HomeMy WebLinkAbout2935_001Wastewater Treatment Plant Aeration Blower System Improvements Project
Control Svstems Integrator Pre -Qualification Checklist
Contractor Name:
Qualified Disqualified
Part 5: Contractor's General Information
Has Contractor filled out the form completely? Yes lI No
Part 6: Criteria Essential for Pre -Qualification
6.1 Meets product experience requirements?
Yes
1/
No
6.2 Meets home office location requirement?
Yes
�✓
No
6.3 Meets fabrication shop location requirement?
Yes
✓
No
6.4 Meets project experience requirements?
Yes
No
6.5 Ineligible to bid (debarred) during project period?
No
•'�
Yes
6.6 Convicted of criminal action?
No
✓
Yes
6.7 Cited by OSHA?
No
✓
Yes
Part 8: Contractor's Certification
Is all the requested information provided? Yes No
Has the form been Notarized? Yes l✓ No
Wastewater Treatment Plant Aeration Blower System Improvements Project
Contro15vstems Integra .ot [Pre-Cualification Scoring,
Contractor Name: �U�' l ��ex-l5
7.1 Association Membership: Associate = 2 pts.; Participant/Partner = 1 pt.; No = 0 pt.
Score:
7.2 Training and Certification: Yes = 3 pts; No = 0 pts.
Score:
7.3 Training and Certification: Yes = 2 pts; No = 0 pts.
Score: 2-
7.4 Training and Certification: Yes = 2 pts.; No = 0 pts.
Score: 2-
7.5 Training and Certification: Yes = 3 pts.; No = 0 pts
Score: 3
7.6 Training and Certification: Yes = 2 pts.; No = 0 pts.
Score: 2-
7.7 Security: 0 = 5 pts.; 1 = 2 pts; >3 = 0 pts.
Score: 5-
7.8 Security: 0 to 1 = 5 pts.; 2 to 3 = 3 pts.; >3 = 0 pts.
Score: t-)
7.9 Security: 0 = 5 pts.; 1 = 2 pts.; >1 = 0 pts.
Score: 5-
7.10 Financial Capacity: No = 5 pts.; Yes = 0 pts.
Score:
7.11 Staffing: (for Engineers and Programmers combined)
>20 = 5 pts.; 10-20 = 3 pts. 5-10 = 1 pt; <5 = 0 pts.
Score: 1
7.12 DBE/MBE/WBE Status: Yes = 3 pts; No = 0 pts.
Score: f
7.13 Insurance: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts.
Score: 7
7.14 Prevailing Wage: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts.
Score:
7.15 Prevailing Wage: No = 5 pts.; Yes (once) = 3 pts; Yes (more than once) = 0 pts.
Score:
7.16 Controls Integration Experience
1. Project Name/Owner: For each project listed, CA = 2 pts; NV = 1 pts; Other States = 0 Pts
Score: 6 (Max = 6 pts)
2. Project Amount: For each project listed, >$3M = 3 pt; $1-3M = 1 pt.; $<1 M = 0 pt.
Score: �, q (Max = 9 pts)
3. % of Project Cost: For each project listed, >5% = 3 pts; 2-5% = 1 pt; <2% = 0 pts
Score: S (Max = 9 pts)
4. Contractor's Project Manager:
• If all 3 projects have same manager: 2 pts
• If 2 of 3 project have same manager: 1 pt
■ If all 3 projects have different managers: 0 pts
Score: 0 (Max = 2 pts)
5. Contractor's Programmer:
• If all 3 projects have same programmer: 2 pts
• If 2 of 3 project have same programmer: 1 pt
• If all 3 projects have different programmer: 0 pts
Score: (Max = 2 pts)
6. Type of Work: For each project listed,
• Water or Wastewater = 6 pts.
• Gas or Electric = 3 pts.
■ Pipelines = 2 pts.
■ Petroleum or Other Public Works =1 pt.
• All Other = 0 pts.
Score: 1 5 (Max = 18 pts.)
A. Existing System?: Yes = 3 pts; No = 0 pts
Score: (Max = 9 pts)
B. Pumping System?: Yes = 3 pts; No = 0 pts
Score: �1 (Max = 9 pts)
C. PLC 1/0: >250 = 3 pts; 100-250 = 2 pts; 50-100 = 1 pt; < 50 = Opts.
Score: I (Max = 9 pts)
D. Equipment Loops: >50 = 3 pts; 20-50 = 2 pts; 10-20 = 1 pt.; < 10 = 0 pts.
Score: (Max = 9 pts)
