Inspection report
Date:Work Order:Pipe Segment Ref.:Weather:Surveyed By:Certificate Number:
Year laid:Pre-cleaning:Pipe Joint Length:Direction:Total Length:Length Surveyed:
WinCanVX Master Server // Page: 1
City:SLT Drainage Area:Upstream MH:SR41
Street:Bal Bijou Media Label:Up Rim to Invert:
Location Code:Flow Control:Downstream MH:SR24
Location Details:Sheet Number:Down Rim to Invert:
Pipe shape:Circular Sewer Use:Total gallons used:0.0
Pipe size:6 "Sewer Category:SEC Joints passed:0
Pipe material:Polyvinyl Chloride Purpose:Joints failed:0
Lining Method:Owner:
Additional Info:
1:1622 Distance Code Observation Counter Photo Grade
0.0 AMH Manhole / SR24 00:00:00
0.0 MWL Water Level, 5% of the vertical dimension 00:00:00
13.5 LR Alignment Right, 15% changed 00:03:10 SR24-SR4
1_61fd137
0-93b9-41
M1
15.0 MMC Material Change / PVC-AC 00:03:25
22.2 MWM Water Mark, 20% of the vertical dimension 00:03:59
27.6 TFC Tap Factory Made Capped at 3 o'clock, 4inch dim 00:04:27 SR24-SR4
1_3e412b
80-7bfa-4f
30.3 S01 SRI Surface Roughness Increased from 12 o'clock to 12
o'clock, within 8 inch, Start
00:04:48 SR24-SR4
1_f6862fe
e-2b91-4b
78.3 TF Tap Factory Made at 3 o'clock, 4inch dim 00:08:13
85.2 MWL Water Level, 25% of the vertical dimension 00:08:45
91.8 S02 MWLS Water Level, Sag in pipe, 50% of the vertical dimension,
Start
00:09:04
120.0 F02 MWLS Water Level, Sag in pipe, 50% of the vertical dimension,
Finish
00:20:16 S3
138.9 TFC Tap Factory Made Capped at 3 o'clock, 6inch dim 00:16:36 SR24-SR4
1_14b007
21-2eb1-4f
180.3 MWL Water Level, 5% of the vertical dimension 00:18:30
209.1 TFA Tap Factory Made Active at 3 o'clock, 6inch dim 00:19:22 SR24-SR4
1_725565
03-d815-4
210.4 S03 DSF Deposits Settled Fine, 20% of cross sectional area from 5
o'clock to 7 o'clock, within 8 inch, Start
00:20:50 SR24-SR4
1_473640
1d-d84f-4d
9/9/2021 Nick Poohachoff U-0421-70401345 SR24-SR41
No Pre-Cleaning Upstream 303.3 '303.3 '
SR24
South Tahoe Public Utility District
Inspection report
Date:Work Order:Pipe Segment Ref.:Weather:Surveyed By:Certificate Number:
Year laid:Pre-cleaning:Pipe Joint Length:Direction:Total Length:Length Surveyed:
WinCanVX Master Server // Page: 2
1:1622 Distance Code Observation Counter Photo Grade
219.3 F03 DSF Deposits Settled Fine, 20% of cross sectional area from 5
o'clock to 7 o'clock, within 8 inch, Finish
00:21:18 M3
219.3 VZ Vermin Other, quantity:, 4, within 8 inch 00:21:32 SR24-SR4
1_717bc33
a-f603-409
M1
249.6 TF Tap Factory Made at 3 o'clock, 4inch dim 00:22:43 SR24-SR4
1_fc808a5
8-805c-4a
264.6 TBA Tap Break-In Active at 9 o'clock, 4inch dim 00:23:24 SR24-SR4
1_40a04b
95-96b0-4
290.4 TFC Tap Factory Made Capped at 3 o'clock, 4inch dim 00:24:11 SR24-SR4
1_bfea3aa
a-f246-484
