Loading...
HomeMy WebLinkAboutAddendum 1 - Aeration Blower System Pre-Qualification Control System Integrators ADDENDUM NO. 1 PREQUALIFICATION POLICY FOR CONTROL SYSTEM INTEGRATORS WASTEWATER TREATMENT PLANT AERATION BLOWER SYSTEM IMPROVEMENTS PROJECT South Tahoe Public Utility District South Lake Tahoe, California February 4, 2025 Prequalification for Control System Integrators Addendum No.1 Wastewater Treatment Plant Aeration Blower System Improvements Project February 4, 2025 GENERAL NOTES: The Prequalification Checklist and Prequalification Scoring are provided as attachments to this addendum. These are for reference only and do not need to be completed by the Applicant. The replaced Contractor’s Certification (Part 8) provided in this addendum must be provided with the applicant’s submission. The submission date is being extended to allow 72 hours to review these documents prior to finalizing the submissions. THE FOLLOWING CHANGES SHALL BE MADE TO THE PREQUALIFICATION POLICY: 1. Introduction Page 1 of 17 REPLACE: Pre-Qualification and Bid Schedule Date Milestone January 10, 2025 District issues invitation for Pre-qualification January 30, 2025 Last day for applicants to ask questions or submit objections February 5, 2025 District receives Pre-qualification Packages February 12, 2025 District staff issues recommendation of qualified bidders list for Control System Integrators. February 18, 2025 Last day for applicants to appeal District's decision with respect to pre-qualification ratings. February 25, 2025 Last day for appeals to be heard by the District March 6, 2025 District Board considers adoption of qualified bidders list for Control System Integrators. Board authorizes Staff to bid project. March 14, 2025 District begins advertising for bids. March 27, 2025 District holds Mandatory Pre-Bid Meeting and Site Walk April 17, 2025 District opens bids May 1, 2025 District Board considers award of project contract WITH: Date Milestone January 10, 2025 District issues invitation for Pre-qualification February 5, 2025 Last day for applicants to ask questions or submit objections February 7, 2025 District receives Pre-qualification Packages Prequalification for Control System Integrators Addendum No.1 Wastewater Treatment Plant Aeration Blower System Improvements Project February 4, 2025 February 14, 2025 District staff issues recommendation of qualified bidders list for Control System Integrators. February 20, 2025 Last day for applicants to appeal District's decision with respect to pre-qualification ratings. February 27, 2025 Last day for appeals to be heard by the District March 6, 2025 District Board considers adoption of qualified bidders list for Control System Integrators. Board authorizes Staff to bid project. March 14, 2025 District begins advertising for bids. March 27, 2025 District holds Mandatory Pre-Bid Meeting and Site Walk April 17, 2025 District opens bids May 1, 2025 District Board considers award of project contract 3. Pre-qualification Process Page 4 of 17 REPLACE: Thursday, January 30, 2025 WITH: Wednesday, February 5, 2025 Page 4 of 17 REPLACE: Wednesday, February 5, 2025 WITH: Friday, February 7, 2025 Page 5 of 17 REPLACE: Wednesday, February 12, 2025 WITH: Friday, February 14, 2025 5. Contractor’s General Information Page 7 of 17 REPLACE: Wednesday, February 5, 2025 WITH: Friday, February 7, 2025 8. Contractor’s Certification Page 16 of 17 REPLACE: Part 8 in its entirety. WITH: Part 8 (attached). 8. Contractor’s Certification CERTIFICATION UNDER PENALTY OF PERJURY I, the undersigned, certify and declare that I know the contents of all documents submitted pursuant to the Pre – Qualification Policy, have read all the foregoing answers to the Criteria Essential for Pre-Qualification and the Pre – Qualification Questionnaire included in the Pre – Qualification Packet and any attached sheets and know their contents. Furthermore, I certify and declare that I have received Addendum No. 1 to the Pre-Qualification Policy, and have incorporated all requirements contained therein. The matters contained in, or submitted pursuant to the Pre – Qualification Policy, and all answers to the Criteria Essential for Pre-Qualification and the Pre – Qualification Questionnaire are true of my own knowledge and belief, except as to those matters stated on information and belief, as to those matter I believe them to be true. