Loading...
HomeMy WebLinkAboutWinCanVX SR24-SR41South Tahoe Public Utility District Inspection report Date:Work Order:Pipe Segment Ref.:Weather:Surveyed By:Certificate Number: Year laid:Pre-cleaning:Pipe Joint Length:Direction:Total Length:Length Surveyed: WinCanVX Master Server // Page: 1 City:SLT Drainage Area:Upstream MH:SR41 Street:Bal Bijou Media Label:Up Rim to Invert: Location Code:Flow Control:Downstream MH:SR24 Location Details:Sheet Number:Down Rim to Invert: Pipe shape:Circular Sewer Use:Total gallons used:0.0 Pipe size:6 "Sewer Category:SEC Joints passed:0 Pipe material:Polyvinyl Chloride Purpose:Joints failed:0 Lining Method:Owner: Additional Info: 1:1622 Distance Code Observation Counter Photo Grade 0.0 AMH Manhole / SR24 00:00:00 0.0 MWL Water Level, 5% of the vertical dimension 00:00:00 13.5 LR Alignment Right, 15% changed 00:03:10 SR24-SR4 1_61fd137 0-93b9-41 M1 15.0 MMC Material Change / PVC-AC 00:03:25 22.2 MWM Water Mark, 20% of the vertical dimension 00:03:59 27.6 TFC Tap Factory Made Capped at 3 o'clock, 4inch dim 00:04:27 SR24-SR4 1_3e412b 80-7bfa-4f 30.3 S01 SRI Surface Roughness Increased from 12 o'clock to 12 o'clock, within 8 inch, Start 00:04:48 SR24-SR4 1_f6862fe e-2b91-4b 78.3 TF Tap Factory Made at 3 o'clock, 4inch dim 00:08:13 85.2 MWL Water Level, 25% of the vertical dimension 00:08:45 91.8 S02 MWLS Water Level, Sag in pipe, 50% of the vertical dimension, Start 00:09:04 120.0 F02 MWLS Water Level, Sag in pipe, 50% of the vertical dimension, Finish 00:20:16 S3 138.9 TFC Tap Factory Made Capped at 3 o'clock, 6inch dim 00:16:36 SR24-SR4 1_14b007 21-2eb1-4f 180.3 MWL Water Level, 5% of the vertical dimension 00:18:30 209.1 TFA Tap Factory Made Active at 3 o'clock, 6inch dim 00:19:22 SR24-SR4 1_725565 03-d815-4 210.4 S03 DSF Deposits Settled Fine, 20% of cross sectional area from 5 o'clock to 7 o'clock, within 8 inch, Start 00:20:50 SR24-SR4 1_473640 1d-d84f-4d 9/9/2021 Nick Poohachoff U-0421-70401345 SR24-SR41 No Pre-Cleaning Upstream 303.3 '303.3 ' SR24 South Tahoe Public Utility District Inspection report Date:Work Order:Pipe Segment Ref.:Weather:Surveyed By:Certificate Number: Year laid:Pre-cleaning:Pipe Joint Length:Direction:Total Length:Length Surveyed: WinCanVX Master Server // Page: 2 1:1622 Distance Code Observation Counter Photo Grade 219.3 F03 DSF Deposits Settled Fine, 20% of cross sectional area from 5 o'clock to 7 o'clock, within 8 inch, Finish 00:21:18 M3 219.3 VZ Vermin Other, quantity:, 4, within 8 inch 00:21:32 SR24-SR4 1_717bc33 a-f603-409 M1 249.6 TF Tap Factory Made at 3 o'clock, 4inch dim 00:22:43 SR24-SR4 1_fc808a5 8-805c-4a 264.6 TBA Tap Break-In Active at 9 o'clock, 4inch dim 00:23:24 SR24-SR4 1_40a04b 95-96b0-4 290.4 TFC Tap Factory Made Capped at 3 o'clock, 4inch