Loading...
HomeMy WebLinkAboutD1712508 TAC Mtng 2 Materials_06122018South Y Feasibility Study of Remedial Alternatives (D1712508) 1 Technical Advisory Committee (TAC) Roster 17W006 X:\Projects\General\17W006_So Y FS\TAC\D1712508 TAC Roster_final _06112018.docx 6/11/2018 AGENCY Member, Title Roles/Responsibilities Email Phone # SAG Member SWRCB- DOFA Tricia Carter, Water Resource Control Engineer, Grant Manager Responsible for management and performance of the Agreement. Tricia.Carter@Water boards.ca.gov (916) 319- 8259 STPUD Ivo Bergsohn, PG, CHG, Project Director Responsible for the overall management of the administrative and technical elements of the Agreement. ibergsohn@stpud.dst .ca.us (530) 543- 6204 X SWRCB- DDW Salvador Turrubiartes, PE, Associate Sanitary Engineer Responsible for review of Technical Work Plans and Technical Reports. Assist in resolving technical issues associated with project implementation in accordance with the MOU. Salvador.Turrubiartes @waterboards.ca.go v (916) 552- 9998 LRWQCB Brian Grey, PG Engineering Geologist Responsible for review of Technical Work Plans and Technical Reports. Assist in resolving technical issues associated with project implementation in accordance with the MOU. brian.grey@waterbo ards.ca.gov (530) 542- 5421 CSLT Jason Burke, Stormwater Program Coordinator Responsible for review of Technical Work Plans and Technical Reports. Assist in resolving technical issues associated with project implementation. jburke@cityofslt.us (530) 542- 6038 X South Y Feasibility Study of Remedial Alternatives (D1712508) 2 Technical Advisory Committee (TAC) Roster 17W006 X:\Projects\General\17W006_So Y FS\TAC\D1712508 TAC Roster_final _06112018.docx 6/11/2018 AGENCY Member, Title Roles/Responsibilities Email Phone # SAG Member LBWC Jennifer Lukins, Assistant General Manager Responsible for review of Technical Work Plans and Technical Reports. Assist in resolving technical issues associated with project implementation. Jennifer@lukinswate r.com (530) 541- 2606 X TKWC Rick Robillard, PE, Water Company Manager Responsible for review of Technical Work Plans and Technical Reports. Assist in resolving technical issues associated with project implementation. rrobillard@tahoekey spoa.org (530) 542- 6451 X SWRCB - DOFA Robert Reeves, Program Manager for Grant Program (TAC Alternate) Assist the Grant Manager and serve as an Alternate for T. Carter on the TAC. Robert.Reeves@wat erboards.ca.gov (916) 319- 8254 SWRCB- DDW Ali Rezvani, Sacramento District Engineer (TAC Alternate) Assist the SWRCB-DDW Sanitary Engineer and serve as an Alternate for S. Turrubiartes on the TAC. Ali.Rezvani@waterbo ards.ca.gov (916) 445- 5285 TKPOA Kirk Wooldridge, General Manager (TAC Alternate) Assist the TKPOA Water Company Manager and serve as an Alternate for R. Robillard on the TAC. kwooldridge@tahoek eyspoa.org (530) 542- 6444 x224 POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, TR. SCATTERED SUBROUNDED COARSE GRAINED SAND, ~50% MEDIUM GRAINED SAND,~50% FINE GRAINED SAND, LOOSE, WET POORLY GRADED SAND (SP) VERY DARK GRAYISHBROWN OVERALL, TR. COARSE GRAINED SAND, ~80-90% FINE GRAINED SAND, ~10% SILT, WET WELL GRADED SAND (SW) DARK YELLOWISHBROWN OVERALL, TR. FINE GRAVEL, ~10-15% COARSE GRAINED SAND, ~50% MEDIUM GRAINEDSAND, ~40% FINE GRAINED SAND WELL GRADED SAND WITH SILT (SW) DARKYELLOWISH BROWN OVERALL, TR. FINE GRAVEL,TR. COARSE GRAINED SAND, ~40% MEDIUM GRAINED SAND, ~40% FINE GRAINED SAND, ~10-15%SILT, VERY DENSE WELL GRADED SAND WITH GRAVEL (SW) GRAYISHBROWN OVERALL, TR. COBBLES, ~10%SUBROUNDED GRAVEL TO 1-INCH, ~10% COARSE GRAINED SAND, ~60% FINE GRAINED SAND, ~10%SILT, VERY DENSE AND COHESIVE 19 FT. COLOR INCLUDES PALE BROWN POORLY GRADED SAND (SP) PALE BROWN TOLIGHT YELLOWISH BROWN, ~100% FINE GRAINED SAND, VERY DENSE 20.5 - 21 FT. SOME COARSE GRAINED SAND AND MEDIUM GRAINED SAND SANDY SILT (ML) LBG AND YELLOWISH BROWN, ~25-50% FINE GRAINED SAND INCLUDING MICA,~50% SILT, VERY STIFF, NO PLASTICITY 25 FT. UP TO ~50% FINE GRAINED SAND WELL GRADED SAND (SW) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 33-35 FT. AND 35-37 FT.: 1.4 - 9.6% FINE GRAVEL, 10.5 -17.1% COARSE GRAINED SAND, 62.0 - 43.3% MEDIUMGRAINED SAND, 20.5-22.9% FINE GRAINED SAND, 5.6-7.1% SILT, DENSE, WET, APPEARANCE OFHIGHLY WEATHERED GRANITIC CLASTS TO COBBLE SIZE, POSS. WEATHERED IN PLACE EW-124-24.5 EW-125/25.5 EW-133-35 10YR5/4 10YR3/2 10YR4/6 10YR5/2 10YR6/3 10YR6/3 10YR6/4 10YR 6/2 10YR 5/8 10YR5/4 221721192713485391217133650 PID = 0.9 PPM Bentonite-CementGrout PID = 0.5 PPM PID = 0 PPM 24.5-25.5 ft.K=1.14E-04 33-35 ft. K=1.38E-03 Zone Test 1PCE: 30.7 ug/lToluene 0.9 ug/l SP SP SW SW SW SP ML SW HAND AUGER 3 8 0.8 1.5 1.5 0.5 0.5 6 BORING LOCATION DRILLING COMPANY DRILLING METHOD(S) ISOLATION CASING BLANK CASING SLOTTED CASING SIZE AND TYPE OF FILTER PACK SEAL GROUT WELL COMPLETION T. Hatch 7" core with 8" Casing n/a ELEVATION AND DATUM DATE STARTED Cascade Drilling Sonic - TS 150 8-in. Sonic Drive Casing (Temp.) 4-in. SCH 40 PVC (Temp.) 4-in. SS CWW 0.050 in. slot (Temp.) n/a n/a 3-5% Bentonite Cement Boring Name EW-1 DRAFT n/a M. McLeod Sonic core; Standard Pen. Test n/a n/a n/a n/a n/a 0 LOGGED BY n/a n/a n/a n/a n/a 130 STATIC WATER ELEVATION 150.0 ft. bgs SAMPLING METHODS Project Number 1770027.00 953 Eloise St., South Lake Tahoe FT. FT. FT. FT. FT. FT. TO TO TO TO TO TO FROM FROM FROM FROM FROM FROM DRILLER DRILL BIT(S) SIZE STAND PIPE FT. Project Name South Tahoe PUD TOTAL DEPTH DATE COMPLETED SURFACE HOUSING 4/30/18 5/5/18 Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 1 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 1 / 1 8 5 10 15 20 25 30 35 Handout 3a1 WELL GRADED SAND CONT'D SANDY SILT (ML) YELLOWISH BROWN OVERALL,MIXED LAYERS OF SAND WITH SILT, AND SMALLAMOUNT OF CLAY; SAND IS MAINLY FINE WITH STREAKS OF 10YR 5/8 OXIDATION, SOFT, NOPLASTICITY GRADES TO ALTERNATING LAYERS OF SILTYSAND AND POORLY GRADED SAND (SM) SAND ISMAINLY ~90% FINE GRAINED SAND, WITH ~10% SILT, LOOSE, WET POORLY GRADED SAND (SP) LIGHT YELLOWISHBROWN OVERALL, ~70-80% MEDIUM GRAINED SAND, ~20-30% FINE GRAINED SAND, DENSE, WET WELL GRADED SAND (SW) YELLOWISH BROWN OVERALL, ~10% SUBROUNDED COARSE GRAINEDSAND, ~30% MEDIUM GRAINED SAND, ~60% MEDIUMGRAINED SAND, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 44-46 FT. AND 46-48 FT.: 0.2-0.1% FINE GRAVEL, 3.7-3.6%COARSE GRAINED SAND, 37% MEDIUM GRAINEDSAND, 50.9-24.0% FINE GRAINED SAND, 8.1-10.3% SILT, VERY DENSE, WET 50 FT. COLOR CHANGES SLIGHTLY, MATERIAL BECOMES DENSER 54 FT. THIN SUBHORIZONTAL LAYER OF FINE-GRAINED SILTY SAND 55.5 FT. SOME MEDIUM GRAINED FELDSPAR GRAINS WELL GRADED SAND (SW) LIGHT YELLOWISH BROWN OVERALL, TR. SUBROUNDED COARSEGRAINED SAND, ~10-20% MEDIUM GRAINED SANDQUARTZ AND FELDSPAR, ~70-80% FINE GRAINED SAND INCLUDING MICA, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWN OVERALL, BASED UPON GRADATION TESTS AT 64-66FT.: 1.2% COARSE GRAINED SAND, 30.7% MEDIUMGRAINED SAND, 61.8% FINE GRAINED SAND, 6.3% SILT, MASSIVE, DENSE, WET EW-135-37 EW-138.5-39EW-139-39.5 EW-144-46 EW-146-48 EW-164-66 10YR5/4 10YR 6/4 10YR5/4 10YR4/4 10YR6/4 10YR5/4 1189496121718171721 2948502018311250 35-37 ft.:K=4.12E-04 38.5-39 ft.K=3.5E-08 39-39.5 ft.K=8.33E-05 PID = 0.5 PPMPID = 0.7 PPM 44-46 ft.K=1.82E-06 PID = 0.6 PPM 46-48 ft. K=1.06E-05 Zone Test 2 Benzene 112 ug/l Ethyl Benzene:4.2 ug/lStyrene 0.6 ug/l PCE 66 ug/lTCE 2.8 ug/l Toluene 18 ug/l Xylenes (Tot.) 0.9 ug/lPID = 0.6 PPM PID = 1.2 PPM Zone Test 3 PCE: 1.5 ug/lZone Test 3 PCE: 1.5 ug/l64-66 ft.K=5.78E-05 PID = 2.0 PPM PID = 0.9 PPM Bentonite-CementGrout PID = 0.3 PPM SW ML SM SP SW SP SW SP 1.5 0.8 0.5 1 7.1 2 1.5 1.5 0 11.5 9.4 Project Name South Tahoe PUD Project Number 1770027.00 Boring Name EW-1 DRAFT Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 2 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 1 / 1 8 40 45 50 55 60 65 70 75 80 SILTY SAND (SM) PALE BROWN WITHSUBHORIZONTAL YELLOWISH BROWN BANDING, ~60-80% FINE GRAINED SAND INCLUDING MICAS,~20-40% SILT, DENSE, NO PLASTICITY, WET WELL GRADED SAND (SW) PALE BROWN OVERALL, <10% SUBROUNDED COARSE GRAINEDSAND, ~30-40% MEDIUM GRAINED SAND, ~50% FINE GRAINED SAND INCLUDING MICA, MASSIVE, DENSE,WET SANDY SILT (ML) PALE BROWN WITH SUBHORIZONTAL AND CURVED YELLOWISH BROWNBANDING, FINE GRAINED SAND VARIES FROM ~20-50%, SILT VARIES ~80-50%, VERY STIFF, NO TOLOW PLASTICITY, WET SILTY SAND (SM) BROWN TO YELLOWISH BROWN WITH BANDS OF STRONG BROWN AND STREAKS OFVERY DARK GRAYISH BROWN, ~90% FINE GRAINEDSAND, ~10-20% SILT, DENSE, WET SILT TO SANDY SILT (ML) BROWN OVERALL WITHTHIN SUBHORIZONTAL STREAKS OF YELLOWISH BROWN, UP TO ~50% FINE GRAINED SANDINCLUDING MICA, WITH SAND DECREASING FROM94 TO 96 FT., SOME THIN SUBHORIZONTAL SANDY LAYERS PRESENT CLAY TO SILTY CLAY (CL) DARK GRAYISH BROWN OVERALL, VERY STIFF, LOW PLASTICITY, HIGHTOUGHNESS, LOW TO SLOW DILANTANCY POORLY GRADED SAND (SP) 10YR 5/8 YELLOWISH BROWN TO 2.5Y N4/0 DARK GRAY WELL GRADED SAND (SW) DARK GRAY, GRAY, GRADING TO LIGHT YELLOWISH BROWN, ~5% FINEGRAVEL, INCLUDING SUBROUNDED CLASTS ANDGRANITIC CLASTS WEATHERING IN PLACE, ~5% COARSE GRAINED SAND, ~30-40% MEDIUM GRAINEDSAND, ~30% FINE GRAINED SAND WELL GRADED SAND WITH GRAVEL (SW) DARKGRAYISH BROWN OVERALL, ~10% GRAVEL TO 1-INCH, UP TO ~20% COARSE GRAINED SAND,~20-30% MEDIUM GRAINED SAND, ~30% FINEGRAINED SAND, VERY DENSE, WET WELL GRADED SAND (SW) DARK GRAY OVERALL,BASED UPON GRADATION TESTS AT 122-127 FT.: 3.6% FINE GRAVEL, 25.1% COARSE GRAINED SAND,37.0% MEDIUM GRAINED SAND, 24.0% FINE GRAINEDSAND, 7.6% SILT, DENSE, MASSIVE, WET EW-196-98 EW-1122-124 10YR 6/3 10YR 5/8 10YR 6/310YR 5/47.5YR 4/6 10YR 4/310YR 5/8 10YR4/2 ** 2.5YN4/0 10YR8/1 10YR6/4 10YR4/2 2.5YN4/0 