Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BidResultList (25)
Issued on 03/31/2023; Bid due on April14, 2023 10 AM Item#Description U/M Qnty Unit Price Line Total Unit Price Total 1 Mobilization and Demobilization (not to exceed 10% of Total)LS 1 $16,500.00 $16,500.00 $38,280.00 $38,280.00 2 Erosion Control LS 1 $6,500.00 $6,500.00 $9,000.00 $9,000.00 3 Ground Water Dewatering LS 1 $5,500.00 $5,500.00 $2,000.00 $2,000.00 4 Sheeting, Shoring, and Bracing or equivalent method LS 1 $8,000.00 $8,000.00 $31,250.00 $31,250.00 5 Traffic Control LS 1 $6,050.00 $6,050.00 $15,625.00 $15,625.00 6 4” Line Stop on Steel Main EA 2 $17,405.00 $34,810.00 $36,000.00 $72,000.00 7 4” Cut-in Valve EA 4 $12,565.00 $50,260.00 $14,063.00 $56,252.00 8 6” Cut-in Valve EA 2 $13,115.00 $26,230.00 $14,438.00 $28,876.00 9 8” Cut-in Valve EA 1 $13,665.00 $13,665.00 $15,858.00 $15,858.00 10 8” Insertion Valve EA 1 $29,650.00 $29,650.00 $40,250.00 $40,250.00 11 Fire Hydrant Installation with 4” mainline valve EA 2 $17,050.00 $34,100.00 $21,000.00 $42,000.00 12 Intertie - South Ave & 4th Street LS 1 $42,000.00 $42,000.00 $29,469.00 $29,469.00 13 4” Asphalt Permanent Patch SF 1500 $19.50 $29,250.00 $21.60 $32,400.00 14 Raise Buried Valve in Caltrans ROW LS 1 $12,750.00 $12,750.00 $2,713.00 $2,713.00 15 Unknown Conditions LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $340,265.00 $440,973.00TOTAL: LAFLEUR EXCAVATING, INC.HAEN CONSTRUCTORS