Loading...
HomeMy WebLinkAbout3247_field_report 6-14-23 CONSTRUCTION Report No. MATERIALS FIELD REPORT ENGINEERS, INC. DATE JOB NO. 06/14/23 3247 Page 1 of 2 300 Sierra Manor Drive,Suite 1 PROJECT Reno, Nevada 89511 STPUD 2023 INSPECTIONS&TESTING SERVICES- phone(775)851-8205 TASK ORDER NO.21 fax(775)851-8593 LOCATION South Lake Tahoe,CA OWNER South Tahoe Public Utility District Adrian Combes CONTRACTOR SOUTH TAHOE PUBLIC UTILITY DISTRICT Vinciguerra 1275 Meadow Crest Drive WEATHER TEMP Partly Cloud /Calm South Lake Tahoe, CA 96150 Y 53 °F at 08:00 AM Y "F at PM PRESENT AT SITE: THE FOLLOWING WAS NOTED CME personnel arrived onsite at 8:00am. Upon arrival at the PUD yard there was no sign of the Vinciguerra crew once again. Drove the site and still no sign of contractor. Once again went meter hunting in different areas of South Lake Tahoe. Met with Trevor about the hydrant at station 2+10 left on Horace Greeley. There was a fence in close proximity to where it was to be installed There would have been clearance issues with the fence and snow plows also were a concern. After some discussion it was decided to place it on Hank Monk at approximately station 5+10 right. This would provide more clearance from the fence and protection from snow plows. The change will be noted on the plans and as built plans. A sample of the aggregate base material was also acquired from the stockpile in the STPUD yard and transported to the CME laboratory where a new proctor will be run. This is to get prepared for when the crew begins placing pipe.. FIELD DENSITY SUMMARY Gauge Info: Make: Troxler I Model: 3430 Serial No: Date of Calibration: Std Count Density Method of Measurement:Direct Std Count Moisture Soils Density Results: Material Description: In-Place In-Place Optimum Maximum In-Place Specified Test Elevation Test Dry Moisture Moisture Dry Relative Relative No. Depth Density Content Content Density Compaction Compaction Material Source: (in.) (PCF) (%) (%) (PCF) ( ) (Min.%) *FG=Finish Grade/SG=Subgrade/RG=Rough Grade/OG=Original Grade/FTG=Footing Grade/BC=Base Course/Prefix B=Below IN HOUSE ROUTE TO: EMAIL: JVL Submitted by Tom Ingram