E. Equipment Tags: > 110000 = 3 pts; 500-1000 = 2 pts; 250-500 = 1 pt; < 250 = 0 pt.
Score:.Z+2� } ~ J (Max = 9 pts)
F. Products: One point for each box checked
Score: 0- (Max = 18 pts)
7.17 Recent Past Experience
1. Project Name/Owner: For each project listed, CA = 2 pts; NV = 1 pts; Other States = 0 Pts
Score: b (Max = 6 pts)
2. Project Amount: For each project listed, >$3M = 3 pt; $1-3M = 1 pt.; $<1 M = 0 pt.
Score: q (Max = 9 pts)
3. % of Project Cost: For each project listed, >5% = 3 pts; 2-5% =1 pt; <2% = 0 pts
Score: -7 (Max = 9 pts)
4. Contractor's Project Manager:
a. If all 3 projects have same manager: 2 pts
b. If 2 of 3 project have same manager: 1 pt
c. If all 3 projects have different managers: 0 pts
Score: 0 (Max = 2 pts)
5. Contractor's Programmer:
a. If all 3 projects have same programmer: 2 pts
b. If 2 of 3 project have same programmer: 1 pt
c. If all3 projects have different programmer: Opts
Score: I (Max = 2 pts)
6. Type of Work: For each project listed,
a. Water or Wastewater = 6 pts.
b. Gas or Electric = 3 pts.
c. Pipelines = 2 pts.
d. Petroleum or Other Public Works =1 pt.
e. All Other = 0 pts.
Score: a R (Max =18 pts.)
Questionnaire Subtotal Score: 1 � t (Min 159/212 required to Pre -Qualify)
� h,CA1 5y f�c ,-'�
REFERENCE INTERVIEW QUESTIONS
The following questions will be used to interview project managers of completed projects selected
from the list provided by Contractor. South Tahoe Public Utilities District will conduct the
interviews.
Two interviews will be conducted. The maximum score for each interview is 110 points. To pass
this section, contractor must receive at least 90 points for each interview. If, however, contractor
receives a score of at least 90 points for one interview and between 72 and 89 points for the other
interview, a third interview will be conducted by randomly selecting one additional project from the
List submitted by contractor. If contractor receives a score of at least 90 points for the third
interview, contractor will be deemed to have met the requirements for passing this section.
Notwithstanding the foregoing, however, in the event that less than two (2) of the contractors who
apply for pre -qualification hereunder and meet the requirements for passing this section as stated
in the immediately preceding paragraph, the District may, at its own discretion, adjust the
requirements for passing this section as follows: contractors receiving at least 72 points for each of
the first two interviews will be deemed to have met the requirements for passing this section;
contractors receiving less than 72 points for either of the first two interviews will be denied pre -
qualification and no additional interviews will be conducted.
First, please give a brief description of the project.
1. Are there any outstanding stop notices, liens, or claims by the contractor that are currently
unresolved on contracts for which notices of completion were recorded more than 120
days ago? (1 point for each is deducted from overall score with no limit on amount
deducted)
Score: 0 (deductive points)
2. On a scale of 1-10, with 10 being the best, did the contractor provide adequate qualified
personnel and equipment to perform the work?
Score: ( � (Max. 10 points)
3. On a scale of 1-10, with 10 being the best, how well did the contractor and the contractor's
field supervisors plan, coordinate, and execute the work and coordinate with your
construction manager and field personnel?
Score: 110 (Max. 10 points)
4. On a scale of 1-10, with 10 being the best, rate the contractor on whether there were an
unusually high number of claims, given the nature of the project, or unusual difficulty in
resolving them.
Score: / 0 (Max. 10 points)
5. Were the contract and intermediate milestones completed on time? (10 points if the
answer is "yes") Or, if the answer is "no," on a scale of 1-10, with 10 being the best, to what
extent was the contractor responsible for the delay in completing the milestones on time?
Score: 10 (Max. 10 points)
6. On a scale of 1-10, with 10 being the best, rate the contractor on the timely submission of
reasonable cost and time estimates to perform change order work.
Score: 10 (Max. 10 points)
7. On a scale of 1-10, with 10 being the best, rate how well the contractor anticipated,
alleviated, or prevented change orders on the project.
Score: g (Max. 10 points)
8. On a scale of 1-10, with 10 being the best, rate how well the contractor communicated and
coordinated in a timely manner with the owner's representative.
Score: , 0 (Max. 10 points)
9. On a scale of 1-10, with 10 being the best, rate how well the contractor was timely in
providing thorough RFIs, submittals, and change order documentation.
Score: 0 (Max. 10 points)
10. On a scale of 1-10, with 10 being the best, rate the contractor on how well the contractor
worked with
its subcontractors and your field inspectors.
Score: 0 (Max. 10 points)
11. On a scale of 1-10, with 10 being the best, how would you rate the quality of the work by the
contractor overall?
Score: /0 (Max. 10 points)
12. On a scale of 1-10, with 10 being the best, how would you rate the performance by the
contractor overall?
Score: 10 (Max. 10 points)
Interview Score: (Min 90/110 required to Pre -Qualify)