Loading...
HomeMy WebLinkAboutSM8-SM7South Tahoe Public Utility District      Page P-1 Number of sections 1 Total length of sections 344.21 ft Total length of inspected sections 181.92 ft Total length of not inspected sections 0.00 ft Total abandoned inspections 0 Number of section inspection photos 15 Number of section inspection videos 0 Number of section inspection scans 1 Number of section inclination measurements 0 Pipe Segment Reference SM8-SM7 Upstream MH SM8 City SLT Downstream MH SM7 Street Venice Dr Profile Circular 8inch Total Length 344.2 Material Asbestos Cement Distance PACP Code Observation 1 0.0 AMH Manhole 2 0.0 MWL Water Level, 10% of the vertical dimension 3 2.1 SRI Surface Roughness Increased from 9 o'clock to 3 o'clock, within 8 inch 4 6.7 VC Vermin Cockroach, within 8 inch 5 20.0 DSF Deposits Settled Fine, 40% of cross sectional area from 4 o'clock to 8 o'clock, within 8 inch 6 21.0 TF Tap Factory Made at 3 o'clock, 4.0inch dim, within 8 inch 7 23.1 RFJ Roots Fine Joint from 9 o'clock to 3 o'clock, within 8 inch 8 25.0 SRI Surface Roughness Increased from 9 o'clock to 3 o'clock, within 8 inch 9 25.0 VC Vermin Cockroach, within 8 inch 10 32.1 MWM Water Mark, 60% of the vertical dimension 11 47.1 SSS Surface Spalling from 10 o'clock to 1 o'clock 12 60.4 DAGS Deposits Attached Grease, 5% of cross sectional area at 4 o'clock, within 8 inch 13 65.6 DAGS Deposits Attached Grease, 5% of cross sectional area at 4 o'clock, within 8 inch 14 77.4 SSS Surface Spalling at 10 o'clock, within 8 inch 15 119.2 IS 16 119.2 DAE Deposits Attached Encrustation, 5% of cross sectional area at 4 o'clock 17 119.2 IW Infiltration Weeper at 1 o'clock 18 161.2 DAE 19 168.3 DAE 20 170.2 DAE Deposits Attached Encrustation, 5% of cross sectional area at 8 o'clock, within 8 inch 21 176.6 DAE Deposits Attached Encrustation, 5% of cross sectional area at 8 o'clock, within 8 inch 22 177.4 ISJ 23 177.5 RFJ Roots Fine Joint from 9 o'clock to 3 o'clock, within 8 inch 24 181.9 AMH Manhole Section Summary 1/29/2018 Project WinCanVX Master Server South Tahoe Public Utility District      Inspection report Date: Work Order:Pipe Segment Ref.:Weather: Surveyed By: Certificate Number: Year laid: Pre-cleaning: Pipe Joint Length:Direction: Total Length: Length Surveyed: WinCanVX Master Server // Page: 1 City:SLT Drainage Area:K-25 Upstream MH:SM8 Street:Venice Dr Media Label: Up Rim to Invert: Location Code: Flow Control: Downstream MH:SM7 Location Details: Sheet Number: Down Rim to Invert: Pipe shape:Circular Sewer Use: Total gallons used:0.0 Pipe size:8 "Sewer Category:SEC Joints passed:0 Pipe material:Asbestos Cement Purpose: Joints failed:0 Lining Method: Owner: Additional Info:Reviewer ESS T-1208-7921 1:1166 Distance Code Observation Counter Photo Grade 0.0 AMH Manhole / SM8 0.0 MWL Water Level, 10% of the vertical dimension 2.1 SRI Surface Roughness Increased from 9 o'clock to 3 o'clock, within 8 inch 0:00:04. dbba2f77- 688e-4336 -ab65-eda S1 6.7 VC Vermin Cockroach, within 8 inch 0:00:13. b4991163- 84ba-4e8b -8562-192 20.0 DSF Deposits Settled Fine, 40% of cross sectional area from 4 o'clock to 8 o'clock, within 8 inch 0:00:40. 71cabb87- 4563-4c13 -bb0d-9cd M5 21.0 TF Tap Factory Made at 3 o'clock, 4.0inch dim, within 8 inch 0:00:42. b1343b4a- 1783-4269 -a1bb-983 23.1 RFJ Roots Fine Joint from 9 o'clock to 3 o'clock, within 8 inch 0:00:47 883c6a7b- 348a-468c -b804-edb 25.0 SRI Surface Roughness Increased from 9 o'clock to 3 o'clock, within 8 inch 0:00:50. S1 25.0 VC Vermin Cockroach, within 8 inch 0:00:50. M1 32.1 MWM Water Mark, 60% of the vertical dimension 0:01:05. 6e118123- 28a9-4684 -90f5-98d7 M4 47.1 SSS Surface Spalling from 10 o'clock to 1 o'clock 0:01:35. f162685b- b95d-48de -95d2-926 S2 60.4 DAGS Deposits Attached Grease, 5% of cross sectional area at 4 o'clock, within 8 inch 0:02:02. c2bc1549- 2abc-4d9c- ab5d-03f3 65.6 DAGS Deposits Attached Grease, 5% of cross sectional area at 4 o'clock, within 8 inch 0:02:13. M2 77.4 SSS Surface Spalling at 10 o'clock, within 8 inch 0:02:37. 70f448ed- 31f0-42ab- b662-537b S2 119.2 IS 0:04:02. ef5b5156- dd26-4e7b -adbd-5d6 3/19/2019 JPaul U-0519070304953 SM8-SM7 Jetting Downstream 344.2 ' 181.9 ' SM8 South Tahoe Public Utility District      Inspection report Date: Work Order:Pipe Segment Ref.:Weather: Surveyed By: Certificate Number: Year laid: Pre-cleaning: Pipe Joint Length:Direction: Total Length: Length Surveyed: WinCanVX Master Server // Page: 2 1:1166 Distance Code Observation Counter Photo Grade 119.2 DAE Deposits Attached Encrustation, 5% of cross sectional area at 4 o'clock 0:04:02. 7f78d2ee- 86f3-45b4- aece-7f89a M2 119.2 IW Infiltration Weeper at 1 o'clock 0:04:02. 117162a2- fcde-4ed4- 8f44-2763c M2 161.2 DAE 0:05:27. M2 168.3 F07 DAE 0:05:42 M2 170.2 DAE Deposits Attached Encrustation, 5% of cross sectional area at 8 o'clock, within 8 inch 0:05:46 0809d236- cdc7-4d31- 9e11-52f9 M2 176.6 DAE Deposits Attached Encrustation, 5% of cross sectional area at 8 o'clock, within 8 inch 0:05:59 8a2dc1cb- c2d3-4d45 -b3ad-d0fe M2 177.4 ISJ 0:06:00. 5ca53e43- a120-4016 -ab67-949 177.5 RFJ Roots Fine Joint from 9 o'clock to 3 o'clock, within 8 inch 0:06:00. M1 181.9 AMH Manhole / SM7 3/19/2019 JPaul U-0519070304953 SM8-SM7 Jetting Downstream 344.2 ' 181.9 ' QSR QMR SPR MPR OPR SPRI MPRI OPRI 2211 5141 5.0 140.0 1.7 1.1 1.1145.0 QOR 5141 SM7