293639 253550/0.4Corefrom90-100 ft. 3850 PID = 1.1 PPM PID = 1.0 PPM 96-98 ft. K=2.86E-07 Bentonite-CementGrout PID = 0.3 PPM PID = 0.3 PPM Zone Test 5 PCE: <0.5 ug/lTCE: 0.6 ug/l 122-124 ft. K=7.42E-05 SM SW ML SM ML CL SP SW SW SW 1 1.5 0.4 8 0.4 4.2 9 Project Name South Tahoe PUD Project Number 1770027.00 Boring Name EW-1 DRAFT Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 3 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 1 / 1 8 85 90 95 100 105 110 115 120 125 WELL GRADED SAND CONT'D COMPLEX ZONE OF MIXED AND DEFORMED LAYERS OF SILT AND WELL GRADED SAND (ML)SILTY LAYERS COLOR INCUDES YELLOWISHBROWN (10YR 5/8), GRAY (2.5Y N5), OLIVE GRAY (2.5Y N4-5Y 5/1); WELL GRADED SAND LAYERSTYPICALLY 2.5Y N8, SILTY LAYERS ARE TYPICALLYUP TO ~50% FINE GRAINED SAND, ~50% SILT, VERY STIFF, NO PLASTICITY, WET, ALTERNATING LAYERSARE ~1-2 INCHES THICK AND CURVED ANDDEFORMED; DARK GRAY CLASTS ARE POSSIBLE ORGANIC MATTER SILTY SAND TO POORLY GRADED SAND (SM-SP) PINK FROM 130 - 131 FT, DARK GRAY BELOW, ~50%MEDIUM GRAINED SAND, ~50% FINE GRAINED SANDTO 134 FT., GRADING TO ~80% FINE GRAINED SAND ~10-20% SILT SILTY SAND (SM) PINK AND GRAY, ~60-80% FINE GRAINED SAND INCLUDING MICAS, ~20-40% SILT,VERY DENSE AND COHESIVE, NO PLASTICITY POORLY GRADED SAND (SP) GRAY OVERALL, TR.COARSE GRAINED SAND, ~100% FINE GRAINEDSAND, ~10%? SILT, FAINT SUBHORIZONTAL LAYERING SILTY SAND TO SANDY SILT (SM-ML) PINK AND GRAY, ~40-60% FINE GRAINED SAND, ~40-60% SILT,VERY STIFF, NO PLASTICITYNOTES 1. ALL CONTACTS APPROXIMATE 2. BGS: BELOW GROUND SURFACE 3. COLOR DESIGNATION IN ACCORDANCE WITH THE MUNSELL SOIL COLOR CHARTS(KOLLMORGEN INSTRUMENTS CORPORATION, 1990) 4. PID = PHOTOIONIZATION DETECTOR HEADSPACE READING 5. PPM = PARTS PER MILLION 6. SOIL CLASSIFIED IN ACCORDANCE WITH THE UNIFIED SOIL CLASSIFICATION SYSTEM, ASTM D-2488-93 7. ZONE TEST 1: SCREEN 31-36 FT. BGS; CASING TO 27 FT. BGS 8. ZONE TEST 2: SCREEN 41 FT. - 51 FT. BGS; CASING TO 38 FT. BGS 9. ZONE TEST 3: SCREEN 59.5 FT. - 69.5 FT. BGS; CASING TO 58 FT. BGS 10. ZONE TEST 5: SCREEN 120 FT. - 125 FT. BGS; CASING TO 117 FT. BGS 11. ZONE TEST COMPONENTS INCLUDE 4-INCH SCH40 PVC BLANK CASING AND 4-INCHSTAINLESS STEEL CONTINUOUS WIRE WOUND WELL SCREEN WITH 0.050-INCH OPENINGS.FILTER SAND WAS CEMEX #4/12 SAND. 12. K = PERMEABILITY IN CENTIMETERS/SECOND EW-1150 2.5YN4/0 ** 5Y5/1 5YR 7/3 10YR6/1 5YR 7/310YR 6/1 Bentonite-Cement Grout Slough 150 ft. K=3.64E-06 SW ML SM-SP SM SP SM-ML 8 18.4 Project Name South Tahoe PUD Project Number 1770027.00 Boring Name EW-1 DRAFT Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 4 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 1 / 1 8 130 135 140 145 150 @A@A@A @A@A &( @A@A &( @A@A !>MW-4A15-25 FTPCE: 1.5TCE: <0.5 MW-4B35-50 FTPCE: 64TCE: 2.3 MW-7C70-80 FTPCE: 3.4TCE: <0.5 MW-7D120-140 FTPCE: 14TCE: <0.5 MW-10B35-50 FTPCE: <0.5TCE: <0.5 MW-10C65-80 FTPCE: <0.5TCE: <0.5 EW-4D120-140 FTPCE: <0.5TCE: <0.5 MW-4C59-79 FTPCE: 2.7TCE: <0.5 Boring (May 2018)30-35 FT PCE: 30.7 TCE: 0.841-51 FT PCE: 66 TCE: 2.860-70 FT PCE: 1.5 TCE: <0.5119-124 FT PCE: <0.5 TCE: 0.6 Tahoe Keys Well #2 Tahoe Keys Well #1 Lukins Brothers Well No.5 Lukins Brothers Well No.4 Lukins Brothers Well No.2 Tata #3Tata #2 Tata #1 Clement Well Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community05001,000 1,500250Feet $Do c u m e n t P a t h : C : \ U s e r s \ A l i c e R o b i n s o n \ D o c u m e n t s \ A r c G I S \ P a c k a g e s \ F i g 1 - 4 _ P D I G e o l o g y _ f i n a l _ 8 F F 0 B 2 7 E - 4 D D 3 - 4 3 7 C - 9 0 9 B - 8 7 B B 9 1 3 D B 0 9 3 \ v 1 0 5 \ F i g 1 - 4 _ P D I W o r k P l a n _ F I N A L . m x d Legend Public WaterSystem Well $1 Active $1 Standby $1 Inactive PDI Well &(Private Well !>Soil Boring (May 2018) @A Monitoring Well (SampledMay 2018) South "Y" Plume (2016Extent, approximate) All TCE/PCE results in micrograms per liter. Handout 3a2 $1 $1 $1 $1 $1 $1 $1 $1 $1 $1 $1$1$1 $1 Tahoe Keys Well #3 Tahoe Keys Well #2 Tahoe Keys Well #1 Lukins Brothers Well No.5 Lukins Brothers Well No.4 Lukins Brothers Well No.2 Lukins Brothers Well No.1 J6 J6J6 J6J6 5E5E 5E5E J5 J5 J5 J5 J4 J4 J4J4 J3 J3 J2 J1 J1J1 J1 TENTENTENTENROG ROGROG KM2KM2 KM2KM2KM1 DUN2 DUN1 LTB4 LTB4LTB4 LTB4 TATATATA TATATATA CL-1CL-1 MW-9BMW-9AMW-9C HMW-4HMW-3 LBWC#5 LBWC#1 LBWC #4 LW-MW-5SLW-MW-1S TKWC #1/45 TKWC #1/45 LBWC #2/126 TKWC #2/250 TKWC #3/125 TKWC #3/125 TKWC #2/250 LBWC #4 / 70-75 Rockwater / 65-70Rockwater / 65-70 TV School/110-115 LBWC #4 / 125-130 LBWC #2 / 145-150 Content may not reflect National Geographic's current map policy. Sources: National Geographic, Esri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp. 0 500 1,000 1,500250Feet $ 3/2018 Do c u m e n t P a t h : X : \ P r o j e c t s \ G e n e r al \ 1 7 W 0 0 6 _ S o Y F S \ P D I \ W o r k p l a n \ P D I G I S F i l e s \ P D I GI S F i l e s _ F I N A L \ F i g 1 - 9 _ PD I 2 0 1 7 P C E _ f i n a l _ 0 3 1 61 8 . m x d Legend South "Y" Plume (2016 Extent, approximate) Water System South Tahoe PUD Lukins Brothers WC Tahoe Keys WC Public Water System Well $1 Active $1 Standby $1 Inactive $1 Destroyed 2017 PCE (ug/L) <0.5 ug/L >0.5 - 5 ug/L >5 - 50 ug/L >50 - 100 ug/L > 100 ug/L EKI, 2017 GW Inv. PCE (ug/L) <0.5 ug/L 0.5 - 5.0 ug/L >5 - 50 ug/L >50 - 100 ug/L >100 - 500 ug/L >500 ug/L Project Site (potential) 895 Eloise (AKA 903 Eloise) 953 Eloise Handout 3a3 South Y PCE Grant 2016-2017 Water Quality Data Page 1 X:\Projects\General\17W006_So Y FS\PDI\Field Investigation\Sampling & Analysis\STPUD Lab\VOCs\Results - PCE Study 2018.xls 6/8/2018 Depth Temp EC D.O.Turb PCE cis-1,2-DCE TCE MTBE TPH-DRO TDS Chloride NO3-N SO4SourceDateID#ft C pH uS/cm mg/L NTU ug/L ug/L ug/L ug/L mg/L mg/L mg/L mg/L mg/L Phase I 30-35'05/01/2018 AG61161 26.2 11.0 5.08 522 3.23 26 30.7 <0.5 0.8 <0.2 <0.5 328 123 1.08 6.90 Phase I 41-51'05/02/2018 AG61175 37.9 11.9 5.03 558 2.38 26 66 <0.5 2.8 <0.2 <0.5 430 149 1.36 6.43 Phase I 60-70'05/03/2018 AG61192 63.2 12.6 5.17 381 8.38 54 1.5 <0.5 <0.5 <0.2 <0.5 278 87.8 0.456 3.91 Phase I 119-124'05/05/2018 AG61207 25.3 16.0 7.42 228 2.04 299 <0.5 <0.5 0.6 <0.2 <0.5 154 25.1 0.109 8.45 MW-4A 05/02/2018 AG61178 1.5 <0.5 <0.5 <0.2 MW-4B 05/02/2018 AG61179 64 0.8 2.3 <0.2 MW-4C 05/02/2018 AG61180 2.7 <0.5 <0.5 <0.2 MW-7C 05/02/2018 AG61181 3.4 0.6 <0.5 <0.2 MW-7D 05/02/2018 AG61182 14 <0.5 <0.5 <0.2 MW-10B 05/02/2018 AG61183 <0.5 <0.5 <0.5 <0.2 MW-10C 05/02/2018 AG61184 <0.5 <0.5 <0.5 <0.2 EW-4D 05/02/2018 AG61185 <0.5 <0.5 <0.5 <0.2 Handout 3a4 South Y PCE Grant 2016-2017 Water Quality Data Page 2 X:\Projects\General\17W006_So Y FS\PDI\Field Investigation\Sampling & Analysis\STPUD Lab\VOCs\Results - PCE Study 2018.xls 6/8/2018 Source Date Phase I 30-35'05/01/2018 Phase I 41-51'05/02/2018 Phase I 60-70'05/03/2018 Phase I 119-124'05/05/2018 MW-4A 05/02/2018 MW-4B 05/02/2018 MW-4C 05/02/2018 MW-7C 05/02/2018 MW-7D 05/02/2018 MW-10B 05/02/2018 MW-10C 05/02/2018 EW-4D 05/02/2018 <------------Alkalinity---------------> HCO3 CO3 OH Total Al As Cd Cr Cu Mn Se U Zn Boron Ca Fe Mg K Na mg/L mg/L mg/L mg/L pCi/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L ug/L mg/L mg/L mg/L 46.1 0 0 46.1 <20 <1 <0.5 <1 2.21 134 <5 111 <0.05 38.6 0.05 8.83 1.80 36.8 54.9 0 0 54.9 3000 1.34 <0.5 2.98 7.54 104 <5 71.6 <0.05 52.7 2.81 13.4 2.16 34.8 46.4 0 0 46.4 <20 <1 <0.5 <1 <2 35.1 <5 32.1 <0.05 31.6 0.08 7.15 1.44 25.2 69.1 1.98 0 71.1 90 3.28 <0.5 <1 <2 121 <5 <20 <0.05 12.0 0.11 4.83 2.14 25.5 Handout 3a5 X:\Projects\General\17W006_So Y FS\PDI\GW Levels\So Y GWLevels.xlsx 6/8/2018 SOUTH TAHOE PUBLIC UTILITY DISTRICT SOUTH Y FEASIBILITY STUDY VERTICAL GRADIENT ESTIMATES MW-4A MP 6255.85 MW-4A Screen bottom- 25 6230.85 MW-4B MP 6256.02 MW-4B Screen bottom-50 6206.02 MW-4C MP 6256.32 MW-4C Screen bottom-79 6177.32 24.83 28.70 53.53 B - A C - B C - A WL_Date DTW WL_ELEV DTW WL_ELEV DTW WL_ELEV Ivert Ivert Ivert 01/17/18 6.39 6249.46 11.08 6244.94 13.86 6242.46 -0.18 -0.09 -0.13 04/30/18 4.88 6250.97 9.33 6246.69 12.13 6244.19 -0.17 -0.09 -0.13 05/02/18 5.00 6250.85 9.44 6246.58 12.27 6244.05 -0.17 -0.09 -0.13 MW-4A MW-4CMW-4B MW-4A - MW-4B: Vertical Separation (dl) MW-4B - MW-4C: Vertical Separation (dl) MW-4A - MW-4C: Vertical Separation (dl) Handout 3a6 X:\Projects\General\17W006_So Y FS\PDI\GW Levels\So Y GWLevels.xlsx 6/8/2018 SOUTH TAHOE PUBLIC UTILITY DISTRICT SOUTH Y FEASIBILITY STUDY VERTICAL GRADIENT ESTIMATES MW-10A MP 6261.41 MW-10A Screen bottom- 25 6236.41 MW-10B MP 6261.22 MW-10B Screen bottom-50 6211.22 MW-10C MP 6261.31 MW-10C Screen bottom-80 6181.31 25.19 29.91 55.10 B - A C - B C - A WL_Date DTW WL_ELEV DTW WL_ELEV DTW WL_ELEV Ivert Ivert Ivert 10/23/17 15.57 6240.28 18.65 6237.37 23.90 6232.42 -0.12 -0.17 -0.14 05/02/18 12.77 6243.08 16.54 6239.48 21.71 6234.61 -0.14 -0.16 -0.15 MW-10A - MW-10B: Vertical Separation (dl) MW-10B - MW-10C: Vertical Separation (dl) MW-10A - MW-10C: Vertical Separation (dl) MW-10A MW-10B MW-10C X:\Projects\General\17W006_So Y FS\PDI\GW Levels\So Y GWLevels.xlsx 6/8/2018 SOUTH TAHOE PUBLIC UTILITY DISTRICT SOUTH Y FEASIBILITY STUDY VERTICAL GRADIENT ESTIMATES MW-7C MP 6251.12 MW-7C Screen bottom- 80 6171.12 MW-7D MP 6251.25 MW-7D Screen bottom-140 6111.25 59.87 D - C WL_Date DTW WL_ELEV DTW WL_ELEV DTW WL_ELEV Ivert 05/02/18 15.57 6240.28 18.65 6237.37 -0.05 MW7C - MW7D: Vertical Separation (dl) MW-7C MW-7D Construction Materials Engineers, Inc. Laboratory Testing South Tahoe Public Utility District CME Project No. 2199 Moisture Density Results ASTM D7263 GLA Project No. AS18.1024 Sample Dry Density, pcf Moisture Content, %  EW1 24’‐24.5’ 119.1 11.7  EW1 38.5’‐39’ 109.2 18.9  EW1 39.0’‐39.5’ 110.2 16.3  EW1 96’‐98’ 79.9 27.9  EW1 150’ 115.0 16.3  EW1 33’‐35’ 87.4 10.4  EW1 35’‐37’ 78.2 