HomeMy WebLinkAboutTahoe KeysIslanders 2 Utilities
John Cefalu <John,Cefalu@fsresidential.com>
Thu 6/6/2024 5:07 PM
To:Sabine Litten <sl,caldak@gmail.com>;Hallie Kirkingburg <HaIlie. Kirkingburg @fsresidentiaLcom>;ken,silveira <ken.silveira@msn.com>;
michellepandori <michellepandori@yahoo.com>
Cc:Madelyn Nicholas <Madelyn.Nicholas@fsresidentiaLcom>;Kyle Miller<Kyle.Miller2@fsresidential,com>
0 3 attachments (9 MB)
Islanders 2 Water Line Events,docx; Islanders 2 Sewer Report.pdf; 12 Sewer and Water Invoices to Contractors.pdf;
Hello Everyone,
Here is everything we've drummed up to this point:
Water Line Events (Provided by Raul on three different occasions in past three years) - still working to get dates
attached to these and Jen is working on reports from her system.
o There are an additional 8 events that Haen has (I am trying to cross reference invoices to find these exact
dates)- Haen is looking through his system on Monday, but the main issue we are running into is before we
got here they did not used to submit invoices by Cove (which is making them harder to track down than
anticipated.
12 Sewer and Water Invoices
o These are invoices that have gone directly to 12 that have been entered properly as Islanders 2 (will be in
conjunction with Haen Monday)
12 Sewer Report
• We also heard from ZTec, the plumber in question and he was not aware of a large majority of the issues
o Here is a summary (outside of the report) that we are dealing with:
■ Per code, sewer laterals need to be 4" pipe (this comes with needing a 2% slope, as soon as you go
over a 4" pipe, you no longer need that 2% slope, but then you are required by code to install a
manhole for access. We have 6" pipe at roughly a static slope with no manhole which is helping cause
the problem.
■ We currently have 6" ABS pipe, whereas the norm would be SDR26 used for sewer lines
■ No ABS glue was used for joints, it was Christy's red hot which causes breaks in joints and failure
through pressure,
■ Whereas the individual on the call was correct as of the date that Ztec had come out to clear root
intrusion, that is not a cure to root intrusion. That is basically what jetting lines does is clear those
intrusions, but intrusions come back. Once you have root intrusions, simply clearing them does not
cause them to go away unless you continually jet multiple times per year, which has been the case as
seen in invoices attached.
■ Based on scoping and report, root intrusions and bellies located in multiple locations, part of the
repair solution provided by Ztec is using a liner for the sewer lines which does not fix the belly and/or
slop issue.
Water Line Additional Info
o Useful Life of Galvanized Pipe: https: repipe.com/articles/how-long-do-galvanized-pipes-last.htmI
■ Islanders 2 was constructed in 1960, meaning the galvanized pipe used for the laterals is currently 64
years old. Even without leaks, water events and repairs, we are coming up at the tail end of the
useful life,
o Electrolysis in Dissimilar Metal Plumbing https://www,nuflowmidwest.com/will-using-dissimilar-plumbing:
pipe -metals -accelerate -pipe -corrosion/
■ The current water system has galvanized pipe, connecting to copper transitions into homeowner
units, and in a lot of cases brass fittings in between. Even though we are seeing a lot of pinholes and
corrosion on the galvanized pipes themselves, most of the leaks are coming at the connection points
where electrolysis is speeding up corrosion at joints and causing additional leaks.
More to come when I get can reporting from Jen, dates from Raul on attached pictures, and Invoices for any Haen work
as we track it down. Raul also dropped of samples of lines that have been removed in the Tahoe Keys which further
shows what we are talking about.
Best,
JOHN CEFALU
Facilities Director
t7a-hoe keys Tahoe Keys Property Owners Association
356 Ala Wai Blvd I South Lake Tahoe, CA 96150
Direct: 530.542.6444
Fax: 530.541.2521
Email: john.cefalu@fsresidential.com
000 Book time with John Cefalu
tkpoa.com
IiStSE.'iVICe ,xrv^;mr rnnl 24/7 Customer Care Center: 800.428.5588
Website I Facebook I Linkedln I YouTube
Islanders 2 Water Line Events
Haen Constructors
1012 Industrial Ave Ste 2
South Lake Tahoe, CA 96150
(530) 541-4700
Islanders 2 - Sewer System:
Overall sewer system has minor bellies and some areas of excess buildup and should be cleaned more
regularly. No flush inlets were noted on the 6" mains so all access points are 4" diameter clean outs.
