Loading...
HomeMy WebLinkAboutBid SummaryItem T & S KG Walters Construction Corporation dba Resource Development Initial Engineer's Revised Engineer's 1 insurance, and cleanup. (Note: this lump sum figure cannot exceed 10 percent of the total amount of Bid Schedule B LS 1 150,000.00$ 175,000.00$ 105,000.00$ 150,000.00$ 150,000.00$ 2 Secondary Clarifier No. 2 Rehabilitation work including demolition work, launder covers, concrete rehabilitation work, and installation of new RAS piping, electrical and instrumentation work, and all ancillary work associated with these facilities, complete as shown and as specified in these Contract Documents, excluding only work listed in the other LS 1 970,000.00$ 866,000.00$ 736,600.91$ 800,000.00$ 825,000.00$ 3 Secondary Clarifier No. 2 Damaged Expansion Joint Material Removal and Replacement, including preparation, labor, LF 60 7,500.00$ 2,400.00$ 21,810.00$ 12,000.00$ 12,000.00$ 4 Equipment installation, including startup and testing for a LS 1 225,000.00$ 368,000.00$ 219,000.00$ 150,000.00$ 250,000.00$ 5 Secondary Clarifier No. 2 Sludge Collector Mechanism concrete foundation including inlet piping, sump, subgrade preparation, formwork, concrete, and all materials and labor LS 1 200,000.00$ 160,000.00$ 524,500.00$ 150,000.00$ 165,000.00$ 6 as specified in Section 03_01_30.72, including surface preparation prior to application of the material, for SF 1435 57,400.00$ 34,440.00$ 33,148.50$ 71,750.00$ 71,750.00$ 7 Provide, install, and maintain erosion control measures and LS 1 5,000.00$ 15,000.00$ 4,600.00$ 15,000.00$ 25,000.00$ 8 9 for worker safety in accordance with OSHA and District LS 1 15,000.00$ 54,000.00$ 7,300.00$ 40,000.00$ 40,000.00$ 10 11 LF 300 30,000.00$ 39,000.00$ 36,960.00$ 30,000.00$ 45,000.00$ 12 13 Interstitial Wall Fill with Cellular Concrete for Secondary LS 1 125,000.00$ 125,000.00$ 124,200.00$ 125,000.00$ 150,000.00$ Subtotal 1,864,900.00$ 1,959,340.00$ 1,961,619.41$ 1,639,750.00$ 1,838,750.00$ 14 15 Subtotal 200,000.00$ 200,000.00$ 200,000.00$ 200,000.00$ 200,000.00$ Total 2,064,900.00$ 2,159,340.00$ 2,161,619.41$ 1,839,750.00$ 2,038,750.00$ Bid Schedule A Secondary Clarifier No. 02 Rehabilitation Project Bid Schdule B: Miscellaneous System Improvements Bid Results for Secondary Clarifier No. 2 Rehabilitation Project