8.4  EW1 44’‐46’ 92.9 20.4  EW1 46’‐48’ 83.1 17.3  EW1 64’‐66’79.0 17.4 EW1 122’‐124’ 104.4 15.5  Handout 4a1 Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW1 33'-35' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 87.4 N/A -------- -------- Loaded 3.7%89.1 N/A 0.16 1.38E-03 Dry Dens., pcf Moist. % Initial Moisture Content, %10.4 Final Moisture Content, %14.9 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 2,800 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW1 35'-37' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 78.2 N/A -------- -------- Loaded 6.9%84.0 N/A 0.16 4.12E-04 Dry Dens., pcf Moist. % Initial Moisture Content, %8.4 Final Moisture Content, %20.7 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 2,800 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW-1 44' - 46' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 92.9 N/A -------- -------- Loaded 5.6%98.4 N/A 1.48 1.82E-06 Dry Dens., pcf Moist. % Initial Moisture Content, %20.4 Final Moisture Content, %28.4 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 0 20 40 60 80 100 120 140 160 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 3,400 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW1 46'-48' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 83.1 N/A -------- -------- Loaded 6.3%88.7 N/A 0.16 1.06E-05 Dry Dens., pcf Moist. % Initial Moisture Content, %17.3 Final Moisture Content, %18.4 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 3,400 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW-1, 46'-48' (2nd trial) USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 83.1 N/A -------- -------- Loaded 8.1%90.5 N/A 2.61 4.59E-06 Dry Dens., pcf Moist. % Initial Moisture Content, %17.3 Final Moisture Content, %16.0 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 0.0 20.0 40.0 60.0 80.0 100.0 120.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 3,400 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW-1 64' - 66' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 79.0 N/A -------- -------- Loaded 5.0%83.2 N/A 1.26 5.78E-05 Dry Dens., pcf Moist. % Initial Moisture Content, %17.4 Final Moisture Content, %20.7 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 4,500 psf Client:Construction Materials Engineers, Inc. Project:STPUD Lab Testing, Proj.No.2199 Project No.:AS18.1024.00 Sample No:EW-1, 122'-124' USCS Classification:N/A Moisture Condition Settlement, % Dry Density, pcf % of Standard Proctor Hydraulic Gradient Hydraulic Conductivity, cm/sec Initial -------- 104.4 N/A -------- -------- Loaded 9.4%115.2 N/A 2.32 7.42E-05 Dry Dens., pcf Moist. % Initial Moisture Content, %15.5 Final Moisture Content, %19.3 Sandcone Density Test N/A N/A FIXED WALL HYDRAULIC CONDUCTIVITY TEST RESULTS 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hy d r a u l i c C o n d u c t i v i t y , c m / s e c Time, Hours Hydraulic Conductivity vs. Time Saturated Hydraulic Conductivity USBR 5600‐89 Construction Materials  Engineers, Inc. STPUD Lab Testing CME Proj. No. 2199 Note:  Sample was loaded to 9,900 psf Client: Project: Project No.: Sample No: Date: Initial Final water Specific Gravity1 6.35 6.35 68 2.65 7.112 7.193 0.76712 1 - Assumed 12.30 16.78 0.031416 119.26 114.66 12 84 101 Initial Hydraulic Gradient 15.03 Final Hydraulic Gradient 6.79 Hydraulic Conductivity, cm/sec South Tahoe Public Utility District Lab Testing FLEX WALL HYDRAULIC CONDUCTIVITY TEST RESULTS - ASTM D 5084 Construction Materials Engineers, Inc. SPECIMEN DATA RESULTS Effective Consolidation Stress, psi AS18.1024 EW-1 24.'-24.5', 25'-25.5' combined 2 - Final saturation value is considered approximate. BOUNDARY CONDITIONS 1.14E-04 Saturation2 Area of Headwater Tube, cm2 Area of Tailwater Tube, cm2 Back-pressure, psi Permeant 5/17/2018 Dry Density, pcf Moisture, % Diameter,cm Length, cm 1.000E-07 1.000E-06 1.000E-05 1.000E-04 1.000E-03 1.000E-02 0246810 Hy d r a u l i c C o n d u c t i v i t y ( c m / s e c ) Time (sec) Hydraulic Conductivity vs. Time FLEX WALL HYDRAULIC CONDUCTIVITY ASTM D 5084 Construction Materials Engineers, Inc. STPUD Laboratory Testing CME Proj.No. 2199 Note:  ASTM D5084 is valid for hydraulic conductivities  of 1.0 E‐05 cm/s and slower.  Multiple trials were  conducted to estimate the result presented. Client: Project: Project No.: Sample No: Date: Initial Final water Specific Gravity1 6.35 6.347 59 2.65 7.112 7.112 0.76712 1 - Assumed 18.90 17.60 0.031416 108.61 110.15 21 96 93 Initial Hydraulic Gradient 17.3 Final Hydraulic Gradient 10.71 Hydraulic Conductivity, cm/sec South Tahoe Public Utility District Lab Testing FLEX WALL HYDRAULIC CONDUCTIVITY TEST RESULTS - ASTM D 5084 Construction Materials Engineers, Inc. SPECIMEN DATA RESULTS Effective Consolidation Stress, psi AS18.1024 EW-1 38.5' - 39.0' 2 - Final saturation value is considered approximate. BOUNDARY CONDITIONS 3.50E-08 Saturation2 Area of Headwater Tube, cm2 Area of Tailwater Tube, cm2 Back-pressure, psi Permeant 5/17/2018 Dry Density, pcf Moisture, % Diameter,cm Length, cm 1.000E-09 1.000E-08 1.000E-07 1.000E-06 0 1000 2000 3000 4000 5000 Hy d r a u l i c C o n d u c t i v i t y ( c m / s e c ) Time (sec) Hydraulic Conductivity vs. Time FLEX WALL HYDRAULIC CONDUCTIVITY ASTM D 5084 Construction Materials Engineers, Inc. STPUD Laboratory Testing CME Proj.No. 2199 Client: Project: Project No.: Sample No: Date: Initial Final water Specific Gravity1 6.35 6.343 59 2.65 7.112 7.112 0.76712 1 - Assumed 15.80 23.50 0.031416 109.94 107.98 21 83 117 Initial Hydraulic Gradient 17.3 Final Hydraulic Gradient 1.65 Hydraulic Conductivity, cm/sec South Tahoe Public Utility District Lab Testing FLEX WALL HYDRAULIC CONDUCTIVITY TEST RESULTS - ASTM D 5084 Construction Materials Engineers, Inc. SPECIMEN DATA RESULTS Effective Consolidation Stress, psi AS18.1024 EW-1 39.0'-39.5' 2 - Final saturation value is considered approximate. BOUNDARY CONDITIONS 8.33E-05 Saturation2 Area of Headwater Tube, cm2 Area of Tailwater Tube, cm2 Back-pressure, psi Permeant 5/17/2018 Dry Density, pcf Moisture, % Diameter,cm Length, cm 1.000E-07 1.000E-06 1.000E-05 1.000E-04 1.000E-03 1.000E-02 024681012 Hy d r a u l i c C o n d u c t i v i t y ( c m / s e c ) Time (sec) Hydraulic Conductivity vs. Time FLEX WALL HYDRAULIC CONDUCTIVITY ASTM D 5084 Construction Materials Engineers, Inc. STPUD Laboratory Testing CME Proj.No. 2199 Note:  ASTM D5084 is valid for hydraulic conductivities  of 1.0 E‐05 cm/s and slower.  Multiple trials were  conducted to estimate the result presented. Client: Project: Project No.: Sample No: Date: Initial Final water Specific Gravity1 7.62 7.46 40 2.65 7.112 7.28 0.76712 1 - Assumed 27.90 33.21 0.031416 79.85 79.34 40 69 81 Initial Hydraulic Gradient 12.53 Final Hydraulic Gradient 1.72 Hydraulic Conductivity, cm/sec South Tahoe Public Utility District Lab Testing FLEX WALL HYDRAULIC CONDUCTIVITY TEST RESULTS - ASTM D 5084 Construction Materials Engineers, Inc. SPECIMEN DATA RESULTS Effective Consolidation Stress, psi AS18.1024 EW1 96'-98' 2 - Final saturation value is considered approximate. BOUNDARY CONDITIONS 2.86E-07 Saturation2 Area of Headwater Tube, cm2 Area of Tailwater Tube, cm2 Back-pressure, psi Permeant 5/14/2018 Dry Density, pcf Moisture, % Diameter,cm Length, cm 1.000E-08 1.000E-07 1.000E-06 1.000E-05 1.000E-04 0 1000 2000 3000 Hy d r a u l i c C o n d u c t i v i t y ( c m / s e c ) Time (sec) Hydraulic Conductivity vs. Time FLEX WALL HYDRAULIC CONDUCTIVITY ASTM D 5084 Construction Materials Engineers, Inc. STPUD Laboratory Testing CME Proj.No. 2199 Client: Project: Project No.: Sample No: Date: Initial Final water Specific Gravity1 7.62 7.488 30 2.65 7.112 7.409 0.76712 1 - Assumed 16.30 17.53 0.031416 115.37 109.68 50 100 91 Initial Hydraulic Gradient 13.38 Final Hydraulic Gradient 1.37 Hydraulic Conductivity, cm/sec Area of Tailwater Tube, cm2 Back-pressure, psi Permeant 5/14/2018 Dry Density, pcf Moisture, % Diameter,cm Length, cm AS18.1024 EW1 150' 2 - Final saturation value is considered approximate. BOUNDARY CONDITIONS 3.64E-06 Saturation2 Area of Headwater Tube, cm2 South Tahoe Public Utility District Lab Testing FLEX WALL HYDRAULIC CONDUCTIVITY TEST RESULTS - ASTM D 5084 Construction Materials Engineers, Inc. SPECIMEN DATA RESULTS Effective Consolidation Stress, psi 1.000E-07 1.000E-06 1.000E-05 1.000E-04 1.000E-03 0 50 100 150 200 250 300 Hy d r a u l i c C o n d u c t i v i t y ( c m / s e c ) Time (sec) Hydraulic Conductivity vs. Time FLEX WALL HYDRAULIC CONDUCTIVITY ASTM D 5084 Construction Materials Engineers, Inc. STPUD Laboratory Testing CME Proj.No. 2199 Handout 4a2 POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, TR. SCATTERED SUBROUNDED COARSE GRAINED SAND, ~50% MEDIUM GRAINED SAND,~50% FINE GRAINED SAND, LOOSE, WET POORLY GRADED SAND (SP) VERY DARK GRAYISHBROWN OVERALL, TR. COARSE GRAINED SAND, ~80-90% FINE GRAINED SAND, ~10% SILT, WET WELL GRADED SAND (SW) DARK YELLOWISHBROWN OVERALL, TR. FINE GRAVEL, ~10-15% COARSE GRAINED SAND, ~50% MEDIUM GRAINEDSAND, ~40% FINE GRAINED SAND WELL GRADED SAND WITH SILT (SW) DARKYELLOWISH BROWN OVERALL, TR. FINE GRAVEL,TR. COARSE GRAINED SAND, ~40% MEDIUM GRAINED SAND, ~40% FINE GRAINED SAND, ~10-15%SILT, VERY DENSE WELL GRADED SAND WITH GRAVEL (SW) GRAYISHBROWN OVERALL, TR. COBBLES, ~10%SUBROUNDED GRAVEL TO 1-INCH, ~10% COARSE GRAINED SAND, ~60% FINE GRAINED SAND, ~10%SILT, VERY DENSE AND COHESIVE 19 FT. COLOR INCLUDES PALE BROWN POORLY GRADED SAND (SP) PALE BROWN TOLIGHT YELLOWISH BROWN, ~100% FINE GRAINED SAND, VERY DENSE 20.5 - 21 FT. SOME COARSE GRAINED SAND AND MEDIUM GRAINED SAND SANDY SILT (ML) LBG AND YELLOWISH BROWN, ~25-50% FINE GRAINED SAND INCLUDING MICA,~50% SILT, VERY STIFF, NO