Below are some notes and screenshots of issues identified.
A clean out at unit 291 was used to access the sewer main. A small belly was encountered as the camera
entered the 6" main from the 4". High water stains are visible on the pipe near the top, evidence of
previous bacl<ups (Figure 1). Significant build up was also encounter on pipe walls in some places
reducing pipe capacity by 60% (Figure 2).
Figure 1
Haen Constructors
1012 Industrial Ave Ste 2
South Lake Tahoe, CA 9M50
(530) 541-4700
Figure 2
Unit 282 - Sewer main accessed from clean out at unit 282. At 10' a separated joint was encountered
(Figure 3).
Figure 3
Haen Constructors
IMEM211111�3 1012 Industrial Ave Ste 2
H A E N South Lake Tahoe, CA 96150
CONSTRUCTORS (530) 541-4700
Unit 292 — Sewer main was accessed through clean out in front of unit 292. Joints just inside of cleanout
appear to be broken (Figure 4). No other defects were noted
Figure 4 '
A final large root intrusion was located near the retaining wall, adjacent to a large tree. See
(Figure 5).
Tahoe Keys Property Owners' Association
4Vessel Registration
Name:
Keys Address: Unit#:
Phone #: Cell Phone #:
Vessel Information
Mal<e:
Length: Feet Inches
Vessel #:
Required Paperwork
For Property Owners:
® Copy of current Registration
® Copy of current Insurance Policy (100,000 Liability)
(Check Expiration Dates, Must a# be in the same name)
For Long Term Rental Tenants:
® Copy of current Registration
® Copy of current Insurance Policy (100,000 Liability)
® Copy of the Rental Agreement
® Copy of a current utility bill
(Check Expiration Dates, Must a// be in the same name)
For Vacation Rental Tenants (less than 30 days):
® Copy of current Registration
® Copy of current Insurance Policy (100,000 Liability)
® Copy of the Rental Agreement
(Check Expiration Dates Must all be in the same name)
Fees
* $25.00 for Vacation renters (anything under 30 days)
* $30.00 for Long-term renters (anything over 30 days)
* NO FEE for Homeowners
Annual Sticl<er #:
Issue Date:
Issued by:
03/15/2020
Renter Stickel• #:
Expiration Date:
(For Internal Use Only)
h4; Chavez Plumbing Inc.
807 Eloise Ave
South Lake Tahoe, CA 96150
BilI To
Tahoe Keys POA
356 Ala Wai Blvd
S I L 1 T l C 96150
Invoice
Dine Imroicc !1
8/28/2020 I 4200
""Ccounts Paya oe � Mail
r icicup
tanerating Reserve Mold
out 1 a <e a ioe, a
hur.;i
1.5
ry'(od•--- -Date:--
Approval:
Work Order No, Due Dale i lob Address
3278 8/28/2020 2081 Venice Dr 11282
I
Descriptiou Rate Amounl
Found broken frost free hose bib and had to call Tahoe Keys to turn water off to owners
own main water shut off. The shut off was not working and had to replace. Check work and
all in good working order.
