Loading...
HomeSearchMy WebLinkAbout10-31-2024 Herbert Walkup2017.122018.012018.01 (2)2018.062018.06.142018.072018.082018.08.152018.102018.112018.122018.12 (3)2019 STPUD Water Grids2019.032019.042019.04.222019.06.132019.07.312019.12.042019.12.312020 PES2020.01.222020.01.232020.06.172020.06.242020.08.032020.09.092020.10.062020.10.272020.11.052021 Certificate of Transparency2021.02.092021.04.282021.06 3708 Lake Tahoe Blvd 06-212021.06.16 1079 Juniper 6-16-20212021.06.25 Skyline from Coto to Elk Club 06-25-20212021.10.132021.11.04 Southwest Gas2021.12.08 Keller-Heavenly2021.12.08 Keller-Heavenly 22021.12.08 O'Daily2022.01.03 Deltek 1-3-222022.01.18 Martin Ave Bridge2022.03.22 1242 Emerald Bay Rd2022.04.08 Village Shopping Center2022.06.22 Clarifier Rehab Project2022.06.27 Helen Ave and Barton Ave2022.07.27 AT&T2022.08.03 Maiden Hair Court2022.08.04 Chippewa St to Maya Way2022.08.04 Emerald Bay Road2022.09.26 3066 Lake Tahoe Boulevard2022.12.01 Parcel Sewer Map2023 Asphalt Patching & Trench Paving2023 Black Bart Waterline2023.01.24 Emerald Bay Road2023.02.09 Emerald Bay Road2023.02.14 2022 Bowers & Bijou 2/3 Waterline Replacement Project2023.03.20 2022 Asphalt Patching Services2023.03.24 IT Strategic Plan2023.04.07 2635, 2629 Lake Tahoe Blvde.2023.04.12 Keller-Heavenly 32023.06.26 Asphalt Patching & Trenching2023.06.26 Keller-Heavenly2023.09.14 Cell Towers2023.10.30 Rubicon Trail2023.12.19 Kellever Heavenly Water System Improvements Project, Phase 1 REBID 12-19-232024.01.02 Cell Towers2024.01.08 Lakeside Park2024.01.19 Tahoe Keys Pump Station Replacement Project2024.01.19 Upper Truckee Pump Station Rehabilitation Project2024.02.14 Secondary Clarifier No. 2 Rehab2024.03.27 961 Emerald Bay Road2024.03.28 Filter Rehabilitation Project2024.04.19 Herbert Walkup2024.04.25 1080 Emerald Bay Road2024.05.22 Blew & Associates - 4130 Manzanita Sewer Plans2024-08-13 Lakeshore Drive Fire Hydrants2024-08-14 2070 Lake Tahoe Blvd.2024-08-14 Apache and Bug Station2024-08-20 3540 Pioneer Trail2024-08-20 3900 and 3908 Lake Tahoe Blvd.2024-09-06 Fallen Leaf Sewer Spill2024-10-02 CMMS 20242024-10-02 Uncashed and Unclaimed Funds2024-10-30 Herbert Walkup Pipeline Project2024-11-12, 1161 Ski Run2024-11-21 Paloma and Keller Backup Power2024-12-12 Route 50 from Kyburz2024-12-19 CCTV On Call Consultant List2024-12-23 Website Redesign RFPFallen Leaf LakeFresno AvenueKahle DriveSanchezSouthwest GasVerizonWater Companies