PLASTICITY 25 FT. UP TO ~50% FINE GRAINED SAND WELL GRADED SAND (SW) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 33-35 FT. AND 35-37 FT.: 1.4 - 9.6% FINE GRAVEL, 10.5 -17.1% COARSE GRAINED SAND, 62.0 - 43.3% MEDIUMGRAINED SAND, 20.5-22.9% FINE GRAINED SAND, 5.6-7.1% SILT, DENSE, WET, APPEARANCE OFHIGHLY WEATHERED GRANITIC CLASTS TO COBBLE SIZE, POSS. WEATHERED IN PLACE 10YR5/4 10YR3/2 10YR4/6 10YR5/2 10YR6/3 10YR6/3 10YR6/4 10YR 6/2 10YR 5/8 10YR5/4 Grout Seal Bentonite Seal Gravel Pack 28 ft. Zone Test 1PCE: 30.7 ug/lToluene 0.9 ug/l Louvered Screen SP SP SW SW SW SP ML SW BORING LOCATION DRILLING COMPANY DRILLING METHOD(S) ISOLATION CASING BLANK CASING SLOTTED CASING SIZE AND TYPE OF FILTER PACK SEAL GROUT WELL COMPLETION n/a ELEVATION AND DATUM DATE STARTED Cascade Drilling Sonic - TS 150 Sonic Drive Casing (Temp.) 6-in. SCH 80 PVC 6-in. Stainless Steel 0.050-inch Louvered SRI #6 3/8-in. Bentonite Chips Neat Cement Grout Well Name EW-1 Option 1 - One Well 3 n/a +2 See 26 23 3 LOGGED BY n/a See Notes Notes 64 26 23 STATIC WATER ELEVATION 150.0 ft. bgs SAMPLING METHODS Project Number 1770027.00 953 Eloise St., South Lake Tahoe FT. FT. FT. FT. FT. FT. TO TO TO TO TO TO FROM FROM FROM FROM FROM FROM DRILLER DRILL BIT(S) SIZE STAND PIPE FT. Project Name South Tahoe PUD TOTAL DEPTH DATE COMPLETED SURFACE HOUSING X Well cap Stand pipe Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 1 4OFSHEET Type& No. SAMPLES WELL CONSTRUCTION Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 5 10 15 20 25 30 35 Handout 4a3 WELL GRADED SAND CONT'D SANDY SILT (ML) YELLOWISH BROWN OVERALL,MIXED LAYERS OF SAND WITH SILT, AND SMALLAMOUNT OF CLAY; SAND IS MAINLY FINE WITH STREAKS OF 10YR 5/8 OXIDATION, SOFT, NOPLASTICITY GRADES TO ALTERNATING LAYERS OF SILTYSAND AND POORLY GRADED SAND (SM) SAND ISMAINLY ~90% FINE GRAINED SAND, WITH ~10% SILT, LOOSE, WET POORLY GRADED SAND (SP) LIGHT YELLOWISHBROWN OVERALL, ~70-80% MEDIUM GRAINED SAND, ~20-30% FINE GRAINED SAND, DENSE, WET WELL GRADED SAND (SW) YELLOWISH BROWN OVERALL, ~10% SUBROUNDED COARSE GRAINEDSAND, ~30% MEDIUM GRAINED SAND, ~60% MEDIUMGRAINED SAND, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 44-46 FT. AND 46-48 FT.: 0.2-0.1% FINE GRAVEL, 3.7-3.6%COARSE GRAINED SAND, 37% MEDIUM GRAINEDSAND, 50.9-24.0% FINE GRAINED SAND, 8.1-10.3% SILT, VERY DENSE, WET 50 FT. COLOR CHANGES SLIGHTLY, MATERIAL BECOMES DENSER 54 FT. THIN SUBHORIZONTAL LAYER OF FINE-GRAINED SILTY SAND 55.5 FT. SOME MEDIUM GRAINED FELDSPAR GRAINS WELL GRADED SAND (SW) LIGHT YELLOWISH BROWN OVERALL, TR. SUBROUNDED COARSEGRAINED SAND, ~10-20% MEDIUM GRAINED SANDQUARTZ AND FELDSPAR, ~70-80% FINE GRAINED SAND INCLUDING MICA, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWN OVERALL, BASED UPON GRADATION TESTS AT 64-66FT.: 1.2% COARSE GRAINED SAND, 30.7% MEDIUMGRAINED SAND, 61.8% FINE GRAINED SAND, 6.3% SILT, MASSIVE, DENSE, WET 10YR5/4 10YR 6/4 10YR5/4 10YR4/4 10YR6/4 10YR5/4 38 ft. 44 ft. Zone Test 2Benzene 112 ug/lEthyl Benzene: 4.2 ug/lStyrene 0.6 ug/lPCE 66 ug/l TCE 2.8 ug/l Toluene 18 ug/l Xylenes (Tot.) 0.9 ug/l Gravel Pack 59 ft. Sump Zone Test 3PCE: 1.5 ug/l Not Drilled SW ML SM SP SW SP SW SP Project Name South Tahoe PUD Project Number 1770027.00 Well NameEW-1 Option 1 - One Well Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 2 4OFSHEET Type& No. SAMPLES WELL CONSTRUCTION Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 40 45 50 55 60 65 70 75 80 SILTY SAND (SM) PALE BROWN WITHSUBHORIZONTAL YELLOWISH BROWN BANDING, ~60-80% FINE GRAINED SAND INCLUDING MICAS,~20-40% SILT, DENSE, NO PLASTICITY, WET WELL GRADED SAND (SW) PALE BROWN OVERALL, <10% SUBROUNDED COARSE GRAINEDSAND, ~30-40% MEDIUM GRAINED SAND, ~50% FINE GRAINED SAND INCLUDING MICA, MASSIVE, DENSE,WET SANDY SILT (ML) PALE BROWN WITH SUBHORIZONTAL AND CURVED YELLOWISH BROWNBANDING, FINE GRAINED SAND VARIES FROM ~20-50%, SILT VARIES ~80-50%, VERY STIFF, NO TOLOW PLASTICITY, WET SILTY SAND (SM) BROWN TO YELLOWISH BROWN WITH BANDS OF STRONG BROWN AND STREAKS OFVERY DARK GRAYISH BROWN, ~90% FINE GRAINEDSAND, ~10-20% SILT, DENSE, WET SILT TO SANDY SILT (ML) BROWN OVERALL WITHTHIN SUBHORIZONTAL STREAKS OF YELLOWISH BROWN, UP TO ~50% FINE GRAINED SANDINCLUDING MICA, WITH SAND DECREASING FROM94 TO 96 FT., SOME THIN SUBHORIZONTAL SANDY LAYERS PRESENT CLAY TO SILTY CLAY (CL) DARK GRAYISH BROWN OVERALL, VERY STIFF, LOW PLASTICITY, HIGHTOUGHNESS, LOW TO SLOW DILANTANCY POORLY GRADED SAND (SP) 10YR 5/8 YELLOWISH BROWN TO 2.5Y N4/0 DARK GRAY WELL GRADED SAND (SW) DARK GRAY, GRAY, GRADING TO LIGHT YELLOWISH BROWN, ~5% FINEGRAVEL, INCLUDING SUBROUNDED CLASTS ANDGRANITIC CLASTS WEATHERING IN PLACE, ~5% COARSE GRAINED SAND, ~30-40% MEDIUM GRAINEDSAND, ~30% FINE GRAINED SAND WELL GRADED SAND WITH GRAVEL (SW) DARKGRAYISH BROWN OVERALL, ~10% GRAVEL TO 1-INCH, UP TO ~20% COARSE GRAINED SAND,~20-30% MEDIUM GRAINED SAND, ~30% FINEGRAINED SAND, VERY DENSE, WET WELL GRADED SAND (SW) DARK GRAY OVERALL,BASED UPON GRADATION TESTS AT 122-127 FT.: 3.6% FINE GRAVEL, 25.1% COARSE GRAINED SAND,37.0% MEDIUM GRAINED SAND, 24.0% FINE GRAINEDSAND, 7.6% SILT, DENSE, MASSIVE, WET 10YR 6/3 10YR 5/8 10YR 6/310YR 5/47.5YR 4/6 10YR 4/310YR 5/8 10YR4/2 ** 2.5YN4/0 10YR8/1 10YR6/4 10YR4/2 2.5YN4/0 Not Drilled Zone Test 5PCE: <0.5 ug/l TCE: 0.6 ug/l SM SW ML SM ML CL SP SW SW SW Project Name South Tahoe PUD Project Number 1770027.00 Well NameEW-1 Option 1 - One Well Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 3 4OFSHEET Type& No. SAMPLES WELL CONSTRUCTION Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 85 90 95 100 105 110 115 120 125 WELL GRADED SAND CONT'D COMPLEX ZONE OF MIXED AND DEFORMED LAYERS OF SILT AND WELL GRADED SAND (ML)SILTY LAYERS COLOR INCUDES YELLOWISHBROWN (10YR 5/8), GRAY (2.5Y N5), OLIVE GRAY (2.5Y N4-5Y 5/1); WELL GRADED SAND LAYERSTYPICALLY 2.5Y N8, SILTY LAYERS ARE TYPICALLYUP TO ~50% FINE GRAINED SAND, ~50% SILT, VERY STIFF, NO PLASTICITY, WET, ALTERNATING LAYERSARE ~1-2 INCHES THICK AND CURVED ANDDEFORMED; DARK GRAY CLASTS ARE POSSIBLE ORGANIC MATTER SILTY SAND TO POORLY GRADED SAND (SM-SP) PINK FROM 130 - 131 FT, DARK GRAY BELOW, ~50%MEDIUM GRAINED SAND, ~50% FINE GRAINED SANDTO 134 FT., GRADING TO ~80% FINE GRAINED SAND ~10-20% SILT SILTY SAND (SM) PINK AND GRAY, ~60-80% FINE GRAINED SAND INCLUDING MICAS, ~20-40% SILT,VERY DENSE AND COHESIVE, NO PLASTICITY POORLY GRADED SAND (SP) GRAY OVERALL, TR.COARSE GRAINED SAND, ~100% FINE GRAINEDSAND, ~10%? SILT, FAINT SUBHORIZONTAL LAYERING SILTY SAND TO SANDY SILT (SM-ML) PINK AND GRAY, ~40-60% FINE GRAINED SAND, ~40-60% SILT,VERY STIFF, NO PLASTICITY 2.5YN4/0 ** 5Y5/1 5YR 7/3 10YR6/1 5YR 7/310YR 6/1 Not Drilled SW ML SM-SP SM SP SM-ML Project Name South Tahoe PUD Project Number 1770027.00 Well NameEW-1 Option 1 - One Well Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 4 4OFSHEET Type& No. SAMPLES WELL CONSTRUCTION Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 130 135 140 145 150 POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, TR. SCATTERED SUBROUNDED COARSE GRAINED SAND, ~50% MEDIUM GRAINED SAND,~50% FINE GRAINED SAND, LOOSE, WET POORLY GRADED SAND (SP) VERY DARK GRAYISHBROWN OVERALL, TR. COARSE GRAINED SAND, ~80-90% FINE GRAINED SAND, ~10% SILT, WET WELL GRADED SAND (SW) DARK YELLOWISHBROWN OVERALL, TR. FINE GRAVEL, ~10-15% COARSE GRAINED SAND, ~50% MEDIUM GRAINEDSAND, ~40% FINE GRAINED SAND WELL GRADED SAND WITH SILT (SW) DARKYELLOWISH BROWN OVERALL, TR. FINE GRAVEL,TR. COARSE GRAINED SAND, ~40% MEDIUM GRAINED SAND, ~40% FINE GRAINED SAND, ~10-15%SILT, VERY DENSE WELL GRADED SAND WITH GRAVEL (SW) GRAYISHBROWN OVERALL, TR. COBBLES, ~10%SUBROUNDED GRAVEL TO 1-INCH, ~10% COARSE GRAINED SAND, ~60% FINE GRAINED SAND, ~10%SILT, VERY DENSE AND COHESIVE 19 FT. COLOR INCLUDES PALE BROWN POORLY GRADED SAND (SP) PALE BROWN TOLIGHT YELLOWISH BROWN, ~100% FINE GRAINED SAND, VERY DENSE 20.5 - 21 FT. SOME COARSE GRAINED SAND AND MEDIUM GRAINED SAND SANDY SILT (ML) LBG AND YELLOWISH BROWN, ~25-50% FINE GRAINED SAND INCLUDING MICA,~50% SILT, VERY STIFF, NO PLASTICITY 25 FT. UP TO ~50% FINE GRAINED SAND WELL GRADED SAND (SW) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 33-35 FT. AND 35-37 FT.: 1.4 - 9.6% FINE GRAVEL, 10.5 -17.1% COARSE GRAINED SAND, 62.0 - 43.3% MEDIUMGRAINED SAND, 20.5-22.9% FINE GRAINED SAND, 5.6-7.1% SILT, DENSE, WET, APPEARANCE OFHIGHLY WEATHERED GRANITIC CLASTS TO COBBLE SIZE, POSS. WEATHERED IN PLACE 10YR5/4 10YR3/2 10YR4/6 10YR5/2 10YR6/3 10YR6/3 10YR6/4 10YR 6/2 10YR 5/8 10YR5/4 Shallow wellborehole shown on left. Deep well borehole shownon right. Cement Grout Seal 23 ft. Bentonite Seal 25.5 ft. Filter Pack 27.5 ft. Zone Test 131-36 ft.PCE: 30.7 ug/l Toluene 0.9 ug/l SP SP SW SW SW SP ML SW BORING LOCATION DRILLING COMPANY DRILLING METHOD(S) ISOLATION CASING BLANK CASING SLOTTED CASING SIZE AND TYPE OF FILTER PACK SEAL GROUT WELL COMPLETION n/a ELEVATION AND DATUM DATE STARTED Cascade Drilling Sonic - TS 150 Sonic Drive Casing (Temp.) 6-in. SCH 80 PVC - Two boreholes 6-in. Stainless Steel 0.050-inch Louvered SRI #6 3/8-in. Bentonite Chips Neat Cement Grout Boring Name EW-1 Two Wells-Two Boreholes n/a n/a +2-27.5 27.5-35 25.5-38 23-25.5 0-23 LOGGED BY n/a +2-44 44-59 41-64 38.5-41 0-38.5 STATIC WATER ELEVATION 150.0 ft. bgs SAMPLING METHODS Project Number 1770027.00 953 Eloise St., South Lake Tahoe FT. FT. FT. FT. FT. FT. TO TO TO TO FROM FROM FROM FROM DRILLER DRILL BIT(S) SIZE STAND PIPE FT. Project Name South Tahoe PUD TOTAL DEPTH DATE COMPLETED SURFACE HOUSING Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 1 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 5 10 15 20 25 30 35 Handout 4a4 WELL GRADED SAND CONT'D SANDY SILT (ML) YELLOWISH BROWN OVERALL,MIXED LAYERS