HomeMy WebLinkAboutWinlad DNQ Letter
General Manager
Paul Hughes
Directors
Nick Haven
Shane Romsos
Joel Henderson
Kelly Sheehan
Nick Exline
June 2, 2025
Daniel Muwanguzi
Winlad Electrical Controls, Llc
5817 Seasons Valley Ct.
Bakersfield, Ca 93313
dmuwanguzi@winlad.com
Re: Wastewater Treatment Plant Aeration Blower System Improvements Project
Control Systems Integrator Pre-Qualification
South Lake Tahoe, CA
Dear Daniel,
Thank you for participating in our pre-qualification process. We truly appreciate the time and effort
you expended to complete the packet. However, after careful review, your firm was found not
qualified to provide Control Systems Integration services for the Wastewater Treatment Plant
Aeration Blower System Improvements Project. For the written portion of the application, you
scored 146 out of a maximum 212 points; a minimum of 159 points is required to qualify. We have
attached a copy of your score sheet for your reference. If, after reviewing your scores, you feel that
the District’s determination is in error, you have until Friday, June 6, 2025, to make an appeal in
writing in accordance with the pre-qualification procedures.
Please feel free to call the undersigned, should you have any questions about the pre-qualification
process. We strongly encourage you to continue to pursue District projects, and wish you the best
for the future.
Sincerely,
Brent Goligoski
Senior Engineer
Item Max
Winlad
Electrical
Controlls,
LLC
7.1 2 1
7.2 3 0
7.3 2 2
7.4 2 2
7.5 3 3
7.6 2 2
7.7 5 5
7.8 5 5
7.9 5 5
7.10 5 5
7.11 5 1
7.12 3 3
7.13 5 5
7.14 5 5
7.15 5 5
7.16.1 6 6
7.16.2 9 1
7.16.3 9 6
7.16.4 2 1
7.16.5 2 2
7.16.6 18 12
7.16.A 9 9
7.16.B 9 3
7.16.C 9 4
7.16.D 9 4
7.16.E 9 3
7.16.F 18 14
7.17.1 6 6
7.17.2 9 2
7.17.3 9 9
7.17.4 2 1
7.17.5 2 2
7.17.6 18 12
Max 212 146
Pass 159 DNQ
Questionnaire