Loading...
HomeMy WebLinkAbout3247_field_report 6-19-23 CONSTRUCTION Repoli No. MATERIALS FIELD REPORT ENGINEERS, INC. DATE JOB NO. 06/19/23 3247 Page 1 of 2 300 Sierra Manor Drive,Suite 1 PROJECT Reno, Nevada 89511 STPUD 2023 INSPECTIONS&TESTING SERVICES- phone(775)851-8205 TASK ORDER NO.21 fax(775)851-8593 LOCATION South Lake Tahoe,CA OWNER South Tahoe Public Utility District Adrian Combes CONTRACTOR SOUTH TAHOE PUBLIC UTILITY DISTRICT Vinciguerra 1275 Meadow Crest Drive WEATHER TEMP Clear/Breezy 48 °P at 08:00 AM South Lake Tahoe, CA 96150 y °F at PM PRESENT AT SITE: Morgan w/Vinciguerra THE FOLLOWING WAS NOTED CME personnel arrived onsite at 8:00am. Arrived at yard and no sign of the contractor was noted. Did get a call from Wayne and was informed that they did have a crew member onsite and he had dug some potholes so a sample of the native material could be acquired and transported to the lab for testing. The tests to be run are a sieve, proctor and PI. This material is to be classified as engineered fill with specifications that need to be met. Ran up to the Keller tank project but the contractor was working at this site either, they were waiting parts. Pulled out the list of meters and finished the day hunting meters. FIELD DENSITY SUMMARY Gauge Info: Make: Troxler I Model: 3430 Serial No: Date of Calibration: Std Count Density Method of Measurement:Direct Std Count Moisture Soils Density Results: Material Description: In-Place In-Place Optimum Maximum In-Place Specified Test Elevation Test Dry Moisture Moisture Dry Relative Relative No. Depth Density Content Content Density Compaction Compaction Material Source: (in.) (PCF) I%) (%) (PCF) (%) (Min.%) *FG=Finish Grade/SG=Subgrade/RG=Rough Grade/OG=Original Grade/FTG=Footing Grade/BC=Base Course/Prefix B=Below IN HOUSE ROUTE TO: EMAIL: JVL Submitted by Tom Ingram