OF SAND WITH SILT, AND SMALLAMOUNT OF CLAY; SAND IS MAINLY FINE WITH STREAKS OF 10YR 5/8 OXIDATION, SOFT, NOPLASTICITY GRADES TO ALTERNATING LAYERS OF SILTYSAND AND POORLY GRADED SAND (SM) SAND ISMAINLY ~90% FINE GRAINED SAND, WITH ~10% SILT, LOOSE, WET POORLY GRADED SAND (SP) LIGHT YELLOWISHBROWN OVERALL, ~70-80% MEDIUM GRAINED SAND, ~20-30% FINE GRAINED SAND, DENSE, WET WELL GRADED SAND (SW) YELLOWISH BROWN OVERALL, ~10% SUBROUNDED COARSE GRAINEDSAND, ~30% MEDIUM GRAINED SAND, ~60% MEDIUMGRAINED SAND, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWNOVERALL, BASED UPON GRADATION TESTS AT 44-46 FT. AND 46-48 FT.: 0.2-0.1% FINE GRAVEL, 3.7-3.6%COARSE GRAINED SAND, 37% MEDIUM GRAINEDSAND, 50.9-24.0% FINE GRAINED SAND, 8.1-10.3% SILT, VERY DENSE, WET 50 FT. COLOR CHANGES SLIGHTLY, MATERIAL BECOMES DENSER 54 FT. THIN SUBHORIZONTAL LAYER OF FINE-GRAINED SILTY SAND 55.5 FT. SOME MEDIUM GRAINED FELDSPAR GRAINS WELL GRADED SAND (SW) LIGHT YELLOWISH BROWN OVERALL, TR. SUBROUNDED COARSEGRAINED SAND, ~10-20% MEDIUM GRAINED SANDQUARTZ AND FELDSPAR, ~70-80% FINE GRAINED SAND INCLUDING MICA, DENSE, WET POORLY GRADED SAND (SP) YELLOWISH BROWN OVERALL, BASED UPON GRADATION TESTS AT 64-66FT.: 1.2% COARSE GRAINED SAND, 30.7% MEDIUMGRAINED SAND, 61.8% FINE GRAINED SAND, 6.3% SILT, MASSIVE, DENSE, WET 10YR5/4 10YR 6/4 10YR5/4 10YR4/4 10YR6/4 10YR5/4 35 ft. 38 ft.38.5 ft. Bentonite Seal 41.0 ft. Filter Pack 44 ft. Zone Test 240-50 ft. Benzene 112 ug/l Ethyl Benzene:4.2 ug/lStyrene 0.6 ug/l PCE 66 ug/lTCE 2.8 ug/l Toluene 18 ug/l Xylenes (Tot.) 0.9 ug/l Filter Pack 59 ft. 64 ft. Zone Test 3PCE: 1.5 ug/l Not Drilled SW ML SM SP SW SP SW SP Project Name South Tahoe PUD Project Number 1770027.00 Boring NameEW-1 Two Wells-Two Boreholes Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 2 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 40 45 50 55 60 65 70 75 80 SILTY SAND (SM) PALE BROWN WITHSUBHORIZONTAL YELLOWISH BROWN BANDING, ~60-80% FINE GRAINED SAND INCLUDING MICAS,~20-40% SILT, DENSE, NO PLASTICITY, WET WELL GRADED SAND (SW) PALE BROWN OVERALL, <10% SUBROUNDED COARSE GRAINEDSAND, ~30-40% MEDIUM GRAINED SAND, ~50% FINE GRAINED SAND INCLUDING MICA, MASSIVE, DENSE,WET SANDY SILT (ML) PALE BROWN WITH SUBHORIZONTAL AND CURVED YELLOWISH BROWNBANDING, FINE GRAINED SAND VARIES FROM ~20-50%, SILT VARIES ~80-50%, VERY STIFF, NO TOLOW PLASTICITY, WET SILTY SAND (SM) BROWN TO YELLOWISH BROWN WITH BANDS OF STRONG BROWN AND STREAKS OFVERY DARK GRAYISH BROWN, ~90% FINE GRAINEDSAND, ~10-20% SILT, DENSE, WET SILT TO SANDY SILT (ML) BROWN OVERALL WITHTHIN SUBHORIZONTAL STREAKS OF YELLOWISH BROWN, UP TO ~50% FINE GRAINED SANDINCLUDING MICA, WITH SAND DECREASING FROM94 TO 96 FT., SOME THIN SUBHORIZONTAL SANDY LAYERS PRESENT CLAY TO SILTY CLAY (CL) DARK GRAYISH BROWN OVERALL, VERY STIFF, LOW PLASTICITY, HIGHTOUGHNESS, LOW TO SLOW DILANTANCY POORLY GRADED SAND (SP) 10YR 5/8 YELLOWISH BROWN TO 2.5Y N4/0 DARK GRAY WELL GRADED SAND (SW) DARK GRAY, GRAY, GRADING TO LIGHT YELLOWISH BROWN, ~5% FINEGRAVEL, INCLUDING SUBROUNDED CLASTS ANDGRANITIC CLASTS WEATHERING IN PLACE, ~5% COARSE GRAINED SAND, ~30-40% MEDIUM GRAINEDSAND, ~30% FINE GRAINED SAND WELL GRADED SAND WITH GRAVEL (SW) DARKGRAYISH BROWN OVERALL, ~10% GRAVEL TO 1-INCH, UP TO ~20% COARSE GRAINED SAND,~20-30% MEDIUM GRAINED SAND, ~30% FINEGRAINED SAND, VERY DENSE, WET WELL GRADED SAND (SW) DARK GRAY OVERALL,BASED UPON GRADATION TESTS AT 122-127 FT.: 3.6% FINE GRAVEL, 25.1% COARSE GRAINED SAND,37.0% MEDIUM GRAINED SAND, 24.0% FINE GRAINEDSAND, 7.6% SILT, DENSE, MASSIVE, WET 10YR 6/3 10YR 5/8 10YR 6/310YR 5/47.5YR 4/6 10YR 4/310YR 5/8 10YR4/2 ** 2.5YN4/0 10YR8/1 10YR6/4 10YR4/2 2.5YN4/0 Not Drilled Zone Test 5119-124 ft. PCE: <0.5 ug/lTCE: 0.6 ug/l SM SW ML SM ML CL SP SW SW SW Project Name South Tahoe PUD Project Number 1770027.00 Boring NameEW-1 Two Wells-Two Boreholes Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 3 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 85 90 95 100 105 110 115 120 125 WELL GRADED SAND CONT'D COMPLEX ZONE OF MIXED AND DEFORMED LAYERS OF SILT AND WELL GRADED SAND (ML)SILTY LAYERS COLOR INCUDES YELLOWISHBROWN (10YR 5/8), GRAY (2.5Y N5), OLIVE GRAY (2.5Y N4-5Y 5/1); WELL GRADED SAND LAYERSTYPICALLY 2.5Y N8, SILTY LAYERS ARE TYPICALLYUP TO ~50% FINE GRAINED SAND, ~50% SILT, VERY STIFF, NO PLASTICITY, WET, ALTERNATING LAYERSARE ~1-2 INCHES THICK AND CURVED ANDDEFORMED; DARK GRAY CLASTS ARE POSSIBLE ORGANIC MATTER SILTY SAND TO POORLY GRADED SAND (SM-SP) PINK FROM 130 - 131 FT, DARK GRAY BELOW, ~50%MEDIUM GRAINED SAND, ~50% FINE GRAINED SANDTO 134 FT., GRADING TO ~80% FINE GRAINED SAND ~10-20% SILT SILTY SAND (SM) PINK AND GRAY, ~60-80% FINE GRAINED SAND INCLUDING MICAS, ~20-40% SILT,VERY DENSE AND COHESIVE, NO PLASTICITY POORLY GRADED SAND (SP) GRAY OVERALL, TR.COARSE GRAINED SAND, ~100% FINE GRAINEDSAND, ~10%? SILT, FAINT SUBHORIZONTAL LAYERING SILTY SAND TO SANDY SILT (SM-ML) PINK AND GRAY, ~40-60% FINE GRAINED SAND, ~40-60% SILT,VERY STIFF, NO PLASTICITY 2.5YN4/0 ** 5Y5/1 5YR 7/3 10YR6/1 5YR 7/310YR 6/1 Not Drilled SW ML SM-SP SM SP SM-ML Project Name South Tahoe PUD Project Number 1770027.00 Boring NameEW-1 Two Wells-Two Boreholes Boring & Well Construction Log F-40.1 (6-87) (3-88) (8-90) Penetr.Resist.Blows/6" DrillDepth(Feet) USCSLog Lithology Color SAMPLE DESCRIPTION and DRILLING REMARKSRecovery (Feet) 4 4OFSHEET Type& No. SAMPLES BACKFILL DETAILS Kennedy/Jenks Consultants BO R I N G & W E L L C O N S T R U C T I O N 1 7 7 0 0 2 7 . 0 0 . G P J K E N N E D Y J E N K S . G D T 6 / 5 / 1 8 130 135 140 145 150 SOUTH Y PCE MODEL INTERIM RESULTS Greg Pohll, Susie Rybarski, & Rosemary CarrollApril 5, 2017 Excerpt of pdf for 6/12/18 TAC Mtg Outline Modeling Objectives Historical Context Regional/Local Models Modeling Approach Results No Action Scenario Next Steps Modeling Objectives Develop a flow and PCE transport model of the South Y Area The model will be used to help optimize the design of the remediation system Once complete the model will be released to interested stakeholders for additional analysis Modeling Approach Regional models GSFLOW MODFLOW Local model MODFLOW MT3D Regional vs. Local Models Local PCE Model 10 m 100 m Refined at 10 m around estimated plume extent. 4 model layers Layer 1 = 40 m thick Layer 2 = 40 m thick Layer 3 = 80 m thick Layer 4 ~ 125 m thick (bottom elev. 1600 m) Production Wells vs. Model Layer WELL WATER SYSTEM SO U R C E CA P A C I T Y (G P M ) STATUS Perforated Interval (ft bgs)Wa t e r - B e a r i n g Zo n e PC E MODEL LAYER Clement Well STPUD 180 Inactive, Treated 80 -120 TKZ5 X 1 Julie Well STPUD Destroyed 65 - 100; 115-125 TKZ5, TKZ4 X 1 South Y Center Well STPUD Destroyed 40' between 190 - 260 TKZ3 X 2 Tata Well #4 STPUD Destroyed 85 - 125 TKZ5, TKZ4 X 1 Industrial Well #2 STPUD Abandoned, Observation Well 40-92; 97 -107; 110- 190 TKZ5, TKZ4, SLTZ3 X 2 Tata Well #1 STPUD Abandoned, not destroyed 36 -105; 167 - 223 TKZ5, TKZ4, SLTZ3 1-2 Tata Well #2 STPUD Abandoned, Observation Well 73 - 193 TKZ4, SLTZ3 1-2 Tata Well #3 STPUD Abandoned, Observation Well 55 - 75; 200 -220 TKZ5, SLTZ3 1-2 LBWC Well #1 LBWC 720 Active Untreated 132 - 182 TKZ4 2 LBWC Well #2 LBWC 290 Offline, Impaired 132 - 156 TKZ4 X 2 LBWC Well #3 LBWC Destroyed 70 -80 TKZ5 X 1 LBWC Well #4 LBWC Abandoned, not destroyed 43 - 63; 68 - 78; 105 -115 TKZ5, TKZ4 X 1 LBWC Well #5 LBWC 720 Offline, Impaired 141-180 TKZ4 X 2 TKWC #1 TKWC 1,000 Active Untreated 125 - 312 TKZ4 X 1-3 TKWC #2 TKWC 1,800 Active Treated (GAC capacity 550 gpm)138 - 188; 348 - 414; 426 - 480 TKZ4, TKZ2, TKZ1 X 2-3 TKWC #3 TKWC 1,750 Active Untreated 175 - 300 TKZ4, TKZ3 X 2-3 Tahoe Valley Elementary LTUSD Inactive 86 - 146 TKZ5 (?)X 1-2 Rockwater Apartments SCWS Abandoned, not destroyed 70 - 99 TKZ5 X 1 Simulated Time Periods Transient historical 1971 –2016 Transient predictive 2017 –2066 Time Steps MODFLOW –1 year MT3D -adaptive Inflows and Outflows Inflows Recharge Up-Gradient flow Outflows Streams Lake Tahoe Wells Specified Head Boundary Conditions Extracted from regional groundwater flow model Legend Flow direction Groundwater level (m) Hydraulic Parameters Water levels from shallow, middle, and deep zones indicate a downward gradient near LTLW Plume contours show vertical migration does not occur until further downgradient A’ A From Lahontan Regional Water Quality Control Board, 2016 Hydraulic Parameters Low K clay lens approximately interpolated from USA Gas cross- sections Simulated as zone of low vertical conductivity between layers 1 and 2 Extent of simulated clay lens shown in red PCE Sources Simulated Source PCE trapped in vadose zone pore space Water level rises, reaching PCE PCE is mobilized in groundwater Observed vs. Simulated PCE Concentrations South Y Feasibility Study Handout 5b Revised 6/11/18 \\sac2\job\2017\1770027.00_south tahoe pud‐south y feasiblity study\09‐reports\9.09‐reports\task q.1‐q.2. outreach (formerly task f)\tac\061218- mtg\handouts\5b_table-edits_task c-modeling-from_fs_scope.docx Report Title, Project Name | Page B‐ 1 Table 1: Potential Modeling Scenarios F&T MODEL ELEMENTS SCENARIO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 SOURCE AREA TBD TBD TBD Single Source, No Action X X X X X TBD TBD TBD Multiple Source, No Action X TBD TBD TBD Single Source, Clean-Up (CAO R6T-2016-PROP) X X X X TBD TBD TBD Multiple Source, Clean-Up (In-situ Remediation) X TBD TBD TBD Biodegradation analysis X TBD TBD TBD EXTRACTION WELLS TBD TBD TBD Shallow well at 953 Eloise site – 5- 10 gpm X X TBD TBD TBD 883/903 Eloise Ave well X X TBD TBD TBD Rockwater Apartment Well X X TBD TBD TBD Optimal Well Configuration (TBD by Modeling Analysis) X X X X X X X X X X X GROUNDWATER PRODUCTION (GPM) TBD TBD TBD Clement Well (180) X X X X X X X X X X TBD TBD TBD LBWC#1 (720) X X X X X X X X X X X X TBD TBD TBD LBWC #4 (200) - Replacement Well X TBD TBD TBD LBWC #4 (400)- Replacement Well X TBD TBD TBD LBWC #4 (800)- Replacement Well X X TBD TBD TBD LBWC #5 (750) - Treatment X X X X X TBD TBD TBD TKWC #1 (1,000) X X X X X X X TBD TBD TBD TKWC #1 (550) X X X X X TBD TBD TBD TKWC #2 (550) X X X X X X X TBD TBD TBD TKWC #2 (1,800) - Treatment X X X X X TBD TBD TBD South Y Feasibility Study Handout 5b Revised 6/11/18 \\sac2\job\2017\1770027.00_south tahoe pud‐south y feasiblity study\09‐reports\9.09‐reports\task q.1‐q.2. outreach (formerly task f)\tac\061218- mtg\handouts\5b_table-edits_task c-modeling-from_fs_scope.docx Report Title, Project Name | Page B‐ 2 F&T MODEL ELEMENTS SCENARIO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TKWC #3 (1,750) X X X X X X X X X X X X TBD TBD TBD Alternate TKWC Well locations/configurations DISCHARGE TBD TBD TBD Sewer Discharge (200 GPM Limited) X X X TBD TBD TBD Treated Water System Reuse X X X X X TBD TBD TBD Injection X X X TBD TBD TBD Handout 7a Table 1: DRAFT Remedial Action Objectives – SOUTH Y PCE Contamination Response South Tahoe PUD, Feasibility Study Addressing PCE in Groundwater Page 1 of 1 \\sac2\job\2017\1770027.00_south tahoe pud-south y feasiblity study\09-reports\9.09-reports\task q.1-q.2. outreach (formerly task f)\tac\061218-mtg\handouts\7a_draftrao-table-rev_053018.doc Line No General EPA Remedial Action Objectives South Y Specific Remedial Action Objectives Comments Source: Per EPA Document 540/R-96/023: Objectives applicable for all sites with contaminated groundwater include the following: 1 Prevent exposure to contaminated ground water, above acceptable risk levels. Allow additional groundwater production without treatment 2 Prevent or minimize further migration of the contaminant plume (plume containment). Design and implement remedies without increasing existing volume of groundwater impacted by HVOCs (plume containment) 3 Prevent or minimize further migration of contaminants from source materials to ground water (source control). Concentration reduction to < 50 ppb at drinking water wells, mass removal for proposed remedial measure? To avoid 97-005 4 Return ground waters to their expected beneficial uses wherever practicable (aquifer restoration). Not applicable for South Y study Source: Per EPA Document 540/G-88/003: Remedial Action Objectives for contaminated groundwater sites should address the following: 5 Cleanup Level Assist in overall objective of supplying water without detectable HVOCs to customers Comply with regulatory agency requirements and directives regarding HVOCs in groundwater RAO that aims to reduce contaminant mass to reduce the cleanup burden (eg reduce well head treatment duration) for downgradient receptors required to cleanup water to MCLs for distribution and consumption – maybe this amounts to some level of concentration reduction, but still greater than MCLs. 6 Area of Attainment Address groundwater within specified area and depth interval (needs assistance to articulate/define) This is addressed above and likely to include the area of the plume between the source zone and the downgradient extent of the plume 7 Restoration Time Frame Need some sort of time criteria – are water agencies able to continue remediation indefinitely? RAO that acknowledges STPUD’s/Water Agency’s efforts as interim and will be maintained until such time that source control has been implemented by the RPs and groundwater concentrations have declined to influent levels that are equal to or less than the proposed cleanup level above) Other South Y Specific Objectives Preserve ability to recover HVOC response costs from responsible parties and/or state grant funding in the future Preference for beneficial use of any extracted groundwater resource (i.e. not disposal to sanitary sewer or storm drain) Reduce costs (capital or long-term O&M) for groundwater remedial wellhead treatment to retail customers Perform community outreach and information activities regarding HVOCs in groundwater Notes: (a) STPUD is responsible for management of the groundwater basin. Other water supply entities are the water retailers. (b) Other parties have been named as responding parties to a Cleanup and Abatement Order issued by the Water Board. (c) HVOCs = halogenated volatile organic compounds including tetrachloroethene (PCE) and its degradation products. 1 WORKING DRAFT - FOR DISCUSSION PURPOSES ONLY – [MONTH] [DAY], 2018 MEMORANDUM OF UNDERSTANDING REGARDING TECHNICAL ADVISORY COMMITTEE WITH THE STATE WATER RESOURCES CONTROL BOARD, [REGION] REGIONAL WATER QUALITY CONTROL BOARD, AND [Grantee] I. The purpose of this Memorandum of Understanding (MOU) between the [Grantee], State Water Resources Control Board (State Water Board), and the [Region/Location] Regional Water Quality Control Board (Regional Water Board) is to identify the forum and processes for discussion and resolution of issues related to monitoring, planning, modeling, remedial investigation, feasibility studies, design, construction, and operation of any [Grantee] projects that are currently funded or may in the future be funded by the State Water Board under Proposition 1 (Cal. Water Code §§79700 et seq.) for the prevention or cleanup of groundwater contamination in the [Location] Basin (Project or Projects), and to ensure those Projects support and do not negatively impact nearby third-party cleanup efforts. II. The State Water Board and Regional Water Board enter into this MOU under the authorities of California Water Code section13225, subsections (a), (b), and (j). [Grantee] enters into this MOU under the authority of [XXX]. III. The Parties to this MOU recognize that the implementation of the Project(s) may involve complex technical issues regarding prevention and/or cleanup of contamination in groundwater. The implementation of this MOU will be primarily through a Technical Advisory Committee (TAC) that will provide a forum for discussion and resolution of technical issues associated with the implementation of the Project(s). The TAC will be made up of technical staff from the State Water Board’s Division of Financial Assistance (DFA), from the State Water Board’s Division of Drinking Water (DDW), and from the Regional Water Board, and representatives of [Grantee]. The TAC may also include representatives of other State or federal regulatory agencies that are not Parties to this MOU, such as the Department of Toxic Substances Control and the U.S. Environmental Protection Agency. Technical issues not resolved by the TAC will be forwarded to a Steering Committee consisting of executive level staff of the Parties for resolution. The Steering Committee will include [title of DFA person], [title of DDW person], [title of RB person], and [title of Grantee person] or their respective designees. The Steering Committee will also address non-technical issues as needed. IV. The Parties to this MOU share the same goal: prevention and/or cleanup of contamination in groundwater in the most timely and cost effective manner feasible, in compliance with applicable state, federal, and local laws. V. The Parties recognize the need to proceed expeditiously with the Project(s) and without interruption or undue delay to Project schedules. TAC members commit to 2 WORKING DRAFT - FOR DISCUSSION PURPOSES ONLY – [MONTH] [DAY], 2018 providing technical review comments to [Grantee] and the DFA grant manager within three weeks of receipt of the deliverable subject to TAC review, unless the funding agreement specifies otherwise or an alternative review period is mutually agreed upon by the Parties. VI. The State Water Board through DFA, as the funding authority, retains decision- making authority regarding whether [Grantee] has met the deliverables and other requirements of the Grant Agreement. The Parties recognize that the Project(s) must be consistent with and support the State Water Board’s and Regional Water Board’s regulatory programs and be consistent with applicable laws and regulations, including State Water Board Resolution 92-49, State Water Board Resolution 68-16, and applicable plans and policies of the State and Regional Water Boards. VII. [Grantee] recognizes that the State Water Board and Regional Water Board have an interest in receiving information from and communicating with [Grantee] regarding investigation, planning, design, construction, and operation of the Project(s), as applicable, to ensure that the Project(s) will be effective and will not adversely affect other nearby remediation projects. VIII. For any implementation Project(s), [Grantee] will coordinate with the TAC to evaluate cleanup progress and demonstrate whether or not the Project(s) is successful in achieving prevention and/or cleanup of contamination in groundwater. Such evaluation and demonstration will include development of a monitoring plan with monitoring frequencies and locations aimed at evaluating changes to the extent of the plume and contaminant concentrations (Monitoring Plan). The State Water Board shall approve the Monitoring Plan. a. Where feasible and consistent with this purpose, the Monitoring Plan may incorporate existing monitoring locations and/or frequencies that are used to meet other regulatory or operational requirements, including but not limited to locations listed in the DDW 97- 005 or drinking water permit requirements. b. As part of the Monitoring Plan development, the TAC will consider and identify appropriate methods for the ongoing evaluation of groundwater quality data in comparison to assumptions used in Project design to proactively identify trends that would affect Project operations. IX. Proposition 1 grant agreements for implementation Projects may require [Grantee] to submit Operational Reports after commencement of operation. The State Water Board may provide [Grantee] Operational Reports to the TAC and the TAC may provide technical insight and comments in writing to the State Water Board and [Grantee] regarding the Operational Reports. [Grantee] agrees to communicate with the TAC regarding the technical insight and comments it may provide in response to [Grantee] Operational Reports during the 5 years, or longer, such reports are provided. 