HomeMy WebLinkAbout7b Goligoski Blower System Upgrades Prequalification October 17, 2024 BOARD AGENDA ITEM 7b TO: Board of Directors FROM: Brent Goligoski, Senior Engineer MEETING DATE: October 17, 2024 ITEM – PROJECT NAME: Aeration Blower System Improvements Project REQUESTED BOARD ACTION: Authorize staff to prequalify contractors to bid on the Aeration Blower System Improvements Project. DISCUSSION: Carollo Engineers and District staff are working to finalize the Bid Documents for the Aeration Blower System Improvements Project. This project includes the following improvements at the District’s Wastewater Treatment Plant (WWTP):  Replace the existing engine-driven blower with a new hybrid positive displacement blower  Replace Blower Building electrical switchgear, including power submetering in the blower building and elsewhere throughout the treatment plant  Blower building ventilation improvements  Replace and upgrade valving, instrumentation and control for aeration system  Replacement of a large electrical transformer and multiple sets of electrical switchgear  Replacement or installation of fire alarms in the Blower Building, Filter Building, Hypo Building, and Small Generator Building  Biosolids Building HVAC and Odor Control System Improvements including addition of a strobic fan for odor control. All work will be performed on the WWTP site, while the District continues to operate the WWTP. This complex project will require the services of a general contractor, an electrical contractor, and a controls integrator. The Project is expected to cost $8 million. Based on staff experience, integrating a new control system into an existing, operational system can be a difficult, risky operation that requires special expertise. Likewise, award to an unqualified contractor can result in project delays, increased claims, fines and penalties from regulatory agencies, and diminished quality of the General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline Brent Goligoski October 17, 2024 Page 2 of 2 project. As such, staff recommends that the District prequalify controls integrators for this project prior to proceeding with the bid period. Staff expects to advertise for prequalification in October and review results in November. Staff will return to the Board with the prequalification results for approval and authorization to bid the construction contract. The project is expected to be completed in 2025 through 2026. Staff is currently preparing a prequalification questionnaire, an objective scoring system, and an appeals process following California Department of Industrial Relations Guidelines and in accordance with California Public Contract Code Section 20101. Bidders will only be allowed to name in their bids those controls integrators who have prequalified to bid the project. SCHEDULE: October - November, 2024 COSTS: N/A ACCOUNT NO: 10.30.8156/BLOSYS BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: None ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO