HomeMy WebLinkAbout3247_field_6-16-23 CONSTRUCTION Repoli No.
MATERIALS FIELD REPORT
ENGINEERS, INC. DATE JOB NO.
06/16/23 3247 Page 1 of 2
300 Sierra Manor Drive,Suite 1 PROJECT
Reno, Nevada 89511 STPUD 2023 INSPECTIONS&TESTING SERVICES-
phone(775)851-8205 TASK ORDER NO.21
fax(775)851-8593 LOCATION
South Lake Tahoe,CA
OWNER
South Tahoe Public Utility District
Adrian Combes CONTRACTOR
SOUTH TAHOE PUBLIC UTILITY DISTRICT Vinciguerra
1275 Meadow Crest Drive WEATHER TEMP
Clear/Calm 58 °F at 08:00 AM
South Lake Tahoe, CA 96150 °F at PM
PRESENT AT SITE:
THE FOLLOWING WAS NOTED
CME personnel arrived onsite at 8:00am.
Upon arrival went to yard and there was sign of the contractor, this was also also the case when the project was
driven.
Was again asked to run over and observe the Haen crew working in the area of the hospital. They again had
the vac truck onsite and were continuing to work areas where the valves will be placed. Steel plates were again set
with cold mix placed around the edges.
The crew had placed traffic control prior to the start of the operation as they took 1 lane of traffic with the vac
truck.
Ran to the Keller tank site and met with Trent to get a run down of the project as he will out 2 weeks and there is
a chance they may need coverage .
FIELD DENSITY SUMMARY
Gauge Info:
Make: Troxler I Model: 3430 Serial No: Date of Calibration: Std Count Density
Method of Measurement:Direct Std Count Moisture
Soils Density Results:
Material Description: In-Place In-Place Optimum Maximum In-Place Specified
Test Elevation Test Dry Moisture Moisture Dry Relative Relative
No. Depth Density Content Content Density Compaction Compaction
Material Source: (in.) (PCF) I%) (%) (PCF) (%) (Min.%)
*FG=Finish Grade/SG=Subgrade/RG=Rough Grade/OG=Original Grade/FTG=Footing Grade/BC=Base Course/Prefix B=Below
IN HOUSE ROUTE TO: EMAIL:
JVL
Submitted by Tom Ingram