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Date: _________________________________________________________________ Signed: ________________________________________________________________ Name: ________________________________________________________________ Title: __________________________________________________________________ Wastewater Treatment Plant Aeration Blower System Improvements Project Control Systems Integrator Pre-Qualification Checklist Contractor Name: Qualified Disqualified Part 5: Contractor’s General Information Has Contractor filled out the form completely? Yes ______ No ______ Part 6: Criteria Essential for Pre-Qualification 6.1 Meets product experience requirements? Yes ______ No _______ 6.2 Meets home office location requirement? Yes ______ No _______ 6.3 Meets fabrication shop location requirement? Yes ______ No _______ 6.4 Meets project experience requirements? Yes ______ No _______ 6.5 Ineligible to bid (debarred) during project period? No _______ Yes ______ 6.6 Convicted of criminal action? No _______ Yes ______ 6.7 Cited by OSHA? No _______ Yes ______ Part 8: Contractor’s Certification Is all the requested information provided? Yes ______ No _______ Has the form been Notarized? Yes ______ No _______ Wastewater Treatment Plant Aeration Blower System Improvements Project Control Systems Integrator Pre-Qualification Scoring Contractor Name: _________________________________________________ 7.1 Association Membership: Associate = 2 pts.; Participant/Partner = 1 pt.; No = 0 p t. Score: ________ 7.2 Training and Certification: Yes = 3 pts; No = 0 pts. Score: ________ 7.3 Training and Certification: Yes = 2 pts; No = 0 pts. Score: ________ 7.4 Training and Certification: Yes = 2 pts.; No = 0 pts. Score: ________ 7.5 Training and Certification: Yes = 3 pts.; No = 0 pts Score: ________ 7.6 Training and Certification: Yes = 2 pts.; No = 0 pts. Score: ________ 7.7 Security: 0 = 5 pts.; 1 = 2 pts; >3 = 0 pts. Score: ________ 7.8 Security: 0 to 1 = 5 pts.; 2 to 3 = 3 pts.; >3 = 0 pts. Score: ________ 7.9 Security: 0 = 5 pts.; 1 = 2 pts.; >1 = 0 pts. Score: ________ 7.10 Financial Capacity: No = 5 pts.; Yes = 0 pts. Score: ________ 7.11 Staffing: (for Engineers and Programmers combined) >20 = 5 pts.; 10-20 = 3 pts. 5-10 = 1 pt; <5 = 0 pts. Score: ________ 7.12 DBE/MBE/WBE Status: Yes = 3 pts; No = 0 pts. Score: ________ 7.13 Insurance: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts. Score: ________ 7.14 Prevailing Wage: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts. Score: ________ 7.15 Prevailing Wage: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts. Score: ________ 7.16 Controls Integration Experience 1. Project Name/Owner: For each project listed, CA = 2 pts; NV = 1 pts; Other States = 0 Pts Score: ________ (Max = 6 pts) 2. Project Amount: For each project listed, >$3M = 3 pt; $1-3M = 1 pt.; $<1M = 0 pt. Score: ________ (Max = 9 pts) 3. % of Project Cost: For each project listed, >5% = 3 pts; 2-5% = 1 pt; <2% = 0 pts Score: ________ (Max = 9 pts) 4. Contractor’s Project Manager: • If all 3 projects have same manager: 2 pts • If 2 of 3 project have same manager: 1 pt • If all 3 projects have different managers: 0 pts Score: ________ (Max = 2 pts) 5. Contractor’s Programmer: • If all 3 projects have same programmer: 2 pts • If 2 of 3 project have same programmer: 1 pt • If all 3 projects have different programmer: 0 pts Score: ________ (Max = 2 pts) 6. Type of Work: For each project listed, • Water or Wastewater = 6 pts. • Gas or Electric = 3 pts. • Pipelines = 2 pts. • Petroleum or Other Public Works = 1 pt. • All Other = 0 pts. Score: ________ (Max = 18 pts.) A. Existing System?: Yes = 3 pts; No = 0 pts Score: ________ (Max = 9 pts) B. Pumping System?: Yes = 3 pts; No = 0 pts Score: ________ (Max = 9 pts) C. PLC I/O: >250 = 3 pts; 100-250 = 2 pts; 50-100 = 1 pt; < 50 = 0 pts. Score: ________ (Max = 9 pts) D. Equipment Loops: >50 = 3 pts; 20-50 = 2 pts; 10-20 = 1 pt.; < 10 = 0 pts. Score: ________ (Max = 9 pts) E. Equipment Tags: > 1000 = 3 pts; 500-1000 = 2 pts; 250-500 = 1 pt; < 250 = 0 p t. Score: ________ (Max = 9 pts) F. Products: One point for each box checked Score: ________ (Max = 18 pts) 7.17 Recent Past Experience 1. Project Name/Owner: For each project listed, CA = 2 pts; NV = 1 pts; Other States = 0 Pts Score: ________ (Max = 6 pts) 2. Project Amount: For each project listed, >$3M = 3 pt; $1-3M = 1 pt.; $<1M = 0 pt. Score: ________ (Max = 9 pts) 3. % of Project Cost: For each project listed, >5% = 3 pts; 2-5% = 1 pt; <2% = 0 pts Score: ________ (Max = 9 pts) 4. Contractor’s Project Manager: a. If all 3 projects have same manager: 2 pts b. If 2 of 3 project have same manager: 1 pt c. If all 3 projects have different managers: 0 pts Score: ________ (Max = 2 pts) 5. Contractor’s Programmer: a. If all 3 projects have same programmer: 2 pts b. If 2 of 3 project have same programmer: 1 pt c. If all 3 projects have different programmer: 0 pts Score: ________ (Max = 2 pts) 6. Type of Work: For each project listed, a. Water or Wastewater = 6 pts. b. Gas or Electric = 3 pts. c. Pipelines = 2 pts. d. Petroleum or Other Public Works = 1 pt. e. All Other = 0 pts. Score: ________ (Max = 18 pts.) Questionnaire Subtotal Score: (Min 159/212 required to Pre-Qualify) REFERENCE INTERVIEW QUESTIONS The following questions will be used to interview project managers of completed projects selected from the list provided by Contractor. South Tahoe Public Utilities District will conduct the interviews. Two interviews will be conducted. The maximum score for each interview is 110 points. To pass this section, contractor must receive at least 90 points for each interview. If, however, contractor receives a score of at least 90 points for one interview and between 72 and 89 points for the other interview, a third interview will be conducted by randomly selecting one additional project from the list submitted by contractor. If contractor receives a score of at least 90 points for the third interview, contractor will be deemed to have met the requirements for passing this section. Notwithstanding the foregoing, however, in the event that less than two (2) of the contractors who apply for pre-qualification hereunder and meet the requirements for passing this section as stated in the immediately preceding paragraph, the District may, at its own discretion, adjust the requirements for passing this section as follows: contractors receiving at least 72 points for each of the first two interviews will be deemed to have met the requirements for passing this section; contractors receiving less than 72 points for either of the first two interviews will be denied pre- qualification and no additional interviews will be conducted. First, please give a brief description of the project. 1. Are there any outstanding stop notices, liens, or claims by the contractor that are currently unresolved on contracts for which notices of completion were recorded more than 120 days ago? (1 point for each is deducted from overall score with no limit on amount deducted) Score: ________ (deductive points) 2. On a scale of 1-10, with 10 being the best, did the contractor provide adequate qualified personnel and equipment to perform the work? Score: ________ (Max. 10 points) 3. On a scale of 1-10, with 10 being the best, how well did the contractor and the contractor’s field supervisors plan, coordinate, and execute the work and coordinate with your construction manager and field personnel? Score: ________ (Max. 10 points) 4. On a scale of 1-10, with 10 being the best, rate the contractor on whether there were an unusually high number of claims, given the nature of the project, or unusual difficulty in resolving them. Score: ________ (Max. 10 points) 5. Were the contract and intermediate milestones completed on time? (10 points if the answer is “yes”) Or, if the answer is “no,” on a scale of 1-10, with 10 being the best, to what extent was the contractor responsible for the delay in completing the milestones on time? Score: ________ (Max. 10 points) 6. On a scale of 1-10, with 10 being the best, rate the contractor on the timely submission of reasonable cost and time estimates to perform change order work. Score: ________ (Max. 10 points) 7. On a scale of 1-10, with 10 being the best, rate how well the contractor anticipated, alleviated, or prevented change orders on the project. Score: ________ (Max. 10 points) 8. On a scale of 1-10, with 10 being the best, rate how well the contractor communicated and coordinated in a timely manner with the owner’s representative. Score: ________ (Max. 10 points) 9. On a scale of 1-10, with 10 being the best, rate how well the contractor was timely in providing thorough RFIs, submittals, and change order documentation. Score: ________ (Max. 10 points) 10. On a scale of 1-10, with 10 being the best, rate the contractor on how well the contractor worked with its subcontractors and your field inspectors. Score: ________ (Max. 10 points) 11. On a scale of 1-10, with 10 being the best, how would you rate the quality of the work by the contractor overall? Score: ________ (Max. 10 points) 12. On a scale of 1-10, with 10 being the best, how would you rate the performance by the contractor overall? Score: ________ (Max. 10 points) Interview Score: (Min 90/110 required to Pre-Qualify)