3 WORKING DRAFT - FOR DISCUSSION PURPOSES ONLY – [MONTH] [DAY], 2018 X. [Grantee] will be responsible for coordinating the logistics of TAC meetings as follows: a. Schedule and hold quarterly TAC meetings following submittal of quarterly progress reports. Meeting frequency may be modified as mutually agreed by [Grantee] and the State Water Board. b. Prepare agendas and action items and communicate them to TAC members. c. Arrange audio visual equipment, phone conference lines, web-based meetings, and other meeting logistics, as needed. d. Should additional meetings be deemed necessary by the State Water Board, meetings will be scheduled at the earliest mutually convenient time and place. XI. The State Water Board recognizes that [Grantee] may be entitled to cost recovery from various third parties. Nothing in this MOU is meant, in any way, to alter or change those rights that may exist. Any costs recovered must be used consistent with the requirements of Proposition 1. XII. Reservation of Rights: Each Party to this MOU shall be solely responsible and liable in connection with its actions associated with its responsibilities under this MOU. For purposes of this MOU, the relationship of the Parties is that of independent entities and not as agents of each other or as joint venturers or partners. The Parties shall maintain sole and exclusive control over their personnel, agents, consultants, and operations. Nothing in this MOU alters the statutory or regulatory authority of [Grantee], the State Water Board, or Regional Water Board, or any other provision of law, nor shall anything in this MOU limit [Grantee] or the State and Regional Water Boards’ legal authority or responsibilities. XIII. Third Parties: Nothing in this MOU is intended to create duties or obligations to or rights in third parties to this MOU or affect the legal liability of the Parties to this MOU. XIV. AMENDMENTS AND TERMINATION a. In entering into this MOU, it is the intention of the Parties that this MOU shall not be construed to be an enforceable contract or agreement, but is, rather, a statement of principles. b. This MOU shall remain in effect until all components have been fully implemented or until [DATE], whichever occurs sooner. 4 WORKING DRAFT - FOR DISCUSSION PURPOSES ONLY – [MONTH] [DAY], 2018 c. This MOU may be amended with the mutual written approval of all Parties or their successors. d. Any Party to this MOU, or its successor agency, may withdraw from the MOU by giving 30-days advanced written notice to the other Parties, in which case, the MOU is no longer effective. e. Governing Law: This MOU is governed by, interpreted under, and construed and enforced in accordance with the laws of the State of California. f. Authorized signatures: The Parties hereby represent and warrant that their respective signatory to this MOU is duly authorized to execute and bind the agency for which he or she signs. g. Severability: If any provision of this MOU shall be determined by any court to be invalid, illegal or unenforceable to any extent, the remainder of this MOU shall not be affected and this MOU shall be construed as if the invalid, illegal or unenforceable provision had never been contained in this MOU. h. Execution: This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Delivery of an executed Agreement by one party to the other may be made by facsimile or electronic PDF transmission. IN WITNESS WHEREOF, the Parties to this MOU have caused this MOU to be executed on their behalf as of the date specified below, respectively, as follows: FOR THE STATE WATER RESOURCES CONTROL BOARD: Dated: _____________, 2018 Name of ED Executive Director State Water Resources Control Board ______________________________ Name of ED FOR THE [Name of Region/Location] REGIONAL WATER QUALITY CONTROL BOARD: Dated: _____________, 2018 [First Name] [Last Name] Executive Officer [Name of Region/Location] Regional Water Quality Control Board ______________________________ [First Name] [Last Name] 5 WORKING DRAFT - FOR DISCUSSION PURPOSES ONLY – [MONTH] [DAY], 2018 FOR THE [GRANTEE] Dated: __________, 2018 Name Title Agency _____________________ [Name of person above] ID Task Name Duration Start Finish Predecessors Resource Names 1 Proposition 1 GWGP Program 488 days Wed 6/15/16 Sun 4/29/18 2 FS Planning Grant Pre-Application 40 days Wed 6/15/16 Tue 8/9/16 3 SWRCB Invitation Letter 1 day Thu 10/6/16 Thu 10/6/16 4 FS Planning Grant Full Proposal 80 days Thu 8/4/16 Wed 11/23/16 5 Preliminary Award 1 day Thu 3/30/17 Thu 3/30/17 6 Board Meeting - Authorizing Resolution 1 day Thu 5/18/17 Thu 5/18/17 7 Negotiate Grant Agreement 201 days Fri 5/19/17 Fri 2/23/18 6 8 Final Agreement 46 days Mon 2/26/18 Sun 4/29/18 7 9 RFP/Consultant Selection 100 days Fri 3/31/17 Thu 8/17/17 10 Develop Request for Proposal (RFP)40 days Fri 3/31/17 Thu 5/25/17 5 11 RFP Solicitation 35 days Tue 5/30/17 Mon 7/17/17 10FS+2 days 12 Last Day for Consultant Questions 1 day?Wed 7/5/17 Wed 7/5/17 11FS-9 days 13 Proposal Due Date 1 day?Mon 7/17/17 Mon 7/17/17 11FS-1 day 14 Technical Proposal Review Meeting 1 day Tue 8/1/17 Tue 8/1/17 13FS+10 days 15 Technical Proposal Review Scores Due to District 1 day Mon 8/7/17 Mon 8/7/17 14FS+3 days 16 Staff Recommendation 1 day Wed 8/9/17 Wed 8/9/17 15FS+1 day 17 Board Meeting - Project Award 1 day Thu 8/17/17 Thu 8/17/17 16FS+2 days 18 (A.1) Task A - Grant Administration 257 days Mon 1/1/18 Tue 12/25/18 19 (A.1.1) Technical/Admin Services 240 days Mon 4/30/18 Fri 3/29/19 8 20 (A.1.2) GM Notifications 240 days?Mon 4/30/18 Fri 3/29/19 8 21 (A.1.3) Detailed Project Schedule 75 days Mon 2/26/18 Fri 6/8/18 22 Final Agreement Schedule (Section A-6)35 days Mon 2/26/18 Fri 4/13/18 7 23 Schedule Update 1 40 days Mon 4/16/18 Fri 6/8/18 22 24 (A.1.4) Site Visits 1 day?Tue 6/12/18 Tue 6/12/18 25 Periodic Site Visit 1 (953 Eloise Avenue)1 day Tue 6/12/18 Tue 6/12/18 26 Final Site Visit (953 Eloise Avenue) 27 (A.1.5) Photo Monitoring 195 days?Tue 10/17/17 Mon 7/16/18 28 Pre- Implementation 140 days Tue 10/17/17 Sat 4/28/18 29 During 55 days Mon 4/30/18 Fri 7/13/18 111 30 Post Implementation 1 day?Mon 7/16/18 Mon 7/16/18 29 31 A-5 Reporting 230 days Fri 3/30/18 Thu 2/14/19 32 (G.1) Grant Progress Report (GPRs)230 days Fri 3/30/18 Thu 2/14/19 33 GPR 1 - 2018 Q1 50 days Fri 3/30/18 Thu 6/7/18 8 34 GPR 2 - 2018 Q2 33 days Fri 6/29/18 Tue 8/14/18 35 GPR 3 - 2018 Q3 34 days Fri 9/28/18 Wed 11/14/18 36 GPR 4 - 2018 Q4 35 days Fri 12/28/18 Thu 2/14/19 37 2017/2018 Ann. Progress Summary 34 days Mon 10/1/18 Thu 11/15/18 38 Task B - Project Management and Coordination 300 days Wed 11/1/17 Tue 12/25/18 39 Project Invoicing (KJC internal)360 days Tue 8/15/17 Mon 12/31/18 53 Task C - Submit GPS and Monitoring Plan (MP) and Monitoring and Reporting Plan (MRP) 109 days Wed 11/1/17 Mon 4/2/18 54 (A.2.1) Global Positioning System (GPS) Information 30 days Tue 6/26/18 Mon 8/6/18 55 (A.2.1) Complete GPS Survey 30 days Tue 6/26/18 Mon 8/6/18 127FS-2 days 56 (A.2.2) Monitoring and Reporting Plan (MRP)103 days Wed 11/1/17 Fri 3/23/18 95SS 57 (A.2.2.2) Task D - Prepare Quality Assurance Project Plan (QAPP)103 days Wed 11/1/17 Fri 3/23/18 58 (A.2.3) Task E - Upload Data to GeoTracker/GAMA system in EDF 90 days Mon 5/21/18 Fri 9/21/18 121 59 (A.3) Task F - Permitting for Field Work 91 days?Tue 1/30/18 Tue 6/5/18 60 CEQA NOE 1 day Mon 3/5/18 Mon 3/5/18 61 EDC Well Construction Permit 2 days Wed 4/18/18 Thu 4/19/18 62 CSLT Road Closure/Obstruction in ROW Permit 7 days Tue 4/17/18 Wed 4/25/18 63 (A.3.1) Site Access Agreements 63 days?Tue 1/30/18 Thu 4/26/18 64 Negotiate Agreements 63 days?Tue 1/30/18 Thu 4/26/18 65 Liberty Utilities (930 Eloise) - Negotiate 19 days Tue 1/30/18 Fri 2/23/18 66 CSLT (953 Eloise) - Negotiate 19 days Tue 1/30/18 Fri 2/23/18 67 District Board Approval - Access Agreeements 1 day?Thu 3/1/18 Thu 3/1/18 68 Execute Site Access Agreements 41 days Thu 3/1/18 Thu 4/26/18 69 Liberty Utilities (930 Eloise) - Execute 3 days Thu 3/1/18 Mon 3/5/18 70 CSLT (953 Eloise) - Execute 41 days Thu 3/1/18 Thu 4/26/18 71 (A.3.1) List of Approvals, Entitlements or Permits 91 days Tue 1/30/18 Tue 6/5/18 63SS 10/6 3/30 5/18 4/29 7/5 7/17 8/17 6/7 8/14 11/14 2/14 11/15 3/1 6/5 E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B ber NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembe January FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch Apr Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Deadline Progress South Tahoe PUD South Y Feasibility Study Schedule Page 1 Project: South Y Feasibility Study Date: Tue 6/5/18 Handout 9a ID Task Name Duration Start Finish Predecessors Resource Names 72 (A.4) Task G - Establish TAC, Kickoff Meeting and up to 3 TAC Meetings 203 days Wed 11/1/17 Fri 8/10/18 73 (A.4.1) Subtask G.1: Establish TAC 62 days Wed 11/1/17 Thu 1/25/18 74 (A.4.1) TAC Member List 30 days Thu 1/25/18 Wed 3/7/18 75SS 75 (A.4.2) TAC Meeting 1: Kick-Off 1 day Thu 1/25/18 Thu 1/25/18 76 (A.4.3) Subtask G.2: TAC Meetings 88 days?Tue 6/12/18 Thu 10/11/18 77 (A.4.3) TAC Meeting 2 1 day