Loading...
HomeMy WebLinkAboutTask Order#2A 1275 Meadow Crest Drive +f f `f 1 f I�IIII l I Purchase Order South Lake Tahoe, CA �Il.�ll�lGl�lililll:u.� l,l�ll.�fAPPEAR ON Page 1 of 1 (s) 96150-7401 2021000000248 PACKAGES,AND SHIPPING PAPERS,_ Purchase Order Number 2021-00000248-1 Bill To Ship To 1275 Meadow Crest Drive 1275 Meadow Crest Drive Purchase Order Date 0911612020 South Lake Tahoe, CA 96150 South Lake Tahoe, CA 96150 Department Engineering Engineering Additional Instructions Vendor Sewer Knowledge 9732 59th STREET SEATTLE, WA 98118 CHAivjL JKL VENDORVENDOR PHONE NUMBER EMAIL VENDOR NUMBER RESOLUTION NUMBER DELIVERY REFERENCE (206)457-7610 sawerknowled gmali.com 48884 SEWER KNOWLEDGE • Eng.RL-SK TO#2A Sewer Pipeline Assessment CCTV Coding(PACP) ITEM# DESCRIPTION QUANTITY UOM 1 _Consultant-TO#2A Sewer Pipeline Assessment CCTV Coding(PACP) 4,070.0000 Not To Exceed $1.0000 $4,070.00 This instrument has been audited in the manner required by local government regulations and laws. Your jurisdiction's specific legal text may be placed in this area. Heidi 13augh-Purchd4ing Agent Purchase Order Total $4,070.00 Purchasing Copy SEWER KNOWLEDGE SERVICES LLC AMENDMENT A TO TASK ORDER NO. 2 CONSULTING SERVICES This Task Order is made and entered into as of the 11 th day of September,2020 by and between South Tahoe Public Utility District,hereinafter referred to as"DISTRICT"and Sewer Knowledge Services LLC hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated August 27, 2018 and as specifically hereinafter set forth,the parties do hereby agree as follows: 1. PURPOSE The purpose of this Amendment A to Task Order No. 2 is for CONSULTANT to provide additional professional civil engineering services for the Pipeline Assessment Certification Program (PACP) coding of approximately 18, 500 linear feet of Panaramo Mainline inspection data including quality assurance and quality control of codes by National Association of Sewer Service Companies (NASSCO) PACP/MACP/LACP certified personnel. 2. SCOPE OF WORK The scope of work for these consulting services is contained in the CONSULTANT's written Proposal dated August 12,2020.This Proposal is attached hereto,marked Exhibit"A",and incorporated herein by this reference as a part of this Task Order. 3. STAFFING Staffing will consist of Eric Sullivan, Sr. Project Manager, QA/QC; Nicholas Aguon, Condition Assessment Technician; Steve Saddler, Condition Assessment Technician; and Robert Swords, Assistant Project Manager. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIES DISTRICT agrees that its officers and employees will cooperate with CONSULTANT in the performance of services under this Task Order and will provide documentation and information in District's possession as requested. 5. TIME OF PERFORMANCE Tasks for this scope of work will commence upon signature of this document by all parties,on or about September 11, 2020 and shall be concluded on or before October 16, 2020. At which time CONSULTANT will complete a QA/QC of the remaining data and send all files electronically to South Tahoe Public Utility District. 1 6. PAYMENT Payment to CONSULTANT for services performed under this Amendment A to Task Order No.2 shall be as provided in Article IV of the Master Services Agreement and in accordance with CONSULTANT's Fee schedule(attached as part of Exhibit"A").Final compensation shall be based on the amount of CCTV Pipe Inspection Coding performed, but shall not exceed the amount of Four Thousand Seventy Dollars ($4,070.00) unless the scope of work is changed and an increase is authorized by DISTRICT. 7. INSURANCE COVERAGE CONSULTANT's Errors&Omissions coverage shall be$1,000,000 aggregate with a deductible of not more than $5,000 for the duration of this Task Order. 