Frost Free Hose Bib
08/28/2020: Francisco - Labor
Sales Tax / City of South Lake Tahoe 2018/2019
80.00 1 80.00T
130.00 ( 195.00
7.75% 6.20
Total $281.20
$281.20
Phone it
(530)721-2531 chuvczplombin82531(r�gn�ail.conr
CHAVPL - CHAVEZ PLUMBING
Thursday, June 6, 2024 2:28 PM
P,O. Box 17052
So, Lake Tahoe, CA 96151
Date Type
11 /25/2019 Invoice
Check
03/01 /2020 Invoice
Check
08/28/2020 Invoice
Check
10/20/2020 Invoice
Check
08/19/2021 Invoice
Check
09/22/2021 Invoice
Check
10/08/2021 Invoice
Check
04/19/2022 Invoice
Check
06/24/2022 Invoice
Check
Document #
3386
267
3708
281
4200
307
3994
314
5197
347
5250
1018
5339
1021
5814
363
5976
367
12 - TKTH Islanders 2
Reference
Clear Sewer Line
Check (Computer)
2/24SewerLnCams-#287,290
Check (Computer)
Hose Bib Repair#281&282
Check (Computer)
Sewer Line Repair #290
Check (Computer)
Emergy Sewer CleanUp#290
Check (Computer)
Sewer at 280/290
Check (Computer)
sewer line repair
Check (Computer)
Sewer Line Snaked - #289
Check (Computer)
Sewer Cleaned Out #289
Check (Computer)
Invoice Activity
Total Payables: 18,245.70
Invoice Disbursement: 18,245.70
Cancelled Payables; 0.00
Current Balance: 0.00
Amount
$200.00
($200.00)
$0.00
$630.00
($630.00)
$0.00
$281.20
($281.20)
$0.00
$900,00
($900.00)
$0.00
$295.00
($295.00)
$0.00
$7,650.43
($7,650.43)
$0.00
$7,829.07
($7,829.07)
$0.00
$265.00
($265.00)
$0.00
$195.00
($195.00)
$0.00
vz 14"Mi ing Inc,
ti,lulll I .ILI' I,dlu,�. � 1 veil `•U
Jilt! is
1;oll lr hive
350 Ala \\',li 1110
ti,1nt11 I akl• i;ihol% ('.I the M
M
1�: Ad f .
'list
I
Ull 1(1 ,71171:( ill ati111181t 11�' 111111 %''til. I)IIII 1111 IIIiC fbJl 11.U1 II di11 I11 lbl' hilt'. I IRllid I' ';1'vvCf
1
ea" line light above drain Zinc. I lad to nl.ikc trench bii-oci III he able to mo c
-.0\er hill' mcl alltl }'1'( It Illlt t1111111111(k1 }'ati lili('.
i I
I
M 17 NOI: ow llll W"O Iine I" ill Ama A MA 11 "1n (No 11.1d milt 11.'IwIl.inllll. It\ IIIIII 1
,. N'hl lilt '.('ill(11) Jill! mid `wl Ill`VA I" r\IV-, hill' mid L'lov II a I S 1'M& '\II 11L11
10 LIkli' d110 t11 111C pl lint'. Mi kod 1111ed 1111c.
j I
ug 22 Q I : (A u o ~!'Mill! I& 11 VM and No mm V ABS pipe AH in i!lllltl vsull.in;1
�
uid r. Kwkcd fill
�I I
1
I
ttul�I' \13ti I'i1�y, i �u
II nil
,,I;,1nl11
IIn!lul
II'itw, I(1,AIitil Iltlhliln'
( ` , it I l ;
I
I I rrnrhel (quilvni(•nt I ry, I..I„II Ill
� I. tau nil
('ow-w(e `-;'m 1'1111ipinrnt I Ill'
j
�1)IIu1111r�' � `nnnl
'nl..
� I O9 I it "0" 1: 1U IIU
1� '1llf lln
lanic" - kibol I UI IIII
I, 11111111
IN (W'v U021:D.1Id..I1lbol h�lul�
i
I
I vII(I
t l l I I II i
ti ` 1111 I .1 _4),'. 1 :.!Mall - 1 •Ib111.
