 1 970,000.00$ 866,000.00$ 736,600.91$ 800,000.00$ 825,000.00$
3
Secondary Clarifier No. 2 Damaged Expansion Joint Material
Removal and Replacement, including preparation, labor,
LF 60 7,500.00$ 2,400.00$ 21,810.00$ 12,000.00$ 12,000.00$
4
Equipment installation, including startup and testing for a
LS 1 225,000.00$ 368,000.00$ 219,000.00$ 150,000.00$ 250,000.00$
5
Secondary Clarifier No. 2 Sludge Collector Mechanism
concrete foundation including inlet piping, sump, subgrade
preparation, formwork, concrete, and all materials and labor
LS 1 200,000.00$ 160,000.00$ 524,500.00$ 150,000.00$ 165,000.00$
6
as specified in Section 03_01_30.72, including surface
preparation prior to application of the material, for
SF 1435 57,400.00$ 34,440.00$ 33,148.50$ 71,750.00$ 71,750.00$
7
Provide, install, and maintain erosion control measures and
LS 1 5,000.00$ 15,000.00$ 4,600.00$ 15,000.00$ 25,000.00$
8
9
for worker safety in accordance with OSHA and District
LS 1 15,000.00$ 54,000.00$ 7,300.00$ 40,000.00$ 40,000.00$
10
11 LF 300 30,000.00$ 39,000.00$ 36,960.00$ 30,000.00$ 45,000.00$
12
13
Interstitial Wall Fill with Cellular Concrete for Secondary
LS 1 125,000.00$ 125,000.00$ 124,200.00$ 125,000.00$ 150,000.00$
Subtotal 1,864,900.00$ 1,959,340.00$ 1,961,619.41$ 1,639,750.00$ 1,838,750.00$
14
15
Subtotal 200,000.00$ 200,000.00$ 200,000.00$ 200,000.00$ 200,000.00$
Total 2,064,900.00$ 2,159,340.00$ 2,161,619.41$ 1,839,750.00$ 2,038,750.00$
Bid Schedule A Secondary Clarifier No. 02 Rehabilitation Project
Bid Schdule B: Miscellaneous System Improvements
Bid Results for Secondary Clarifier No. 2 Rehabilitation Project