Tue 6/12/18 Tue 6/12/18 78 (A.4.3) TAC Meeting 3 1 day?Wed 7/18/18 Wed 7/18/18 79 (A.4.3) TAC Meeting 4 1 day?Thu 10/11/18 Thu 10/11/18 80 (A.5) Subtask Q.1 -Stakeholders Advisory Group (SAG)209 days Fri 12/15/17 Wed 10/3/18 81 (A.5.1) Establish SAG 1 day Fri 12/15/17 Fri 12/15/17 82 (A.5.1) List of SAG Members 90 days Mon 12/18/17 Fri 4/20/18 81 83 (A.5.2) SAG Meetings 209 days Fri 12/15/17 Wed 10/3/18 84 (A.5.2) So Y SAG Meeting 1 1 day Fri 12/15/17 Fri 12/15/17 85 (A.5.2) So Y SAG Meeting 2 1 day Thu 1/25/18 Thu 1/25/18 86 (A.5.2) So Y SAG Meeting 3 1 day Tue 6/12/18 Tue 6/12/18 87 (A.5.2) So Y SAG Meeting 4 1 day Wed 10/3/18 Wed 10/3/18 88 (A.5.2.1) SAG Meeting Schedule 40 days Mon 4/23/18 Fri 6/15/18 82 89 (A.5.2.2) SAG Meeting Materials 150 days Mon 12/18/17 Fri 7/13/18 84 90 (A.6) Task H - MOU Preparation 149 days Tue 11/14/17 Fri 6/8/18 91 Review MOU Template 52 days Tue 11/14/17 Wed 1/24/18 92 Review Updated MOU 3 days Wed 5/23/18 Fri 5/25/18 91 93 (A.6.1) Execute MOU 10 days Mon 5/28/18 Fri 6/8/18 92 94 (B.7) Task I - Prepare Pre-Design Investigation Workplan 113 days Wed 11/1/17 Fri 4/6/18 95 Develop Workplan (incl. Sampling, Analysis and Monitoring Plan, QAPP)60 days Wed 11/1/17 Tue 1/23/18 96 (B.7.1) Deliver draft Workplan to TAC for review 1 day Wed 1/24/18 Wed 1/24/18 97 Complete Draft Final Workplan (incl. TAC Comments)42 days Thu 1/25/18 Fri 3/23/18 96 98 Complete Final Workplan 9 days Mon 3/26/18 Thu 4/5/18 97 99 (B.7.2) Upload Final Workplan to FAAST 1 day Fri 4/6/18 Fri 4/6/18 98 100 (A.8) Task J - Conduct Pre-Design Investigation and Prepare Report 107 days Fri 12/1/17 Mon 4/30/18 101 Contract with Driller and Pumper 20 days Wed 1/10/18 Tue 2/6/18 102 SubContractor Site Walk 6 days Fri 3/30/18 Fri 4/6/18 103 Cascade Drilling - Site Walk 1 day Fri 3/30/18 Fri 3/30/18 104 Carson Pump - Site Walk 1 day Fri 4/6/18 Fri 4/6/18 105 Subcontractor Quotes 124 days Tue 10/17/17 Fri 4/6/18 106 Carson Pump Quote 124 days Tue 10/17/17 Fri 4/6/18 107 Pure Effect Quote 114 days Mon 10/30/17 Thu 4/5/18 108 District Board Approval - Subcontractor Quotes 1 day?Thu 4/19/18 Thu 4/19/18 109 (A.8.1) Test Well Drilling Program - I 32 days Tue 4/17/18 Wed 5/30/18 110 Stake Test Hole Location (Underground Clearance)1 day Tue 4/17/18 Tue 4/17/18 111 Mobilization I - Cascade Drilling 1 day Sun 4/29/18 Sun 4/29/18 112 Test Hole Drilling & Formation Testing 5 days Mon 4/30/18 Fri 5/4/18 111,125 113 DeMobilization I - Cascade Drilling 1 day Sat 5/5/18 Sat 5/5/18 112 114 Soil Testing Analyses (CME)20 days Thu 5/3/18 Wed 5/30/18 112 115 (A.8.1) Water Treatment System - I 6 days?Sat 4/28/18 Mon 5/7/18 116 Carson Pump Mobilization I 1 day Mon 4/30/18 Mon 4/30/18 111 117 Filter System Delivery - (Pure Effect)1 day Sat 4/28/18 Sat 4/28/18 111 118 Carson Pump Demobilization I 1 day?Mon 5/7/18 Mon 5/7/18 113 119 (A.8.1.3) Base Line Sampling (Blaine Tech)15 days Mon 4/30/18 Fri 5/18/18 120 Groundwater Sampling 2 days Mon 4/30/18 Tue 5/1/18 111,125 121 Analytical Lab Analyses - I 10 days Mon 5/7/18 Fri 5/18/18 112 122 (A.8.1) Test Well Drilling Program - II 38 days Thu 5/10/18 Mon 7/2/18 123 Test Well Design 20 days Thu 5/10/18 Wed 6/6/18 114 124 Test Well Order & Fabrication 10 days Thu 6/7/18 Wed 6/20/18 123 125 Mobilization II - Cascade Drilling 1 day Sun 6/24/18 Sun 6/24/18 126 Carson Pump Mobilization II 1 day Mon 6/25/18 Mon 6/25/18 127 Test Well Construction & Development 4 days Mon 6/25/18 Thu 6/28/18 125 128 DeMobilization II - Cascade Drilling 1 day Mon 7/2/18 Mon 7/2/18 127FS+1 day 1/24 6/8 1/24 4/6 3/30 4/6 4/19 4/17 4/29 6/6 6/24 6/25 E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B ber NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembe January FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch Apr Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Deadline Progress South Tahoe PUD South Y Feasibility Study Schedule Page 2 Project: South Y Feasibility Study Date: Tue 6/5/18 ID Task Name Duration Start Finish Predecessors Resource Names 129 (A.8.1.2) Aquifer Testing Program 15 days?Mon 7/9/18 Fri 7/27/18 130 8-Hour Step Test 1 day?Mon 7/9/18 Mon 7/9/18 131 72 - Hour Constant Rate Test 3 days Tue 7/10/18 Thu 7/12/18 130 132 LGAC Waste Characterization Sampling 1 day?Fri 7/13/18 Fri 7/13/18 131 133 Analytical Lab Analyses - II 10 days Mon 7/16/18 Fri 7/27/18 132 134 Carson Pump Demobilization II 1 day?Mon 7/16/18 Mon 7/16/18 131FS+1 day 135 Filter System Demobilization - II 1 day?Mon 7/16/18 Mon 7/16/18 132 136 Reporting 60 days Thu 5/17/18 Wed 8/8/18 137 (A.8.1.1) Well Completion Report 10 days Wed 6/27/18 Tue 7/10/18 128 138 (A.8.2) Pre-Design Investigation Report 60 days Thu 5/17/18 Wed 8/8/18 139 Data Compilation, Review and Analysis 42 days Thu 5/17/18 Fri 7/13/18 121 140 Report Writing 21 days Wed 7/11/18 Wed 8/8/18 137 141 (B.9) Baseline Human Health Risk Assessment (BHHRA) - NEW 63 days?Mon 4/23/18 Wed 7/18/18 142 (B.9.1) Prepare BHHRA Report 45 days?Mon 4/23/18 Fri 6/22/18 145 143 (B.9.1) TAC Review 15 days Mon 6/25/18 Fri 7/13/18 142 144 (B.9.1) Finalize BHHRA Report 3 days Mon 7/16/18 Wed 7/18/18 143 145 (B.10) Task K - Feasibility Study Workplan 83.5 days Thu 3/1/18 Tue 6/26/18 8 146 (B.10.1) Prepare FS Workplan 30 days Mon 4/30/18 Fri 6/8/18 8 147 (B.10.1) TAC Review 15 days Mon 6/11/18 Fri 6/29/18 146 148 (B.10.1) Finalize FS Workplan 3 days Mon 7/2/18 Wed 7/4/18 147 149 (B.11) Task L.1-L.3 - Groundwater/Contaminant Transport Modeling (Formerly Task C) 406 days Thu 10/20/16 Thu 5/10/18 150 (B.11.1) Subtask L.2: Develop Fate & Transport Model (DRI)356 days Thu 10/20/16 Thu 3/1/18 151 (B.11.1) Define Remedial Alternative Scenarios 15 days Mon 6/4/18 Fri 6/22/18 152 (B.11.1) Subtask L.3.:Modeling Analysis -Pumping/PCE Containment Scenarios (DRI) 21 days Mon 6/25/18 Mon 7/23/18 151 153 (B.11.2) Prepare draft F&T Modeling Report (by DRI)28 days Tue 7/24/18 Thu 8/30/18 152 154 (B.11.2) TAC Review 15 days Fri 8/31/18 Thu 9/20/18 153 155 (B.11.3) Finalize F&T Modeling Report (DRI)10 days Mon 9/3/18 Fri 9/14/18 154 156 Seven Springs/Fox So Y GW Investigation 62 days?Fri 5/12/17 Mon 8/7/17 162 TKPOA Phase 1 Facilities Design 416 days Wed 5/24/17 Wed 12/26/18 170 (B.12) Task M.1-M.10 - Feasibility Study (Formerly Task D)170 days Mon 4/2/18 Fri 11/23/18 152SS 171 SubTask M.1 - Data Review 10 days Fri 6/15/18 Thu 6/28/18 146FS+4 days 172 SubTask M.1 - Kick-Off Meeting 1 day Fri 6/29/18 Fri 6/29/18 171 173 Subtask M.2 - Screen Modeled Alternatives for Engineering Evaluation 20 days Thu 7/5/18 Wed 8/1/18 152SS 174 Subtask M.3: Define Infrastructure Needs (3 Alternatives)20 days Thu 8/2/18 Wed 8/29/18 173 175 Subtask M.4 - Develop Life Cycle Cost Estimates (3 Alternatives)17 days Thu 8/2/18 Fri 8/24/18 174SS 176 Subtask M.5 - Develop Environmental Analysis Checklists (3 Alternatives) 20 days Thu 8/2/18 Wed 8/29/18 174SS 177 Subtask M.6 - Select and Develop Recommended Alternative 20 days Thu 8/30/18 Wed 9/26/18 176 178 SubTask M.7 - Implementation Plan for Recommended Alternative: Financial and Governance Plan (including drafting of report section) 20 days Thu 9/27/18 Wed 10/24/18 177 179 (B.12.2) Subtask M.8 - Prepare Draft Report 30 days Thu 10/25/18 Wed 12/5/18 178 180 (B.12.2) Subtask M.8 - TAC Review 15 days Thu 12/6/18 Wed 12/26/18 179 181 (B.12.2) Subtask M.9 - Prepare Final Report 20 days Thu 12/27/18 Wed 1/23/19 180 182 Subtask M.10 - Project Management, Monthly Conference Calls, and QA/QC 155 days Fri 6/15/18 Thu 1/17/19 171SS 183 Task M.11 - As-Directed Services 190 days Fri 6/29/18 Thu 3/21/19 172SS 184 (B.13) Task N - Prepare Interim Remedial Action Plan (Based on FS Implementation Plan) 29 days Mon 8/13/18 Thu 9/20/18 178 185 (B.13.1) Prepare draft I- RAP 29 days Thu 12/27/18 Tue 2/5/19 180 186 (B.13.2) I-RAP Review 20 days Wed 2/6/19 Tue 3/5/19 185 187 (B.13.3) Finalize I-RAP 10 days Wed 3/6/19 Tue 3/19/19 186 188 (B.14) Task O - Prepare Environmental Compliance for I- RAP 18 days Wed 3/6/19 Fri 3/29/19 185 189 (B.14.1.1) Prepare draft CEQA IS Checklist 10 days Wed 3/6/19 Tue 3/19/19 186 190 (B.14.1.1) Prepare draft TRPA Env. Checklist 10 days Wed 3/6/19 Tue 3/19/19 186 191 (B.14.1.1) Agency Review 5 days Wed 3/20/19 Tue 3/26/19 190 192 (B.14.1.2) Finalize IS Checklist 3 days Wed 3/27/19 Fri 3/29/19 191 7/16 7/16 7/4 7/23 9/14 6/29 8/1 1/23 E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B ber NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembe January FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch Apr Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Deadline Progress South Tahoe PUD South Y Feasibility Study Schedule Page 3 Project: South Y Feasibility Study Date: Tue 6/5/18 ID Task Name Duration Start Finish Predecessors Resource Names 193 Task P - District Monitoring to Support Feasibility Study (Formerly Task E)156 days Thu 12/1/16 Thu 7/6/17 194 (B.15) Task Q - Public Outreach (Formerly Task F)272 days Wed 1/10/18 Thu 1/24/19 195 (B.15.1) Develop Outreach Materials 268 days Wed 1/10/18 Fri 1/18/19 196 (B.15.2) Subtask Q.2 - DAC Outreach (3 Workshops)252 days Wed 2/7/18 Thu 1/24/19 197 Public Workshop 1 1 day Wed 2/7/18 Wed 2/7/18 198 Public Workshop 2 1 day Tue 7/31/18 Tue 7/31/18 199 Public Workshop 3 1 day Thu 1/24/19 Thu 1/24/19 181 E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B ber NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch April May June July August SeptembOctober NovembeDecembe January FebruaryMarch April May June July August SeptembOctober NovembeDecembeJanuary FebruaryMarch Apr Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Deadline Progress South Tahoe PUD South Y Feasibility Study Schedule Page 4 Project: South Y Feasibility Study Date: Tue 6/5/18