;111111
1 111: IJII
1, 1...........1 ,,.,, ,i lil ,1 , •Ili Illl—A . „t,\a ,II• II. I 11,'uA IIII \Jill! I`I1 .III. "�'. - 11I II 1111 ,'I IIII' III
l kill mhuullnnl v, l I Il -nl,ui will
Alcorn Enflinooring Ino
P804 ;;;Into Chu!; I)fl%/()
,,ou I I I I aki) f it I I()(), (,A 9f' 150 t P�',
AL alconlow)Inomino(womml com
BILL TO
TKPOA
a% Alo W;d Blvd
S Lako ],,ihoo, CA 96150
P,O. NUMBER
Island(w, 11Utility AC, patchin
Utility Patching
Patch parking lot utility trpnche�; with hit mix
asphalt
<
BALANCE DUL
INVOICE # 11139
DATE 10.;1812021
DUE DATE 1 (Y 1812021
TERM,") Mai on tpcoipt
WO 00
I II.Ink ym; fof y, r.,f hwonw, 0 A : I , :,I,fvf� o I,;o w0l i o 1 1, if :(, '(III : Ild 11, Iyfrwlli,
R
1) I .5O0.00
Tahoe Keys 110A
356 Ala War Blvd,
South Lake Tahoe, CA 9611;0
khnd(�r 11 )
2081 Venice N ive
As per I onl Callahan
PO t) 1 FIRMS Due DUF- DATF 10/ 18/2019
Rr P
HA
M SCRIP IION
t,ry
PIM
AM( M11I
Inspect seiner line at VP"WP and Christie, Returner) to camera and mark `;ewer
line. Found roots at 15 16 feet and at 109 feet. Markers Sewer lkw and made
note! of Issue, Attuned to dll; Up Sewer line n'xt to lunisp to repla(e (:dannigM
;e(tknL Replaced %edion of darnll;ed %Pwer line fmin I)rO,ty line at
approximately 12 feet out. Ba( kfrlled and started or) a %o(-on(d spot Rehlned
to t mu nne chgging (11) sewer bile. Had to Saw out asphalt, found a 6" main.
Replaced ,vction of sewer line. BackhHed. Removed de.brrs. Conlpart and
Wall base in driveway area. Remove all cones and fence.
Camera Charge 5/17/19
1,5
250,00
375.00
Labor Fees: 06/21/19 AG
1
140,00
140.00
Labor Fees: 10/14/19 SG
5.75
140.00
805.00
I.abor 1:ees: 10/14/19 HA
5. /5
140.00
805.00
Labor Fees: .10/15/19 HA
6,5
140,00
91O.00
Lobar Fees: 10/15/19 SG
7.5
14 0. 00
11050.00
labor Fees IN 16M9 SG
7
140.00
Labor I ow,: 10/16/11) HA
I
14O,00
98000
Labor Ives: 1,01 // 19 SG
6. /5
140.00
9/111'00
Labor Fee,: 10/ 17/ 19 11A
635
140.00
94`_ MO
Mir Excavator Days
3
150.00
750.00
Wax Rhip,
1
6,50
6,50
Saw Cutter
1
140.00
14(100
lunlpinl; lack
I
11).00
75.UC>
Base Material
2
10.00
60,00
Olsposal Fee
44.00
44.00
4" ABS hype
40
4.00
160.00
4" Female Adaptor with Phill, ABS
2
HMO
28.00
4" Combo ABS
1
112.00
4 2. 00
3" x 4" Fernco
1
18.00
18.00
4" Fernco AC / PI
4
18.00
/2.0()
Thank you for y(lur business.
PWW I
Total
12 - TKTH Islanders 2
LKTAHP - Lake Tahoe Plumbing & Heating Invoice Activity
Thursday, June 6, 2024 2,43 PM
Total Payables:
11,222.50
1611 Shop Street
Invoice Disbursement:
11,222,50
Suite 2A
Cancelled Payables;
0.00
SO LAKE TAHOE, CA 96150
Current Balance:
0.00
Date Type
Document #
Reference
Amount
01/30/2020 Invoice
206658
sewer line repair
$9,542.50
Check
1015
Check (Computer)
($9,542,50)
$0.00
12/23/2020 Invoice
209334
Cleanout Sewer Line-#288
$180.00
Check
325
Check (Computer)
($180.00)
$0,00
01/02/2021 Invoice
209389
Cleanout Sewer Line-#292
$1,500.00
Check
325
Check (Computer)
($1,500.00)
$0.00
Chavez Plumbing Inc.
807 Eloise Ave
South Lake Tahoe, CA 96150
Tahoe Keys POA
356 Ala Wai Blvd
South Lake Tahoe, Ca 96150
Invoice
Date 111voice 4
8/28/2020 4200
"accounts Payable Mail
Pickup
Oneratbig Reserve Hold
----Date:
Approval: Date:
3279 1 8/28/2020
Found broken frost free hose bib and had to call Tahoe Keys to turn water off to owners
I own main water shut off. The shut off was not working and had to replace. Check work and
al I in good working order.
Frost Free Hose Bib
1.5108/28/2020: Francisco - Labor
Sales Tax / City of South Lake'rahoe 2018/2019
2081 Venice Dr #282
80.00 1
80.001,
130.00
195.00
7.75%
6.20
Total $281.20
$281.20
1111011C 9 (530)721-2531 chavezplumbing253 I (i—egmail.com
12 - TKTH Islanders 2
CHAVPL - CHAVEZ PLUMBING
Thursday, June 6, 2024 2:28 PM
P,O. Box 17052
So. Lake Tahoe, CA 96151
Date
Type
Document #
Reference
11/25/2019
Invoice
3386
Clear Sewer Line
Check
267
Check (Computer)
03/01 /2020
Invoice
3708
2/24SewerLnCams-#287, 290
Check
281
Check (Computer)
08/28/2020
Invoice
4200
Hose Bib Repair#281&282
Check
307
Check (Computer)
10/20/2020
Invoice
3994
Sewer Line Repair #290
Check
314
Check (Computer)
08/19/2021
Invoice
5197
Emergy Sewer Cleanup#290
Check
347
Check (Computer)
09/22/2021
Invoice
5250
Sewer at 280/290
Check
1018
Check (Computer)
10/08/2021
Invoice
5339
sewer line repair
Check
1021
Check (Computer)
04/19/2022
Invoice
5814
Sewer Line Snaked - #289
Check
363
Check (Computer)
06/24/2022
Invoice
5976
Sewer Cleaned Out #289
Check
367
Check (Computer)
Invoice Activity
Total Payables: 18,245.70
Invoice Disbursement: 18,245.70
Cancelled Payables: 0.00
Current Balance: 0.00
Amount
$200.00
($200.00)
$0.00
$630.00
($630.00)
$0.00
$281.20
($281.20)
$0.00
$900.00
($900.00)
$0.00
$295.00
($295.00)
$0.00
$7,650.43
($7,650.43)
$0.00
$7,829.07
($7,829.07)
$0.00
$265.00
($265.00)
$0.00
$195.00
($195.00)
$0.00
W + dc"
Chavez 1"Iti"Ihiing lliniv
j wuv Pw,N r, YN
On Ahl Wai Md
SMAh I Ac I ,air s% (A
So=
11 X"I
I � I I I ) ) I It , : I "i 6" 1 %, I,— I �r
W v2W and :2TH:
W) in A to avirth by U00, YJ low ir to Ad hy a do M Vdiviv I WMd F
Joe and 2" gn hne Qu Mume lain low I Wd b, ortak vcnd; fignei os R As to it
-~l hic '""'a and k out fiom ljodt'.'x9`, hfic
WN 17 10 J: IN, up w"n Line to do ham A mm -?M W had ;,40 fivowitzammi H, inn,
t:ln 'Ccllol. oin xibi sel ne" V ABS PYC dMI pot d .1 1 X" vomit \11 At 0 X%dalk"101
Po gNv it bi dw ga, Ow. BaAcd nNal htw,
(Vit 22 NO (in ma nuM A wfil 0") and A no" � ` ABN pQv. AH in y"A vioNno-',
,W MIA ill
T, \W, I'o'!