dim 00:24:11 SR24-SR4 1_bfea3aa a-f246-484 301.8 TF Tap Factory Made at 9 o'clock, 6inch dim 00:24:40 SR24-SR4 1_11483c6 2-9b35-41 302.7 MMC Material Change / AC-PVC 00:25:03 303.3 F01 SRI Surface Roughness Increased from 12 o'clock to 12 o'clock, within 8 inch, Finish 00:27:42 S1 303.3 MSA Survey Abandoned / Camera hung up on 6" Lateral 00:29:02 SR24-SR4 1_6961b7 26-0a6f-41 9/9/2021 Nick Poohachoff U-0421-70401345 SR24-SR41 No Pre-Cleaning Upstream 303.3 '303.3 ' QSR QMR SPR MPR OPR SPRI MPRI OPRI 361J 3212 73.0 8.0 1.2 2.0 1.281.0 QOR 381J South Tahoe Public Utility District Page 3 Section Pictures - 9/9/2021 - SR24-SR41 SLT Bal Bijou 9/9/2021 SR24-SR41 1490 SR24-SR41_61fd1370-93b9-4118-a8f8-ff53233160a1_20210 909_075731_319.jpg, 00:03:10, 13.50ft Alignment Right, 15% changed SR24-SR41_f6862fee-2b91-4bcc-a056-8e5fbfe86e72_202109 09_080024_682.jpg, 00:04:48, 30.30ft Surface Roughness Increased from 12 o'clock to 12 o'clock, within 8 inch, Start SR24-SR41_3e412b80-7bfa-4feb-ba98-2ba8314ca134_20210 909_075953_947.jpg, 00:04:27, 27.60ft Tap Factory Made Capped at 3 o'clock, 4inch dim SR24-SR41_14b00721-2eb1-4fd6-9414-b9ed9a469581_2021 0909_081311_146.jpg, 00:16:36, 138.90ft Tap Factory Made Capped at 3 o'clock, 6inch dim City Street Date Lateral Segment Reference Nr. South Tahoe Public Utility District Page 4 Section Pictures - 9/9/2021 - SR24-SR41 SLT Bal Bijou 9/9/2021 SR24-SR41 1490 SR24-SR41_72556503-d815-4544-aaa3-e45dbaee2433_2021 0909_081620_660.jpg, 00:19:22, 209.10ft Tap Factory Made Active at 3 o'clock, 6inch dim SR24-SR41_717bc33a-f603-409e-977b-5aa86dcd3b1e_2021 0909_082002_831.jpg, 00:21:32, 219.30ft Vermin Other, quantity:, 4, within 8 inch SR24-SR41_4736401d-d84f-4d1d-99fa-de5c10fdadeb_20210 909_081858_408.jpg, 00:20:50, 210.40ft Deposits Settled Fine, 20% of cross sectional area from 5 o'clock to 7 o'clock, within 8 inch, Start SR24-SR41_fc808a58-805c-4aa4-8dd3-57b5b8db05ba_2021 0909_082123_691.jpg, 00:22:43, 249.60ft Tap Factory Made at 3 o'clock, 4inch dim City Street Date Lateral Segment Reference Nr. South Tahoe Public Utility District Page 5 Section Pictures - 9/9/2021 - SR24-SR41 SLT Bal Bijou 9/9/2021 SR24-SR41 1490 SR24-SR41_40a04b95-96b0-4257-bd51-8a7efa371da2_2021 0909_082218_336.jpg, 00:23:24, 264.60ft Tap Break-In Active at 9 o'clock, 4inch dim SR24-SR41_11483c62-9b35-411b-897d-47b87c5a6dfb_2021 0909_082356_464.jpg, 00:24:40, 301.80ft Tap Factory Made at 9 o'clock, 6inch dim SR24-SR41_bfea3aaa-f246-4840-832f-73d10f0ede09_20210 909_082314_617.jpg, 00:24:11, 290.40ft Tap Factory Made Capped at 3 o'clock, 4inch dim SR24-SR41_6961b726-0a6f-4150-9a42-7a9cab64fdda_20210 909_082912_038.jpg, 00:29:02, 303.30ft Survey Abandoned / Camera hung up on 6" Lateral City Street Date Lateral Segment Reference Nr.