8. LABOR CODE REQUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Amendment A to Task Order No. 2 will become effective upon execution by both parties. IN WITNESS WHEREOF,this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Task Order to be executed the day and year first above written. SOUTH TAHOE PUBLIC UTILITY DISTRICT r 3�� September 11, 2020 JonTTSe , P.E., M.B.A. Approval Date General Manager/Engineer Attest C� ( kJor * aw4r-- Melonie Gut , Clerk o Board SEWER KNO EDGE SERVICES LLC Eric Sullivan, Owner, Principal 2 EXHIBIT A SEWER QUOTE KNOWLEDGE DATE: 81220120 QUOTE# 081220ES02 Sewer Knowledge Services LLC PAYMENT TERMS NET 30 Days 9732 59th Ave S, ATTN: Ryan Lee Seattle,WA 98118 Asset Management Analyst Phone:(206)457-7610 South Tahoe Public Utility District Email:sewerknowledge@gmail.com 1275 Meadow Crest Dr South Lake Tahoe, CA 96150 Phone:530-543-6234 Email: rlee@stpud.us DESCRIPTION RATE QUANTITY AMOUNT COST PER LF Coding of digital Closed Circuit Television("CCTV") video of gravity sewer main lines according to NASSCO PACP $0.22 18,500 $4,070.00 standards. Project Description&Scope of Work:perform coding of CCTV data/imagery of our gravity collection system using the National Association of Sewer Service Companies("NASSCO")Pipeline Assessment Certification Program("PACP")coding standards. The work will involve coding CCTV footage of gravity sewer mains according to the current version of the NASSCO PACP specifications. The District currently has a backlog of approximately 80,000 Linear Feet ("LF")of CCTV footage to be coded.The District will deliver a PACP exchange database or WinCan database and associated CCTV media files electronically to the Consultant.All work completed by the Consultant is expected to be completed remotely with no need to be on- site.At such time when the Consultant's services are required,District staff will forward a Task Order for the requested services along with any pertinent supporting information. Coding Specifications. These specifications constitute the minimum requirements for PACP coding of CCTV video of the District's gravity sewer collection system. A. It is desirable that coding shall be completed using the current version of the WinCan VX software.If the Consultant does not use the WinCan VX software,they must be able to export a PACP exchange database file that the District can import into the WinCan VX software. B. Inspection coding shall be done according to the current version of the NASSCO PACP specifications. C.Section and inspection headers will typically be completed by the District field crews collecting the video,but it is the responsibility of the Consultant to ensure completeness and accuracy of inspection headers based on observed conditions and all data made available. D.All observed defects shall have at least 1 photo attached. E.The name and NASSCO certificate number of the person performing the observation coding shall be added to the Reviewed By fields in the inspection header of all inspections coded by the Consultant. Schedule:turnaround is-40,000 LF per month,ready to start $4,070.00 Payment Options: 'Check payable to Sewer Knowledge Services LLC. "PayPal:sewerknowledge@gmail.com(+2.9%surcharge added) 'Wire transfer(please request banking info) THANK YOU FOR THE OPPORTUNITY TO EARN YOUR BUSINESSI EXHIBIT A Star Glaze From: Ryan Lee Sent: Friday, September 4, 2020 11:07 AM To: Star Glaze Subject: RE: Sewer Knowledge Task Order Happy Friday, No worries,there's no big rush on this one. Let's change the start date on that one to 9/11 please and we can leave the end date the same. That still gives him plenty of time. Thanks! Ryan From: Star Glaze Sent: Friday, September 4, 2020 10:25 AM To: Ryan Lee Subject: Sewer Knowledge Task Order Hi Ryan, I apologize for the delay on this Task Order. I had to finalize the ones for yesterday's Board Meeting...all 5 of them! Back on track on this one now. I noticed that you had put the start date as 9/7 which is a holiday. Not sure if you want to push that out a bit? Let me know. THANKS! Starfet Cfaze Contracts Administrator South Tahoe Public Utility District 530.543.6205 s9laze@Dstywd.-dsbqa.us ;o. 1 Star Glaze From: Star Glaze Sent: Wednesday, August 26, 2020 1:56 PM To: Ryan Lee Subject: RE: Sewer Knowledge TO Amendment Of course, Will do ;) Starfet Glaze Contracts Administrator South Tahoe Public Utility District s gi a ze@stp u d.dst_n,us Phone: 530-543-6205 (e) From: Ryan Lee Sent: Wednesday, August 26, 2020 12:00 PM To: Star Glaze Subject: RE: Sewer Knowledge TO Amendment Can we make the start date 9/7 so I have time to package the project and get it to him? From: Star Glaze Sent: Wednesday, August 26, 2020 11:42 AM To: Ryan Lee Subject: RE: Sewer Knowledge TO Amendment Hi Ryan, What is the start date for the new work on the Task Order Amendment? Starfet GCaze Contracts Administrator South Tahoe Public Utility District 530.543.6205 s laze@st ud.dst.ca.us M From: Ryan Lee Sent: Wednesday, August 26, 2020 9:28 AM 1 To: Star Glaze Subject: Sewer Knowledge TO Amendment Good morning, Here's the quote that we can use for our amendment to the most recent Sewer Knowledge task order.We're giving him a new project with an additional 18,500 linear feet of CCTV, but nothing else is changing in the scope of work.We can extend the deadline for the work to 10/16. Do you need any other information from me on this? Thanks for all your help! Ryan Lee Asset Management Analyst South Tahoe Public Utility District 1275 Meadow Crest Dr South Lake Tahoe, CA 96150 Phone:530-543-6234 Email: rlee@stpud.us 2 TASK ORDERS CHECKLIST 134(V - (Instructions for Preparation) ?1)qr 1. Check Task Order Log electronically or in Master Agreement folder to determine next Task Order number. 2. Prepare task order using proposal*from consultant. Determine date of Board meeting when proposalltask order will be approved. This is the date to use in first paragraph of task order. If not taken to the Board, use date being prepared. *Proposal will be attached as Fxhibit A to the task order and incorporated as part of the task order as such. 3. Send two copies (or email with instructions to print in duplicate, sign and return both) of the task order to consultant firm for signature. Instruct them to return both copies for final execution upon approval by Board. 4. Give a copy of the proposal or unsigned task order to Admin. Secretary for agenda packet, if applicable. If you have the two signed copies returned to you in time, put in Friday Folder for signature by Gen'] Mgr and Clerk of the Board after the Board meeting, irapplicabie. 5. Request purchase order(PO)for task order after Board/General Manager has approved. 6. Upon Board approval, present both TO's(already signed by consultant)to General Manager(GM)and Clerk of Board for signature. 7. Return one fully executed duplicate original TO along with copy of the corresponding PO to firm with cover letter for record of transmission. 8. Record all information about the task order to the LOG in the Master Agreement folder, including PO ni_tmhe.r_ 9. File signed copy of task order along with printed copy of PO in corresponding project file under firm's name. � ITEM NQ. DESCRIPTION OF CHECKLIST STEP DATE DONE .p r 1. Check Task Order Log. Use next Task Order(TO) number. U I ]Lo 2 av 2. Prepare TO ]1 I f 3. 1 Send two copies to firm,or Email with instruction to rint in du licate,si n and return. 4. 1 Give copy to Admin Secretary for Agenda(if applicable). �/T 5. Request PO. 6 �n0 fl� app ca;^r, press t} GM and Cfa f Board f^ nature. � Lr n and r n..o a.: r rk o „r , �u� / 7. Return TO along with copy of PO to firm. 8. Record info to TO Log in Master Agreement folder. 9. File signed TO with printed PO in corresponding roject file. S:\StaMHeidlFamslChecklists\Checklist Task Order doc