4" 1 van" I oAk"-t 4, olifilinv,
Yrcuchk'r 1"palf'"111"In I ""n
( on"-rcic'save Filutralwill I ec
lomw I c4"
qP; to 0121 VMS. I ANM
09 16 2021 Ljmw� - I okt 4
(M I o 2,02 1 D'I'o id - I sIkor
"01) 17 -'i 12 1: luavi - I at-,t q
17 -10' J: lama-, - I A,ot
WYMP I V"" F"M"A qj" "IV of'
Alcorn Engineering Inc
8 O'd I (Jxi^ Drive,
50 US
a I C i-I r n o F) g 1 n, Hl' f i v g (a) q rt 1 a i 1, C o -i
www
BILL TO
TKPOA
kt Ala Wat Blvd
S, Lako Tahoo, CA 96150
P.O. NUMBER
lsdandpf°-� 11 Mihly AC palf,:Jim
UtjW Patching
Patch parknq lol uldity trenches with hit mrx,
asphalt
INVOICE # 1389
DATE I O1 8/21D21
DUE DATE 10
TERMS Dist-- on tw-pipl
I I", ()o 2, 5 0 ID 0 11)
BALANCE DUE $2,500.00
P, m-, voui 1,)f b , ,,'A:!,-ry . , wvli �,, -1 4,3t , 't�l � Ild I I'll; wwl�
Tahoe Keys POA
356 Ala Was Blvd.
South Lake Tahoe, GA 96150
I E P tyl '-', Due
L)ESCRIPTI(-�N
-1081 Venice Drive
A,, per Torn Callahan
F)UF DATF 10/18/2019 PL P HA
Inspect sewer line at Venice and Christie. Returned to (amera and mark ,ovver
line, Freund rooV, At 15-16 feet and at 109 feet, Marked -.es es lint., and roade
note of issue Returned to dig tip �ewer Line next to hemse to rr fa0 at r damaged
,ecfion, Replaced section of damaged ,ewer line from property line at
approximately 12 feet out, Bar filled And %tarted on a .,(,,roncJ <,pol Retuined
to continue digging up --,,,ewer line, Hid to saw out asphalt, found a G" Irlain,
Replaced section of sewer line. Backfilled. Removed dr2bri,,. (ompact ind
sw,tall base in driveway area. Remove all cones and fence.
Camera Charge 5/17/19
1,5
250,00
375.00
Labor Feces: 06/21/19 AG
1
14000
14CLOO
Labor Fees: 10/14/19 SG
5.75
140,00
805,00
Labor Fees10/14/19 HA
�), /5
140,00
80500
1, a bor Fees: 10/15/19 HA
6,5
140,00
910,00
Labor fees10/15/19 SG
7.5
140,00
1,01)0.00
La b o r Fees: 10/16/19 SG
7
14000
Labor Fees -1 10/16/19 HA
7
14000
980 00
Labor Fees1017/19 SG
6 /5
140,00
9 4 S, (X)
Labor Fee,, , 10/17/19 HA
6,75
140,00
9111).00
Mini Excavator Days
3
250.00
750,00
Wax Ring
1
6,50
is 1) ()
Saw Cutter
1
140.00
140,00
Jumping Jack
1
7 5. Oo
/ 1) 00
Base Material
2
30.00
6000
Disposal fee
44.00
44 00
4" ABS Pipe
40
4,00
16000
4" Feniale Adaptor with Plug ABS
2
1400
28,00
4" (orribcs ABS
1
42 00
42,01)
3" x 4" Fernco
1
1&00
I&OL)
4" Fetrics) A( / Pl-
4
18,00
17 2, 00
Thank, Von for your
P,A,4t- I
12 - TKTH Islanders 2
LKTAHP - Lake Tahoe Plumbing & Heating Invoice Activity
Thursday, June 6, 2024 2:43 PM
Total Payables:
11,222.50
1611 Shop Street
Invoice Disbursement:
11,222.50
Suite 2A
Cancelled Payables:
0.00
SO LAKE TAHOE, CA 96150
Current Balance:
0.00
Date Type
Document #
Reference
Amount
01/30/2020 Invoice
206658
sewer line repair
$9,542.50
Check
1015
Check (Computer)
($9,542.50)
$0.00
12/23/2020 Invoice
209334
Cleanout Sewer Line-#288
$180.00
Check
325
Check (Computer)
($180.00)
$0.00
01/02/2021 Invoice
209389
Cleanout Sewer Line-#292
$1,500.00
Check
325
Check (Computer)
($1,500.00)
$0.00