Loading...
HomeMy WebLinkAbout3247_field_report 6-1-23 CONSTRUCTION Repoli No. MATERIALS FIELD REPORT ENGINEERS, INC. DATE JOB NO. 06/01/23 3247 Page 1 of 2 300 Sierra Manor Drive,Suite 1 PROJECT Reno, Nevada 89511 STPUD 2023 INSPECTIONS&TESTING SERVICES- phone(775)851-8205 TASK ORDER NO.21 fax(775)851-8593 LOCATION South Lake Tahoe,CA OWNER South Tahoe Public Utility District Adrian Combes CONTRACTOR SOUTH TAHOE PUBLIC UTILITY DISTRICT Vinciguerra 1275 Meadow Crest Drive WEATHER TEMP 49 *F at 08:00 AM Clear/Calm South Lake Tahoe, CA 96150 `F at PM PRESENT AT SITE: Morgan THE FOLLOWING WAS NOTED CME personnel arrived onsite at 8:00am. Upon arrival was informed that the vac truck was down and there was a possibility that another was on the way. In the meantime a crew member was working in the yard and shuttling material to the fenced area by the post office. While material was being moved more meters were looked for off the list that had been provided by the district. Fuel arrived and members of the crew returned to Hank Monk to continue pot hole at the valve in front of 2741 Hank Monk(61"top pipe). They also performed pot holing operations at 1495 Horace Greeley(48"top pipe, 3' into AC). One was also dug at the east intersection of Hank Monk and Horace Greeley(51-40", it's coming up at an angle). Saw cut lines were also placed on Snowshoe Thompson and Horace Greeley. Pot hole locations were also placed on Ormsby. FIELD DENSITY SUMMARY Gauge Info: Make: Troxler I Model: 3430 Serial No: Date of Calibration: Std Count Density Method of Measurement:Direct Std Count Moisture Soils Density Results: Material Description: In-Place In-Place Optimum Maximum In-Place Specified Test Elevation Test Dry Moisture Moisture Dry Relative Relative No. Depth Density Content Content Density Compaction Compaction Material Source: (in.) (PCF) I%) (%) (PCF) (%) (Min.%) *FG=Finish Grade/SG=Subgrade/RG=Rough Grade/OG=Original Grade/FTG=Footing Grade/BC=Base Course/Prefix B=Below IN HOUSE ROUTE TO: EMAIL: JVL Submitted by Tom Ingram