301.8 TF Tap Factory Made at 9 o'clock, 6inch dim 00:24:40 SR24-SR4
1_11483c6
2-9b35-41
302.7 MMC Material Change / AC-PVC 00:25:03
303.3 F01 SRI Surface Roughness Increased from 12 o'clock to 12
o'clock, within 8 inch, Finish
00:27:42 S1
303.3 MSA Survey Abandoned / Camera hung up on 6" Lateral 00:29:02 SR24-SR4
1_6961b7
26-0a6f-41
9/9/2021 Nick Poohachoff U-0421-70401345 SR24-SR41
No Pre-Cleaning Upstream 303.3 '303.3 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
361J 3212 73.0 8.0 1.2 2.0 1.281.0
QOR
381J
South Tahoe Public Utility District
Page 3
Section Pictures - 9/9/2021 - SR24-SR41
SLT Bal Bijou 9/9/2021 SR24-SR41 1490
SR24-SR41_61fd1370-93b9-4118-a8f8-ff53233160a1_20210
909_075731_319.jpg, 00:03:10, 13.50ft
Alignment Right, 15% changed
SR24-SR41_f6862fee-2b91-4bcc-a056-8e5fbfe86e72_202109
09_080024_682.jpg, 00:04:48, 30.30ft
Surface Roughness Increased from 12 o'clock to 12 o'clock,
within 8 inch, Start
SR24-SR41_3e412b80-7bfa-4feb-ba98-2ba8314ca134_20210
909_075953_947.jpg, 00:04:27, 27.60ft
Tap Factory Made Capped at 3 o'clock, 4inch dim
SR24-SR41_14b00721-2eb1-4fd6-9414-b9ed9a469581_2021
0909_081311_146.jpg, 00:16:36, 138.90ft
Tap Factory Made Capped at 3 o'clock, 6inch dim
City Street Date Lateral Segment Reference Nr.
South Tahoe Public Utility District
Page 4
Section Pictures - 9/9/2021 - SR24-SR41
SLT Bal Bijou 9/9/2021 SR24-SR41 1490
SR24-SR41_72556503-d815-4544-aaa3-e45dbaee2433_2021
0909_081620_660.jpg, 00:19:22, 209.10ft
Tap Factory Made Active at 3 o'clock, 6inch dim
SR24-SR41_717bc33a-f603-409e-977b-5aa86dcd3b1e_2021
0909_082002_831.jpg, 00:21:32, 219.30ft
Vermin Other, quantity:, 4, within 8 inch
SR24-SR41_4736401d-d84f-4d1d-99fa-de5c10fdadeb_20210
909_081858_408.jpg, 00:20:50, 210.40ft
Deposits Settled Fine, 20% of cross sectional area from 5
o'clock to 7 o'clock, within 8 inch, Start
SR24-SR41_fc808a58-805c-4aa4-8dd3-57b5b8db05ba_2021
0909_082123_691.jpg, 00:22:43, 249.60ft
Tap Factory Made at 3 o'clock, 4inch dim
City Street Date Lateral Segment Reference Nr.
South Tahoe Public Utility District
Page 5
Section Pictures - 9/9/2021 - SR24-SR41
SLT Bal Bijou 9/9/2021 SR24-SR41 1490
SR24-SR41_40a04b95-96b0-4257-bd51-8a7efa371da2_2021
0909_082218_336.jpg, 00:23:24, 264.60ft
Tap Break-In Active at 9 o'clock, 4inch dim
SR24-SR41_11483c62-9b35-411b-897d-47b87c5a6dfb_2021
0909_082356_464.jpg, 00:24:40, 301.80ft
Tap Factory Made at 9 o'clock, 6inch dim
SR24-SR41_bfea3aaa-f246-4840-832f-73d10f0ede09_20210
909_082314_617.jpg, 00:24:11, 290.40ft
Tap Factory Made Capped at 3 o'clock, 4inch dim
SR24-SR41_6961b726-0a6f-4150-9a42-7a9cab64fdda_20210
909_082912_038.jpg, 00:29:02, 303.30ft
Survey Abandoned / Camera hung up on 6" Lateral
City Street Date Lateral Segment Reference Nr.